HEADING             NOTES
Project title       CEMENT AND GYPSUM BOARD PROJECT IN LINDI
Project description The project involves mining and beneficiation of the gypsum rock
                    and setting up a gypsum processing plant for the production of
                    gypsum boards and gypsum cement and other products based on
                    gypsum deposits (Hydrated Calcium Sulphate – CaSO4.2H2O) at
                    Mbaru and Pindiro in Kilwa District, Lindi Region. The deposits are
                    estimated at 5 million tons with average thickness of 20m and purity
                    over 80%.
                    The rock gypsum deposits are situated in Kilwa district, Lindi
                    region within the Mtwara Development Corridor (MtDC. The
                    deposits are located about half way between the towns of Kilwa
                    Kivinje and Lindi between latitudes 09o 17‟ 45” South and 09o
                    31‟ 20” South and longitudes 39o 16‟ 20” East and 39o 26‟ 35”
                    East. There are three major deposits located within approximately
                    30 km of each other. The project area can be reached from Dar es
                    Salaam by the Dar es Salaam-Kibiti-Lindi road, some 440km from
                    Dar es Salaam and 96km from Lindi.The gypsum board will serve
                    the domestic market in the construction industry as well as for
                    export.
Programme           Mtwara Development Corridor.
Country             Tanzania.
Economic sector     Mining and Quarrying
Contact person      Mr. Kimambo (Chairman)
                    KDCL Minerals (T) Limited
                    P.O. BOX 9233
                    Dar es Salaam
                    E-Mail: kdclmine@africaonline.co.tz
                    Tel: +255 (0)75 4434209
                    TANZANIA
Estimated capex     US$ 50 million
Estimated annual    $20 million
turnover (US$)
Project stage       Pre-feasibility.
Current status      The project promoters, KDCL invites JV partnership to develop the
                    mineral potential for commercial exploitation. Further geological
                    exploration would be required to augment the proven reserve to be
                    followed by feasibility study in order to establish project viability.
Investor type       Private Sector
No. of jobs         200 direct jobs and 400 indirect jobs.
Movement of         About 100,000tons per annum of cement and gypsum boards will be
cargo, where &      generated and handled at Rushungi Port, Lindi
how much?


                                                                                             1
HEADING               NOTES
Project title         MODERNIZATION OF NAMWELE-NKOMOLO COAL
                      PROJECT
Project description   The Namwele-Nkomolo coalfield is located in Sumbawanga District,
                      Rukwa Region. The coalfield is about 35km North-East of Sumbawanga
                      town and 20km west of Lake Rukwa and lies between Latitudes 70 41‟
                      00‟‟ to 70 50‟ 00‟‟S and Longitudes 310 24‟ 00‟‟ to 310 31‟ 00‟‟. Total
                      proven coal reserve is 1.5 million tons while inferred reserve is 17.2
                      million tons making a total of 18.7 million tons. Currently, limited mining
                      (500tons/month coal production) is being carried out by a local investor
                      for supply of coal to Mbeya cement, Mbeya Textile, Mwamba Brewing
                      Company in mbeya and others. A coal briquette plant has been set out for
                      making coal briquettes for local consumption. Modernization and
                      expansion of the coalmine is required with improved mining equipment so
                      as to produce over 15,000 tons per month (180,000 tons /yr) for supply to
                      local industries, domestic use (coal briquettes) and for power generation.

Programme             Mtwara Development Corridor.
allocation
Country               Tanzania.
Economic sector       Mining
Contact person        Cassiano Lucas Kaegele
                      MANAGING DIRECTOR
                      UPENDO GROUP LTD
                      P.O. BOX 336
                      SUMBAWANGA
                      Tel. 025 28022253
                      Fax. 025 2802502
                      Mob. 0754533776
Estimated capex       $20 million
value ($US)
Estimated annual      $12.6 million
turnover (US$m)
Project stage         Pre-feasibility.
Current status        Efforts to secure a strategic investor to partner with the local investor are
                      ongoing
Investor type         private sector
No. of jobs created   200 direct jobs and 400 indirect jobs.
Movement of cargo,    180,000 tons/yr – produced on site and then transported by road to Mbeya,
where & how           Dar es Salaam and other places in the hinterland.
much?




