Docstoc

TSOs proposal European Energy Regulators

Document Sample
TSOs proposal European Energy Regulators Powered By Docstoc
					7th IG Meeting South Gas Regional Initiative
            Open Seasons

             Madrid, July 10th 2008
Objective

• An European will: One European Gas market.
• Development  of interconnections between
  France and Spain in order to increase market
  fluidity .
• Objectives : foster competition, develop price
  arbitrage and reinforce security of supply.




                                                2
Working meetings in 2008
• Mars 3rd     Draft documents for Information
               Memorandum and Allocation Rules under
• April 15th   construction

• May 14th
               Some questions to solve :
• May   21st
               -Coordination of capacity sales
• June 11st    -Finalize the definition of Biriatou
               development in order to include it in the OS
• June 25th    -Eastern corridor



                                                      3
Projects


                                                 North

       Western Corridor

                            Guyenne
                            Guyenne
                                         South
                    Euskadour
                    Euskadour                  Rhône
                                               Rhône
                          Larrau
                          Larrau

                                      MidCat
                                      MidCat




                                   Eastern Corridor



                                                         4
    Western Corridor:
    Coordination of OS and OSP
•   From South to North
       •     Spain -> TIGF (OS, new capacities)
       •     TIGF -> GRTgaz South (OS, new capacities)
       •     GRT gaz South -> GRTgaz North (OS, existing capacities)
•   From North to South
       •     As capacities from GRTgaz North to GRTgaz South are not available
             for long term and long notice bookings,
       •     Development decision could be taken on commitments obtained on
             South to North path. If successful, then capacities from North to
             South would be sold through OSP processes organised in a
             coordinated manner together with GRTgaz North – GRTgaz South
             and GRTgaz South – TIGF OSP processes :
                                                         If current rule applied :
              • GRTgaz North - > GRTgaz South (OSP)
                                                         Capacities available on
              • GRTgaz South -> TIGF (OSP)               1st of April 2013 will be
              • TIGF -> Spain (OSP)                      sold 6 months before
                                                         (in 2012)
                                                                              5
EUSKADOUR International Connection
Associated Infrastructures


                      Decided Infrastructures
                      Infrastructures under study
                       + new entry points in the Cantabric Cornice
                            + pipeline. Bilbao-Treto-Llanera


  MUSEL
                                                                       Coudures-Arcanges



                                       Vergara-Irún Duplication
             Lemona-Haro
             CS Haro reinf.



                                                           CS Border




                                                                                           6
EUSKADOUR Technical Capacity

                                                                                   FRANCE  SPAIN                              SPAIN  FRANCE
            CAPACITY                                                        SPANISH side   FRENCH side   Common value   SPANISH side   FRENCH side   Common value
                                                          Border pressure       30 bar         30 bar        30 bar         30 bar         30 bar        30 bar

   Current status                                                WINTER      20 GWh/day      0 GWh/day      0 GWh/day     9 GWh/day      5 GWh/day      5 GWh/day

                                                                SUMMER       10 GWh/day     15 GWh/day     10 GWh/day    22 GWh/day      4 GWh/day      4 GWh/day
                                                          Border pressure       30 bar         30 bar        30 bar         30 bar         30 bar        30 bar




                                                4Q-2008
    + dup Vergara-Zaldivia                                       WINTER      20 GWh/day      0 GWh/day      0 GWh/day    19 GWh/day      5 GWh/day      5 GWh/day

                                                                SUMMER       10 GWh/day     15 GWh/day     10 GWh/day    25 GWh/day      4 GWh/day      4 GWh/day
                                                          Border pressure       30 bar         30 bar        30 bar         30 bar         30 bar        30 bar

                                                2Q-2009
    + dup Zaldivia-Villabona                                     WINTER      20 GWh/day      0 GWh/day      0 GWh/day    34 GWh/day      5 GWh/day      5 GWh/day

                                                                SUMMER       10 GWh/day     15 GWh/day     10 GWh/day    38 GWh/day      4 GWh/day      4 GWh/day
                                                          Border pressure       30 bar         30 bar        30 bar         30 bar         30 bar        30 bar
                                                3Q-2009



