docid docid CR BOE title
1513 BoE for WBS 1.0.1.1 - RR Cooling Systems Capacity
BoE for WBS 1.0.1.1 - Design Reviews for RR Cooling
1514 Systems
1527 BoE for WBS 1.0.1.1 - RR alignment
BOE for WBS 1.0.1.1 RR Mods Stochastic Cooling
1530 Decommissioning
1845 BoE for WBS 1.0.1.1 RR Device Removal
1873 BoE for WBS 1.0.1.1 - Trim Magnet Corrector Reassignment
1900 4954 BoE for WBS 1.0.1.1 - Test Recycler 53 MHz RF
1913 BoE for WBS 1.0.1.1 - RR 53 Mhz Design Review
BOE for WBS 1.0.1.1 - Recycler Transfer Lines Design
2592 Review
BOE for WBS 1.0.1.2 - AD Oversight of TD Magnet
1456 Construction
BoE for WBS 1.0.1.2 - Gap Clearing Prototype Bumper PS
1480 Beam Test
BOE for WBS 1.0.1.2 - RR Inj Gap Clearing Pulse Forming
1481 Networks
BOE for WBS 1.0.1.2 - RR Injection Gap Clearing Resonant
1482 Chargers Procure/Assemble
BOE for WBS 1.0.1.2 - RR Extr/MI Inj/RR Abort Line Kickers
1773 Design & Review
BoE for WBS 1.0.1.2 RR Inj & Gap Clearing Kickers
1780 Prototype
BoE for WBS 1.0.1.2 - RR Inj Gap Clearing Kickers Prototype
1781 Testing
BOE for WBS 1.0.1.3 - RR Instr Design BPM Cables and
1927 Transition Boards
BOE for WBS 1.0.1.3 - RR Instru Design Transverse
1928 Dampers
1929 BOE for WBS 1.0.1.3 - RR Instr Design Longitudinal Damper
1930 BOE for WBS 1.0.1.3 - RR Instrumentation Design Review
1463 BOE for WBS 1.0.1.4 - Recycler Ring Radiation Safety
BoE for WBS 1.0.1.1, 2.0.1.1 RR Extraction Line Cooling
1516 System Design
BoE for WBS 1.0.1.1, 2.0.1.1 - RR Injection Line Cooling
1517 System Design
BoE for WBS 1.0.1.1, 2.0.1.1 - RR Abort Line Cooling
1518 System Design
BoE for WBS 1.0.1.1, 2.0.1.1 - RR RF Cavities Cooling
1519 Systems
BOE for WBS 1.0.1.1, 2.0.1.1 - Vertical Dipole Magnet Power
1526 5002 Supply Design
1537 BoE for WBS 1.0.1.1, 2.0.1.1 - RR MI-8 Pump Room Design
1707 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Installation Planning
1725 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Stand Design
BoE for 1.0.1.1, 2.0.1.1 - PDD magnets for Recycler transfer
1793 lines
1794 BoE for WBS 1.0.1.1, 2.0.1.1 PDS magnets RR transfer lines
BoE for WBS 1.0.1.1, 2.0.1.1 Reduced Field PDD (PDDW)
1795 magnets for RR Transfer Lines
BoE for WBS 1.0.1.1, 2.0.1.1 - MGS Gradient Magnets RR
1800 4990 Transfer Lines
BoE for WBS 1.0.1.1, 2.0.1.1 - Common Tooling - Refurbish
1809 Perm Magnets RR Transfer Lines
BoE for WBS 1.0.1.1, 2.0.1.1 - RQNx Perm Gradient
1812 4945 CR168 Magnets RR Transfer Lines
BoE for WBS 1.0.1.1, 2.0.1.1 - MLAW Lambertsons RR
1813 CR115 Transfer Lines
BOE for WBS 1.0.1.1, 2.0.1.1 RR Vert Dipole ADC Magnets
1842 Transfer Lines
1899 BoE for WBS 1.0.1.1, 2.0.1.1 - Design Recycler 53MHz RF
BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Ceramic
1462 Beamtubes Procure Fab Process
BOE for WBS 1.0.1.2, 2.0.1.2 - RR Ext/MI Inj Line Kickers
1771 Procure Parts & Assemble
BoE for WBS 1.0.1.2, 2.0.1.2 RR Ext/MI Inj/Beam Abort
1774 Power Supply Pulsers procure parts & assemble
BoE for WBS 1.0.1.2, 2.0.1.2 - RR Inj Gap Clearing Power
1782 Supply Pulsers
BoE for WBS 1.0.1.2, 2.0.1.2 RR Inj Gap Clearing Pulser
1783 Testing
BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems design,
1784 procure parts, assemble fluorinert skids
BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Systems PFL
1785 Frames & Cable
BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems
1786 Installation, Testing, and Checkout
BOE for WBS 1.0.5, 2.0.4.2 - PM Costs for ANU Portion of
1683 4944 CR120 NOvA
BOE for WBS 2.0.1.1 - Injection, Extraction, Beam Abort
1484 Lines Controls/Timing including Kickers
1528 BoE for WBS 2.0.1.1 - RR Instrumentation Stand Fabrication
BoE for WBS 2.0.1.1RR Injection Line Cooling System
1540 Constn
1687 BoE for WBS 2.0.1.1 - Recycler 53MHz RF Construction
1723 BOE for WBS 2.0.1.1 - RR Magnet Installations
1724 BOE for WBS 2.0.1.1 - RR Instrumentation Installation
BoE for WBS 2.0.1.1 - RR Vert Dipole Magnet PS
1733 5002 procurement
BOE for WBS 2.0.1.1 - TL Vert Dipole Cable & Power
1752 5002 Supply Installation
1753 BOE for WBS 2.0.1.1 Transfer Line Cable procurements
1788 BOE for WBS 2.0.1.1 - RR Magnet Stand Fabrication
BoE for WBS 2.0.1.1 - RR Extraction Line Cooling System
1818 Constn
BoE for WBS 2.0.1.1 - RR Abort Line Cooling System
1819 Construction
BoE for WBS 2.0.1.1 - RR RF Cavities Cooling Systems
1823 Construction
1825 BoE for WBS 2.0.1.1 - RR Vacuum Equipment Procurement
1826 BoE for WBS 2.0.1.1 - RR Vacuum System Installation
1851 BoE for WBS 2.0.1.1 - RR MI8 Pump Room Upgrade constn
1905 BoE for WBS 2.0.1.1 - Trim Magnet Power Supply Placement
1907 BoE for WBS 2.0.1.1 - MI60 Anode Power Supply Room
2352 BOE for WBS 2.0.1.1 - Accel Shutdown Rad Comp Removal
BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Procure
1769 Parts and Assemble
1770 BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Testing
1772 BOE for WBS 2.0.1.2 - RR Ext/MI Inj Line Kickers Testing
BoE for WBS 2.0.1.2 - RR Extraction MI Injection Beam
1775 Abort Power Supply Pulsers testing
BoE for WBS 2.0.1.2 RR Inj Kicker Pre-Production LV HV
1776 Life Testing
BoE for WBS 2.0.1.2 - RR Inj Kickers Preprod & Prod
1777 Assembly
BoE for WBS 2.0.1.2 - RR Injection Kickers Preprod & Prod
1778 Procurement
BOE for WBS 2.0.1.3 - RR Instr Transfer Line Torroid
1862 Relocation
1863 BOE for WBS 2.0.1.3 - RR Instr Install Transfer Dampers
1864 BOE for WBS 2.0.1.3 - RR Instr Install Longitudinal Damper
BOE for WBS 2.0.1.3 - RR Instr Procure/Test Longitudinal
1865 Damper
BOE for WBS 2.0.1.3 - RR Instr Procure/Test Transverse
1866 Dampers
BOE for WBS 2.0.1.3 RR Instr BPM Cable/Connector
1897 Procure & Install
BOE for WBS 2.0.1.3 RR Instr Transfer Line Cable
1898 Installation
BOE for WBS 2.0.1.3 - RR Instr BPM Transition Board
1906 Procure and Test
Status Comment
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, no new information
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Updated, CR pending Updated in blanket ANU FY10 CR
Completed, no change necessary
Not changed, CY10 complete Not changed, should be complete this year
Not changed, FY10 in progress, FY11-12 seem
No changes required valid
Completed, no change necessary
Not changed, no new information
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Completed, no change necessary
Completed, no change necessary
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, should be complete this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Changed. Updates to transfer line design
required changes in work plan. Updated in
Updated, CR pending blanket ANU FY10 CR
Not changed, no new information
Not changed, no new information
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Updated, no CR
Completed, no change necessary
Changed. Decided to build all 43 magnets in
advance (schedule risk abatement). New
Updated, CR exists estimates documented in CR 168.
Completed, no change necessary
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, May Need updating: increased
uncertainty on RR Inj/MI Ext/BA overall
beamtube length requirement, and whether
vendors will be able to produce it with existing
furnaces, possible increase tooling costs or
Not changed, no new information redesign of magnet to reduce length.
Not changed, no new information. May need
Not changed, no new information updating, see BoE 1462
Not changed, no new information Not changed, in progress, no new information
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, shutdown related Not changed, shutdown task, planning underway
Updated, CR pending Updated in blanket ANU FY10 CR
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, no new information
Not changed, no new information
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Updated, new tasks due to changes in transfer
Updated, CR pending line design. Updated in blanket ANU FY10 CR
Updated, new tasks. Updated in blanket ANU
Updated, CR pending FY10 CR
Not changed, no new information Not changed, in progress, no new information
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, no new information. Working on
Future update revisions at this time.
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Updated, CR pending Updated in blanket ANU FY10 CR
Not changed, shutdown related Not changed, in progress or shutdown task
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, no new information. May need
Not changed, no new information updating, see BoE 1462
Not changed, no new information. May need
Not changed, no new information updating, see BoE 1462
Not changed, no new information. May need
Not changed, no new information updating, see BoE 1462
Not changed, no new information
Not changed, no new information
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, CY10 complete Not changed, in progress, will be done this year
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed - no new information, BOE looks
No changes required sensible
Not changed - tasks substantially complete. BOE
No changes required is good estimate for the work that remains.
Not changed, shutdown related Not changed, shutdown task, planning underway
Not changed, shutdown related Not changed, shutdown task, planning underway
Not Changed, Engineer says estimates are still
No changes required good.
Status Count
Completed, no change necessary 6
Not changed, CY10 complete 19
Not changed, no new information 21
Not changed, shutdown related 22
Updated, CR pending 6
No changes required 4
Updated, no CR 1
Updated, CR exists 1
Future update 1
Grand Total 81
new
docid docid BOE title
1470 4958 BOE for WBS 1.0.2.1 - MI Mods Machine Timing Modifications
1472 BOE for WBS 1.0.2.1 - MI Mods A1 Extraction Line Decommissioning
1473 BOE for WBS 1.0.2.1 - MI Mods 2.5 MHz RF Cavities Decommissioning
1507 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Analysis
1508 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Design Review
1822 4957 BOE for WBS 1.0.2.1 - MI Mods Recycler Beamline Controls
1486 BoE for WBS 1.0.2.2 - MI RF Cavities Utility Modifications
1503 BoE for WBS 1.0.2.2 - MI RF Cavity Pre-install Testing
1504 BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design
BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design
1505 Reviews
1511 BoE for WBS 1.0.2.2 - MI RF Cavities Design Bus Bar
1454 BOE for WBS 1.0.2.3 - MI Radiation Safety
1684 BOE for WBS 2.0.2.1 - MI Mods Upgrade Vertical Quad Bus
1743 BOE for WBS 2.0.2.1 - MI-14 Communications & Controls Infrastructure
1747 BOE for WBS 2.0.2.1 - MI-39 Communications & Controls Infrastructure
1748 BOE for WBS 2.0.2.1 - MI Mods Design & Modify RR LL RF System
1749 5005 BOE for WBS 2.0.2.1 - MI Mods Design & Modify MI LL RF System
1475 BoE for WBS 2.0.2.2 - MI RF Cavities Final System Test
1476 BoE for WBS 2.0.2.2 - MI RF Cavities Align Cavities
1477 BoE for WBS 2.0.2.2 - MI RF Install Cavities
1478 BoE for WBS 2.0.2.2 - MI RF Move Cavities 4 & 15
1479 BoE for WBS 2.0.2.2 - MI RF Cavities Cabling
1498 BoE for WBS 2.0.2.2 - MI RF Software Programming
1506 BoE for WBS 2.0.2.2 - MI RF Cavity Water Cooling Systems Install
BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Raw Material
1509 Procurement
1512 BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Fab & Install
1710 BoE for WBS 2.0.2.2 - MI RF Cavities Power Amplifiers
1711 BoE for WBS 2.0.2.2 - MI RF Cavities Series Tube Modulators
1712 4989 BoE for WBS 2.0.2.2 - MI RF Cavities Solid State Amplifiers
1713 BoE for WBS 2.0.2.2 - MI RF Cavities Controls
1714 BoE for WBS 2.0.2.2 - MI RF Cavities Ferrite Bias Supplies
Status Comment
Updated, CR pending Updated in blanket ANU FY10 CR
Not changed, shutdown task, planning
Not changed, shutdown related underway
Not changed, shutdown task, planning
Not changed, shutdown related underway
Not changed, CY10 complete Not changed, should be complete this year
Not changed, no new information No updating at this time.
