1.        Purpose

The Overflow Response Plan is to ensure that every confirmed sanitary sewer overflow
(SSO) is adequately addressed to ensure that the effects of the overflow are minimized
with respect to impacts to public health and adverse effects on beneficial uses and
water quality of surface waters and customer service. This is required under s.283.55
(1)(dm) Wisconsin Statues and in accordance with the WPDES permit. This is
accomplished by:
        Immediate response to the SSO
        Minimize the effects of the SSO
        Provide containment and proper clean-up of the overflow
        Determining the cause of the SSO

2.        Background

The Village is committed to eliminate preventable Sanitary Sewer Overflows (SSOs) in
their collection system. This plan will provide procedures to respond to the SSOs. The
CMOM Plan requires an Overflow Response Plan (ORP). The ORP includes provisions
to ensure safety and public health are protected and notification and reporting is made
to the Wisconsin DNR and other agencies as required.

The primary objective of the ORP is to protect public health and the environment, to
satisfy regulatory agencies and discharge permit conditions which address procedures
for managing sewer overflows, and minimize risk of enforcement actions against the
Village.

The ORP presents a strategy for the Village to mobilize labor, materials, tools and
equipment to correct or repair any condition which may cause or contribute to an
unpermitted discharge. The major components of the ORP are:

     1.    Identification of known or potential overflow sites
     2.    Receipt of Information regarding a potential SSO
     3.    Dispatch
     4.    Overflow Mitigation, Containment and Cleanup
     5.    Notification and Documentation
     6.    Root Cause Failure Analysis




Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                   Page 1 of 10
                                                                APPENDIX D
                                                    VILLAGE OF SHOREWOOD
                                                  OVERFLOW RESPONSE PLAN

Additional objectives of the ORP are as follows:
        Protect collection system personnel and wastewater treatment plant;
        Protect the collection system, wastewater treatment facilities, and all
          appurtenances; and
        Protect private and public property beyond the collection and treatment
          facilities.

3.    Identification of Overflow Sites

There are four gravity overflow sites in the Village of Shorewood as listed in Table D-1.
The overflow sites have a valve that is normally CLOSED. To prevent wastewater from
backing up into basements and creating an immediate health hazard, the valves may be
opened to flow to a storm sewer. These sites have specific procedures to respond to
and document overflows. This procedure can be found in Appendix F, Wet Weather
Procedure SOP. These sites are:

                                            Table D-1
                            Overflow Sites – Village Of Shorewood
     Description                                  Location                           Manhole
     Overflow Manhole (valved – to storm sewer)   Larkin & Glendale storm-12”        277
     Overflow Manhole (valved – to storm sewer)   Morris & Glendale-12”              279
     Overflow Manhole (valved – to storm sewer)   Woodburn & Glendale-12”            284
     Overflow Manhole (valved – to storm sewer)   Wildwood & Glendale-12”            286

4.    Receipt of Information Regarding an SSO

An overflow may be detected by Village employees or by
others. The Village is responsible to respond to any calls or
reports of a potential SSO and to provide immediate response             UNTIL FIELD
to investigate and/or correct reported sewer overflows.                 VERIFIED, THE
                                                                         REPORT OF A
All calls are routed to the Department of Public Works (DPW)           POSSIBLE SPILL
during work hours and to the police department after hours. All          WILL NOT BE
calls are documented using a Sewer Backup Form. The                   REFERRED TO AS A
person taking the call will contact the foreman to address the             “SEWER
problem. See Appendix E for the form. The following items                OVERFLOW.”
should be included:                                                               
     Time and date call was received


Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                  Page 2 of 10
                                                                     APPENDIX D
                                                         VILLAGE OF SHOREWOOD
                                                       OVERFLOW RESPONSE PLAN
          Callers name and phone number
          Time that the potential overflow was noticed
          Specific location of the problem
          Description of the problem and observations
          Other information that could assist the Village to quickly location, assess and
           correct the problem.