   + Pipeline Lemona-Haro                                        WINTER      20 GWh/day      0 GWh/day      0 GWh/day    40 GWh/day      5 GWh/day      5 GWh/day
   + Reinforcement CS Haro
                                                                SUMMER       10 GWh/day     15 GWh/day     10 GWh/day    43 GWh/day      4 GWh/day      4 GWh/day
                                                          Border pressure       30 bar         30 bar        30 bar         45 bar         45 bar        45 bar
                                                4Q-2010




    + dup Villabona-Irún                                         WINTER      20 GWh/day      0 GWh/day      0 GWh/day    40 GWh/day      5 GWh/day      5 GWh/day

                                                                SUMMER       10 GWh/day     15 GWh/day     10 GWh/day    43 GWh/day      9 GWh/day      9 GWh/day
   + new entry points in the                              Border pressure       30 bar         30 bar        30 bar         45 bar         45 bar        45 bar
                                                4Q-2012




   Cantabric Cornice (Musel terminal,                          WINTER      20 GWh/day      0 GWh/day      0 GWh/day    58 GWh/day      5 GWh/day      5 GWh/day
   Bilbao terminal)
   + pipeline. Bilbao-Treto-Llanera                             SUMMER       10 GWh/day     15 GWh/day     10 GWh/day    65 GWh/day      9 GWh/day      9 GWh/day
                                                          Border pressure       65 bar         65 bar        65 bar         45 bar         45 bar        45 bar
                                                4Q-2013




   + Arcanges-Coudures                                           WINTER      45 GWh/day     63 GWh/day     45 GWh/day    58 GWh/day      9 GWh/day      9 GWh/day

                                                                SUMMER       50 GWh/day     78 GWh/day     50 GWh/day    65 GWh/day     21 GWh/day     21 GWh/day
                                                          Border pressure   45 / 72 bar    45 / 72 bar   45 / 72 bar    45 / 72 bar    45 / 72 bar   45 / 72 bar
                                                4Q-2015




   + CS Border                                                   WINTER      58 GWh/day 101 GWh/day        58 GWh/day    58 GWh/day 122 GWh/day        58 GWh/day

                                                                SUMMER       65 GWh/day 125 GWh/day        65 GWh/day    65 GWh/day 117 GWh/day        65 GWh/day
  NOTE: detailed capacities correspond to Normal Operational Conditions (according to NGTS)
                                                                                                                                                              7
 Eastern Corridor

• In order to define Le Perthus interconnexion point
  associated to Midcat project, some questions need to be
  discussed between french TSOs and CRE :
   • Capacity products
   • Related investments
   • Economic and Tariff principles




                                                     8
Information Memorandum Contents
• The main contents of the Information Memorandum will be:
   • Objectives of the OS
   • Existing and new capacities to be offered under the OS
   • Marketing of capacities / OS phases
   • Calendar of the OS
   • Coordination with other OSs/OSPs in France and Spain
   • Allocation procedures
   • Infrastructures associated to incremental capacities
   • Binding / non-binding application sheet



                                                      9
Technical Capacity (I)
                                                                Western Corridor                                 Eastern Corridor - MIDCAT
                             2013
                                                              Incremental Capacity                                 Incremental Capacity
                    before investment OS
 SPA IN

                                                                    2Q-2013                                               2Q-2015
          GWh/d
                                                                                                                              (*)             (*)
GRTgaz




                                                                                                                                        200
                                                                                                                  [100;200]
                                                230
NORTH
                             230




                                                                                         0
                                                                      0
GRTgaz
SOUTH                                                                                                                                   180

                                                325




                                                                                         50
                                                                      180
                             80