Updated, CR pending Updated in blanket ANU FY10 CR
Not changed, no new information No updating is required.
Completed, no change necessary Not changed, tasks complete
Not changed, no new information No updating at this time.
Not changed, no new information No updating at this time.
Completed, no change necessary Not changed, tasks complete
Not changed, CY10 complete Not changed, should be complete this year
Not changed, procurement complete,
Not changed, shutdown related shutdown tasks remaining, planning underway
Not changed, CY10 complete Not changed, should be complete this year
Not changed, CY10 complete Not changed, should be complete this year
Not changed, in progress & shutdown task,
Not changed, shutdown related planning underway
Updated, CR pending Updated in blanket ANU FY10 CR
Not changed, below threshold for
CR Not changed, less than $5k cost impact
Not changed, shutdown task, planning
Not changed, shutdown related underway
Not changed, shutdown task, planning
Not changed, shutdown related underway
Not changed, shutdown task, planning
Not changed, shutdown related underway
Not changed, shutdown task, planning
Not changed, shutdown related underway
No changes required No updating is required.
Not changed, shutdown task, planning
Not changed, shutdown related underway
Completed, no change necessary Not changed, tasks complete
Completed, no change necessary Not changed, tasks complete
Not changed, CY10 complete Not changed, should be complete this year
Not changed, CY10 complete Not changed, should be complete this year
Updated, CR pending Updated in blanket ANU FY10 CR
No changes required No updating is required
Not changed, CY10 complete Not changed, should be complete this year
Row Labels Count
Not changed, shutdown related 9
Not changed, CY10 complete 7
Completed, no change necessary 4
Updated, CR pending 4
Not changed, no new information 4
Not changed, below threshold for
CR 1
No changes required 2
Grand Total 31
new
docid docid CR BOE title
BoE for WBS 1.0.3.1 - A150 Quadrupole Magnet Recovery for NuMI
1885 Primary Beam
1959 BOE for WBS 1.0.3.1 - NuMI Profile Monitor Design & Review
1492 BOE for WBS 1.0.3.2 NuMI Hadron Monitor Beam Abort Design
1721 BOE for WBS 1.0.3.2 - NuMI Hadron Monitor Design
1737 BoE for WBS 1.0.3.2 - NuMI Target Carrier Design
1738 BoE for WBS 1.0.3.2 - NuMI Baffle Design
BOE for WBS 1.0.3.2 - NuMI Target/Baffle/Carrier/Hadron Monitor
1792 Design Reviews
BOE for WBS 1.0.3.3 - Revision & Review of NuMI Shielding
1493 Assessment Document (SAD)
1767 BoE for WBS 1.0.3.3 - NuMI TH Operations Space Planning
1791 BOE for WBS 1.0.3.3 - NuMI Target Hall Infrastructure Reviews
1797 BoE for WBS 1.0.3.3 - NuMI Target Chase/Radiant Heat Loads Design
BOE for WBS 1.0.3.4 - NuMI Decay Pipe/Hadron Absorber/Utilities
1790 Reviews
1805 BOE for WBS 1.0.3.4 - NuMI Utilities Electrical Infrastructure Design
BoE for WBS 1.0.3.1, 2.0.3.1 - Upgrade to NumI Primary Quadrupole
1804 Magnets
1736 BoE for WBS 1.0.3.2, 2.0.3.2 - NuMI Medium Energy Target Design
1465 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Target Chase Cooling Design
BoE for WBS 1.0.3.3, 2.0.3.3 - Horn 2 Relocation to ME/Shielding
1700 Reconfiguration & Design
BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block
1719 Design
1734 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Horn 2 Stripline Extension Design
1701 5000 CR176 BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI RAW Water Systems Design
BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI Non-RAW Water Cooling
1740 5001 CR173 Systems Design
BoE for WBS 2.0.3.1 - NuMI Extraction Kicker Charging Supply
1754 Construction
BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Dipole Power
1755 Supplies Construction
BoE for WBS 2.0.3.1 - Upgraded NuMI Primary Transport Profile
1756 Monitors Construction
BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Quadrupole Power
1757 Supplies Construction
BoE for WBS 2.0.3.1 - Upgraded NuMI Quadrupole Cables Procure
1803 Install
1884 BoE for WBS 2.0.3.1 - NuMI Extraction Kicker PS Upgrade Design
BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Beam Abort
1494 Procure/Install
1709 4999 CR177 BOE for WBS 2.0.3.2 - NuMI Target Carrier Construction
1722 BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Construction
1729 BoE for WBS 2.0.3.2 - NuMI Medium Energy Target Procurement
1730 BoE for WBS 2.0.3.2 NuMI Baffle Procurement
1466 BoE for WBS 2.0.3.3 - NuMI Target Chase Cooling Construction
BoE for WBS 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block
1720 Procure/Assemble
BoE for WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig
1731 Procure/Assemble
1744 BoE WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig Install
BoE for WBS 2.0.3.3 - NuMI TH Operations Space Planning
1768 Procure/Install
1796 BoE for WBS 2.0.3.3 - NuMI Horn 2 Stripline Extension Procure/Install
BoE for WBS 2.0.3.3 - NuMI Target Chase/Radiant Heat Loads
1798 Procure/Install
1715 BoE for WBS 2.0.3.4 - NuMI Target RAW System Construction
1727 BoE for WBS 2.0.3.4 - NuMI Horns RAW Systems construction
BoE for WBS 2.0.3.4 - NuMI Horn 2 RAW Piping Extension
1728 Construction
1735 BoE for WBS 2.0.3.4 - NuMI Decay Pipe RAW Construction
BoE for WBS 2.0.3.4 - NuMI Hadron Absorber RAW Systems
1739 Construction
1742 BoE for WBS 2.0.3.4 - NuMI Non-RAW LCW System Construction
BoE for WBS 2.0.3.4 - NuMI Non-RAW CUB Cooling Water System
1758 Construction
BoE for WBS 2.0.3.4 - NuMI Non-RAW Sump Cooling Water System
1759 Construction
BoE for WBS 2.0.3.4 - NuMI Non-RAW Secondary Chilled Water
1760 System Construction
BOE for WBS 2.0.3.4 - NuMI Utilities Electrical Infrastructure
1806 Construction
Status Comment
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Completed, no change necessary
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, no new information Not changed, no new information
Not changed, no new information No new information is available.
Not changed, shutdown related Shutdown task, planning underway
Not changed, Needs updating but
Not changed, no new information awaiting information from IHEP.
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, should be complete
Not changed, CY10 complete this year
Completed, no change necessary
Not changed, should be complete
Not changed, CY10 complete this year
Changed. CR 176 has been
submitted to add tasks for a RAW
exchange system and shielding of
Updated, CR exists the DI bottles
Changed. CR 173 has been
submitted to remove the NuMI
Sump Cooling System. It is being
done as part of an upgrade for the
Updated, CR exists MINERvA experiment.
Not changed, may need CR for
schedule adjustment due to
Not changed, no new information resource availability.
Not changed, should be complete
Not changed, CY10 complete this year
Not Changed, May need updating,
awaiting results from running after
Not changed, no new information summer 2010 shutdown.
Not changed, procurement
complete & shutdown tasks
Not changed, shutdown related remaining, planning underway
Not changed, no new information Not changed, no new information
Not changed, may need CR for
schedule adjustment due to
Not changed, no new information resource availability.
Not changed, no new information Not changed, no new information
Changed. CR 177 has been
submitted to account for the new
target carrier design, prototyping,
Updated, CR exists and construction.
Not changed, no new information Not changed, no new information
Not changed, Needs updating but
Not changed, no new information awaiting information from IHEP.
Not changed, no new information Not changed, in progress.
Not changed, no new information.
Waiting on completion of the Target
Chase Cooling Review. May need
additional tasks due to an observed
increase in the humidity levels in the
Not changed, no new information target chase.
Completed, no change necessary
Not changed, no new information.
Not changed, no new information Internal review in progress.
Not changed, no new information.
Not changed, no new information Internal review in progress.
Not changed, should be complete
Not changed, CY10 complete this year
Not changed, CY10 complete Not changed, no new information
Not changed, CY10 complete Not changed, no new information
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, no new information,
Not changed, shutdown related shutdown task
Not changed, no new information,
Not changed, shutdown related shutdown task
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, shutdown task,
Not changed, shutdown related planning underway
Not changed, shutdown task,
Not changed, shutdown related planning underway
Row Labels Count
Completed, no change necessary 3
Not changed, shutdown related 13
Not changed, CY10 complete 16
Not changed, no new information 14
Updated, CR exists 3
Grand Total 49
new
docid docid BOE title
1763 BoE for WBS 1.0.4.1 - Beam Physics - ANU Demands on Proton Plan
1764 BoE for WBS 1.0.4.2 - Beam Physics - Machine & Process Analysis
1765 BoE for WBS 1.0.4.3 - Beam Physics - ANU Proton Projections
Status Comment
Not changed, in progress, will be done this
Not changed, CY10 complete year
Not changed, in progress, will be done this
Not changed, CY10 complete year
No changes required Not changed, in progress
Row Labels Count
Not changed, CY10 complete 2
No changes required 1
Grand Total 3
new
docid docid Change RequestsBOE title
4909 BoE - WBS 1.1.5 - Near Detector Surface Building
2679 BoE for WBS 2.1.1.2.5 Wetland Banking Credits
2693 4905 CR084 CR103 CR147 BoE - WBS 2.1.1.4 Site Preparation Build Phase
2081 4908 CR103 CR108 BoE for WBS 2.1.1.5 EDIA
2694 4906 CR084 CR095 CR103 BoE for WBS 2.1.2.3 Far Detector Building Build Phase
2689 4907 CR103 BoE for WBS 2.1.2.4 EDIA
2691 BoE for WBS 2.1.4.1 Permits
2692 BoE for WBS 2.1.4.4 Quality Control
Status Comment
New, CR exists
Not Changed, Complete
Updated, CR exists
Updated, CR exists
Updated, CR exists
Updated, CR exists
Not Changed, Complete
No changes required No changes required
Row Labels Count
No changes required 1
Not Changed, Complete 2
New, CR exists 1
Updated, CR exists 4
Grand Total 8
new
docid docid CR BOE title
2421 BoE for WBS 1.2.9.1.4 ISO Tank Delivery and Leasing
2443 BoE for WBS 1.2.9.2.1.1 Purchase secondary containment
BoE for WBS 1.2.9.2.2.2 Procure blending system parts (pumps, hoses,
2442 instrumentation, scales)
BoE for WBS 2.2.1.5.2 - 2.2.1.5.4 Mineral Oil Production, Delivery, and Storage -
2094 5048 CR175 FY10, FY11, FY12
