					Dear Technology Strategy Board Retrofit for the Future (Phase 2) winner,




Property Details
Please provide details of each property to be retrofitted as part of the competition on the 'Property' tab, one line per property.

Short Term Tests
Please provide details for each property of the requirements and timescales for short term testing on the 'Short Term Test' tab.

Smart Metering
    Environmental Conditions




1




2




3




4
Dear Technology Strategy Board Retrofit for the Future (Phase 2) winner,

The Energy Saving Trust has been appointed by the Technology Strategy Board to carry out the data collection and aggregation for
the Phase 2 of the TSB Retrofit for the Future competition. The Energy Saving Trust will be carrying out the core short term
monitoring (external thermal Imagery and air-tightness testing) at all properties in the trial. Applicants also have the option of taking
the Energy Saving Trust's 'off the shelf' package for Smart Metering and Environmental Conditions monitoring or can choose an
alternative monitoring package that meets the monitoring specification set out in the 'Evaluating energy and carbon performance in
the ‘Retrofit for the Future’ demonstrator projects, Version 2, 9th November 2009 edition. All of the external thermal Imagery and air
tightness testing and installation of 'off the shelf' packages will be carried out/installed though the Energy Saving Trust's installation
and monitoring contractor BSRIA.

Due to the nature of the core short term tests, they will need to be carried out at all properties in the competition before the end of
March 2010, as they require differentials between the internal and external temperatures which are unlikely to be achieved outside o
the current heating season. The Energy Saving Trust also need information on the monitoring kit to be used by the applicants for th
Smart metering, measurement of environmental conditions and additional monitoring undertaken by the applicants for the
development of the database that will hold the data generated from the completion.

Where applicants are seeking to install the Energy Saving Trust off the shelf package for the Smart Metering and/or Environmental
Conditions this will need to be indicated, so that equipment can be paid for and procured, as lead times can be up to 4-6 weeks from
order. Where applicants are using alternative monitoring equipment this will need to detailed to ensure compliance with the
specification set out in the 'Evaluating energy and carbon performance in the ‘Retrofit for the Future’ demonstrator projects, Version
9th November 2009 edition and to ensure it can be integrated with the development of the Energy Saving Trust database.


Therefore the Energy Saving Trust requires some additional information not captured in the TSB Phase 2 of the TSB Retrofit for the
Future application documentation, so that site visits for core short term testing can be organised and to ensure that all kit to be used
the trials can be co-ordinated with the design of the database at the development stage. Where additional tests/monitoring is being
carried out by the applicants (i.e. microgen monitoring, wall moisture content or occupancy detection) information will also be require
on the equipment and methodology to be used.

Please can you provide the information required by answering the questions below and filling in the tabs of this
spreadsheet? Some of the information required is more time critical that others as Short Term test need to be arranged ov
the next couple of months and to ensure equipment is procured and/or compliant. Therefore we request that all the
information highlighted in green be returned to the Energy Saving Trust completed by 12 noon on 10th February, all other
information (highlighted blue) needs to be returned by the noon on the 19th February.


Property Details
Please provide details of each property to be retrofitted as part of the competition on the 'Property' tab, one line per property.

Short Term Tests
Please provide details for each property of the requirements and timescales for short term testing on the 'Short Term Test' tab.

Smart Metering

Please indicate for each property whether you are going for the Energy Saving Trust off the shelf package or whether you are going
for an alternative metering solution. If an alternative metering solution has been chosen please provide details of the equipment to b
used on the 'Smart Metering' tab. If specification sheets for equipment can be provided please attach to response.
Environmental Conditions

Please indicate for each property whether you are going for the Energy Saving Trust off the shelf package or whether you are going
for an alternative monitoring solution. If an alternative monitoring solution has been chosen please provide details of the equipment
be used on the 'Environ Conditions' tab. If specification sheets for equipment can be provided please attach to response.

Additional Testing & Monitoring
Please indicate for each property what additional measurements will be undertaken, please provide details of the equipment to be
used and the methodology for the measurements on the 'Additional Testing & Monitoring' tab. If specification sheets for equipment
can be provided please attach to response.

Further Questions

Please provide details of how data will be collected and communicated to the Energy Saving Trust database from monitoring/meteri
equipment? I.e. direct dial up to the monitoring equipment, uploaded by applicant or via 3rd party. If an organisation will be collectin
data on you behalf please provide details and a contact at the relevant organisation.




Please provide details of how the post occupancy evaluation will be carried out and communicated to the Energy Saving Trust
database? If an organisation will be collecting data on you behalf please provide details and a contact at the relevant organisation.


Would you potentially, be interested in opening the property from time to time for public and industry engagement as part of an
exemplars programme? We recognise this would require a tenant incentive.


Would you potentially, be interested in sharing the data collected from your project to 3rd parties (other than TSB and the Energy
Saving Trust) for research purposes? We will not pass your details on to any other 3rd party, but will give you specific 3rd party
details.
              Please complete one line for each property to be refurbished in the competition.