                                                                                                      2
HEADING             NOTES
Project title       PROPOSED MUZE COAL TO ELECTRICITY PROJECT
Project description Muze coalfield is located on the floor of Lake Rukwa trough at the
                    foot of the Ufipa escarpment. It is 60km from Sumbawanga town
                    and about 20km east of Namwele-Nkomolo coalfield. Elevations
                    within the coalfields varies from 800m to 900m above sea level and
                    the coalfield lies between latitudes 70 39‟ 00‟‟S to 70 43‟‟ 00‟‟S and
                    longitudes 310 32‟ 00‟‟E to 310 35‟ 00‟‟E. Total proven coal reserve
                    is 3.41 million tons while inferred reserve is 56.59 million tons
                    making a total reserve of 50 million tons. The Muze Coal to
                    Electricity Project involves setting up an opencast coalmine with a
                    linked Coal Fired Power Station with a generatyion capacity of
                    300MW to supply power to the local regions of Rukwa, Mbeya,
                    Kigoma, Tabora and to the National Grid. Export opportunities exist
                    for export power to Zambia, DRC and Burundi. Detailed geological
                    explorations will be required before implementation.

Project ID           xxxx
Programme            Mtwara Development Corridor.
allocation
Country              Tanzania.
Economic sector      Mining/Energy
Contact person       Cassiano Lucas Kaegele
                     MANAGING DIRECTOR
                     UPENDO GROUP LTD
                     P.O. BOX 336
                     SUMBAWANGA
                     Tel. 025 28022253
                     Fax. 025 2802502
                     Mob. 0754533776
Estimated capex      $ 400 million
value ($US)
Estimated annual     $120 million
turnover (US$m)
Project stage        Pre-feasibility.
Current status       Efforts to secure a strategic investor to partner with the local investor are
                     ongoing
Investor type        Private Sector
No. of jobs          400 direct jobs and 800 indirect jobs.
created
Movement of          About 2.4 GWh will be wheeled through the National Power Grid
cargo, where &
how much?




                                                                                                     3
HEADING            NOTES
Project Title      Production of Iron Ore-Mara Region, Tanzania
Project            To establish a project for steel processing from iron ore deposit in
Description        Kurwirwi village, Mara Region, the plant will be situated at Kurwirwi
                   and it is proposed to process iron ore at a rate of 5000 tons a day.

                   Limestone flux is available locally and coal for coke will come from
                   within Tanzania and from Mozambique or South Africa.

                   It is ideal to have this plant in our region due to the fact that in
                   Eastern and Central Africa there is no steel processing plant despite
                   of available huge market for steel.

                   The project is viable and details can be found in a feasibility study
                   carried out by Mara Ore Industry Company Ltd.

Country          Tanzania
Economic Sector  Minerals
Contact Person   T. S. Panga,
                 Chairperson,
                 Mara Ore Industry Company Ltd.
                 P.O. Box 123,
                 Musoma, Tanzania
                 Email: maraore@yahoo.com
Estimated Cost   US $ 100million
Internal Rate of Above 50%
Return(RR)
Project Stage    Feasibility Study already carried out
Current Status   Looking for Financier/Partner
Investor Type    Joint venture




                                                                                      4
HEADING                 NOTES
Project title           LIGANGA SPONGE IRON PROJECT.
Project description     The Liganga V-Ti Magnetite Ore deposits are located about 850 km Southwest of
                        Dar es Salaam in the Iringa region near Lake Nyassa.

                        SPONGE IRON PROJECT
                        With the opening up & development of the coal mine in Mchuchuma there is an
                        opportunity to open up the Liganga mine to produce „sponge iron (si)‟.
                        During the process the raw iron is upgraded to a concentrate suitable for
                        palletising prior to „direct reduction‟ and iron ore will be in excess of 60% with
                        very low 0.02% sulphur. The sponge iron is iron ore reduced in a solid state by a
                        reduction process using natural gas or coal as a reluctant also known as Direct
                        Reduced Iron (DRI) and the DR (Direct Iron) is a process of producing iron from
                        iron oxide (from lumps or pellets) directly into a solid state – unlike going thru the
                        molten stage in blast furnace. The final product is honeycombed hence the name
                        „sponge iron‟ which also still includes impurities. The final product will be +- 80-
                        90% Fe; metallizen % of about 92% with impurities containing; S1O2; S; P; Pb;
                        2n; Cu; Sn; Cn; Ni; and As. Sponge Iron is used as an input in production of iron
                        & steel products in furnace processing. Production is expected to be in the region
                        of 50,000 mt/y and will expand into the next phase if successful. Water supply,
                        electricity supply and auxiliary facilities including township will be part of the
                        development.