 TIGF
                                                100




                                                                                         120
                             115




                                                                         85
 SPAIN                                                                                                           230

                   Investments decided and                                                                      Investments related to MIDCAT
                                                      TSO      Investments BINDED to OS         TSO                                                        TSO
                       not binded to OS                                                                                not binded to OS
                  C.S. Navarra                    ENAGAS     P.Lussagnet-Lacq                  TIGF     P. Martorell - Figueras                         ENAGAS
                  P.Tivissa-Paterna               ENAGAS     C.S. Mont                         TIGF
                                                                                                                Investments related to MIDCAT
                                                                                                                                                           TSO
                  P. Tivissa-Castelnou            ENAGAS     P. Arcangues-Coudures 2 & 3       TIGF                    BINDED to OS
                  P.Zarza de Tajo-Yela-Villar
                                                  ENAGAS
                  de Arnedo                                  P. Lussagnet-Captieux             TIGF     P. Artère du Rhône                              GRTgaz
                  C.S.Villar de Arnedo            ENAGAS     C.S. Chazelles                    GRTgaz   C.S. At Etrez                                   GRTgaz
                  P. Lemona-Haro                  ENAGAS     Reinforce C.S. Sauveterre         TIGF     Additional C.S. at St. Martin                   GRTgaz
                  Reinforcement C.S. Haro         ENAGAS     Reinforce C.S. Lussagnet          TIGF     P. Sp/Fr border - Barbaira                      TIGF
                  P. Vergara-Irún               NATURGAS                                                Additional C.S. at Barbaira                     TIGF
                  P. Captieux-Laprade                 TIGF                                                     Investments related to MIDCAT
                  C.S. Sauveterre                     TIGF                                              Investments conditioned to the development of      TSO
                                                                                                                  the french Infrastructure
                  Reinforce C.S. Lussagnet            TIGF
                  P. Artère de Beauce
                                                  GRTgaz                                                C.S. Martorell                                  ENAGAS
                                                                                                        P. Figueras-Sp/Fr Border                        ENAGAS


                           Note: Incremental capacities in Biriatou, and the infrastructures associated to those incremental
                           capacities, are currently under review.
                           (*) Infrastructures increasing capacity between GRTgaz NORTH and GRTgaz SOUTH are not detailed.   10
   Technical Capacity (II)
                                                                  Western Corridor                                         FULL DEVELOPMENT
                             2013
                                                              Capacity after investment                                 Capacity after investment
                    before investment OS
 SPA IN

                                                                         2Q-2013                                                          2015
          GWh/d
                                                                                                                                    (*)                  (*)
GRTgaz




                                                                                                                        [330;430]
                                                                                        230




                                                                                                                                                   430
                                                230
NORTH




                                                                      230
                             230

GRTgaz                                                                                                                                                     180
SOUTH




                                                                                                                                                 375
                                                                                         375
                                                325




                                                                      260




                                                                                                                 260
                             80




 TIGF




                                                                                                                                                 220
                                                100




                                                                                         220




                                                                                                                 200
                             115




                                                                      200
SPAIN
                                                                                                                                    230
                   Investments decided and                                                                      Investments related to MIDCAT
                                                      TSO      Investments BINDED to OS         TSO                                                               TSO
                       not binded to OS                                                                                not binded to OS
                  C.S. Navarra                    ENAGAS     P.Lussagnet-Lacq                  TIGF     P. Martorell - Figueras                                ENAGAS
                  P.Tivissa-Paterna               ENAGAS     C.S. Mont                         TIGF
                                                                                                                Investments related to MIDCAT
                                                                                                                                                                  TSO
                  P. Tivissa-Castelnou            ENAGAS     P. Arcangues-Coudures 2 & 3       TIGF                    BINDED to OS
                  P.Zarza de Tajo-Yela-Villar
                                                  ENAGAS
                  de Arnedo                                  P. Lussagnet-Captieux             TIGF     P. Artère du Rhône                                     GRTgaz
                  C.S.Villar de Arnedo            ENAGAS     C.S. Chazelles                    GRTgaz   C.S. At Etrez                                          GRTgaz
                  P. Lemona-Haro                  ENAGAS     Reinforce C.S. Sauveterre         TIGF     Additional C.S. at St. Martin                          GRTgaz
                  Reinforcement C.S. Haro         ENAGAS     Reinforce C.S. Lussagnet          TIGF     P. Sp/Fr border - Barbaira                             TIGF
                  P. Vergara-Irún               NATURGAS                                                Additional C.S. at Barbaira                            TIGF
                  P. Captieux-Laprade                 TIGF                                                     Investments related to MIDCAT
                  C.S. Sauveterre                     TIGF                                              Investments conditioned to the development of             TSO
                                                                                                                  the french Infrastructure
                  Reinforce C.S. Lussagnet            TIGF
                  P. Artère de Beauce
                                                  GRTgaz                                                C.S. Martorell                                         ENAGAS
                                                                                                        P. Figueras-Sp/Fr Border                               ENAGAS




