scope of work template
							                                                            UCI IT Projects

Project Name & Description                                                                                            Status
Academic Computing

   •   EEE Course Management System – Perform ongoing EEE enhancements to instructional toolkits
                                                                                                                      Ongoing
       (communication tool, semester support for law school, online add/drop of courses).


   •   Distance Learning via Moodle Course Management System – Perform ongoing Moodle enhancements,
                                                                                                                      February 2010
       software updates, and distance learning support for an increasing number of accredited UCI online courses.


   •   Institutional Blogging – Bring blogging to UCI using the popular WordPress MU software. This service
       enables faculty, staff and departments to blog in the context of representing the University, their academic   End of Summer 2009
       pursuits, offices and selves.


   •   Institutional Course Casting – Implement software to capture and distribute classroom and individual
                                                                                                                      Fall 2009
       podcasts. The Lecture Casting pilot will run from September 23, 2009 through December 11, 2009.


   •   WASC & Learning Assessment – Review IT needs and help implement IT solutions for DUE’s Research &
                                                                                                                      Planning Phase
       Evaluation Support group’s accreditation tracking/reporting needs.


   •   DUE Information Systems Support – Manage DUE’s central application development, desktop and server
       support efforts. DUE-IT also works with DUE units and programs to provide backup and coordination of local     Ongoing
       IT staff to ensure an effective, integrated approach to Information Technology.


   •   Academic Personnel Merit and Promotion Review System – Proceed to develop and expand UCSD’s
                                                                                                                      Planning Phase
       APOL – online Merit and Promotion Review for use at UCI based upon an approved joint project proposal.




                                                                                                                                       1
•   Academic Personnel Faculty Recruit System Expansion to UCSD – Provide AP Recruit as a software
    service to UCSD in exchange for UCSD’s APOL Review application, currently developing features to manage
                                                                                                                        October 2009
    applicants, cross-list positions, update diversity reports for the Office of Equal Opportunity and Diversity, and
    user interface enhancements and updates.


•   Academic Personnel Digital Measures MyData Integration – Enhance Digital Measures using Shibboleth
    to improve security, provide a more effective web service to update faculty database for publications and           Ongoing
    presentations.


•   Unifying research cluster support (MPC, Green Planet, BDUCS, and standalone clusters) – Provide
    financial planning for support costs/coordination meetings and on-line documentation with campus partners           Early 2010
    (ICS and PS)/merging of MPC and BDUCS cluster operating systems, head units, and queuing systems.


•   BDUCS research computing cluster disk storage subsystem – Build a reliable and large user disk                      End of Summer 2009
    system using Broadcom donated NetApp equipment.


•   Major expansion of Green Planet cluster with inclusion of non-PS research groups – Provide financial
    planning/co-location of system in ADC/completion of cluster operation systems tools/program optimization of         TBD
    major user codes.


•   Re-opening of MPC research compute cluster to new research partners – Provide financial planning/co-
    location of added system in ADC or elsewhere on campus/long term funding model with current MPC                     July 2010
    partners. Begins in July 2009.


•   Completion of new scheduled computer lab in Social and Behavioral Sciences Bldg. - Purchase and
    deploy 120 computers in three labs, two adjacent with movable partition to create 100 seat scheduled                Late Fall 2009
    instructional lab. Currently pending funding.




                                                                                                                                         2
   •   Remote Scientific Applications study and deployment in coordination with School of Social Science –
       Use Windows Terminal Services to provide research computing applications to remote users. Study
                                                                                                                    Late 2009
       proceeding during summer 2009 with expected initial deployment of statistical software applications campus
       wide in late 2009. Uses Broadcom donated servers for computing engines.


Administrative Computing Systems Development
                                                                                                                    Tentatively
   •   Kuali Financial System Assessment – Perform an assessment to replace our 27-year-old legacy Financial        scheduled for June
       System and include a mapping to a new, more flexible Chart of Accounts.                                      2010 but is subject to
                                                                                                                    change

   •   Kuali COES Research Administration – Streamline the research proposal and grant submission process.          March 2010


   •   American Recovery & Reinvestment Act (ARRA) Report – Allow departments to track and report on
       ARRA funds under Section 1512 of the American Recovery and Reinvestment Act of 2009 through a                September 2009
       reporting application.