2095 BoE for WBS 2.2.1.6 - QC-Mineral Oil
BoE for WBS 2.2.2.5- Pseudocumene Production, Delivery, and Storage-FY10,
2096 FY11 and FY12
2097 BoE for WBS 2.2.2.6- QC Pseudocumene
BoE for WBS 2.2.3.5.2, 2.2.3.5.3, 2.2.3.7 - Waveshifters Production and Delivery
2098 (low-rate FY08/full-rate FY09)
2099 BoE for WBS 2.2.3.6.1 QC -Waveshifters-FY08, FY09
2100 BoE for WBS 2.2.4.2.1- Prepare preproduction batch of fluor concentrate
2102 BoE for WBS 2.2.4.2.2 - QC preproduction batch of flour concentrate
2103 BoE for WBS 2.2.4.2.3- Production Blending of Flour Concentrate
2108 BoE for WBS 2.2.4.2.4- QC-Production Fluor Concentrate
2104 BoE for WBS 2.2.4.3.1 - Prepare preproduction batch of scintillator blend
2106 BoE for WBS 2.2.4.3.2-QC preproduction batch of scintillator blend
2107 BoE for WBS 2.2.4.3.3 - Production Blending of Scintillator
2109 BoE for WBS 2.2.4.3.4- QC-Production Scintillator Blend
2408 BoE for WBS 2.2.4.4 Production Blending Development
2110 BoE for WBS 2.2.5.3 - Far Detector Scintillator Transport
2144 BoE for WBS 2.2.6 Liquid Scintillator Management
Status Comment
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Updated, CR exists
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, below threshold for CR
Completed, no change necessary
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, CY10 complete
Not changed, no new information
Not changed, no new information
Status Count
Completed, no change necessary 4
Not changed, CY10 complete 1
Not changed, no new information 13
Updated, CR exists 1
Not changed, below threshold for CR 1
Grand Total 20
new
docid docid CR BOE title
2717 BOE for WBS 1.3.4 Development of QA Methods
2716 4883 CR145 BoE for WBS 1.3.5 BoE Integration Prototype Detector Fiber Production
2196 4884 CR145 BoE for WBS 2.3.2.1 Fiber Production
2217 4895 CR145 BoE for WBS 2.3.2.12 Fiber Quality Assurance
2495 BoE for WBS 2.3.2.13 Shipping Fiber to Module Factory
2549 BoE for WBS 2.3.2.14 Infrastructure Improvements
2497 BoE for WBS 2.3.3 Fiber Management
Status Comment
Completed, no change necessary QA methods completed, on budget
Updated, CR exists
Updated, CR exists
Updated, CR exists
No changes required Shipment estimate still valid
Completed, no change necessary Infrastructure completed on budget
No changes required Management proceeding on budget
Status Count
Completed, no change necessary 2
Updated, CR exists 3
No changes required 2
Grand Total 7
new
docid docid B OE title Status Com m ent
BoE for WBS 1.4.3.4.5.10, 1,4,3,5,11, 1.4.3.6.3, 1.4.3.7.2 and 1.4.3.7.3
2505 Fabricate remaining Extrusions Completed, no change necessary
2504 BoE for WBS 1.4.2.3.2.3, 1.4.2.4.2.3 and 1.4.2.5.3 Produce PVC Resin Completed, no change necessary
2782 BoE for WBS 2.4.1.2.3.3 Obtain Vendor Samlpes Completed, no change necessary
2783 BoE for WBS 2.4.1.2.3.4 Extrude Samples using NOvA Prototype Dies Completed, no change necessary
2300 BoE for WBS 2.4.1.3.2 "Purchase Commercial QC Instruments" Not changed, CY10 complete In progress, done by end of CY10
2301 BoE for WBS 2.4.1.3.3 "Build Custom QC Instruments" Not changed, CY10 complete In progress, done by end of CY10
2539 BoE for WBS 2.4.1.3.4 Setup QC Instruments Not changed, CY10 complete In progress, done by end of CY10
2500 BoE for WBS 2.4.2.1.3 and 2.4.2.1.8 Produce Test Extrusions (Horizontal) Not changed, CY10 complete In progress, done by end of CY10
BoE for WBS 2.4.2.1.5, 2.4.2.1.9 and 2.4.2.1 15 Evaluation of Extrusions:
2540 Horizontal Not changed, CY10 complete In progress, done by end of CY10
2178 BoE for WBS 2.4.2.1.1 Vendor Setup (Horizontal Extrusion Pre-production) Not changed, CY10 complete In progress, done by end of CY10
2502 BoE for WBS 2.4.2.1.14.1 Produce PVC Extrusions (Horizontal Pre-production) Not changed, CY10 complete In progress, done by end of CY10
BoE for WBS 2.4.2.1.2 Obtain PVC resin for trest and pre-production
2498 (Horizontal) Completed, no change necessary
2501 BoE for WBS 2.4.2..2.3 and 2.4.2.2.8 Not changed, CY10 complete In progress, done by end of CY10
BoE for WBS 2.4.2.2.5, 2.4.2.2.9 and 2.4.2.2.15 Evaluate Test Extrusions:
2541 Vertical Not changed, CY10 complete In progress, done by end of CY10
2458 BoE for WBS 2.4.2.2.1 Vertical Extrusion Production: Vendor Setup Not changed, CY10 complete In progress, done by end of CY10
2503 BoE for WBS 2.4.2.2.14.1 Produce PVC Extrusions (Vertical Pre-production) Not changed, CY10 complete In progress, done by end of CY10
2499 BoE for WBS 2.4.2.2.2 Obtain PVC resin for test and pre-production (Vertical) Completed, no change necessary
2496 BoE for WBS 2.4.3.1 Extrusion Production: Near Detector Not changed, CY10 complete In progress, done by end of CY10
BoE for WBS 2.4.3.2.1.1.2, 2.4.3.2.1.2.2, 2.4.3.2.2.1.1, 2,4,3,2.2.2.1 Far
1342 4926 Detector Extrusion Production: Obtain PVC Resin Block 1 H, etc. Updated, no CR
BoE for WBS 2.4.3.2.1.1.3, 2.4.3.2.1.2.3, 2.4.3.2.2.1.2, 2.4.3.2.2.2.2 Far
Detector Extrusion Production: Produce PVC Extrusions Block 1 H (type A),
2479 4927 etc. Updated, no CR
BoE for WBS 2.4.3.2.1.1.4, 2.4.3.2.1.2.4, 2.4.3.2.2.1.3, 2.4.3.2.2.2.3 and
2179 others; Ship PVC Extrusions To Module Factory Not changed, no new information No change; RFP being written
BoE for WBS 2.4.3.2.1.1.5, 2.4.3.2.1.2.5, 2.4.3.2.2.1.4, 2.4.3.2.2.2.4
2485 4931 Extrusion Production: Quality Control and Documentation of Extrusions Updated, no CR
BoE for WBS 2.4.4.2, 2.4.4.3, 2.4.4.4, 2.4.4.5, 2.4.4.6 Setup Hardware; Data
2486 Taking Not changed, no new information
2451 BoE for WBS 2.4.4.8, 2.4.4.9, 2.4.4.10 and 2.4.4.11 Ship Samples for QA Not changed, no new information
2299 BoE for WBS 2.4.4.1 Procure Hardware (Quality Assurance Instruments) Not changed, CY10 complete In progress, done by end of CY10
2180 4929 BoE for WBS 2.4.5.2 Pallet System Updated, no CR
BoE for WBS 2.4.5.3.1.1, 2.4.5.3.3.1, 2.4.5.3.4.1 Procure Motion System
2492 Components Not changed, no new information
2493 BoE for WBS 2.4.5.4.1, 2.4.5.4.2 and 2.4.5.4.3 Extrusion Storage at Vendor Not changed, no new information
2457 BoE for WBS 2.4.5.5.1 Extrusion Sorting Device Completed, no change necessary
2453 BoE for WBS 2.4.5.5.2 Make Vacuum Lifting Fixtures Completed, no change necessary
2302 BoE for WBS 2.4.6 for Management - Construction Not changed, no new information
Status Count
Completed, no change necessary 8
Not changed, CY10 complete 13
Not changed, no new information 6
Updated, no CR 4
Grand Total 31
new
docid docid CR BOE title
BoE for WBS 1.5.5.9 / 2.5.3.1.11 / 2.5.3.2.6.8 Develop quality assurance
8/31 tracking system procedures, software, and training / Procure quality
2366 5029 review assurance system hardware / Install quality assurance tracking system
see see
above 5036 above same as above
see see
above 5045 above same as above
2515 BoE for WBS 1.5.6 Module Shipping and Storage R&D
2687 BoE for WBS 1.5.10 Management – R&D Phase
2202 BoE for WBS 1.5.2.1.1 Fiber Manifold Component R&D
BoE for WBS 1.5.2.1.1.10 Integration Prototype Manifold Manufacturing (not
2206 IPND)
2200 BoE for WBS 1.5.2.2 End Plate R&D
8/31
2195 5032 review BoE for WBS 1.5.2.3 Joining Technology R&D
2439 BoE for WBS 1.5.3 Photo Detector Interface R&D
2437 BoE for WBS 1.5.4.2 Factory Material Handling, Tooling, & Fixtures R&D
3810 BOE for WBS 1.5.4.3 -- FHEP Module Production
BoE for WBS 1.5.5 Quality Assurance and Quality Control Methods
2438 Development
BoE for WBS 1.5.7.1.3 Install and Setup Additional Infrastructure and Factory
2440 Machines
2395 BoE for WBS 1.5.7.1.1 Identify and acquire factory space
BoE for WBS 1.5.7.1.2 Acquire and Install Factory Tools, Fixtures, and Other
2189 Infrastructure
BoE for WBS 1.5.7.1.4 Develop Initial Versions of Machine Operating
2441 Procedures
BoE for WBS 1.5.7.3.1 and 1.5.7.3.2 IPND Manifold Production and
2192 Assemble and test IPND Manifolds
BoE for WBS 1.5.7.3.3 and 1.5.7.3.4 IPND End Plate Components /
2203 Assemble and test preproduction prototype (IPND) end plates and seals
BoE for WBS 1.5.7.3.5 Manufacture preproduction prototype (IPND) optical
2201 conectors
2446 BoE for WBS 1.5.7.3.6 Produce IPND Modules
2448 BoE for WBS 1.5.8 Initial Production Module Specifications
2449 BoE for WBS 1.5.9 Initial Factory Tooling Specifications
8/31
2211 5022 review BoE for WBS 2.5.1.1: Fiber Manifold Production (drawing files in v2)
2212 2212 BoE for WBS 2.5.1.2: End Plate And Seal Production
2188 2188 BoE for WBS 2.5.1.2.6 Procure edge stiffeners
2213 2213 BoE for WBS 2.5.2 Optical Connector Production
BoE for WBS 2.5.3.1.1 and 2.5.3.2.6.7 Fabricate and deliver extrusion lifters
2186 2186 / Install and setup extrusion lifters
8/31 BoE for WBS 2.5.3.1.10 and 2.5.3.2.6.4 Fabricate fiber facing machines /
2215 5024 review Install and setup fiber facing machines
BoE for WBS 2.5.3.1.12, 2.5.3.2.7, 2.5.3.3.2.1.7 Review factory tooling
machines and fixtures / Review factory setup and operation for full
2514 2514 production readiness / Review construction of Block 1 modules
BoE for WBS 2.5.3.1.4 and 2.5.3.2.6.2 Fabricate and deliver pressure testing
2198 2198 equipment/Install and setup pressure testing equipment
BoE for WBS 2.5.3.1.5 and 2.5.3.2.6.6 Fabricate material handling and
2190 2190 storage equipment/Install material handling and storage equipment
BoE for WBS 2.5.3.1.6 and 2.5.3.2.6.5 Procure gluing machines / Install and
2205 2205 setup gluing machines
BoE for WBS 2.5.3.1.7 and 2.5.3.2.6.1 Fabricate fiber stringing machines /
2216 2216 Install and setup fiber stringing machines
BoE for WBS 2.5.3.1.8 and 2.5.3.2.6.3 Fabricate and deliver fiber checking
2214 2214 machine and Install and setup fiber checking machine
BoE for WBS 2.5.3.1.9 and 2.5.3.2.6.9 Floor Crane Procurement and
2207 Install floor cranes
8/31
2365 5023 review BoE for WBS 2.5.3.1.3 Fabricate and deliver tooling and fixtures
BoE for WBS 2.5.3.2.5 and 2.5.3.2.8 Operating factory space /Closeout
2367 2367 factory space
2193 2193 CR122 BoE for WBS 2.5.3.2.1 Factory Lease
2383 BoE for WBS 2.5.3..2.1 Identify factory space
2354 BoE for WBS 2.5.3.2.3 Additional factory HVAC
2368 BoE for WBS 2.5.3.2.4 Additional Factory Utilities and Preparation
8/31
2218 5014 review BoE for WBS 2.5.3.3.2.*.*.1 Assemble and test far detector modules
8/31 BoE for WBS 2.5.3.3.2.1.1.2, 2.5.3.3.2.38.2.2 Ship completed far detector
2357 5025 review modules to far site -Block 1H-38V
2447 BoE for WBS 2.5.3.3.3 Near Detector and 1.5.7.3.6 Produce IPND Modules
BoE for WBS 2.5.3.3.3.5 and 1.5.7.3.6 Ship Completed Near Detector