                                 Note: Incremental capacities in Biriatou, and the infrastructures associated to those incremental
                                 capacities, are currently under review.
                                 (*) Infrastructures increasing capacity between GRTgaz NORTH and GRTgaz SOUTH are not detailed.   11
 Capacities to be Marketed
                              Initial Capacities                                       Capacities after FULL DEVELOPMENT
  SPA IN
                                (2ndQ 2013)                                                           (2015)
           GWh/d
                                               (1)         (2)                               (3)



                                   [110;180]




                                                                                 [210;380]
       GRTgaz




                                                                   [330;430]




                                                                                                            430

                                                                                                                    350
       NORTH




                                                     230
                           230




                                                           0
                                                                                                   (4)

GRTgaz SOUTH                                                                                                               180    180
                                                     375


                                                           140




                                                                                                          375


                                                                                                                  140
                           260

                                   180




                                                                 260

                                                                               180
           TIGF




                                                                                                                          180
                                                     220


                                                           135




                                                                                                          220


                                                                                                                  135
                           200


                                   200




                                                                 200


                                                                               200
           SPAIN
                                                                                             230    230
 TECHNICAL CAPACITY
 AVAILABLE CAPACITY (as of MAY 2008)




                                                                                                                                 12
 Notes
(1)   Currently, from 1st April 2013, the total technical capacity (230GWh/d) is not booked but dedicated to be
      marketed by short (1 year) to medium (2, 3 or 4 years) term OSP procedures, fixed by CRE. According to
      these rules, capacities will be marketed 6 months before the beginning of the period in question. The
      figures here suppose that CRE would adapt this rule in order to allow marketing of a part of existing
      capacity in coordination with OS.
(2)   Currently, from 1st April 2013, 142GWh/d is not booked but dedicated to be marketed by short (1year) to
      medium (2, 3, or 4 years) term OSP procedures, fixed by CRE. According to these rules, capacities will be
      marketed 6 months before the beginning of the period in question. The figure here supposes that CRE
      maintains these rules because of congestion North >South.
(3)   Depending on level of short term capacity decided by CRE, capacity proposed to the market would vary
      between 210 and 380GWh/d.
(4)   Capacity at the GRTgazNorth-GRTgazSouth link might be impacted by other entry points to the
      GRTgazSouth zone, in particular Fos. A detailed description of the different development options should be
      presented in the Info Memo.
      No capacity at the GRTgazNorth-GRTgazSouth link should be dedicated to any entry or exit point.
      Every procedure, OS or OSP, will be open for every shipper and every need.



                                                                                                        13
Provisional timetable of the OS process
• Publication of the Information Memorandum: D (2008, October)
• Publication of the Confidentiality Agreement Template for
  consultation: D
• Publication of a project of priority and allocation rules for
  consultation: D
• Publication of a project of capacity booking contract relative to
  the developed capacities for consultation: D
• Presentation and information meeting with shippers about this
  consultation
• Publication of priority and allocation rules (one document): D + 2
  months
• Publication of capacity booking contract relative to the
  developed capacities (four documents): D + 2 months
                                                             14
Provisional timetable
• Individual discussion following signature of a confidentiality
  agreement with shippers: from D to D+4 months
• Deadline to receipt : D+4 months
    • binding applications for the Western corridor
    • binding or non-binding applications for the Eastern corridor
    • binding or non-binding application for GRTgaz North-South link
• TSO’s response on capacity allocations: D+5 months
• Deadline for signature of contracts: from D+5 months to D+6
  months
• 2nd phase (if applicable): to be launched once information from the
  market has been processed and contracts have been signed: from
  D+6 to D+9
• French TSO’s boards approve their global investments programs:
  D+12 months
                                                               15
Allocation Procedures

• TSOs are committed to develop transparent
 allocation procedures.