Project ID              SIL01
Programme allocation    Mtwara Development Corridor.
Country                 Tanzania.
Economic sector         Mining and Quarrying.
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   $27.00 million.
($US m)
Estimated annual        $7.4 million
turnover (US$m)
Project stage           Pre-feasibility. Application to DBSA for funding has been initiated.
Current status          Arrangements for financing a techno-economic study to determine the
                        commercial viability of the project, including the updating of the existing studies
                        are being made.
Investor type           JV with the private sector
No. of jobs created     376 direct jobs and 903 indirect jobs.
Movement of cargo,      50,000 mt/y – processing on site and then by road to Dar es Salaam. If tonnage
where & how much?       increases there is a possibly to barge sponge iron with coal from Mchuchuma on
                        the lake for further processing with heavy mineral sands project in Chipoka,
                        Malawi and export via Nacala port in Mozambique.




                                                                                                              5
HEADING                 NOTES
Project title           LIGANGA VANADO-TITANIUM MAGNETITE ORE PROJECT - PHASE 1.
Project description     The Liganga Vanado-Titanium Magnetite Ore deposits is located about 850 km
                        Southwest of Dar es Salaam between Latitudes 951´00"S and 1000´05"S and
                        Longitudes 3451´00"E and 3500´20"E. The area can be reached from Dar es
                        Salaam by a Dar es Salaam/Morogoro/Iringa/Njombe/Mundindi road.

                        Phase I
                        During the initial stage, it is proposed to produce titanium and vanadium
                        concentrates for export market. Accordingly, about 2.5 Million tonnes of Liganga
                        titaniferous ore is targeted for mining to produce the following products: -
                        a.        250,000 tonnes per year of titanium (TiO2) concentrates; and,
                        b.        11,000 tonnes per year of vanadium( V2O5 ) concentrates

                        The metallurgical and infrastructure facilities required for the production of
                        vanadium and titanium shall consist of an ore mine, a crushing and commuting plant,
                        a low intensity magnetic separation plant, an electrostatic separation plant, DC
                        plasma arc furnaces, shaking ladles, water supply, electricity supply and auxiliary
                        facilities including township.
Project ID              SIL02.
Programme allocation    Mtwara Development Corridor.
Country                 Tanzania.
Economic sector         Mining and Quarrying.
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   $940.00 million
($US m)
Estimated annual        $116 million
turnover (US$m)
Project stage           Pre-feasibility
Current status          Preparations for the RFQ/RFP Process to invite private developers to carry out
                        detailed explorations are on going.
Investor type           JV with the private sector.
No. of jobs created     985 direct jobs and 1,182 indirect jobs.
Movement of cargo       50,000 mt/y – processing on site and then by road to Dar es Salaam. If tonnage
where & how much?       increases there is a possibility to barge sponge iron with coal from Mchuchuma on
                        the lake for further processing with heavy mineral sands project in Chipoka, Malawi
                        and export via Nacala port in Mozambique.




                                                                                                        6
.
HEADING                 NOTES
Project title           LIGANGA VANADO-TITANIUM MAGNETITE ORE PROJECT – PHASE 2.
Project description     The Liganga V-Ti Magnetite Ore deposits is located about 850 km Southwest of Dar
                        es Salaam between Latitudes 951´00"S and 1000´05"S and Longitudes 3451´00"E
                        and 3500´20"E. The area can be reached from Dar es Salaam by a Dar es
                        Salaam/Morogoro/Iringa/Njombe/Mufindi road.

