Feb Drive 2011

Master of Business Administration - MBA Semester II



MB0044 – Production & Operations Management - 4 Credits



(Book ID: B1133)



Assignment



Set- 1 (60 Marks)

Note: Each Question carries 10 marks. Answer all the questions.







Q1. Explain in brief the origins of Just In Time. Explain the different types of wastes

that can be eliminated using JIT.

Q2. What is Value Engineering or Value Analysis? Elucidate five companies which

have incorporated VE with brief explanation.

Q3. Explain different types of Quantitative models. Differentiate between work

study and motion study.

Q4. What is Rapid Prototyping? Explain the difference between Automated flow line

and Automated assembly line with examples.

Q5. Explain Break Even Analysis and Centre of Gravity methods. Explain Product

layout and process layout with examples.

Q6. Explain Juran’s Quality Trilogy and Crosby’s absolutes of quality. List out the

pillars of Total Productive Maintenance.

Feb Drive 2011

Master of Business Administration - MBA Semester II



MB0044 – Production & Operations Management - 4 Credits



(Book ID: B1133)



Assignment



Set- 2 (60 Marks)

Note: Each Question carries 10 marks. Answer all the questions.







Q1. Explain Logical Process Modelling and Physical Process Modelling. What are the

ingredients of Business Process?

Q2. Explain Project Management Knowledge Areas. With an example explain Work

Breakdown Structure.

Q3. Take an example of any product or project and explain Project Management

Life Cycle.

Q4. Explain PMIS. What is the difference between Key Success Factor (KSF) and

Knowledge (K) Factor? Explain with example.

Q5. Explain the seven principles of supply chain management. Take an example of

any product in the market and explain the scenario of Bullwhip effect.

Q6. Time taken by three machines on five jobs in a factory is tabulated below in

table below. Find out the optimal sequence to be followed to minimise the idle

time taken by the jobs on the machines.

Job Machine 1 Machine 2 Machine 3

(M1) (M2) (M3)

A 6 8 7

B 4 5 3

C 5 5 7

D 3 4 6

E 4 3 4



Other docs by news bird
Setup LAN with Hub or Switch
Views: 10  |  Downloads: 0
adsense money machine
Views: 3  |  Downloads: 0
Application
Views: 1  |  Downloads: 0
CHAPTER 28
Views: 0  |  Downloads: 0
AdSense Secrets for 2007
Views: 1  |  Downloads: 0
Scorpions - Wind Of Change
Views: 10  |  Downloads: 0
AAACREDT
Views: 0  |  Downloads: 0
fastcash
Views: 9  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!