• Principles to be discussed between TSOs and
 NRAs




                                         16
Annexe




         CAPACITIES




                      17
      LARRAU
                                                                              OSP                                                                  OS
                                         April09/   Nov 09/    April10/   Nov10/    April11/   Nov11/    April12/   Nov12/    April13/   Nov13/    April14/   Nov14/         April15/
             Capacities in GWh/day
                                         Oct 09     March 10   Oct 10     March11    Oct11     March12    Oct12     March13    Oct13     March14    Oct14     March15          -->
             ENAGÁS -> TIGF              Summer     Winter     Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter         Summer
             Code: LAR-SUDNOR
LAR-SUDNOR




             Technical capacity
                                           0,00        0,00      0,00      30,00     50,00      30,00     50,00      30,00     165,00     165,00    165,00     165,00         165,00
             (common value)

             Booked under LT contracts
                                           0,00        0,00      0,00       0,00      0,00       0,00      0,00       0,00        0,00      0,00       0,00      0,00            0,00
             (common value)


             Dedicated to other OSPs       0,00        0,00      0,00      30,00     50,00      30,00     50,00      30,00        0,00      0,00       0,00      0,00            0,00
                  MT                       0,00        0,00      0,00      24,00     40,00      24,00     40,00      24,00        0,00      0,00       0,00      0,00            0,00
                  ST                       0,00        0,00      0,00       6,00     10,00       6,00     10,00       6,00        0,00      0,00       0,00      0,00            0,00
             Available for OS                                                                                                 165,00     165,00    165,00     165,00         165,00
                  LT (80%)                                                                                                    132,00     132,00    132,00     132,00         132,00
                  ST (20%)                                                                                                     33,00      33,00     33,00      33,00          33,00

             TIGF -> ENAGÁS              Summer     Winter     Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter         Summer
             Code: LAR-NORSUD
LAR-NORSUD




             Technical capacity
                                         100,00     100,00     100,00     100,00    100,00     100,00    100,00     100,00     165,00     165,00    165,00     165,00         165,00
             (common value)

             Booked under LT contracts
                                          87,00      87,00      87,00      87,00     87,00      87,00     77,52      77,52      77,52      77,52     77,52      77,52          77,52
             (common value)


             Dedicated to other OSPs      13,00      13,00      13,00      13,00     13,00      13,00     22,48      22,48        0,00      0,00       0,00      0,00            0,00
                  MT                      10,40      10,40      10,40      10,40     10,40      10,40     17,98      17,98        0,00      0,00       0,00      0,00            0,00
                  ST                       2,60       2,60       2,60       2,60      2,60       2,60      4,50       4,50        0,00      0,00       0,00      0,00            0,00
             Available for OS                                                                                                  87,48      87,48     87,48      87,48          87,48
                  LT (80%)                                                                                                     69,98      69,98     69,98      69,98          69,98
                  ST (20%)                                                                                                     17,50      17,50     17,50      17,50          17,50


                                                                                                                                                                        18
        BIRIATOU
                                                                              OSP                                                                  OS
                                         April09/   Nov 09/    April10/   Nov10/    April11/   Nov11/    April12/   Nov12/    April13/   Nov13/    April14/   Nov14/         April15/
             Capacities in GWh/day
                                         Oct 09     March 10   Oct 10     March11    Oct11     March12    Oct12     March13    Oct13     March14    Oct14     March15          -->
             NATURGAS -> TIGF            Summer     Winter     Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter         Summer
             Code: BIR-SUDNOR
             Technical capacity
BIR-SUDNOR




             (common value)

             Booked under LT contracts
             (common value)


             Dedicated to other OSPs
                  MT                       0,00        0,00      0,00       0,00      0,00       0,00      0,00       0,00        0,00      0,00       0,00      0,00            0,00
                  ST                       0,00        0,00      0,00       0,00      0,00       0,00      0,00       0,00        0,00      0,00       0,00      0,00            0,00
             Available for OS                                                                                                   0,00       0,00      0,00       0,00           0,00
                  LT (80%)                                                                                                      0,00       0,00      0,00       0,00           0,00
                  ST (20%)                                                                                                      0,00       0,00      0,00       0,00           0,00

             TIGF -> NATURGAS            Summer     Winter     Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter    Summer     Winter         Summer
             Code: BIR-NORSUD
BIR-NORSUD




             Technical capacity
             (common value)

             Booked under LT contracts
             (common value)