2445 Modules to ANL and Ship IPND Modules
2686 BoE for WBS 2.5.4 Management – Construction Phase
8/31
5030 review BOE WBS 2.5.3.1.13 Fabricate and Deliver Module Flatness QA/QC device
8/31
5026 review BOE WBS 2.5.3.2.6.15 Train module factory student technicians
5042 BOE WBS 2.5.3.2.6.14 Train module factory technicians
Status Comment
Title of updated BOE is "BOE
WBS 2.5.3.3.4 Maintain
Module quality assurance
Updated, CR pending tracking system"
Title of updated BOE is "BOE
WBS 2.5.3.1.11 Procure
quality assurance system
Updated, CR pending hardware"
Title of updated BOE is "BOE
WBS 2.5.3.2.6.8 Install quality
Updated, CR pending assurance tracking system"
Completed, no change necessary
Update pending
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Updated BOE has title "BOE
WBS 2.5.3.3.5 Materials
strength and chemical
Updated, CR pending interactions testing"
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Update pending
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Update pending
Update pending
Update pending
Updated, CR pending
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Updated, CR pending
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, below threshold for CR #
Completed, no change necessary
Updated, CR pending
Update was put in same docid
Updated, below threshold for CR #
Update was put in same docid
Updated, CR exists #
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Updated, CR pending
Updated, CR pending
I.5 complete, 2.5 needs policy
Future update decision
Update pending
Update pending
New, CR pending
New, CR pending
New, CR pending
Status Count
Completed, no change necessary 18
Update pending 7
Updated, CR pending 9
Updated, below threshold for CR 11
Updated, CR exists 1
Future update 1
New, CR pending 2
Grand Total 49
new
docid docid BOE title
2684 BoE for WBS 1.6.1.3 Water Cooling
2682 BoE for WBS 1.6.1.2 QA/QC Stations
2657 BoE WBS 1.6.1.6.1.2 APD Engineering Run
2418 BoE for WBS 1.6.1.6.2.1 Procure Manifolds
2422 BoE for WBS 1.6.1.6.2.2 Procure Other Components
2673 BoE for WBS 1.6.1.6.2.3 Assemble and Test Hardware
2718 BoE for WBS 1.6.3.1 - Low Voltage Power Supplies
2719 BoE for WBS 1.6.3.2 - High Voltage Power Supply
2720 BoE for WBS 1.6.3.3 - Power Cables
2721 BoE for WBS 1.6.3.4 - Power Distribution Box
2722 BoE for WBS 1.6.3.5.1 - Low Voltage Power Supplies
2723 BoE for WBS 1.6.3.5.2 - High Voltage Power Supply
2724 BoE for WBS 1.6.3.5.3 - Power Cables
2725 BoE for WBS 1.6.3.5.4 - Power Distribution Boxes
BoE for WBS 1.6.3.5.5 - Ship PDBs, cables, and power
2726 supplies to Fermilab
2249 BoE for WBS 2.6.1.1.1 Manufactured Parts
2251 BoE for WBS 2.6.1.1.2 TE Coolers
2252 BoE for WBS 2.6.1.1.3 Assemble and Test APD housings
2133 BoE for WBS 2.6.1.2.3 - APD Array
2253 BoE for WBS 2.6.1.3 APD Module Testing
2254 BoE for WBS 2.6.1.4.1-33 APD Module Shipping
2255 BoE for WBS 2.6.2.1.1 Far Detector ASIC Production
2257 BoE for WBS 2.6.2.1.3 ADC
2259 BoE for WBS 2.6.2.1.4 COTs
2260 BoE for WBS 2.6.2.1.5 PC Boards
2261 BoE for WBS 2.6.2.1.6 Electronics Box
2262 BoE for WBS 2.6.2.1.7.1-3 TEC Controller Modules
2264 BoE for WBS 2.6.2.2.1 FEB Assembly
2265 BoE for WBS 2.6.2.4 Firmware Maintenance
2266 BoE for WBS 2.6.2.5.1-2 QA/QC
2221 4984 BoE for WBS 2.6.3.1.3-Procure LV pwer supplies
2219 BoE for WBS 2.6.3.1.1-Specify relay racks
2220 4983 BoE for WBS for 2.6.3.1.2-Procure relay racks
2222 4985 BoE for WBS 2.6.3.1.4-Test LV power supplies
2223 4986 BoE for WBS 2.6.3.2.1-Procure HV power supplies
2224 BoE for WBS 2.6.3.2.2-Test HV power supplies
2230 BoE for WBS 2.6.3.3.6-Procure ground cables
2225 4987 BoE for WBS 2.6.3.3.1-Procure PDB to FEB cables
2226 BoE for WBS 2.6.3.3.2-Procure LV supply to PDB cables
2227 BoE for WBS 2.6.3.3.3-Procure LV supply sense cables
2228 BoE for WBS 2.6.3.3.4-Procure HV supply to PDB cables
2229 BoE for WBS 2.6.3.3.5-Procure PDB to DCM cables
2231 BoE for WBS 2.6.3.3.7-Specify cable trays
2232 4988 BoE for WBS 2.6.3.3.8-Procure cable trays
2233 BoE for WBS 2.6.3.4.1-Procure PDB parts
2234 BoE for WBS 2.6.3.4.2-Assemble and test PDBs
2165 BoE for WBS 2.6.3.5.1.1.1-33 Procure Manifolds
2425 BoE for WBS 2.6.3.5.1.2.1-33 Ship Manifolds Block 1-33
2248 BoE for WBS 2.6.3.5.2 Procure Other Components
2268 BoE for WBS 2.6.3.5.4 Fill and Test Equipment
2256 BoE for WBS 2.6.3.5.5 Auxiliary Panel Readout
2236 BoE for WBS 2.6.3.6-Ship power distribution system
Status Comment
Not changed, CY10 complete
Not changed, CY10 complete
Completed, no change necessary
Not changed, CY10 complete
Not changed, CY10 complete
Not changed, CY10 complete
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Not changed, CY10 complete
Not changed, CY10 complete
Not changed, CY10 complete
Not changed, CY10 complete
Not changed, CY10 complete
BOE needs to be updated to account for current bids and PO's
for heat sink parts, quotes for all parts not yet completed so far,
Update pending on track
BOE needs to be updated to account fot TEC PO, BOE 11.10
Update pending quote 7.60 for first 6,500, needs update
BOE needs to be updated to account for labor estimates based
Update pending on construction of Near Detector heat sink assemblies
Not changed, no new information
BOE needs to be updated to account for labor estimates based
Update pending on construction of Near Detector heat sink assemblies
BOE needs to be updated to account for pricing of current
Update pending shipping plans
Not changed, no new information
Not changed, no new information
parts for 600 boards in line with quotes, larger quantity not yet
Update pending complete
parts for 600 boards in line with quotes, larger quantity not yet
Update pending complete
BOE needs to be updated to account for the current PO for Near
Detector electronics boxes. Costs assumed the same for Far
Detector boxes, even though the Far Detector manifolds are yet
Update pending to be designed.
BOE needs to be updated to account for the PO's issued, but
Visser is "too busy" to do it. To the extent I have time, I will try to
Update pending update the BOE.
parts for 600 boards in line with quotes, larger quantity not yet
Update pending complete
Not changed, no new information
Not changed, no new information
Updated, no CR
Not changed, no new information
Updated, no CR
Updated, no CR
Updated, no CR
Not changed, no new information
Not changed, no new information
Updated, no CR
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Updated, no CR
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Status Count
Completed, no change necessary 5
Not changed, CY10 complete 10
Not changed, no new information 21
Update pending 10
Updated, no CR 6
Grand Total 52
new
docid docid Change Requests BOE title
2145 BoE for WBS 1.7.1.1 DAQ Software Standards and Tools
2154 BoE for WBS 1.7.1.10 Online Databases
2146 BoE for WBS 1.7.1.2 Error Handling System
2147 BoE for WBS 1.7.1.3 Message Passing System
2148 BoE for WBS 1.7.1.4 Run Control System
2149 BoE for WBS 1.7.1.5 DAQ Software Architecture Overview
2150 CR144 CR165 BoE for WBS 1.7.1.6 Event Buffer Farm Software
2151 BoE for WBS 1.7.1.7 Data Logger
2152 BoE for WBS 1.7.1.8 Global Trigger System
2153 BoE for WBS 1.7.1.9 DAQ Monitor System
2459 BoE for WBS 1.7.2.1.3 Data Concentrator Prototype
2460 BoE for WBS 1.7.2.1.6 Data Concentrator for IPND
2461 BoE for WBS 1.7.2.2 Control and Timing System Prototype
2462 BoE for WBS 1.7.2.3.2 DAQ Network Prototype Hardware
2477 BoE for WBS 1.7.2.3.3 DAQ Network Prototype Hardware
BoE for WBS 1.7.2.4 Control Room Equipment and
2463 Infrastructure
BoE for WBS 1.7.2.5 DAQ Buffer Farm Evaluation
2464 Components
BoE for WBS 1.7.2.6 DAQ Data Storage Evaluation
2465 Components
2466 BoE for WBS 1.7.2.7 DAQ Cabling for IPND
2467 BoE for WBS 1.7.2.8 Database Computers for IPND
2415 BoE for WBS 1.7.3.1 Install and Test Integration Test Facility
2414 BoE for WBS 1.7.3.2 Buffer Farm Evaluation
BoE for WBS 1.7.3.3 Readout Electronics Integration
2413 Testing
2412 BoE for WBS 1.7.3.4 Software Integration Testing
2411 BoE for WBS 1.7.3.5 End user consultation
2155 4969 CR110 CR144 CR165 BoE for WBS 2.7.1.1 Error Handling System
2164 5006 CR165 CR169 BoE for WBS 2.7.1.10 Online Databases
2156 4970 CR144 BoE for WBS 2.7.1.2 Message Passing System
2157 4972 CR136 CR144 CR165 BoE for WBS 2.7.1.3 Run Control System
2158 BoE for WBS 2.7.1.4 Event Buffer Farm Software
2159 CR136 BoE for WBS 2.7.1.5 Data Logger
2160 CR136 BoE for WBS 2.7.1.6 Data File Transfer System
2161 4979 CR121 CR136 BoE for WBS 2.7.1.7 DAQ Monitor System
2162 BoE for WBS 2.7.1.8 Event Monitor System
2163 BoE for WBS 2.7.1.9 Event Display System
2468 BoE for WBS 2.7.2.1 Data Concentrator Production
BoE for WBS 2.7.2.2.2 Control and Timing System
2469 Preproduction
BoE for WBS 2.7.2.2.6.2.7 Control and Timing System
2470 Production
2471 BoE for WBS 2.7.2.3 DAQ Network Production Components
2472 BoE for WBS 2.7.2.4 Control Room Infrastructure Production
2473 BoE for WBS 2.7.2.5 Buffer Farm Production Computers
2474 BoE for WBS 2.7.2.6 Data Storage Production Components
2475 BoE for WBS 2.7.2.7 DAQ Cabling for Production
2476 BoE for WBS 2.7.2.8 Database Computers for Production
2410 BoE for WBS 2.7.3.1 Readout Electronics Integration Testing
2409 BoE for WBS 2.7.3.2 Software Integration Testing
2287 BoE for WBS 2.7.3.3 Consultation
2083 BoE for WBS 2.7.4.1.1.1 - DCS Master Control servers
2084 BoE for WBS 2.7.4.1.1.2 - DCS readout IOC nodes
2085 BoE for WBS 2.7.4.1.1.3 - DCS local logging station with raid
2086 BoE for WBS 2.7.4.1.1.4 - DCS monitoring displays
BoE for WBS 2.7.4.1.1.5 - DCS electronics room rack
2089 enclosures
BoE for WBS 2.7.4.1.1.9 - DCS Power protection (10KVA
2090 UPS)
2087 BoE for WBS 2.7.4.1.2.1 - DCS system Compact field points
BoE for WBS 2.7.4.1.2.3 - DCS system Compact field point
2828 sensor packs
Status Comment
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Not changed, CY10 complete
Completed, no change necessary
Not changed, CY10 complete
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Not changed, CY10 complete
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Completed, no change necessary
Updated, CR exists
Updated, CR exists
Updated, CR exists
Updated, CR exists
Not changed, no new information
Not changed, CY10 complete
Not changed, CY10 complete
Updated, CR exists
Not changed, no new information No changes. No BOE update
Not changed, no new information No changes. No BOE update.