                        Phase II: The second stage of the development entails production of 1.0 million
                        tonnes per year of iron and steel products including special steels with an option of
                        expansion. The said volume to be produced at the rate of say 3300 tonnes daily
                        would need reliable means to transport the required raw material to the complex and
                        finished products to consumers through Dar es Salaam, Mtwara harbour and other
                        major towns both for local and export markets.

Project ID              SIL03
Programme allocation    Mtwara Development Corridor.
Country                 Tanzania.
Economic sector         Mining and Quarrying.
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   $450.00 million
($USm)
Estimated annual        $245million
turnover (US$m)
Project stage           Pre-feasibility.
Current status          Arrangements for financing a techno-economic study to determine the commercial
                        viability of the project, including the updating of the existing studies are being made.
Investor type           JV with the private sector.
No. of jobs created     1045 direct jobs and 627 indirect jobs.
Movement of cargo       An estimated 1.0 million mt/y, possibly by barge with the coal from Mchuchuma on
where & how much?       the lake, initially for further processing with HMS Project in Chipoka, and export via
                        Nacala and export via that route until such time as the railway line and processing
                        smelter(s) have been installed at either Liganga and/or Mtwara.




                                                                                                           7
HEADING                 NOTES
Project title           MCHUCHUMA COAL TO ELECTRICITY PROJECT.
Project description     Location:

                        The Mchuchuma Coal to Electricity Project is located some 600km inland in the Southern
                        Western part of Tanzania near lake Nyasa and close to its border with Malawi in the west
                        and Mozambique in the South. It is situated in the Ludewa district, Iringa region in
                        Tanzania. The project lies between latitudes 10°14'30" S and Longitudes 34°38'00" E and
                        34°53'20" E, at an altitude of about 1030m above mean sea level.

                        Phase 1: The establishment of an open-cast coal mine of 1.5 million tones per annum at the
                        Mchuchuma Coalfield and the setting up of a 400MW linked, mine-mouth Thermal Power
                        Station to unlock the vast economic potentials of the Southern Regions of Tanzania with
                        trade and investment linkages to the adjoining districts of the neighbouring countries of
                        Malawi, Mozambique and Zambia. The project will consist of:
                        -    A single product Coal Mine on the Mchuchuma and Katewaka reserves owned by
                             Government of Tanzania. The mine will produce steam coal of the required grade
                             exclusively for initially the power station and surpluses for export.
                        -    The Power Station that will generate power for the national grid and across the lake to
                             Malawi Inter-connector. The power station‟s generation output would be 4 x 100MW.
                        -    A Transmission System is to be erected to connect into the national grid at Mufindi
                             (240kms) and (a new proposal) along the lakebed to Chilumba (90kms) in Malawi to
                             integrate into the national grid to support industrial development in Malawi at Mzuzu
                             and Chipoka.

                        The development of the village on the shores of Lake Nyasa. The Manda Village will
                        support the identified infrastructure requirements for the power station and Coal Mine.
                        Coal reserves:
                        -   Total Coal Reserve:         535.75MT;
                        -   Proven Category:            158.80MT; and,
                        -   Indicated Category:         376.95MT.

Project ID              SIS01
Programme allocation    Mtwara Development Corridor.
Country                 Tanzania.
Economic sector         Mining and Quarrying.
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   $687.00 million
($US m)
Estimated annual        $150 million
turnover (US$m)
Project stage           Market Appraisal.
Current status (WIP)    Preparations on the RFQ/RFP Process to invite potential private developers are on going
Investor type           JV with the private sector.
No.of jobs created      1,919 direct jobs and 1,727 indirect jobs.
Movement of cargo -     Phase 1 will be to supply the power station, when purchase power agreements are finalised,
where & how much?       and then phase 2 to supply the Liganga „sponge iron‟ and/or “iron ore” project. In both
                        phases a coal trade component is envisaged, utilising the export of high quality coal down
                        the lake to the Chipoka railhead from the Manda port for export via the maritime port of
                        Nacala in Mozambique.