             Dedicated to other OSPs
                  MT                       0,00        0,00      0,00       0,00      0,00       0,00      0,00       0,00        0,00      0,00       0,00      0,00            0,00
                  ST                       0,00        0,00      0,00       0,00      0,00       0,00      0,00       0,00        0,00      0,00       0,00      0,00            0,00
             Available for OS                                                                                                   0,00       0,00      0,00       0,00           0,00
                 LT (80%)                                                                                                       0,00       0,00      0,00       0,00           0,00
                 ST (20%)                                                                                                       0,00       0,00      0,00       0,00           0,00


                                                                                                                                                                        19
               TIGF → GRTgaz
                                                                                    OSP                                                                                   OS
                                             April09/   Nov 09/     April10/   Nov10/      April11/   Nov11/      April12/   Nov12/      April13/          Nov13/         April14/          Nov14/      April15/
             Capacities in GWh/day
                                             Oct 09     March 10    Oct 10     March11      Oct11     March12      Oct12     March13      Oct13            March14         Oct14            March15       -->
             TIGF -> GRTgazSUD               Summer     Winter      Summer     Winter      Summer     Winter      Summer     Winter      Summer            Winter         Summer            Winter      Summer
             Code: TGS-SUDNOR
             Technical capacity/ Potential
             capacity                         30,00        30,00     30,00        80,00     80,00        80,00     80,00        80,00     255,00            260,00         255,00            260,00      255,00
             (common value)

             Booked under LT contracts
                                                 5,00        5,00       0,00        0,00       0,00        0,00       0,00        0,00        0,00             0,00            0,00             0,00         0,00
             (common value)
TGS-SUDNOR




             Booked under MT contracts
                                                   14,92                  14,92                  12,66                   6,33                       0,00                             0,00                    0,00
             (common value)

             Booked under ST contracts
                                               10,08         2,00       0,00        0,00       0,00        0,00       0,00        0,00        0,00             0,00            0,00             0,00         0,00
             (common value)


             Total Booked capacity             30,00         7,00     14,92         0,00     12,66         0,00       6,33        0,00        0,00             0,00            0,00             0,00         0,00



             Available capacity                  0,00       23,00     15,08        80,00     67,34        80,00     73,67        80,00     255,00            260,00         255,00            260,00      255,00



             Dedicated to other OSPs
                  MT                           0,00         0,00      0,00         0,00      0,00         0,00      0,00         0,00        0,00             0,00            0,00             0,00         0,00
                  ST                           0,00         0,00      0,00         0,00      0,00         0,00      0,00         0,00        0,00             0,00            0,00             0,00         0,00
             Proposed through OS                                                                                                                    (*)             (*)          (*)              (*)          (*)
                  LT (80%)                                                                                                                 0,00              0,00           0,00              0,00        0,00


                                     (*) To be decided
                                                                                                                                                                                               20
             GRTgaz → TIGF
                                                                                    OSP                                                                                  OS
                                             April09/   Nov 09/     April10/   Nov10/      April11/   Nov11/      April12/   Nov12/      April13/      Nov13/           April14/      Nov14/        April15/
             Capacities in GWh/day
                                             Oct 09     March 10    Oct 10     March11      Oct11     March12      Oct12     March13      Oct13        March14           Oct14        March15         -->
             GRTgazSUD -> TIGF               Summer      Winter     Summer     Winter      Summer     Winter      Summer     Winter      Summer            Winter       Summer            Winter    Summer
             Code: TGS-NORSUD
             Technical capacity/ Potential
             capacity                         355,00       325,00    355,00       325,00    355,00       325,00    355,00       325,00    510,00            375,00       510,00            375,00     510,00
             (common value)

             Booked under LT contracts
                                              249,42       144,52    249,42       144,52    249,42        77,52    182,42        77,52    182,42             77,52       182,42             77,52     182,42
             (common value)
TGS-NORSUD




             Booked under MT contracts
                                                   70,78                  70,78                  49,27                  24,64                       0,00                           0,00                  0,00
             (common value)

             Booked under ST contracts
                                               34,80        28,53       0,00        0,00       0,00        0,00       0,00        0,00       0,00                0,00       0,00             0,00        0,00
             (common value)

             Total Booked capacity            355,00       173,05    320,20       144,52    298,69        77,52    207,06        77,52    182,42             77,52       182,42             77,52     182,42


             Available capacity                  0,00      151,95     34,80       180,48     56,31       247,48    147,95       247,48    327,58            297,48       327,58            297,48     327,58