Projections from IPND within
No changes required 10%
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Not changed, no new information
Status Count
Completed, no change necessary 22
Not changed, CY10 complete 5
Not changed, no new information 22
Updated, CR exists 5
No changes required 1
Grand Total 55
new
docid docid BOE title
2532 BoE for WBS 1.8.2 - Structural Design and Validation
2533 BoE for WBS 1.8.3 -- Liquid Scintillator Filling and Handling R&D
2534 BoE for WBS 1.8.4 -- Near Detector Assembly R&D
2391 BoE for WBS 1.8.5.2 IPND Systems Design
2359 BoE for WBS 1.8.5.3 IPND Equipment
2406 BoE for WBS 1.8.5.4 IPND Block Assembly Facility Setup
2360 BoE for WBS 1.8.5.5 IPND Block Fabrication
2399 BoE for WBS 1.8.5.6 MINOS Service Building Contracts
BOE for WBS 1.8.5.7 Installation, Commissioning and Operation in
2424 MINOS Service Building
2536 BoE for WBS 1.8.6 -- Far Detector Assembly Engineering
2361 BoE for WBS 1.8.8.1 Full Scale Block Assembly Prototype
2362 BoE for WBS 1.8.8.2 Full Height Engineering Prototype
2537 BoE for WBS 1.8.9 -- Management, R&D Phase
Status Comment
No change, no new information
Completed, no change necessary
Completed, no change necessary
No change, no new information
No change, no new information
Completed, no change necessary
No change, no new information
Completed, no change necessary
No change, no new information
No change, no new information
Completed, no change necessary
No change, no new information
No change, no new information
Row Labels Count
Completed, no change necessary 5
No change, no new information 8
Grand Total 13
new
docid docid BOE title
BoE for WBS 2.8.1.1 & 2.8.1.2 Cave Excavation Design and Engineering, Tunnel and
2348 Cave Infrastructure Design and Engineering
2241 4952 BoE for WBS 2.8.1.3 - Tunnel Infrastructure Contract
2111 4953 BoE for WBS 2.8.1.4 - Excavation contract
2355 BoE for WBS 2.8.2.1 Containment of ND Full Volume
2240 BoE for WBS 2.8.2.2 - Muon Catcher
2347 BoE for WBS 2.8.2.3, Active Detector
BoE for WBS 2.8.2.4 - 2.8.2.6 South Bookend, Survey and Align Muon Catcher and
2452 Six Blocks, All Blocks and Bookend in Place
2313 BoE for WBS 2.8.3 Liquid Scintillator Filling Equipment
2423 BoE for WBS 2.8.4 Installation Coordination
2484 BoE for WBS 2.8.5 - Management - Construction Phase - Labor
Status Comment
No change, no new information
Updated, no CR Changed to reflect new estimate
Updated, no CR Changed to reflect new estimate
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
Row Labels Count
No change, no new information 8
Updated, no CR 2
Grand Total 10
new
docid docid BOE title
2056 4934 BoE for WBS 2.9.1.1 - Module Lifting Fixture
2057 BoE for WBS 2.9.1.2 - Adhesive Dispenser
2058 BoE for WBS 2.9.1.3 - Block Safety Constraint Beam
2059 BoE for WBS 2.9.1.4 - Block Pivoter Table
2120 BoE for W.B.S. 2.9.1.5 - Survey Equipment for the Far Detector
2060 BoE for WBS 2.9.2.1 - Electrical Infrastructure
2061 BoE for WBS 2.9.2.2 - Far Detector Bookends
2319 BoE for WBS 2.9.2.3 - Detector Structure Monitoring Equipment
2068 BoE for WBS 2.9.3.1 - Scintillator Transfer Facility
2069 BoE for WBS 2.9.3.2 - Scintillator Plumbing
2070 BoE for WBS 2.9.3.3 - Scintillator fill machines
2071 BoE for WBS 2.9.3.4 - Vapor recovery system
2326 BoE for WBS 2.9.3.5 - Scintillator Filling System Commissioning
2072 4933 BoE for WBS 2.9.4.1 - Assembly Infrastructure
2073 4935 BoE for WBS 2.9.4.2 - Block components
2074 4932 BoE for WBS 2.9.4.3 - Block Assembly and Alignment
2426 BoE WBS 2.9.4.4 - Detector Block Filling
2427 BoE for WBS 2.9.4.5 - Detector Block Outfitting
2531 BoE for WBS 2.9.4.6 - Detector Turn-on and Checkout
2506 BoE for WBS 2.9.4.7 -- Far detector assembly crew management
2435 4936 BoE for WBS 2.9.5 - Management
Status Comment
Updated, no CR Changed, new estimate since IPND work
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
No change, no new information
Updated, no CR Changed, new estimate since IPND work
Updated, no CR Changed, new estimate since IPND work
Updated, no CR Changed, new estimate since IPND work
No change, no new information
No change, no new information
No change, no new information
No change, no new information
Updated, no CR Changed, new estimate since IPND work
Row Labels Count
No change, no new information 16
Updated, no CR 5
Grand Total 21
new
docid docid CR BOE title
2275 BoE for WBS 1.9 - Project Management FY06 &FY07
2276 5019 CR185 BoE for WBS 2.10 - Project Management FY10 - FY14
Status
Completed, no change necessary
Updated, CR exists
Status Count
Completed, no change necessary 1
Updated, CR exists 1
Grand Total 2
new
docid docid Change Requests BOE title
1513 BoE for WBS 1.0.1.1 - RR Cooling Systems Capacity
1514 BoE for WBS 1.0.1.1 - Design Reviews for RR Cooling Systems
1527 BoE for WBS 1.0.1.1 - RR alignment
1530 BOE for WBS 1.0.1.1 RR Mods Stochastic Cooling Decommissioning
1845 BoE for WBS 1.0.1.1 RR Device Removal
1873 BoE for WBS 1.0.1.1 - Trim Magnet Corrector Reassignment
1900 4954 BoE for WBS 1.0.1.1 - Test Recycler 53 MHz RF
1913 BoE for WBS 1.0.1.1 - RR 53 Mhz Design Review
2592 BOE for WBS 1.0.1.1 - Recycler Transfer Lines Design Review
1456 BOE for WBS 1.0.1.2 - AD Oversight of TD Magnet Construction
1480 BoE for WBS 1.0.1.2 - Gap Clearing Prototype Bumper PS Beam Test
1481 BOE for WBS 1.0.1.2 - RR Inj Gap Clearing Pulse Forming Networks
1482 BOE for WBS 1.0.1.2 - RR Injection Gap Clearing Resonant Chargers Procure/Asse
1773 BOE for WBS 1.0.1.2 - RR Extr/MI Inj/RR Abort Line Kickers Design & Review
1780 BoE for WBS 1.0.1.2 RR Inj & Gap Clearing Kickers Prototype
1781 BoE for WBS 1.0.1.2 - RR Inj Gap Clearing Kickers Prototype Testing
1927 BOE for WBS 1.0.1.3 - RR Instr Design BPM Cables and Transition Boards
1928 BOE for WBS 1.0.1.3 - RR Instru Design Transverse Dampers
1929 BOE for WBS 1.0.1.3 - RR Instr Design Longitudinal Damper
1930 BOE for WBS 1.0.1.3 - RR Instrumentation Design Review
1463 BOE for WBS 1.0.1.4 - Recycler Ring Radiation Safety
1516 BoE for WBS 1.0.1.1, 2.0.1.1 RR Extraction Line Cooling System Design
1517 BoE for WBS 1.0.1.1, 2.0.1.1 - RR Injection Line Cooling System Design
1518 BoE for WBS 1.0.1.1, 2.0.1.1 - RR Abort Line Cooling System Design
1519 BoE for WBS 1.0.1.1, 2.0.1.1 - RR RF Cavities Cooling Systems
1526 5002 BOE for WBS 1.0.1.1, 2.0.1.1 - Vertical Dipole Magnet Power Supply Design
1537 BoE for WBS 1.0.1.1, 2.0.1.1 - RR MI-8 Pump Room Design
1707 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Installation Planning
1725 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Stand Design
1793 BoE for 1.0.1.1, 2.0.1.1 - PDD magnets for Recycler transfer lines
1794 BoE for WBS 1.0.1.1, 2.0.1.1 PDS magnets RR transfer lines
1795 BoE for WBS 1.0.1.1, 2.0.1.1 Reduced Field PDD (PDDW) magnets for RR Transfe
1800 4990 BoE for WBS 1.0.1.1, 2.0.1.1 - MGS Gradient Magnets RR Transfer Lines
1809 BoE for WBS 1.0.1.1, 2.0.1.1 - Common Tooling - Refurbish Perm Magnets RR Tra
1812 4945 CR168 BoE for WBS 1.0.1.1, 2.0.1.1 - RQNx Perm Gradient Magnets RR Transfer Lines
1813 CR115 BoE for WBS 1.0.1.1, 2.0.1.1 - MLAW Lambertsons RR Transfer Lines
1842 BOE for WBS 1.0.1.1, 2.0.1.1 RR Vert Dipole ADC Magnets Transfer Lines
1899 BoE for WBS 1.0.1.1, 2.0.1.1 - Design Recycler 53MHz RF
1462 BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Ceramic Beamtubes Procure Fab Proces
1771 BOE for WBS 1.0.1.2, 2.0.1.2 - RR Ext/MI Inj Line Kickers Procure Parts & Assemb
1774 BoE for WBS 1.0.1.2, 2.0.1.2 RR Ext/MI Inj/Beam Abort Power Supply Pulsers proc
1782 BoE for WBS 1.0.1.2, 2.0.1.2 - RR Inj Gap Clearing Power Supply Pulsers
1783 BoE for WBS 1.0.1.2, 2.0.1.2 RR Inj Gap Clearing Pulser Testing
1784 BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems design, procure parts, assemble
1785 BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Systems PFL Frames & Cable
1786 BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems Installation, Testing, and Checko
1683 4944 CR120 BOE for WBS 1.0.5, 2.0.4.2 - PM Costs for ANU Portion of NOvA
1484 BOE for WBS 2.0.1.1 - Injection, Extraction, Beam Abort Lines Controls/Timing inclu
1528 BoE for WBS 2.0.1.1 - RR Instrumentation Stand Fabrication
1540 BoE for WBS 2.0.1.1RR Injection Line Cooling System Constn
1687 BoE for WBS 2.0.1.1 - Recycler 53MHz RF Construction
1723 BOE for WBS 2.0.1.1 - RR Magnet Installations
1724 BOE for WBS 2.0.1.1 - RR Instrumentation Installation
1733 5002 BoE for WBS 2.0.1.1 - RR Vert Dipole Magnet PS procurement
1752 5002 BOE for WBS 2.0.1.1 - TL Vert Dipole Cable & Power Supply Installation
1753 BOE for WBS 2.0.1.1 Transfer Line Cable procurements
1788 BOE for WBS 2.0.1.1 - RR Magnet Stand Fabrication
1818 BoE for WBS 2.0.1.1 - RR Extraction Line Cooling System Constn
1819 BoE for WBS 2.0.1.1 - RR Abort Line Cooling System Construction
1823 BoE for WBS 2.0.1.1 - RR RF Cavities Cooling Systems Construction
1825 BoE for WBS 2.0.1.1 - RR Vacuum Equipment Procurement
1826 BoE for WBS 2.0.1.1 - RR Vacuum System Installation
1851 BoE for WBS 2.0.1.1 - RR MI8 Pump Room Upgrade constn
1905 BoE for WBS 2.0.1.1 - Trim Magnet Power Supply Placement
1907 BoE for WBS 2.0.1.1 - MI60 Anode Power Supply Room
2352 BOE for WBS 2.0.1.1 - Accel Shutdown Rad Comp Removal
1769 BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Procure Parts and Assemble
1770 BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Testing
1772 BOE for WBS 2.0.1.2 - RR Ext/MI Inj Line Kickers Testing
1775 BoE for WBS 2.0.1.2 - RR Extraction MI Injection Beam Abort Power Supply Pulser
1776 BoE for WBS 2.0.1.2 RR Inj Kicker Pre-Production LV HV Life Testing
1777 BoE for WBS 2.0.1.2 - RR Inj Kickers Preprod & Prod Assembly
1778 BoE for WBS 2.0.1.2 - RR Injection Kickers Preprod & Prod Procurement
1862 BOE for WBS 2.0.1.3 - RR Instr Transfer Line Torroid Relocation
1863 BOE for WBS 2.0.1.3 - RR Instr Install Transfer Dampers