                                                                                                                   8
HEADING                 NOTES
Project title           MCHUCHUMA COAL EXPORT DEVELOPMENT I.
Project description     Location:
                        The Mchuchuma Coal to Electricity Project is located some 600km inland in the
                        Southern Western part of Tanzania near lake Nyasa and close to its border with
                        Malawi in the west and Mozambique in the South. It is situated in the Ludewa
                        district, Iringa region in Tanzania. The project lies between latitudes 10°14'30" S
                        and Longitudes 34°38'00" E and 34°53'20" E, at an altitude of about 1030m
                        above mean sea level.

                        Phase 2: The increase of open-cast coal mine to 4.5 million tones per annum at the
                        Mchuchuma Coalfield (1.5 million for power and 3.0 m t/y for export via Lake to
                        Nacala Port)

                        Coal reserves:
                        - Total Coal Reserve: 535.75MT
                        - Proven Category: 158.80MT
                        - Indicated Category: 376.95MT
Project id              SIS02.
Programme allocation    Mtwara Development Corridor.
Country                 Tanzania.
Economic sector         Mining and Quarrying.
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   $55.00 million
($US millions)
Estimated annual        $45 million
turnover (US$)
Project stage           Market appraisal.
Current status          NDC is conducting a detailed financial and economic appraisal of the integrated
                        project before invitation of expression of interest.
Investor type           JV with the private sector.
No.of jobs created      565 direct jobs and 949 indirect jobs.
Movement of cargo,      Phase 1 & 2 will be to supply the power station (when the purchase power
where & how much?       agreements are finalised). In Phase 2 it is envisaged that up to 3.0 million mt/y of
                        export quality coal could be sent down the lake from Manda to the Chipoka
                        railhead for export via the maritime port of Nacala in Mozambique. Coal export
                        could be initiated in Phase 1 if the logistics and mine operations were set up.




                                                                                                               9
HEADING                 NOTES
Project title           MCHUCHUMA COAL EXPORT DEVELOPMENT II
Project description     Location:

                        The Mchuchuma Coal to Electricity Project is located some 600km inland in the
                        Southern Western part of Tanzania near lake Nyasa and close to its border with
                        Malawi in the west and Mozambique in the South. It is situated in the Ludewa
                        district, Iringa region in Tanzania. The project lies between latitudes 10°14'30" S
                        and Longitudes 34°38'00" E and 34°53'20" E, at an altitude of about 1030m
                        above mean sea level.

                        Phase 3 - The expansion again of open-cast coal mine to 20.0 million tones per
                        annum at the Mchuchuma Coalfield (1.5 million for power and 18.5 m t/y for
                        export via Lake to Nacala Port (3mt) & 15.0 mt /y via railway line to Mtwara Port
                        Coal reserves:
                        - Total Coal Reserve: 535.75MT
                        - Proven Category: 158.80MT
                        - Indicated Category: 376.95MT

Project id              SIM01
Programme allocation    Mtwara Development Corridor
Country                 Tanzania
Economic sector         Mining and Quarrying
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   $75.00 million
($US m)
Estimated annual        $75million
turnover (US$m)
Project stage           Market appraisal.
Current status          NDC is conducting a detailed financial and economic appraisal of the integrated
                        project before invitation of expression of interest.
Investor type           JV with the private sector
No. of jobs created     960 direct jobs and 864 indirect jobs
Movement of cargo,      When the quality of deposits of coking/export quality steam coal is confirmed,
where & how much?       then Phase 3 will become reality. Exports of +15 million mt/y will be down the
                        new railway line from Mchuchuma (and other coalfields in the sub-region) to
                        Mtwara for export worldwide.




                                                                                                         10
HEADING                         TANZANIA
Project title                   SONGEA LIME DEPOSITS FOR CEMENT AND
                                PHARMACEUTICAL LIME, RUVUMA REGION
Project description             Open cast mine, crushing and processing plant.
                                - Potential markets for Cement for local consumption;
                                - Apart from initial importation of mining & processing
                                   equipment, inputs would be chemicals for the processing of the
                                   pharmaceutical lime and most other items available in
                                   Tanzania; and,
                                - Production of 10,000 mt/y of Agricultural Lime for the regional
                                   market.