             Dedicated to other OSPs
                  MT                           0,00         0,00      0,00         0,00      0,00         0,00      0,00         0,00       0,00             0,00          0,00             0,00       0,00
                  ST                           0,00         0,00      0,00         0,00      0,00         0,00      0,00         0,00       0,00             0,00          0,00             0,00       0,00
             Proposed through OS                                                                                                                           (*)                        (*)                 (*)
                 LT (80%)                                                                                                                      0,00                           0,00                    0,00



                                     (*) To be decided

                                                                                                                                                                                            21
       GRTgaz South → GRTgaz North
                                                                                          OSP                                                                                   OS
                                          April09/         Nov 09/    April10/     Nov10/       April11/     Nov11/       April12/     Nov12/       April13/         Nov13/    April14/         Nov14/     April15/
             Capacities in GWh/day
                                          Oct 09           March 10   Oct 10       March11       Oct11       March12       Oct12       March13       Oct13           March14    Oct14           March15      -->
             GRTgazSUD               ->
             GRTgazNOR
                                          Summer           Winter     Summer           Winter   Summer           Winter   Summer           Winter   Summer           Winter    Summer           Winter    Summer
             Code:
             GRT-SUDNOR
             Technical capacity/
             Potential capacity                  120,0                  120,0          230,0          230,0                       230,0                   230,0                       230,0
             (common value)
             Booked under LT
             contracts                               0,0                   0,0          0,0                0,0                       0,0                       0,0                        0,0                     0,0
GRT-SUDNOR




             (common value)
             Booked under MT
             contracts                           10,5                          10,5                        9,0              9,0             7,5                0,0                        0,0                  0,00
             (common value)
             Booked under ST
             contracts                           16,0                            0,0                       0,0                       0,0                       0,0                        0,0                  0,00
             (common value)
             Total Booked capacity               26,5                          10,5                        9,0              9,0             7,5        0,00            0,00       0,00            0,00         0,00


             Available capacity                  93,5                 109,5            219,5          221,0               221,0            222,5         230,00                     230,00                     0,00


             Dedicated to other OSPs
                  MT                            85,50                  85,50       173,50           175,00                175,00           176,50        184,00                     184,00                     0,00
                  ST                         8,00             8,00     24,00        46,00        46,00     46,00           46,00            46,00         46,00                      46,00                     0,00

             Proposed through OS                                                                                                                                        (*)                        (*)            (*)

                  LT (80%)                                                                                                                             110-180                     110-180                110-180

                               (*) To be verified

                                                                                                                                                                                                          22
             GRTgaz North → GRTgaz South
                                                                                   OSP                                                                         OS
                                          April09/      Nov 09/    April10/   Nov10/     April11/   Nov11/     April12/      Nov12/    April13/   Nov13/      April14/   Nov14/      April15/
             Capacities in GWh/day
                                          Oct 09        March 10   Oct 10     March11     Oct11     March12     Oct12        March13    Oct13     March14      Oct14     March15       -->

             GRTgazNOR               ->
             GRTgazSUD
                                          Summer        Winter     Summer       Winter   Summer       Winter   Summer        Winter    Summer        Winter   Summer        Winter   Summer
             Code:
             GRT-NORSUD
             Technical capacity/
             Potential capacity                230,0                    230,0                 230,0                  230,0                  230,0                  230,0
             (common value)
GRT-NORSUD




             Booked under LT
                                                 87,0                     87,0                  87,0                      87,0                87,0                   87,0                 87,0
             contracts
             Booked under MT
                                                96,00                    96,00                 64,00                  32,00
             contracts
             Booked under CT
                                                46,00
             contracts
             Total Booked capacity             229,00                   183,00                151,00                 119,00                 87,00                   87,00              87,00

             Available capacity                  1,00                    47,00                 79,00                 111,00                 143,00                 143,00              -87,00


             Dedicated to other OSPs
                  MT                             0,00                    0,00                  32,00                  64,00                 85,33                   64,00                0,00
                  ST                             0,00                    46,00                 46,00                  46,00                 46,00                   46,00                0,00
             Proposed through OS
                 LT (80%)                                                                                                                   0,00                    0,00               0,00




                                                                                                                                                                               23
Thank you for your attention

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:4
posted:10/29/2011
language:English
pages:24