5.        Dispatch
     a. Upon receipt of a notification that there could be an overflow OR in the event that
        heavy rains are predicted, the DPW will dispatch a designated employee to
        investigate the problem. This person shall investigate and confirm if there is an
        SSO. See Wet Weather SOP in Appendix F to respond to the specific sites with
        overflows.
     b. If a SSO is confirmed then it must be reported. See Number 7 - Notifications for
        detailed requirements. The DNR must be notified verbally or electronically
        within 24 hours and in writing within 5 days.
     c. Determine the cause of the overflow, (e.g. high flows, sewer line blockage, sewer
        line break, etc.);
     d. Identify and request, if necessary, assistance or additional resources to correct
        the overflow or to assist in the determination of its cause. See emergency
        contractor contact numbers in Table D-3.
     e. Estimate quantities of flow for the overflow.
     f. Estimate overflow quantities based on time and volume
                Note date and time start_______________________
                Note date and time stopped____________________
                Overflow –circle approximate flow depth ¼ pipe ½ pipe ¾ pipe or full
                 pipe
                Or if notified and it appears that this overflow has been occurring for a
                 while – estimate start time
     g. Document time when SSO is contained.
     h. All overflow quantities must be reported to the DNR.
     i.    If using a portable pump document actual start and stop time. Document pump
           capacity and calculate gallons pumped.

            Gallons = pump time (minutes) x pump capacity in gallons per minutes (gpm)


Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                          Page 3 of 10
                                                                        APPENDIX D
                                                            VILLAGE OF SHOREWOOD
                                                          OVERFLOW RESPONSE PLAN
6.       Overflow Mitigation, Containment and Cleanup

The following procedure will be followed to clean-up the SSO.
     a. Identify the destination of the overflow (storm sewer, street, specific location,
        river, lake)
     b. Secure the area to prevent contact by members of the public until the SSO has
        been addressed and cleaned up.
     c. Take immediate steps to stop or minimize the impact of the SSO,
            i.       Relieve Village sewer blockage by cleaning the sewer
           ii.       Install portable pump at the manhole and pump to another sewer manhole
                     if possible.
           iii.      Open Overflow Valves as noted in Table D-1. This can only be done with
                     the permission of the Village Manager or her or his designee.
           iv.       Call emergency contractors or other municipalities for assistance as
                     necessary. See Table D-3 and Table D-4.
     d. Request additional personnel, materials, supplies, or equipment that will expedite
        and minimize the impact of the overflow
     e. Cleanup of the overflow site shall be completed as soon as possible.
            i.       Secure the site – route traffic around if necessary.
           ii.       Take photos of the SSO.
           iii.      Where practical thoroughly flush the area and clean any sewerage or
                     wash-down water. Solids and debris may be flushed, swept, picked up or
                     transported for proper disposal. Liquids may be discharged to the sanitary
                     sewer.
     f. Notification to stakeholders needs to be completed for all SSOs. See Table D-2
        for Notification Contacts.

7.       Notification and Documentation
                 Wisconsin DNR
                 Water Utilities
                 District
                 Village Manager
                 Public Notification
                 Others



Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                         Page 4 of 10
                                                                 APPENDIX D
                                                     VILLAGE OF SHOREWOOD
                                                   OVERFLOW RESPONSE PLAN
   a. DNR Notification

         Notify the DNR within 24 hours of initiation or SSO(verbal)
         Notify the DNR within 5 days 24 hours of initiation or SSO(written)

      If an overflow is verified the Village of Shorewood shall notify the DNR within 24
      hours of initiation or SSO occurrence by telephoning the wastewater staff in
      the regional office as soon as reasonably possible. If staff are unavailable, the
      use of fax, e-mail, or voicemail is acceptable. It is recommended that if possible,
      an email is sent for documentation.