Project id                      DRM02
Programme allocation            Mtwara Development Corridor
Country                         Mining
Economic sector                 Government
Contact person                  Commissioner of Mines, Ministry of Minerals and Energy
                                Or...
                                The Managing Director
                                National Development Corporation
                                P. O. BOX 2669. Dar es Salaam, Tanzania
                                Tel: 255-22-2112893, 2115492
                                E-Mail: ndc@ndctz.com
Estimated capex value ($US m)   US$ 20 million
Estimated annual turnover       Initially US$ 10.5 million growing to US$ 22 million / year (2nd
(US$m)                          Phase).
Project stage                   Requires final bankable feasibility study to be done and thereafter
                                phasing of project developments.
Current status                  Initial study complete now requires bankable feasibility study to be
                                completed.
Investor type                   JV with private sector investor.
No. of jobs created             175 direct and further 294 indirect.
Movement of cargo, where &      All internally by road, rail and ships within the country of some
how much?                       76,000 mt/y (incl. 10,000 Agricultural lime and other products,
                                increasing to 145,000 mt/y in the second phase.
Other Benefits                  Supplying much needed cement up to 95% of all requirements and
                                possible exports of high quality lime saving some US$ 10.0 million
                                in imports and earning some $3.0 million in exports.




                                                                                                       11
HEADING                         TANZANIA
Project title                   LIME DEPOSITS FOR CEMENT AND PHARMACEUTICAL
                                LIME, MTWARA REGION
Project description             Open cast mine, crushing and processing plant.
                                - Potential markets for cement for local consumption;
                                - Apart from initial importation of mining and processing
                                   equipment, inputs would be chemicals for the processing of the
                                   pharmaceutical lime and most other items available in
                                   Tanzania; and,
                                - Production of 10,000 mt/y of agricultural lime for the regional
                                   market.

Project ID                      SMS07
Programme allocation            Mtwara Development Corridor
Country                         Mining
Economic sector                 Government
Contact person                  Commissioner of Mines, Ministry of Minerals and Energy
                                Or...
                                The Managing Director
                                National Development Corporation
                                P. O. BOX 2669. Dar es Salaam, Tanzania
                                Tel: 255-22-2112893, 2115492
                                E-Mail: ndc@ndctz.com
Estimated capex value ($US m)   US$ 20 million.
Estimated annual turnover       Initially US$ 10.5 million growing to US$ 22 million / year (2 nd
(US$m)                          Phase).
Project stage                   Requires final bankable feasibility study to be done and thereafter
                                Phasing of project developments.
Current status                  Initial study complete now requires bankable feasibility study to be
                                completed.
Investor type                   JV with private sector.
No. of jobs created             175 direct and further 294 indirect
Movement of cargo, where &      All internally by road, rail and ships within the country of some
how much?                       76,000 mt/y (including 10,000 of agricultural lime & other
                                products) increasing to 145,000 mt/y in the second phase.
Other benefits                  Supplying much needed cement up to 95% of all requirements and
                                possible exports of high quality lime saving some US$ 10.0 million
                                in imports and earning some $3.0 million in exports.




                                                                                                       12
HEADING                         TANZANIA
Project title                   MTWARA & LINDI REGIONS - GYPSUM INDUSTRY
                                DEPOSITS FOR CEMENT AND PHARMACEUTICAL LIME.
Project description             Open cast mine, crushing, and processing plant:
                                - Potential markets for Cement for local consumption;
                                - Apart from initial importation of mining & processing equipment,
                                   inputs would be chemicals for the processing of the pharmaceutical
                                   lime and most other items available in the region; and,
                                - Production of 10,000 mt/y of agricultural lime for the regional
                                   market.

Project ID                      DLS02
Programme allocation            Mtwara Development Corridor
Country                         Mining
Economic sector                 Government
Contact person                  Commissioner of Mines, Ministry of Minerals and Energy
                                Or...
                                The Managing Director
                                National Development Corporation
                                P. O. BOX 2669. Dar es Salaam, Tanzania
                                Tel: 255-22-2112893, 2115492
                                E-Mail: ndc@ndctz.com
Estimated capex value ($US m)   US$ 4.9 million.
Estimated annual turnover       US$ 2.6 million.
(US$m)
Project stage                   Requires final bankable feasibility study to be done and thereafter
                                Phasing of project developments.
Current status                  Initial study complete now requires bankable feasibility study to be
                                completed.
Investor type                   JV with private sector.
No. of jobs created             263 direct and further 442 indirect
Movement of cargo, where &      All internally by road, rail and ships within country of some 30,000
how much?                       mt/y.
Other benefits                  Supplying much needed gypsum for the cement and pharmaceutical
                                industry and as stationary to the education sector.