              We request that all the information highlighted in green be returned to the Energy Sa


     TP
     Number   FlatLetterNo   BlockHouseName   HouseNo Street             Locality
E.G. ZA645C                                          21 Dartmouth Street Westminster
E.G. ZA645C   24b            Tower House                Old Street       Brighton
   1
   2
   3
   4
   5
   6
   7
   8
   9
  10
furbished in the competition.

reen be returned to the Energy Saving Trust completed by 12 noon on 10th February, all other information (highlighted



                 Town County        Postcode Out   Postcode In   Occupied or Void   No. Tenants
                 London             SW1H           9BP           Occupied                         5
                        East Sussex BN2            4HA           Unoccupied                       0
uary, all other information (highlighted blue) needs to be returned by the noon on the 19th February.



                Adults       Children In situ during pre Retrofit testing   In situ during Retrofit
                         2           3 Yes                                  Yes
                         0           0 No                                   No
e noon on the 19th February.



                 Same occupants after Retrofit
                 Yes
                 No
              For each property please complete

              We request that all the information highlighted in green be returned to the Energy

                          Pre-Retrofit Short Term Testing - All tests have to be completed by 31st March 2010
     TP
     Number   Required Airtightness?    Timeframe Possible        Required Thermal Imaging?
E.G. ZA645C   Yes                       1st Feb - 31st Mar 2010   Yes
E.G. ZA645C   Yes                       1st Feb - 31st Mar 2010   Yes
   1
   2
   3
   4
   5
   6
   7
   8
   9
  10
eturned to the Energy Saving Trust completed by 12 noon on 10th February, all other information (highlighte

eted by 31st March 2010                                Post-Retrofit Short Term Testing - All tests have to be completed by 31

           Timeframe Possible        Required Airtightness?    Timeframe Possible
           1st Feb - 31st Mar 2010   Yes                       1st Sept 2010 - 31st Mar 2011
           1st Feb - 31st Mar 2010   Yes                       1st Sept 2010 - 31st Mar 2011
uary, all other information (highlighted blue) needs to be returned by the noon on the 19th February.

esting - All tests have to be completed by 31st March 2011

            Required Thermal Imaging?          Timeframe Possible
            Yes                                1st Sept 2010 - 31st Mar 2011
            Yes                                1st Sept 2010 - 31st Mar 2011
e 19th February.
              For each property please complete - if additional kit is being used please list

              We request that all the information highlighted in green be returned to the Energy

              EST Off The Shelf Package
     TP                                      Anticipated
     Number   Orsis via EST - Y/N            Start date        Equipment Provider
 1            No                             31nd March 2010   MicroWatt
 2
 3
 4
 5
 6
 7
 8
 9
10
 ing used please list

be returned to the Energy Saving Trust completed by 12 noon on 10th February, all other information (highlig

                            Electricity Metering

           Make/Model   Accuracy   Resolution     Contact                 Spec Attached
           eZone        1kWh                      simon@microwatt.co.uk
                                   +-1% dependent on meter                Yes Pulse Pickup
                                   Pickup from existing / new meter
uary, all other information (highlighted blue) needs to be returned by the noon on the 19th February.
                                               Smart Metering of Utilities
                                                     Gas Metering

          Equipment Provider   Make/Model    Accuracy    Resolution     Contact
          MicroWatt            eZone         0.1m3                      simon@microwatt.co.uk
                                                         +-1% Dependent on meter
                                                         Pickup from existing or secondary meter
on the 19th February.

                                                                     Water Metering

          Spec Attached      Equipment Provider   Make/Model   Accuracy   Resolution
          Yes Pulse Pickup   MicroWatt            eZone        1 itre     +-1%
                                                                          Pickup from existing or secondary meter
Metering                                                                                     Alternative Fuel Metering - Oil,

             Contact                    Spec Attached      Equipment Provider   Make/Model      Accuracy
             simon@microwatt.co.uk      Yes Pulse Pickup   MicroWatt            eZPulse         1 pulse / meter resolution
ckup from existing or secondary meter
ernative Fuel Metering - Oil, Solid

             Resolution     Contact                    Spec Attached
1 pulse / meter resolution simon@microwatt.co.uk       NO
             Pickup from existing or secondary meter
              For each property please complete - if additional kit is being used please list

              We request that all the information highlighted in green be returned to the Energy Sa

              EST Off The Shelf Package                                                    Data Acquis
     TP                                      Anticipated
     Number   Radio Tech via EST - Y/N       Start date        Equipment Provider
1             No                                   3/31/2010   microwatt




 2
 3
 4
 5
 6
 7
 8
 9
10
kit is being used please list

green be returned to the Energy Saving Trust completed by 12 noon on 10th February, all other information (highlighted

                           Data Acquisition                                                          Communications

                  Make/Model     Contact                 Spec Attached       Equipment Provider
                  eZone          simon@microwatt.co.uk                       microwatt
                                                         awaiting confirmation

                                                                           We/microwatt would like
                                                                           to agree communications
                                                                           with EST but we conform
                                                                           to specification as a
                                                                           minimum
0th February, all other information (highlighted blue) needs to be returned by the noon on the 19th February.