   •   Campus Time & Attendance Application – Integrate UCOP’s Time Reporting Web Service for automatic
                                                                                                                    June 2010
       real-time updates from the Medical Center and Campus Time Collection Systems. The campus HR Strategic
       Redesign group has identified Employee Time & Attendance as key to streamlining payroll time collection.


   •   Human Resources Web Redesign for Self-Service – Update the HR web site to include more self-service
                                                                                                                    December 2009
       information and transactions per the campus HR Strategic Redesign group.

   •   Student Financial Services: Housing Support – Support for Graduate Family Housing financial processing
                                                                                                                    April 2010
       and “far future” due and reversal.

   •   Student Financial Services: Law School Mandates – Support for the Tax Relief Act and write-off business
                                                                                                                    December 2010
       transaction.




                                                                                                                                         3
•   Student Financial Services: Campus Billing System Online – Create and implement a web-based online
    invoice generation and cancellation/reversal for students and non students to eliminate labor and postage
    costs associated with printing and mailing student invoices, electronically deliver and present complete          January 2010
    student account for new invoices and payment history, and provide students with eCheck payment option for
    invoices.


•   Student Financial Services Guest Access – Provide UCInetID authentication for student applicants prior to
    Statement of Intent to Register, and to guests/parents designated by student. Permit students to take             October 2009
    positive step for whether we may show detailed financial info to guest. Allow for guest access to billing data.


•   Facilities Management Preventive Maintenance and Scheduled Work Enhancement – Provide the ability
    to efficiently track, manage, and report on preventive maintenance and scheduled work through the Tririga         December 2009
    ERP application (FACserv). Examples include maintenance of elevator inspections and grounds keeping.


•   Campus Enterprise Authorization Security Service – Deploy a campus-wide application authorization and
    access control that meets audit requirements, application integration requirements, vendor integration
                                                                                                                      January 2010
    requirements as well as Web server page level access controls has been a requirement on this campus for
    many years.


•   Application and Database Firewall Appliance Implementation – Implement the application firewall
    purchased by AdCom to protect all Web interfaces against a potential breach of our confidential data or           August 2009
    defacement of our web sites.


•   IBM (Zeus) Decommissioning – Analyze, plan, and implement the effort required and procedures
    necessary to decommission the operation of the AdCom IBM mainframe CPU and migrate the running of all             October 2009
    mainframe-based systems, to UCOP.


•   Data Warehouse Payroll / Employee Data Migration and Development of AdHoc Queries and Reports
    – Migrate all Employee and Payroll History (HDB) and Payroll Audit Record (PAR) data from Zeus to UCI’s           October 2009
    Data Warehouse as part of IBM Decommissioning. New query functionality will also be added.



                                                                                                                                      4
   •   Sybase Database Decommissioning / Database Consolidation – Consolidate database technology
                                                                                                                   June 2010
       through migration of Sybase Database applications and data to Microsoft SQLServer or mySQL.

   •   Migration to Virtual Server and Desktop Technology – Optimize hardware and power consumption
                                                                                                                   December 2010
       through a large expansion of the use of virtual technology for both the server and desktop environment.

Data Center Planning

   •   Interim small expansion of Academic Data Center (ADC) with school and VCR matching funding –
                                                                                                                   End of 2009
       Make available 8-12 racks in Fall 2009/relocation of ADC networking equipment.

   •   AdCom Uninterruptable Power Supply (UPS) replacement – Provide operating stability to genset/UPS
                                                                                                                   Summer 2009
       combination.

   •   Relocation of AdCom Data Center –Find a new home/financial plan and cost analysis/engineering analysis      Likely moved to late
       of possible new sites including ADC periphery.                                                              2010

Infrastructure Services

   •   New campus Electronic Directory for Identity Management System – Migrate the directory to a new
       modern database system that integrates the entire directory information for campus. The new database will   June 2010
       be exported to LDAP for lookups.


