BOE Status List - NOvA

Document Sample

Shared by: xiaohuicaicai
Categories
Tags
Stats
views:
0
posted:
10/27/2011
language:
English
pages:
68
new

docid docid CR BOE title



1513 BoE for WBS 1.0.1.1 - RR Cooling Systems Capacity

BoE for WBS 1.0.1.1 - Design Reviews for RR Cooling

1514 Systems



1527 BoE for WBS 1.0.1.1 - RR alignment

BOE for WBS 1.0.1.1 RR Mods Stochastic Cooling

1530 Decommissioning



1845 BoE for WBS 1.0.1.1 RR Device Removal



1873 BoE for WBS 1.0.1.1 - Trim Magnet Corrector Reassignment

1900 4954 BoE for WBS 1.0.1.1 - Test Recycler 53 MHz RF



1913 BoE for WBS 1.0.1.1 - RR 53 Mhz Design Review

BOE for WBS 1.0.1.1 - Recycler Transfer Lines Design

2592 Review

BOE for WBS 1.0.1.2 - AD Oversight of TD Magnet

1456 Construction

BoE for WBS 1.0.1.2 - Gap Clearing Prototype Bumper PS

1480 Beam Test

BOE for WBS 1.0.1.2 - RR Inj Gap Clearing Pulse Forming

1481 Networks



BOE for WBS 1.0.1.2 - RR Injection Gap Clearing Resonant

1482 Chargers Procure/Assemble

BOE for WBS 1.0.1.2 - RR Extr/MI Inj/RR Abort Line Kickers

1773 Design & Review

BoE for WBS 1.0.1.2 RR Inj & Gap Clearing Kickers

1780 Prototype

BoE for WBS 1.0.1.2 - RR Inj Gap Clearing Kickers Prototype

1781 Testing

BOE for WBS 1.0.1.3 - RR Instr Design BPM Cables and

1927 Transition Boards

BOE for WBS 1.0.1.3 - RR Instru Design Transverse

1928 Dampers



1929 BOE for WBS 1.0.1.3 - RR Instr Design Longitudinal Damper



1930 BOE for WBS 1.0.1.3 - RR Instrumentation Design Review



1463 BOE for WBS 1.0.1.4 - Recycler Ring Radiation Safety

BoE for WBS 1.0.1.1, 2.0.1.1 RR Extraction Line Cooling

1516 System Design

BoE for WBS 1.0.1.1, 2.0.1.1 - RR Injection Line Cooling

1517 System Design

BoE for WBS 1.0.1.1, 2.0.1.1 - RR Abort Line Cooling

1518 System Design

BoE for WBS 1.0.1.1, 2.0.1.1 - RR RF Cavities Cooling

1519 Systems





BOE for WBS 1.0.1.1, 2.0.1.1 - Vertical Dipole Magnet Power

1526 5002 Supply Design



1537 BoE for WBS 1.0.1.1, 2.0.1.1 - RR MI-8 Pump Room Design

1707 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Installation Planning



1725 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Stand Design

BoE for 1.0.1.1, 2.0.1.1 - PDD magnets for Recycler transfer

1793 lines



1794 BoE for WBS 1.0.1.1, 2.0.1.1 PDS magnets RR transfer lines

BoE for WBS 1.0.1.1, 2.0.1.1 Reduced Field PDD (PDDW)