                                                                                                       13
HEADING                         TANZANIA
Project title                   RARE EARTH MINERALS MINING PROJECT, NKASI
                                DISTRICT, RUKWA REGION
Project description             These products have a niche market in the world as not many
                                deposits of rare earth minerals (REM) are available:

                                -   Specialised market for these REM‟s in the IT, TV, Satellite and
                                    communications as well as in sophisticated military defence
                                    projects such as missiles systems etc. -at present controlled by
                                    Peoples Republic Of China; and,

                                -   Process chemicals will be the main imported products and if the
                                    sulphuric acid plant were put up this would save vast amounts
                                    of foreign exchange.

Project ID                      DRkL01
Programme allocation            Mtwara Development Corridor
Country                         Tanzania
Economic sector                 Mining
Contact person                  Commissioner of Mines, Ministry of Minerals and Energy
                                Or...
                                The Managing Director
                                National Development Corporation
                                P. O. BOX 2669. Dar es Salaam, Tanzania
                                Tel: 255-22-2112893, 2115492
                                E-Mail: ndc@ndctz.com
Estimated capex value ($US m)   Phase 1: US$ 35 million
                                Phase 2: Additional US$ 45-50 million
Estimated annual turnover       Phase 1: US$ 30-40 million
(US$m)                          Phase 2: US$ 85-100 million
Project stage                   Concept stage. Requires exploration then implementation of Phase 1
                                pilot project and bankable feasibility study to be commissioned
                                depending on results. Phase 2 would commence 2 years after the
                                start of Phase 1.
Current status                  Concept
Investor type                   Private sector
No. of jobs created             299 and up to 537 indirectly on subcontract basis
Movement of cargo, where &      Phase 1: Approx. 2,500-3,000-tonnes/ month. Initially via Mbeya
how much?                       then to Dar es Salaam or down to Mtwara via Makambako and
                                Songea.
Other benefits                  Downstream agricultural projects could use recycled water from
                                project of 100-300,000 cubic metres per month for irrigation of
                                approx. 3-4,000 hectares of land. Waste products can be used to
                                produce agricultural lime.




                                                                                                       14
HEADING                 NOTES
Project title           NGAKA COAL FIELD, RUVUMA REGION
Project description     Location:
                        The Ngaka Coal field is situated in the southern part of the Ruhuhu depression
                        between the north-easterly trending gneiss ridges of Namschweia-Njendenga-
                        Ndemba and Katumba-Kawana and almost entirely in the Ngaka River valley,
                        which is a perennial motherly flowing entirely in the tributary of the Ruhuhu
                        River. It lies about 40km east of Lake Nyasa and about 80kms WNW of Songea
                        town. It is approximately 32 kilometres south-east of Mchuchuma-Katewaka coal
                        field. The Ngaka coalfield comprises of two areas Mbalawala (southern part) and
                        Mbuyura (Northern part) occurring in an elongated basin trending approx. north-
                        east. The road is passable in the dry season, which goes from Songea, across
                        Rwanda village in the southern part of the coalfield to Lituhi on Lake Nyasa. The
                        following reserves have been reported
                                                              Mbalawala      Mbuyura          Total
                        a. CDC estimate (1953) (M.tons)
                          (i) Proved                          97.7             Nil               97.7
                          (ii) Indicated                      Nil              15.0              15.0
                          Total                               97.7             15.0              112.7
                        b. PRC Team (1967)                    141.0            11.0              152.0

Project ID              SIS05
Programme allocation    Mtwara Development Corridor
Country                 Tanzania
Economic sector         Mining
Contact person          The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   US$ 6.6 million
($US m)
Estimated annual        US$ 3.4 million.
turnover (US$m)
Project stage           NDC has applied for USD 2,5 million to conduct a detailed financial and
                        economic appraisal of the integrated project before invitation of expression of
                        interest.
Current status          As above.
Investor type           JV with private sector
No. of jobs created     173 direct jobs and 155 indirect jobs
Movement of cargo,      To be determined by outcome of feasibility study.
where & how much?