      Primary DNR contact is Theodore Bosch at (414) 263-8623, fax at (414) 263-
      8716, or by e-mail at Theodore.bosch@wisconsin.gov. For the written reporting
      requirements the DNR recommends the permittee submit WDNR Form 3400-184
      “Sanitary Sewer Overflow or Bypass Notification Summary Form”. This form is
      available in Appendix E and is available for download on the DNR site.
      http://dnr.wi.gov/org/water/wm/WW/form3400184.htm/

       Within 5 days of conclusion of the bypass or overflow occurrence, report the
      following information to the DNR in writing:

         Reason the overflow occurred, or explanation of other contributing
          circumstances that resulted in the overflow event. If the overflow is
          associated with wet weather, provide data on the amount and duration of the
          rainfall or snow melt for each separate event.
         Date the overflow occurred.
         Location where overflow occurred.
         Duration of the overflow and estimated wastewater volume discharged.
         Steps taken or the proposed corrective action planned to prevent similar
          future occurrences.
         Receiving water for overflow
         Any other information the permittee believes is relevant.
         Forward a copy of the written report to the District.

   b. Water Utility Notification
      The Village is required to notify the water utilities that might be impacted by the
      SSO to protect their drinking water sources.
      The Village is required to notify the Milwaukee Metropolitan Sewerage District
      (District) of all SSOs. Forward a copy of the DNR form to the District. .

Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                   Page 5 of 10
                                                                           APPENDIX D
                                                               VILLAGE OF SHOREWOOD
                                                             OVERFLOW RESPONSE PLAN
      c. Village
         All overflows shall be reported immediately to the Village Manager and the
         Director of Public Works.

      d. Public Notification
         As appropriate, the public will be notified. This may include a posting on the
         Village website identifying all pertinent information.

      e. Other Notifications
            All overflows that impact other municipalities will be notified. If an overflow
             impacts a downstream municipality as identified on the attached map, notify
             the applicable downstream municipality. The other municipalities that could
             be affected are Whitefish Bay and City of Milwaukee.
            The Public Health Department should be notified if an overflow occurs.

8.      Root Cause Failure Analysis
All overflows need to be investigated to determine the cause. A root cause failure
analysis form is included in the Appendix E to assist in determining the cause of the
overflow. The analysis should also include measures taken to prevent future SSOs.

9.      Safety
Refer to the Village Safety Program for general safety procedures related to sanitary
sewer overflows.

10.     References
a.      Village Safety Program
b.      Appendix E – Forms
       Root Cause Analysis Form
       Sewer Backups Form
c.      Appendix F – Wet Weather Procedure SOP



                                 SOP DOCUMENT TRACKING
     Document Name:    Overflow Response SOP_SH_V2
     Author:           Joan B. Hawley/Superior Engineering
     Approved:         June 22, 2009
     Issue Date:       June 22, 2009
     Revised By:       Joan B. Hawley                           Date: November 30th, 2009 Version 2



Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                                   Page 6 of 10
                                                                                    APPENDIX D
                                                                        VILLAGE OF SHOREWOOD
                                                                      OVERFLOW RESPONSE PLAN

                                            Table D-2
                                    Emergency Contact Numbers
Description                    Name              Number              Email
Village
    Village Manager            Chris Swartz         (414) 847-2700   Manager@villageofshorewood.org
    Director of Public Works   Leeann Butschlick    (414) 847-2650   dpw@villageofshorewood.org
    Assistant Director of      Jim Swenson          (414) 847-2650   jswenson@villageofshorewood.org
    Public Works
    Foreman                    Scott Bohm           (414) 847-2657   sbohm@villageofshorewood.org

   Police – Non-Emergency                           (414) 847-4619
North Shore Health Dept        Jamie Berg           (414) 847-2713
                                                    or 271-2980
District                       Debra Jensen         (414) 225-2143 djensen@mmsd.com
District                       Pete Topczewski      (414) 225-2176 ptopczewski@mmsd.com
MMSD Contract Operator         Veolia Water         (414) 282-7200
                                                    or if busy
                                                    (414) 747-3873
Wisconsin DNR                  Ted Bosch            (414) 263-8623 Theodore.bosch@wiconsin.gov
Water Departments
   Milwaukee Water Works
   North Shore Water           Eric Kiefer, Plant   (414) 963-0160   ekiefer@northshorewc.com
                               Mgr




Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                   Page 7 of 10
                                                                                  APPENDIX D
                                                                      VILLAGE OF SHOREWOOD
                                                                    OVERFLOW RESPONSE PLAN

                                                  Table D-3
                                         Emergency Contactor Numbers
NAME                         ADDRESS             PHONE                       SERVICES PERFORMED

  Village Of Whitefish Bay                         (414) 962-6690            Sewer blockages, cleaning, emergency
                                                                             support
  Visu-Sewer                 W230 N4855 Betker     (262) 695-2340            Sewer blockages, overflow cleanup,
                             Road                                            inspections, emergency sewer lining
                             Pewaukee, WI                                    work.
  Superexcavators            N59-W14601 Boblink,                             Excavating, emergency sewer repair
                             Menomonee Falls
  Globe Contractors Inc      N50 W23076 Betker     (414) 828-8972 cell       Excavating, emergency sewer repair
                             Road                  OFFICE - (262) 246-0600   dano@globecontractors.com
                             Pewaukee, WI 53072    828-8978
  Midcity Plumbing           12930 W. Custer       Office (262) 781-5940;    Excavating, emergency sewer repair,
                             Avenue, Butler, WI    emergency cell no.’s      residential sewer blockages
                                                   (414) 349-0623 & 349-
                                                   0625




Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                   Page 8 of 10
                                                                                   APPENDIX D
                                                                       VILLAGE OF SHOREWOOD
                                                                     OVERFLOW RESPONSE PLAN




                                                    Table D-3
                                     Emergency Contractor Contacts (Continued)
NAME                           ADDRESS           PHONE                SERVICES PERFORMED
WASTE HAULERS
  Veolia ES Special Services   N104 W13275 Donges   (262) 236-8130     Chemical spills, cleanup of hazardous
                               Bay                                     materials and wastewater hauling and disposal
                                                                       (Industrial services)
  Advance Waste Services       1126 S 70th #N408B   (414) 475-3100     Emergency response for cleanup of hazardous
                               West Allis WI                           materials and wastewater hauling and disposal
  Future Environmental         3240 West Elm Road                      Emergency response for cleanup of hazardous
                               Franklin WI          (414) 7619421      materials and wastewater hauling and
                                                                       disposal. Oil disposal.
  North Shore Environmental    N117 W18493 Fulton   (262) 255-4468     Emergency spill response for hazardous
                               Drive                                   materials and wastewater hauling.
                               Germantown, WI




Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                   Page 9 of 10
                                                                                 APPENDIX D
                                                                     VILLAGE OF SHOREWOOD
                                                                   OVERFLOW RESPONSE PLAN




                                                    Table D-4
                                   Mutual Aid Emergency Contact Numbers
Municipality   Name                Title                        Number           Email
Bayside        Andy Pederson       Village Manager              (414) 351-8811   apederson@bayside-wi.gov
Brown Deer     Larry Neitzel       Director of Public Works     (414) 357-0120   vbdpwlarry@sbcglobal.net
Fox Point      Scott Brandmeier    Director of Public Works     (414) 351-8900   sbrandmeier@vil.fox-point.wi.us
Glendale       Dave Eastman        Director of Public Works     (414) 228-1746   d.eastman@glendale-wi.org
River Hills    Kurt Frederickson   Superintendent of Public     (414) 352-0080   lfredrickson@vil.river-hills.wi.us
                                   Works
Shorewood      Leeann Butschlick   Director of Public Works     (414) 847-2650 lbutschlick@villageofshorewood.org




Overflow Response SOP_SH_V2.doc
November 30th, 2009                                                                      Page 10 of 10

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:3
posted:10/28/2011
language:English
pages:10