1795 magnets for RR Transfer Lines

BoE for WBS 1.0.1.1, 2.0.1.1 - MGS Gradient Magnets RR

1800 4990 Transfer Lines

BoE for WBS 1.0.1.1, 2.0.1.1 - Common Tooling - Refurbish

1809 Perm Magnets RR Transfer Lines





BoE for WBS 1.0.1.1, 2.0.1.1 - RQNx Perm Gradient

1812 4945 CR168 Magnets RR Transfer Lines

BoE for WBS 1.0.1.1, 2.0.1.1 - MLAW Lambertsons RR

1813 CR115 Transfer Lines

BOE for WBS 1.0.1.1, 2.0.1.1 RR Vert Dipole ADC Magnets

1842 Transfer Lines



1899 BoE for WBS 1.0.1.1, 2.0.1.1 - Design Recycler 53MHz RF









BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Ceramic

1462 Beamtubes Procure Fab Process



BOE for WBS 1.0.1.2, 2.0.1.2 - RR Ext/MI Inj Line Kickers

1771 Procure Parts & Assemble

BoE for WBS 1.0.1.2, 2.0.1.2 RR Ext/MI Inj/Beam Abort

1774 Power Supply Pulsers procure parts & assemble

BoE for WBS 1.0.1.2, 2.0.1.2 - RR Inj Gap Clearing Power

1782 Supply Pulsers

BoE for WBS 1.0.1.2, 2.0.1.2 RR Inj Gap Clearing Pulser

1783 Testing

BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems design,

1784 procure parts, assemble fluorinert skids

BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Systems PFL

1785 Frames & Cable

BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems

1786 Installation, Testing, and Checkout

BOE for WBS 1.0.5, 2.0.4.2 - PM Costs for ANU Portion of

1683 4944 CR120 NOvA

BOE for WBS 2.0.1.1 - Injection, Extraction, Beam Abort

1484 Lines Controls/Timing including Kickers



1528 BoE for WBS 2.0.1.1 - RR Instrumentation Stand Fabrication

BoE for WBS 2.0.1.1RR Injection Line Cooling System

1540 Constn



1687 BoE for WBS 2.0.1.1 - Recycler 53MHz RF Construction



1723 BOE for WBS 2.0.1.1 - RR Magnet Installations



1724 BOE for WBS 2.0.1.1 - RR Instrumentation Installation



BoE for WBS 2.0.1.1 - RR Vert Dipole Magnet PS

1733 5002 procurement

BOE for WBS 2.0.1.1 - TL Vert Dipole Cable & Power

1752 5002 Supply Installation



1753 BOE for WBS 2.0.1.1 Transfer Line Cable procurements

1788 BOE for WBS 2.0.1.1 - RR Magnet Stand Fabrication

BoE for WBS 2.0.1.1 - RR Extraction Line Cooling System

1818 Constn

BoE for WBS 2.0.1.1 - RR Abort Line Cooling System

1819 Construction

BoE for WBS 2.0.1.1 - RR RF Cavities Cooling Systems

1823 Construction







1825 BoE for WBS 2.0.1.1 - RR Vacuum Equipment Procurement



1826 BoE for WBS 2.0.1.1 - RR Vacuum System Installation



1851 BoE for WBS 2.0.1.1 - RR MI8 Pump Room Upgrade constn



1905 BoE for WBS 2.0.1.1 - Trim Magnet Power Supply Placement



1907 BoE for WBS 2.0.1.1 - MI60 Anode Power Supply Room



2352 BOE for WBS 2.0.1.1 - Accel Shutdown Rad Comp Removal



BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Procure

1769 Parts and Assemble





1770 BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Testing

1772 BOE for WBS 2.0.1.2 - RR Ext/MI Inj Line Kickers Testing

BoE for WBS 2.0.1.2 - RR Extraction MI Injection Beam

1775 Abort Power Supply Pulsers testing

BoE for WBS 2.0.1.2 RR Inj Kicker Pre-Production LV HV

1776 Life Testing

BoE for WBS 2.0.1.2 - RR Inj Kickers Preprod & Prod

1777 Assembly

BoE for WBS 2.0.1.2 - RR Injection Kickers Preprod & Prod

1778 Procurement

BOE for WBS 2.0.1.3 - RR Instr Transfer Line Torroid

1862 Relocation



1863 BOE for WBS 2.0.1.3 - RR Instr Install Transfer Dampers



1864 BOE for WBS 2.0.1.3 - RR Instr Install Longitudinal Damper

BOE for WBS 2.0.1.3 - RR Instr Procure/Test Longitudinal

1865 Damper



BOE for WBS 2.0.1.3 - RR Instr Procure/Test Transverse

1866 Dampers

BOE for WBS 2.0.1.3 RR Instr BPM Cable/Connector

1897 Procure & Install

BOE for WBS 2.0.1.3 RR Instr Transfer Line Cable

1898 Installation

BOE for WBS 2.0.1.3 - RR Instr BPM Transition Board

1906 Procure and Test

Status Comment



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, no new information



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway

Updated, CR pending Updated in blanket ANU FY10 CR



Completed, no change necessary



Not changed, CY10 complete Not changed, should be complete this year

Not changed, FY10 in progress, FY11-12 seem

No changes required valid



Completed, no change necessary



Not changed, no new information





Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Completed, no change necessary



Completed, no change necessary



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, should be complete this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, no new information



Not changed, no new information



Not changed, no new information

Not changed, no new information



Changed. Updates to transfer line design

required changes in work plan. Updated in

Updated, CR pending blanket ANU FY10 CR



Not changed, no new information

Not changed, no new information



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Updated, no CR



Completed, no change necessary



Changed. Decided to build all 43 magnets in

advance (schedule risk abatement). New

Updated, CR exists estimates documented in CR 168.



Completed, no change necessary



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year







Not changed, May Need updating: increased

uncertainty on RR Inj/MI Ext/BA overall

beamtube length requirement, and whether

vendors will be able to produce it with existing

furnaces, possible increase tooling costs or

Not changed, no new information redesign of magnet to reduce length.



Not changed, no new information. May need

Not changed, no new information updating, see BoE 1462



Not changed, no new information Not changed, in progress, no new information



Not changed, no new information Not changed, no new information



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, CY10 complete Not changed, in progress, will be done this year

Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, shutdown related Not changed, shutdown task, planning underway



Updated, CR pending Updated in blanket ANU FY10 CR



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, no new information



Not changed, no new information



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Updated, new tasks due to changes in transfer

Updated, CR pending line design. Updated in blanket ANU FY10 CR

Updated, new tasks. Updated in blanket ANU

Updated, CR pending FY10 CR



Not changed, no new information Not changed, in progress, no new information

Not changed, no new information Not changed, no new information



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway





Not changed, no new information. Working on

Future update revisions at this time.



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Updated, CR pending Updated in blanket ANU FY10 CR



Not changed, shutdown related Not changed, in progress or shutdown task



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, no new information. May need

Not changed, no new information updating, see BoE 1462



Not changed, no new information. May need

Not changed, no new information updating, see BoE 1462

Not changed, no new information. May need

Not changed, no new information updating, see BoE 1462



Not changed, no new information



Not changed, no new information



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, CY10 complete Not changed, in progress, will be done this year



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway

Not changed - no new information, BOE looks

No changes required sensible



Not changed - tasks substantially complete. BOE

No changes required is good estimate for the work that remains.



Not changed, shutdown related Not changed, shutdown task, planning underway



Not changed, shutdown related Not changed, shutdown task, planning underway

Not Changed, Engineer says estimates are still

No changes required good.