                                                                                                          15
HEADING                 NOTES
Project title           MBAMBA BAY COAL FIELD, RUVUMA REGION
Project description     Location:
                        The Mbamba Bay Coal Fields are located on the shores of Lake Nyasa across
                        from Nkhata Bay in Malawi. This project would be ideal as a small-scale mining
                        operation of some 60-75,000 mt/y.
                        - Total Coal Reserve: 29.0MT
                        - Proven Category: 2.4MT
                        - Indicated Category: 26.6MT

Project id              SRM02
Programme allocation    Mtwara Development Corridor
Country                 Tanzania
Economic sector         Mining
Contact person          Commissioner of Mines, Ministry of Minerals and Energy
                        Or...
                        The Managing Director
                        National Development Corporation
                        P. O. BOX 2669. Dar es Salaam, Tanzania
                        Tel: 255-22-2112893, 2115492
                        E-Mail: ndc@ndctz.com
Estimated capex value   US$ 5.3 million
($USm)
Estimated annual        US$ 2.7 million
turnover (US$m)
Project stage           Exploration required
Current status          As above
Investor type           Joint venture with private sector
No. of jobs created     138 direct jobs and 124 indirect jobs
Movement of cargo,      Suggested this project could aim at local markets as well as exporting by lake
where & how much?       transport to Malawi to meet growing industrial demand in that country.




                                                                                                         16
HEADING          NOTES
Project title    Modernization of a Gold Mine
Project          GR & MJ BLACK LABEL GOLD MINES LTD are looking for a strategic investor to
description      provide additional financing for purchasing mining equipments and working capital to
                 strengthen project operations. The company owns four mining licenses and their
                 mining operations are located to close proximity with large mining houses.

                 For more information Contact Tanzania Investment Centre to view the full business
                 plan.

                 information@tic.co.tz
Country          Tanzania
Contact          GR & MJ BLACK LABEL GOLD MINES LTD
person
                 ARUSHA , TANZANIA

                 TELPHONE + 255 784 348580

                              + 255 784 76 9379

                 E-MAIL : dennisferuzi@yahoo.com
Estimated        US$ 1,159,784.00
investment
Cost
Project stage    Operational Mining
Current status   On going
Investor type    Loan Financing
NO. Of jobs      45
Comments         Very promising investment project




                                                                                                17
HEADING                NOTES
Project Title          Rhodolite Mining
Project Description    Currently only 5% of mining activities is going on due to lack of
                       financial resources and modern equipments.
                       Rhodolite mining is located at Hedaru Kilimanjaro region with
                       prospecting license Right No: 000076 and 0000752 each
                       bordered in the area of 900’ *900
Country                Tanzania
Economic Sector        Mining
Contact Person         Grayson Kigonti,
                       P.O. Box 6,
                       Hedaru,
                       Same
                       Tel: +255743 080352
Estimated Cost          US $ 4.m
Estimated      annual
Production
Project Stage         Feasibility study done
Current Status        Looking for Financier/Partner
Investor Type         Joint venture




                                                                                      18
HEADING                NOTES
Project Title          Mwalazi Mining
Project Description    Chrysoprase (Art stone) is a new type of mineral found only in
                       Tanzania and Australia.

                       Mining of Chrysoprase is being carried out by Mwalazi Mining
                       company in a very         small scale due to financial      and
                       technological constraints. Currently the company is not capable
                       to conduct detailed survey to pin down the potential availability
                       and quality of chrysoprase.

Country                Tanzania
Economic Sector        Mining
Contact Person         Mr. J. S. Digallu
                       Managing Director
                       Mwalazi Mining Company LTD
                       P. O. Box 601
                       Morogoro
                       Tel:+255754 374 942
                       Email: mwamco@yahoo.com

Estimated Cost          US $ 1.5m
Estimated Production   75 tons
ton per anum
Project Stage          Pre-Feasibility study done
Current Status         Looking for Financier/Partner
Investor Type          Joint venture




                                                                                      19

								
To top