                         Communications                                                              Internal Temperatures

                 Make/Model    Contact                 Spec Attached       Equipment Provider
                 eZone         simon@microwatt.co.uk                       MicroWatt
                                                       awaiting confirmation
by the noon on the 19th February.
                                                                Environmental Conditions
                         Internal Temperatures & Relative Humidities

               Make/Model    Accuracy Resolution            Contact                 Spec Attached
               eZRoom        0.1oC/0.50%(+/-)0.5oC/(+/-) 3% simon@microwatt.co.uk   Yes
tions
                                      External Temperatures & Relative Humidities

        Equipment Provider   Make/Model   Accuracy Resolution            Contact
        MicroWatt            eZeX         0.1oC/0.50%(+/-)0.5oC/(+/-) 3% simon@microwatt.co.uk
s                                                                CO2 Meters

    Spec Attached   Equipment Provider   Make/Model   Accuracy   Resolution
    Yes             MicroWatt            eZCO2        10ppm      (+/-) 50ppm
CO2 Meters

             Contact                 Spec Attached
             simon@microwatt.co.uk   Yes
                 For each property please complete, indicating what Additional Testing & Monit

                 We request that all the information highlighted in green be returned to the Ene

                                                                                     Solar Radiation (high or
                 Anticipated
     TP Number
                 Start date        Equipment Provider         Make/Model   Accuracy
 1                     3/31/2010   MicroWatt opt 1 (external) eZone        as per spec
 2                     3/31/2010   MicroWatt opt 2 (internal) eZone                 5%
 3
 4
 5
 6
 7
 8
 9
10
at Additional Testing & Monitoring is being carried out - if additional kit is being used please list

green be returned to the Energy Saving Trust completed by 12 noon on 10th February, all other information (

         Solar Radiation (high or low accuracy)

          Resolution     Contact                  Spec Attached   Methodology attached
          as pr spec     simon@microwatt.co.uk    Yes             Yes
          10Lux          simon@microwatt.co.uk    Yes             Yes
being used please list

th February, all other information (highlighted blue) needs to be returned by the noon on the 19th February.

                                                Temperature internal / external (eZRoomL / EZeX)

          Equipment Provider   Make/Model   Accuracy Resolution      Contact
          MicroWatt - int      eZone        as per spec as pr spec   simon@microwatt.co.uk
          MicroWatt - ext      eZone        as per spec as pr spec   simon@microwatt.co.uk
e noon on the 19th February.

omL / EZeX)                                                                         Individual Circuits in Dist U

          Spec Attached   Methodology attached   Equipment Provider   Make/Model   Accuracy
          Yes             Yes                    MicroWatt            eZone               1%
          Yes             Yes
Individual Circuits in Dist Unit (eZCct)

          Resolution     Contact  Spec Attached   Methodology attached   Equipment Provider
          1wh                     Yes
                         simon@microwatt.co.uk    Yes                    MicroWatt
                 Humidity internal / external (eZeX)

Make/Model   Accuracy Resolution       Contact  Spec Attached   Methodology attached
eZone        as per spec as pr spec             Yes
                                       simon@microwatt.co.uk    Yes (NOT battery powered)
                                                    CO2

Equipment Provider   Make/Model   Accuracy Resolution      Contact  Spec Attached
MicroWatt            eZone        as per spec as pr spec            Yes
                                                           simon@microwatt.co.uk
                                              Deep Soil / gradiantTemperature - up to 8 sensors in up to 1m

Methodology attached   Equipment Provider   Make/Model    Accuracy    Resolution
Yes                    MicroWatt            eZone         0.5'C       0.1'C
ature - up to 8 sensors in up to 1m probe                                                            Occupancy Roo

            Contact  Spec Attached          Methodology attached   Equipment Provider   Make/Model
                     Yes
            simon@microwatt.co.uk           Yes                    MicroWatt            eZone
  Occupancy Room sensor PIR (eZin)

Accuracy   Resolution   Contact  Spec Attached   Methodology attached
N/A        5 minutes             Yes
                        simon@microwatt.co.uk    Yes
                                  Moisture Meter (timber/plaster) (eZDamp)

Equipment Provider   Make/Model   Accuracy Resolution   Contact  Spec Attached
MicroWatt            eZone        +/- 2% (8-28%)                 Yes
                                                     1% simon@microwatt.co.uk
                                                 Weather - eZWeather Wind speed/direction, temp,, humid, rain, sola

Methodology attached        Equipment Provider     Make/Model      Accuracy Resolution
                            MicroWatt
Calibrated against CHY 690 Moisture Meter          eZone                        Varies
                                                                   Varies with sensor with sensor
/direction, temp,, humid, rain, solar (eZweather)                                       iTRV - Intelligent Thermostatic ra

            Contact  Spec Attached         Methodology attached   Equipment Provider   Make/Model
                     Yes
            simon@microwatt.co.uk          Yes                    MicroWatt            eZone
RV - Intelligent Thermostatic radiator Valve (LHR project only) (iTRV)

            Accuracy    Resolution     Contact  Spec Attached        Methodology attached
            0.5'C       0.1'C                   Yes
                                       simon@microwatt.co.uk         Yes

				