   •   Law School IT Support – Perform modifications to the quarter system to accommodate the Law School
                                                                                                                   Fall 2009
       semester system (impacts directory, EEE, Student Billing, Registrar systems).


   •   Google Apps for Undergraduates – Provide accounts in the uci.edu Google Apps domain for                     Fall 2009 for pilot
       undergraduates who wish to use them for Email and Google Apps.                                              service


   •   Virtual Server Subscription Services – Rent VMWare virtual servers to interested campus departments.
                                                                                                                   End of July 2009 to
       This will provide departments with a more affordable alternative to purchasing and maintaining their own
                                                                                                                   start pilot service
       servers in their spaces.



                                                                                                                                          5
   •   UCInetID Length Expansion – Extend the length of UCInetIDs. In the analysis/planning phase.

IT Security

   •   IDS Hardware Upgrade – Perform maintenance on the Intrusion Detection System hardware (expires in
                                                                                                                    January 2010
       January 2010). This system helps to protect UCInet and campus computers from security threats.


   •   Internal Network Security Monitoring Pilot – Test a combination of Netflow data and placing IDS sensors
                                                                                                                    October 2009
       at strategic network taps to gain visibility to malicious internal network traffic.


   •   Security Peer Reviews – Perform security peer reviews on the top three priority areas on campus.             November 2009


   •   Security Inventory – Follow-up with units to review precautions.                                             Ongoing


   •   Penetration Testing Service Expansion – Expand the penetration testing service to non PCI-DSS hosts.
                                                                                                                    January 2010
       Currently in pilot with Extension and Advancement.

Network & Telephone

   •   Wireless Network Enhancements: Autonomous WAP to LWAP conversion – Provide better
       manageability, performance, security, and guest access for the campus wireless network. Approximately 575
       lightweight access points will be deployed by the end of the summer. We intend to convert the existing 367   TBD
       autonomous access points to light weight mode to use extended services provided by the newly installed
       WiSMs (Funded, equipment in place, need to implement conversion configurations).


   •   Switch Redundancy Configuration – Dual connect critical edge switches in server rooms to enterprise
                                                                                                                    TBD
       switches in various data centers to improve redundancy (may require equipment purchases).


   •   Border Router and Border Security Redundancy – Request for funds submitted to add redundant border
                                                                                                                    TBD
       router and security equipment (Unfunded).




                                                                                                                                    6
•   Unsupported Network Equipment Replacement – Replace Cisco c1924 style switches. UCInet has
    approximately 100 Cisco c1924 style switches in production. They operate at 10mbps to the desktop. These         TBD
    switches are no longer supported by Cisco (Unfunded).


•   ULAR Animal Research Lab Research Security Cameras – Install IP based cameras. There are ten
    buildings that have been identified to have IP based cameras installed to enhance surveillance of secure         TBD
    areas housing research animals (ULAR funding, NACS planning).


•   Telephone System Upgrade – Plan for a required major upgrade to the campus phone system to extend its
    useful life, to expand capacity, to add functionality, and to provide a higher degree of disaster preparedness   TBD
    (Unfunded).


•   Replace Campus Voice Mail System – Customize the user interface to match the current voice mail system
                                                                                                                     In progress
    to eliminate user-training requirement.


•   Improve Campus Cell Phone Service – Install more cell site infrastructure to improve campus service
                                                                                                                     In progress
    working with cellular service providers.


•   zotALERT Emergency Notification System Enhancements – Develop and test enhancements to the
    zotALERT system that uses cell phone text messaging to quickly notify the UCI community with emergency           In progress
    and safety related information.


•   Design and Installation of UCINet and FacNet Telephone & Network Infrastructure
       o Engineering 3 – 95% completed; implementation phase. January 2003 – June 2009
       o Social & Behavioral Sciences - 65% completed; implementation phase. January 2004 – August
          2009                                                                                                       January 2003 –
       o Humanities - 50% completed; implementation phase. January 2004 – August 2009                                December 2010
       o Medical Education - 20% completed; design phase. January 2005 – December 2009
       o Stem Cell/Gross Hall - 25% complete; design phase. January 2008 – July 2010
       o Arts Building - 50% complete; design phase. January 2007 – December 2010