1864 BOE for WBS 2.0.1.3 - RR Instr Install Longitudinal Damper
1865 BOE for WBS 2.0.1.3 - RR Instr Procure/Test Longitudinal Damper
1866 BOE for WBS 2.0.1.3 - RR Instr Procure/Test Transverse Dampers
1897 BOE for WBS 2.0.1.3 RR Instr BPM Cable/Connector Procure & Install
1898 BOE for WBS 2.0.1.3 RR Instr Transfer Line Cable Installation
1906 BOE for WBS 2.0.1.3 - RR Instr BPM Transition Board Procure and Test
1470 4958 BOE for WBS 1.0.2.1 - MI Mods Machine Timing Modifications
1472 BOE for WBS 1.0.2.1 - MI Mods A1 Extraction Line Decommissioning
1473 BOE for WBS 1.0.2.1 - MI Mods 2.5 MHz RF Cavities Decommissioning
1507 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Analysis
1508 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Design Review
1822 4957 BOE for WBS 1.0.2.1 - MI Mods Recycler Beamline Controls
1486 BoE for WBS 1.0.2.2 - MI RF Cavities Utility Modifications
1503 BoE for WBS 1.0.2.2 - MI RF Cavity Pre-install Testing
1504 BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design
1505 BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design Reviews
1511 BoE for WBS 1.0.2.2 - MI RF Cavities Design Bus Bar
1454 BOE for WBS 1.0.2.3 - MI Radiation Safety
1684 BOE for WBS 2.0.2.1 - MI Mods Upgrade Vertical Quad Bus
1743 BOE for WBS 2.0.2.1 - MI-14 Communications & Controls Infrastructure
1747 BOE for WBS 2.0.2.1 - MI-39 Communications & Controls Infrastructure
1748 BOE for WBS 2.0.2.1 - MI Mods Design & Modify RR LL RF System
1749 5005 BOE for WBS 2.0.2.1 - MI Mods Design & Modify MI LL RF System
1475 BoE for WBS 2.0.2.2 - MI RF Cavities Final System Test
1476 BoE for WBS 2.0.2.2 - MI RF Cavities Align Cavities
1477 BoE for WBS 2.0.2.2 - MI RF Install Cavities
1478 BoE for WBS 2.0.2.2 - MI RF Move Cavities 4 & 15
1479 BoE for WBS 2.0.2.2 - MI RF Cavities Cabling
1498 BoE for WBS 2.0.2.2 - MI RF Software Programming
1506 BoE for WBS 2.0.2.2 - MI RF Cavity Water Cooling Systems Install
1509 BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Raw Material Procurement
1512 BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Fab & Install
1710 BoE for WBS 2.0.2.2 - MI RF Cavities Power Amplifiers
1711 BoE for WBS 2.0.2.2 - MI RF Cavities Series Tube Modulators
1712 4989 BoE for WBS 2.0.2.2 - MI RF Cavities Solid State Amplifiers
1713 BoE for WBS 2.0.2.2 - MI RF Cavities Controls
1714 BoE for WBS 2.0.2.2 - MI RF Cavities Ferrite Bias Supplies
1885 BoE for WBS 1.0.3.1 - A150 Quadrupole Magnet Recovery for NuMI Primary Beam
1959 BOE for WBS 1.0.3.1 - NuMI Profile Monitor Design & Review
1492 BOE for WBS 1.0.3.2 NuMI Hadron Monitor Beam Abort Design
1721 BOE for WBS 1.0.3.2 - NuMI Hadron Monitor Design
1737 BoE for WBS 1.0.3.2 - NuMI Target Carrier Design
1738 BoE for WBS 1.0.3.2 - NuMI Baffle Design
1792 BOE for WBS 1.0.3.2 - NuMI Target/Baffle/Carrier/Hadron Monitor Design Reviews
1493 BOE for WBS 1.0.3.3 - Revision & Review of NuMI Shielding Assessment Documen
1767 BoE for WBS 1.0.3.3 - NuMI TH Operations Space Planning
1791 BOE for WBS 1.0.3.3 - NuMI Target Hall Infrastructure Reviews
1797 BoE for WBS 1.0.3.3 - NuMI Target Chase/Radiant Heat Loads Design
1790 BOE for WBS 1.0.3.4 - NuMI Decay Pipe/Hadron Absorber/Utilities Reviews
1805 BOE for WBS 1.0.3.4 - NuMI Utilities Electrical Infrastructure Design
1804 BoE for WBS 1.0.3.1, 2.0.3.1 - Upgrade to NumI Primary Quadrupole Magnets
1736 BoE for WBS 1.0.3.2, 2.0.3.2 - NuMI Medium Energy Target Design
1465 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Target Chase Cooling Design
1700 BoE for WBS 1.0.3.3, 2.0.3.3 - Horn 2 Relocation to ME/Shielding Reconfiguration &
1719 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block Design
1734 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Horn 2 Stripline Extension Design
1701 5000 CR176 BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI RAW Water Systems Design
1740 5001 CR173 BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI Non-RAW Water Cooling Systems Design
1754 BoE for WBS 2.0.3.1 - NuMI Extraction Kicker Charging Supply Construction
1755 BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Dipole Power Supplies Constructio
1756 BoE for WBS 2.0.3.1 - Upgraded NuMI Primary Transport Profile Monitors Construc
1757 BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Quadrupole Power Supplies Cons
1803 BoE for WBS 2.0.3.1 - Upgraded NuMI Quadrupole Cables Procure Install
1884 BoE for WBS 2.0.3.1 - NuMI Extraction Kicker PS Upgrade Design
1494 BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Beam Abort Procure/Install
1709 4999 CR177 BOE for WBS 2.0.3.2 - NuMI Target Carrier Construction
1722 BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Construction
1729 BoE for WBS 2.0.3.2 - NuMI Medium Energy Target Procurement
1730 BoE for WBS 2.0.3.2 NuMI Baffle Procurement
1466 BoE for WBS 2.0.3.3 - NuMI Target Chase Cooling Construction
1720 BoE for WBS 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block Procure/Assemble
1731 BoE for WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig Procure/Assem
1744 BoE WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig Install
1768 BoE for WBS 2.0.3.3 - NuMI TH Operations Space Planning Procure/Install
1796 BoE for WBS 2.0.3.3 - NuMI Horn 2 Stripline Extension Procure/Install
1798 BoE for WBS 2.0.3.3 - NuMI Target Chase/Radiant Heat Loads Procure/Install
1715 BoE for WBS 2.0.3.4 - NuMI Target RAW System Construction
1727 BoE for WBS 2.0.3.4 - NuMI Horns RAW Systems construction
1728 BoE for WBS 2.0.3.4 - NuMI Horn 2 RAW Piping Extension Construction
1735 BoE for WBS 2.0.3.4 - NuMI Decay Pipe RAW Construction
1739 BoE for WBS 2.0.3.4 - NuMI Hadron Absorber RAW Systems Construction
1742 BoE for WBS 2.0.3.4 - NuMI Non-RAW LCW System Construction
1758 BoE for WBS 2.0.3.4 - NuMI Non-RAW CUB Cooling Water System Construction
1759 BoE for WBS 2.0.3.4 - NuMI Non-RAW Sump Cooling Water System Construction
1760 BoE for WBS 2.0.3.4 - NuMI Non-RAW Secondary Chilled Water System Construct
1806 BOE for WBS 2.0.3.4 - NuMI Utilities Electrical Infrastructure Construction
1763 BoE for WBS 1.0.4.1 - Beam Physics - ANU Demands on Proton Plan
1764 BoE for WBS 1.0.4.2 - Beam Physics - Machine & Process Analysis
1765 BoE for WBS 1.0.4.3 - Beam Physics - ANU Proton Projections
4909 BoE - WBS 1.1.5 - Near Detector Surface Building
2679 BoE for WBS 2.1.1.2.5 Wetland Banking Credits
2693 4905 CR084 CR103 CR147 BoE - WBS 2.1.1.4 Site Preparation Build Phase
2081 4908 CR103 CR108 BoE for WBS 2.1.1.5 EDIA
2694 4906 CR084 CR095 CR103 BoE for WBS 2.1.2.3 Far Detector Building Build Phase
2689 4907 CR103 BoE for WBS 2.1.2.4 EDIA
2691 BoE for WBS 2.1.4.1 Permits
2692 BoE for WBS 2.1.4.4 Quality Control
2421 BoE for WBS 1.2.9.1.4 ISO Tank Delivery and Leasing
2443 BoE for WBS 1.2.9.2.1.1 Purchase secondary containment
2442 BoE for WBS 1.2.9.2.2.2 Procure blending system parts (pumps, hoses, instrumen
2094 BoE for WBS 2.2.1.5.2 - 2.2.1.5.4 Mineral Oil Production, Delivery, and Storage - FY
2095 BoE for WBS 2.2.1.6 - QC-Mineral Oil
2096 BoE for WBS 2.2.2.5- Pseudocumene Production, Delivery, and Storage-FY10, FY1
2097 BoE for WBS 2.2.2.6- QC Pseudocumene
2098 BoE for WBS 2.2.3.5.2, 2.2.3.5.3, 2.2.3.7 - Waveshifters Production and Delivery (lo
2099 BoE for WBS 2.2.3.6.1 QC -Waveshifters-FY08, FY09
2100 BoE for WBS 2.2.4.2.1- Prepare preproduction batch of fluor concentrate
2102 BoE for WBS 2.2.4.2.2 - QC preproduction batch of flour concentrate
2103 BoE for WBS 2.2.4.2.3- Production Blending of Flour Concentrate
2108 BoE for WBS 2.2.4.2.4- QC-Production Fluor Concentrate
2104 BoE for WBS 2.2.4.3.1 - Prepare preproduction batch of scintillator blend
2106 BoE for WBS 2.2.4.3.2-QC preproduction batch of scintillator blend
2107 BoE for WBS 2.2.4.3.3 - Production Blending of Scintillator
2109 BoE for WBS 2.2.4.3.4- QC-Production Scintillator Blend
2408 BoE for WBS 2.2.4.4 Production Blending Development
2110 BoE for WBS 2.2.5.3 - Far Detector Scintillator Transport
2144 BoE for WBS 2.2.6 Liquid Scintillator Management
2717 BOE for WBS 1.3.4 Development of QA Methods
2716 4883 CR145 BoE for WBS 1.3.5 BoE Integration Prototype Detector Fiber Production
2196 4884 CR145 BoE for WBS 2.3.2.1 Fiber Production
2217 4895 CR145 BoE for WBS 2.3.2.12 Fiber Quality Assurance
2495 BoE for WBS 2.3.2.13 Shipping Fiber to Module Factory
2549 BoE for WBS 2.3.2.14 Infrastructure Improvements
2497 BoE for WBS 2.3.3 Fiber Management
BoE for WBS 1.4.3.4.5.10, 1,4,3,5,11, 1.4.3.6.3, 1.4.3.7.2 and
2505 1.4.3.7.3 Fabricate remaining Extrusions
BoE for WBS 1.4.2.3.2.3, 1.4.2.4.2.3 and 1.4.2.5.3 Produce PVC
2504 Resin
2782 BoE for WBS 2.4.1.2.3.3 Obtain Vendor Samlpes
BoE for WBS 2.4.1.2.3.4 Extrude Samples using NOvA Prototype
2783 Dies
2300 BoE for WBS 2.4.1.3.2 "Purchase Commercial QC Instruments"
2301 BoE for WBS 2.4.1.3.3 "Build Custom QC Instruments"
2539 BoE for WBS 2.4.1.3.4 Setup QC Instruments
BoE for WBS 2.4.2.1.3 and 2.4.2.1.8 Produce Test Extrusions
2500 (Horizontal)
BoE for WBS 2.4.2.1.5, 2.4.2.1.9 and 2.4.2.1 15 Evaluation of
2540 Extrusions: Horizontal
BoE for WBS 2.4.2.1.1 Vendor Setup (Horizontal Extrusion Pre-
2178 production)
BoE for WBS 2.4.2.1.14.1 Produce PVC Extrusions (Horizontal Pre-
2502 production)
BoE for WBS 2.4.2.1.2 Obtain PVC resin for trest and pre-production
2498 (Horizontal)
2501 BoE for WBS 2.4.2..2.3 and 2.4.2.2.8
BoE for WBS 2.4.2.2.5, 2.4.2.2.9 and 2.4.2.2.15 Evaluate Test
2541 Extrusions: Vertical
2458 BoE for WBS 2.4.2.2.1 Vertical Extrusion Production: Vendor Setup
BoE for WBS 2.4.2.2.14.1 Produce PVC Extrusions (Vertical Pre-
2503 production)
BoE for WBS 2.4.2.2.2 Obtain PVC resin for test and pre-production
2499 (Vertical)
2496 BoE for WBS 2.4.3.1 Extrusion Production: Near Detector
BoE for WBS 2.4.3.2.1.1.2, 2.4.3.2.1.2.2, 2.4.3.2.2.1.1,
2,4,3,2.2.2.1 Far Detector Extrusion Production: Obtain PVC Resin
1342 4926 Block 1 H, etc.
BoE for WBS 2.4.3.2.1.1.3, 2.4.3.2.1.2.3, 2.4.3.2.2.1.2, 2.4.3.2.2.2.2
Far Detector Extrusion Production: Produce PVC Extrusions Block 1
2479 4927 H (type A), etc.
BoE for WBS 2.4.3.2.1.1.4, 2.4.3.2.1.2.4, 2.4.3.2.2.1.3, 2.4.3.2.2.2.3
2179 and others; Ship PVC Extrusions To Module Factory
BoE for WBS 2.4.3.2.1.1.5, 2.4.3.2.1.2.5, 2.4.3.2.2.1.4,
2.4.3.2.2.2.4 Extrusion Production: Quality Control and
2485 4931 Documentation of Extrusions
BoE for WBS 2.4.4.2, 2.4.4.3, 2.4.4.4, 2.4.4.5, 2.4.4.6 Setup
2486 Hardware; Data Taking
BoE for WBS 2.4.4.8, 2.4.4.9, 2.4.4.10 and 2.4.4.11 Ship Samples
2451 for QA
BoE for WBS 2.4.4.1 Procure Hardware (Quality Assurance
2299 Instruments)
2180 4929 BoE for WBS 2.4.5.2 Pallet System
BoE for WBS 2.4.5.3.1.1, 2.4.5.3.3.1, 2.4.5.3.4.1 Procure Motion
2492 System Components
BoE for WBS 2.4.5.4.1, 2.4.5.4.2 and 2.4.5.4.3 Extrusion Storage
2493 at Vendor
2457 BoE for WBS 2.4.5.5.1 Extrusion Sorting Device
2453 BoE for WBS 2.4.5.5.2 Make Vacuum Lifting Fixtures
2302 BoE for WBS 2.4.6 for Management - Construction
2366 5029 8/31 review BoE for WBS 1.5.5.9 / 2.5.3.1.11 / 2.5.3.2.6.8 Develop quality assurance tracking s
5036
2515 BoE for WBS 1.5.6 Module Shipping and Storage R&D
2687 BoE for WBS 1.5.10 Management – R&D Phase
2202 BoE for WBS 1.5.2.1.1 Fiber Manifold Component R&D
2206 BoE for WBS 1.5.2.1.1.10 Integration Prototype Manifold Manufacturing (not IPND)
2200 BoE for WBS 1.5.2.2 End Plate R&D
2195 5032 8/31 review BoE for WBS 1.5.2.3 Joining Technology R&D
2439 BoE for WBS 1.5.3 Photo Detector Interface R&D
2437 BoE for WBS 1.5.4.2 Factory Material Handling, Tooling, & Fixtures R&D
3810 BOE for WBS 1.5.4.3 -- FHEP Module Production
2438 BoE for WBS 1.5.5 Quality Assurance and Quality Control Methods Development
2440 BoE for WBS 1.5.7.1.3 Install and Setup Additional Infrastructure and Factory Mach
2395 BoE for WBS 1.5.7.1.1 Identify and acquire factory space
2189 BoE for WBS 1.5.7.1.2 Acquire and Install Factory Tools, Fixtures, and Other Infras
2441 BoE for WBS 1.5.7.1.4 Develop Initial Versions of Machine Operating Procedures
2192 BoE for WBS 1.5.7.3.1 and 1.5.7.3.2 IPND Manifold Production and Assemble and
2203 BoE for WBS 1.5.7.3.3 and 1.5.7.3.4 IPND End Plate Components / Assemble a
2201 BoE for WBS 1.5.7.3.5 Manufacture preproduction prototype (IPND) optical conecto
2446 BoE for WBS 1.5.7.3.6 Produce IPND Modules
2448 BoE for WBS 1.5.8 Initial Production Module Specifications
2449 BoE for WBS 1.5.9 Initial Factory Tooling Specifications
2211 5022 8/31 review BoE for WBS 2.5.1.1: Fiber Manifold Production (drawing files in v2)
2212 BoE for WBS 2.5.1.2: End Plate And Seal Production
2188 BoE for WBS 2.5.1.2.6 Procure edge stiffeners
2213 BoE for WBS 2.5.2 Optical Connector Production
2186 BoE for WBS 2.5.3.1.1 and 2.5.3.2.6.7 Fabricate and deliver extrusion lifters / Insta
2215 5024 8/31 review BoE for WBS 2.5.3.1.10 and 2.5.3.2.6.4 Fabricate fiber facing machines / Install and
2514 BoE for WBS 2.5.3.1.12, 2.5.3.2.7, 2.5.3.3.2.1.7 Review factory tooling machines a
2198 BoE for WBS 2.5.3.1.4 and 2.5.3.2.6.2 Fabricate and deliver pressure testing equip
2190 BoE for WBS 2.5.3.1.5 and 2.5.3.2.6.6 Fabricate material handling and storage equ
2205 BoE for WBS 2.5.3.1.6 and 2.5.3.2.6.5 Procure gluing machines / Install and setup
2216 BoE for WBS 2.5.3.1.7 and 2.5.3.2.6.1 Fabricate fiber stringing machines / Install an
2214 BoE for WBS 2.5.3.1.8 and 2.5.3.2.6.3 Fabricate and deliver fiber checking machine
2207 BoE for WBS 2.5.3.1.9 and 2.5.3.2.6.9 Floor Crane Procurement and Install floo
2365 5023 8/31 review BoE for WBS 2.5.3.1.3 Fabricate and deliver tooling and fixtures
2367 BoE for WBS 2.5.3.2.5 and 2.5.3.2.8 Operating factory space /Closeout factory spa
2193 BoE for WBS 2.5.3.2.1 Factory Lease
2383 BoE for WBS 2.5.3..2.1 Identify factory space
2354 BoE for WBS 2.5.3.2.3 Additional factory HVAC
2368 BoE for WBS 2.5.3.2.4 Additional Factory Utilities and Preparation
2218 5014 8/31 review BoE for WBS 2.5.3.3.2.*.*.1 Assemble and test far detector modules
2357 5025 8/31 review BoE for WBS 2.5.3.3.2.1.1.2, 2.5.3.3.2.38.2.2 Ship completed far detector module
2447 BoE for WBS 2.5.3.3.3 Near Detector and 1.5.7.3.6 Produce IPND Modules
2445 BoE for WBS 2.5.3.3.3.5 and 1.5.7.3.6 Ship Completed Near Detector Modules to
2686 BoE for WBS 2.5.4 Management – Construction Phase
5030 8/31 review BOE WBS 2.5.3.1.13 Fabricate and Deliver Module Flatness QA/QC device
5026 8/31 review BOE WBS 2.5.3.2.6.15 Train module factory student technicians
5042 BOE WBS 2.5.3.2.6.14 Train module factory technicians
2684 BoE for WBS 1.6.1.3 Water Cooling
2682 BoE for WBS 1.6.1.2 QA/QC Stations
2657 BoE WBS 1.6.1.6.1.2 APD Engineering Run
2418 BoE for WBS 1.6.1.6.2.1 Procure Manifolds
2422 BoE for WBS 1.6.1.6.2.2 Procure Other Components
2673 BoE for WBS 1.6.1.6.2.3 Assemble and Test Hardware
2718 BoE for WBS 1.6.3.1 - Low Voltage Power Supplies
2719 BoE for WBS 1.6.3.2 - High Voltage Power Supply
2720 BoE for WBS 1.6.3.3 - Power Cables
2721 BoE for WBS 1.6.3.4 - Power Distribution Box
2722 BoE for WBS 1.6.3.5.1 - Low Voltage Power Supplies
2723 BoE for WBS 1.6.3.5.2 - High Voltage Power Supply
2724 BoE for WBS 1.6.3.5.3 - Power Cables
2725 BoE for WBS 1.6.3.5.4 - Power Distribution Boxes
2726 BoE for WBS 1.6.3.5.5 - Ship PDBs, cables, and power supplies to Fermilab
2249 BoE for WBS 2.6.1.1.1 Manufactured Parts
2251 BoE for WBS 2.6.1.1.2 TE Coolers
2252 BoE for WBS 2.6.1.1.3 Assemble and Test APD housings
2133 BoE for WBS 2.6.1.2.3 - APD Array
2253 BoE for WBS 2.6.1.3 APD Module Testing
2254 BoE for WBS 2.6.1.4.1-33 APD Module Shipping
2255 BoE for WBS 2.6.2.1.1 Far Detector ASIC Production
2257 BoE for WBS 2.6.2.1.3 ADC
2259 BoE for WBS 2.6.2.1.4 COTs
2260 BoE for WBS 2.6.2.1.5 PC Boards
2261 BoE for WBS 2.6.2.1.6 Electronics Box
2262 BoE for WBS 2.6.2.1.7.1-3 TEC Controller Modules
2264 BoE for WBS 2.6.2.2.1 FEB Assembly
2265 BoE for WBS 2.6.2.4 Firmware Maintenance
2266 BoE for WBS 2.6.2.5.1-2 QA/QC
2221 4984 BoE for WBS 2.6.3.1.3-Procure LV pwer supplies
2219 BoE for WBS 2.6.3.1.1-Specify relay racks
2220 4983 BoE for WBS for 2.6.3.1.2-Procure relay racks
2222 4985 BoE for WBS 2.6.3.1.4-Test LV power supplies
2223 4986 BoE for WBS 2.6.3.2.1-Procure HV power supplies
2224 BoE for WBS 2.6.3.2.2-Test HV power supplies
2230 BoE for WBS 2.6.3.3.6-Procure ground cables
2225 4987 BoE for WBS 2.6.3.3.1-Procure PDB to FEB cables
2226 BoE for WBS 2.6.3.3.2-Procure LV supply to PDB cables
2227 BoE for WBS 2.6.3.3.3-Procure LV supply sense cables
2228 BoE for WBS 2.6.3.3.4-Procure HV supply to PDB cables
2229 BoE for WBS 2.6.3.3.5-Procure PDB to DCM cables
2231 BoE for WBS 2.6.3.3.7-Specify cable trays
2232 4988 BoE for WBS 2.6.3.3.8-Procure cable trays
2233 BoE for WBS 2.6.3.4.1-Procure PDB parts
2234 BoE for WBS 2.6.3.4.2-Assemble and test PDBs
2165 BoE for WBS 2.6.3.5.1.1.1-33 Procure Manifolds
2425 BoE for WBS 2.6.3.5.1.2.1-33 Ship Manifolds Block 1-33
2248 BoE for WBS 2.6.3.5.2 Procure Other Components
2268 BoE for WBS 2.6.3.5.4 Fill and Test Equipment
2256 BoE for WBS 2.6.3.5.5 Auxiliary Panel Readout
2236 BoE for WBS 2.6.3.6-Ship power distribution system
2145 BoE for WBS 1.7.1.1 DAQ Software Standards and Tools
2154 BoE for WBS 1.7.1.10 Online Databases
2146 BoE for WBS 1.7.1.2 Error Handling System
2147 BoE for WBS 1.7.1.3 Message Passing System
2148 BoE for WBS 1.7.1.4 Run Control System
2149 BoE for WBS 1.7.1.5 DAQ Software Architecture Overview
2150 CR144 CR165 BoE for WBS 1.7.1.6 Event Buffer Farm Software
2151 BoE for WBS 1.7.1.7 Data Logger
2152 BoE for WBS 1.7.1.8 Global Trigger System
2153 BoE for WBS 1.7.1.9 DAQ Monitor System
2459 BoE for WBS 1.7.2.1.3 Data Concentrator Prototype
2460 BoE for WBS 1.7.2.1.6 Data Concentrator for IPND
2461 BoE for WBS 1.7.2.2 Control and Timing System Prototype
2462 BoE for WBS 1.7.2.3.2 DAQ Network Prototype Hardware
2477 BoE for WBS 1.7.2.3.3 DAQ Network Prototype Hardware
2463 BoE for WBS 1.7.2.4 Control Room Equipment and Infrastructure
2464 BoE for WBS 1.7.2.5 DAQ Buffer Farm Evaluation Components
2465 BoE for WBS 1.7.2.6 DAQ Data Storage Evaluation Components
2466 BoE for WBS 1.7.2.7 DAQ Cabling for IPND
2467 BoE for WBS 1.7.2.8 Database Computers for IPND
2415 BoE for WBS 1.7.3.1 Install and Test Integration Test Facility
2414 BoE for WBS 1.7.3.2 Buffer Farm Evaluation
2413 BoE for WBS 1.7.3.3 Readout Electronics Integration Testing
2412 BoE for WBS 1.7.3.4 Software Integration Testing
2411 BoE for WBS 1.7.3.5 End user consultation
2155 4969 CR110 CR144 CR165 BoE for WBS 2.7.1.1 Error Handling System
2164 5006 CR165 CR169 BoE for WBS 2.7.1.10 Online Databases
2156 4970 CR144 BoE for WBS 2.7.1.2 Message Passing System
2157 4972 CR136 CR144 CR165 BoE for WBS 2.7.1.3 Run Control System
2158 BoE for WBS 2.7.1.4 Event Buffer Farm Software
2159 CR136 BoE for WBS 2.7.1.5 Data Logger
2160 CR136 BoE for WBS 2.7.1.6 Data File Transfer System
2161 4979 CR121 CR136 BoE for WBS 2.7.1.7 DAQ Monitor System
2162 BoE for WBS 2.7.1.8 Event Monitor System
2163 BoE for WBS 2.7.1.9 Event Display System
2468 BoE for WBS 2.7.2.1 Data Concentrator Production
2469 BoE for WBS 2.7.2.2.2 Control and Timing System Preproduction
2470 BoE for WBS 2.7.2.2.6.2.7 Control and Timing System Production
2471 BoE for WBS 2.7.2.3 DAQ Network Production Components
2472 BoE for WBS 2.7.2.4 Control Room Infrastructure Production
2473 BoE for WBS 2.7.2.5 Buffer Farm Production Computers
2474 BoE for WBS 2.7.2.6 Data Storage Production Components
2475 BoE for WBS 2.7.2.7 DAQ Cabling for Production
2476 BoE for WBS 2.7.2.8 Database Computers for Production
2410 BoE for WBS 2.7.3.1 Readout Electronics Integration Testing
2409 BoE for WBS 2.7.3.2 Software Integration Testing
2287 BoE for WBS 2.7.3.3 Consultation
2083 BoE for WBS 2.7.4.1.1.1 - DCS Master Control servers
2084 BoE for WBS 2.7.4.1.1.2 - DCS readout IOC nodes
2085 BoE for WBS 2.7.4.1.1.3 - DCS local logging station with raid
2086 BoE for WBS 2.7.4.1.1.4 - DCS monitoring displays
2089 BoE for WBS 2.7.4.1.1.5 - DCS electronics room rack enclosures
2090 BoE for WBS 2.7.4.1.1.9 - DCS Power protection (10KVA UPS)
2087 BoE for WBS 2.7.4.1.2.1 - DCS system Compact field points
2828 BoE for WBS 2.7.4.1.2.3 - DCS system Compact field point sensor packs
2532 BoE for WBS 1.8.2 - Structural Design and Validation
2533 BoE for WBS 1.8.3 -- Liquid Scintillator Filling and Handling R&D
2534 BoE for WBS 1.8.4 -- Near Detector Assembly R&D
2391 BoE for WBS 1.8.5.2 IPND Systems Design
2359 BoE for WBS 1.8.5.3 IPND Equipment
2406 BoE for WBS 1.8.5.4 IPND Block Assembly Facility Setup
2360 BoE for WBS 1.8.5.5 IPND Block Fabrication
2399 BoE for WBS 1.8.5.6 MINOS Service Building Contracts
BOE for WBS 1.8.5.7 Installation, Commissioning and Operation in
2424 MINOS Service Building
2536 BoE for WBS 1.8.6 -- Far Detector Assembly Engineering
2361 BoE for WBS 1.8.8.1 Full Scale Block Assembly Prototype
2362 BoE for WBS 1.8.8.2 Full Height Engineering Prototype
2537 BoE for WBS 1.8.9 -- Management, R&D Phase
BoE for WBS 2.8.1.1 & 2.8.1.2 Cave Excavation Design and
2348 Engineering, Tunnel and Cave Infrastructure Design and Engineering
2241 4952 BoE for WBS 2.8.1.3 - Tunnel Infrastructure Contract
2111 4953 BoE for WBS 2.8.1.4 - Excavation contract
2355 BoE for WBS 2.8.2.1 Containment of ND Full Volume
2240 BoE for WBS 2.8.2.2 - Muon Catcher
2347 BoE for WBS 2.8.2.3, Active Detector
BoE for WBS 2.8.2.4 - 2.8.2.6 South Bookend, Survey and Align
2452 Muon Catcher and Six Blocks, All Blocks and Bookend in Place
2313 BoE for WBS 2.8.3 Liquid Scintillator Filling Equipment
2423 BoE for WBS 2.8.4 Installation Coordination
2484 BoE for WBS 2.8.5 - Management - Construction Phase - Labor
2056 4934 BoE for WBS 2.9.1.1 - Module Lifting Fixture
2057 BoE for WBS 2.9.1.2 - Adhesive Dispenser
2058 BoE for WBS 2.9.1.3 - Block Safety Constraint Beam
2059 BoE for WBS 2.9.1.4 - Block Pivoter Table
2120 BoE for W.B.S. 2.9.1.5 - Survey Equipment for the Far Detector
2060 BoE for WBS 2.9.2.1 - Electrical Infrastructure
2061 BoE for WBS 2.9.2.2 - Far Detector Bookends
2319 BoE for WBS 2.9.2.3 - Detector Structure Monitoring Equipment
2068 BoE for WBS 2.9.3.1 - Scintillator Transfer Facility
2069 BoE for WBS 2.9.3.2 - Scintillator Plumbing
2070 BoE for WBS 2.9.3.3 - Scintillator fill machines
2071 BoE for WBS 2.9.3.4 - Vapor recovery system
2326 BoE for WBS 2.9.3.5 - Scintillator Filling System Commissioning
2072 4933 BoE for WBS 2.9.4.1 - Assembly Infrastructure
2073 4935 BoE for WBS 2.9.4.2 - Block components
2074 4932 BoE for WBS 2.9.4.3 - Block Assembly and Alignment
2426 BoE WBS 2.9.4.4 - Detector Block Filling
2427 BoE for WBS 2.9.4.5 - Detector Block Outfitting
2531 BoE for WBS 2.9.4.6 - Detector Turn-on and Checkout
2506 BoE for WBS 2.9.4.7 -- Far detector assembly crew management
2435 4936 BoE for WBS 2.9.5 - Management
2275 BoE for WBS 1.9 - Project Management FY06 &FY07
2276 5019 BoE for WBS 2.10 - Project Management FY10 - FY14
New, CR pen
Grand Total
Status Status (Local)
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Updated, CR pending Updated, CR pending
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
No changes required No changes required
Completed Completed, no change necessary
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Updated, CR pending Updated, CR pending
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Updated, no CR Updated, no CR
Completed Completed, no change necessary
Updated, CR exists Updated, CR exists
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown related
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, shutdown related Not changed, shutdown related
Updated, CR pending Updated, CR pending
Not changed, shutdown related Not changed, shutdown related
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Updated, CR pending Updated, CR pending
Updated, CR pending Updated, CR pending
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Future update Future update
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Updated, CR pending Updated, CR pending
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
No changes required No changes required
No changes required No changes required
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
No changes required No changes required
Updated, CR pending Updated, CR pending
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Updated, CR pending Updated, CR pending
Not changed, no new information Not changed, no new information
Completed Completed, no change necessary
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, shutdown related Not changed, shutdown related
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, shutdown related Not changed, shutdown related
Updated, CR pending Updated, CR pending
Not changed, below threshold for CR Not changed, below threshold for CR
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
No changes required No changes required
Not changed, shutdown related Not changed, shutdown related
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Updated, CR pending Updated, CR pending
No changes required No changes required
Not changed, CY10 complete Not changed, CY10 complete
Not changed, shutdown related Not changed, shutdown related
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown related
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Not changed, shutdown related Not changed, shutdown related
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Updated, CR exists Updated, CR exists
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Completed Completed, no change necessary
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, shutdown related Not changed, shutdown related
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
No changes required No changes required
New, CR exists New, CR exists
Completed Not Changed, Complete
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Completed Not Changed, Complete
No changes required No changes required
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Updated, CR exists Updated, CR exists
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, below threshold for CR Not changed, below threshold for CR
Completed Completed, no change necessary
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Completed Completed, no change necessary
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
No changes required No changes required
Completed Completed, no change necessary
No changes required No changes required
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Updated, no CR Updated, no CR
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, no new information Not changed, no new information
Updated, CR pending Updated, CR pending
Updated, CR pending Updated, CR pending
Completed Completed, no change necessary
Update pending Update pending
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Updated, CR pending Updated, CR pending
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Update pending Update pending
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Update pending Update pending
Update pending Update pending
Update pending Update pending
Updated, CR pending Updated, CR pending
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, CR pending Updated, CR pending
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Updated, below threshold for CR Updated, below threshold for CR
Completed Completed, no change necessary
Updated, CR pending Updated, CR pending
Updated, below threshold for CR Updated, below threshold for CR
Updated, CR exists Updated, CR exists
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Updated, CR pending Updated, CR pending
Updated, CR pending Updated, CR pending
Future update Future update
Update pending Update pending
Update pending Update pending
New, CR pending New, CR pending
New, CR pending New, CR pending
New, CR pending New, CR pending
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Update pending Update pending
Update pending Update pending
Update pending Update pending
Not changed, no new information Not changed, no new information
Update pending Update pending
Update pending Update pending
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Update pending Update pending
Update pending Update pending
Update pending Update pending
Update pending Update pending
Update pending Update pending
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Updated, no CR Updated, no CR
Updated, no CR Updated, no CR
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Updated, no CR Updated, no CR
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, CY10 complete Not changed, CY10 complete
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Completed Completed, no change necessary
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Updated, CR exists Updated, CR exists
Not changed, no new information Not changed, no new information
Not changed, CY10 complete Not changed, CY10 complete
Not changed, CY10 complete Not changed, CY10 complete
Updated, CR exists Updated, CR exists
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
No changes required No changes required
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information Not changed, no new information
Not changed, no new information No change, no new information
Completed Completed, no change necessary
Completed Completed, no change necessary
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Completed Completed, no change necessary
Not changed, no new information No change, no new information
Completed Completed, no change necessary
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Completed Completed, no change necessary
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Updated, no CR Updated, no CR
Updated, no CR Updated, no CR
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Updated, no CR Updated, no CR
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Updated, no CR Updated, no CR
Updated, no CR Updated, no CR
Updated, no CR Updated, no CR
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Not changed, no new information No change, no new information
Updated, no CR Updated, no CR
Completed Completed, no change necessary
Updated, CR exists Updated, CR exists
Status Count of Status Status (Local) Count
Not changed, CY10 complete 73 Completed, no change necessary 78
Not changed, no new information 133 Future update 2
Not changed, shutdown related 44 New, CR exists 1
Update pending 17 New, CR pending 3
Completed 80 No change, no new information 32
Updated, CR pending 18 No changes required 11
No changes required 11 Not changed, below threshold for CR 2
Updated, no CR 19 Not Changed, Complete 2
Updated, CR exists 18 Not changed, CY10 complete 73
Future update 2 Not changed, no new information 101
Not changed, below threshold for CR 2 Not changed, shutdown related 44
New, CR exists 1 Update pending 17
Updated, below threshold for CR 11 Updated, below threshold for CR 11
New, CR pending 3 Updated, CR exists 18
Grand Total 432 Updated, CR pending 18
Updated, no CR 19
Grand Total 432
Status values Substitute Color value
Changed to reflect new estimate Changed 14136213
Changed, new estimate since IPND work Changed 14136213
Updated, no CR Updated, no CR 14136213
Updated, CR pending Updated, CR pending 14136213
Updated, below threshold for CR Updated, below threshold for CR 14136213
Updated, CR exists Updated, CR exists 14136213
New New 14136213
New, CR exists New, CR exists 14136213
New, CR pending New, CR pending
Updated Changed 14136213
Completed, no change necessary Completed 5296274
Not Changed, Complete Completed 5296274
Not changed, CY10 complete Not changed, CY10 complete 10147522
In progress, done by end of CY10 Not changed, CY10 complete 10147522
No change, no new information Not changed, no new information 11851260
No change; RFP being written Not changed, no new information 11851260
No changes required No changes required 11851260
Not changed, CY10 complete Not changed, CY10 complete 11851260
Not changed, no new information Not changed, no new information 11851260
Not changed, see comment Not changed, no new information 11851260
Not changed, below threshold for CR Not changed, below threshold for CR 11851260
Future update Future update 11851260
Not changed, shutdown related Not changed, shutdown related 12106214
Update pending Update pending 65535
Updated 14136213
Completed, no change necessary 5296274
Not changed, CY10 complete 10147522
Not changed, see comment 11851260
Not changed, no new information 11851260
Not changed, shutdown related 12106214
Update pending 65535