Status Count



Completed, no change necessary 6

Not changed, CY10 complete 19

Not changed, no new information 21

Not changed, shutdown related 22

Updated, CR pending 6

No changes required 4

Updated, no CR 1

Updated, CR exists 1

Future update 1

Grand Total 81

new

docid docid BOE title

1470 4958 BOE for WBS 1.0.2.1 - MI Mods Machine Timing Modifications



1472 BOE for WBS 1.0.2.1 - MI Mods A1 Extraction Line Decommissioning



1473 BOE for WBS 1.0.2.1 - MI Mods 2.5 MHz RF Cavities Decommissioning

1507 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Analysis



1508 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Design Review

1822 4957 BOE for WBS 1.0.2.1 - MI Mods Recycler Beamline Controls



1486 BoE for WBS 1.0.2.2 - MI RF Cavities Utility Modifications



1503 BoE for WBS 1.0.2.2 - MI RF Cavity Pre-install Testing



1504 BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design

BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design

1505 Reviews



1511 BoE for WBS 1.0.2.2 - MI RF Cavities Design Bus Bar

1454 BOE for WBS 1.0.2.3 - MI Radiation Safety





1684 BOE for WBS 2.0.2.1 - MI Mods Upgrade Vertical Quad Bus



1743 BOE for WBS 2.0.2.1 - MI-14 Communications & Controls Infrastructure



1747 BOE for WBS 2.0.2.1 - MI-39 Communications & Controls Infrastructure



1748 BOE for WBS 2.0.2.1 - MI Mods Design & Modify RR LL RF System

1749 5005 BOE for WBS 2.0.2.1 - MI Mods Design & Modify MI LL RF System



1475 BoE for WBS 2.0.2.2 - MI RF Cavities Final System Test



1476 BoE for WBS 2.0.2.2 - MI RF Cavities Align Cavities



1477 BoE for WBS 2.0.2.2 - MI RF Install Cavities



1478 BoE for WBS 2.0.2.2 - MI RF Move Cavities 4 & 15



1479 BoE for WBS 2.0.2.2 - MI RF Cavities Cabling

1498 BoE for WBS 2.0.2.2 - MI RF Software Programming



1506 BoE for WBS 2.0.2.2 - MI RF Cavity Water Cooling Systems Install

BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Raw Material

1509 Procurement



1512 BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Fab & Install

1710 BoE for WBS 2.0.2.2 - MI RF Cavities Power Amplifiers

1711 BoE for WBS 2.0.2.2 - MI RF Cavities Series Tube Modulators

1712 4989 BoE for WBS 2.0.2.2 - MI RF Cavities Solid State Amplifiers

1713 BoE for WBS 2.0.2.2 - MI RF Cavities Controls

1714 BoE for WBS 2.0.2.2 - MI RF Cavities Ferrite Bias Supplies

Status Comment

Updated, CR pending Updated in blanket ANU FY10 CR

Not changed, shutdown task, planning

Not changed, shutdown related underway

Not changed, shutdown task, planning

Not changed, shutdown related underway

Not changed, CY10 complete Not changed, should be complete this year



Not changed, no new information No updating at this time.

Updated, CR pending Updated in blanket ANU FY10 CR



Not changed, no new information No updating is required.



Completed, no change necessary Not changed, tasks complete



Not changed, no new information No updating at this time.



Not changed, no new information No updating at this time.



Completed, no change necessary Not changed, tasks complete

Not changed, CY10 complete Not changed, should be complete this year



Not changed, procurement complete,

Not changed, shutdown related shutdown tasks remaining, planning underway



Not changed, CY10 complete Not changed, should be complete this year



Not changed, CY10 complete Not changed, should be complete this year

Not changed, in progress & shutdown task,

Not changed, shutdown related planning underway

Updated, CR pending Updated in blanket ANU FY10 CR

Not changed, below threshold for

CR Not changed, less than $5k cost impact

Not changed, shutdown task, planning

Not changed, shutdown related underway

Not changed, shutdown task, planning

Not changed, shutdown related underway

Not changed, shutdown task, planning

Not changed, shutdown related underway

Not changed, shutdown task, planning

Not changed, shutdown related underway

No changes required No updating is required.

Not changed, shutdown task, planning

Not changed, shutdown related underway



Completed, no change necessary Not changed, tasks complete



Completed, no change necessary Not changed, tasks complete

Not changed, CY10 complete Not changed, should be complete this year

Not changed, CY10 complete Not changed, should be complete this year

Updated, CR pending Updated in blanket ANU FY10 CR

No changes required No updating is required

Not changed, CY10 complete Not changed, should be complete this year

Row Labels Count

Not changed, shutdown related 9

Not changed, CY10 complete 7



Completed, no change necessary 4

Updated, CR pending 4



Not changed, no new information 4

Not changed, below threshold for

CR 1

No changes required 2

Grand Total 31

new

docid docid CR BOE title

BoE for WBS 1.0.3.1 - A150 Quadrupole Magnet Recovery for NuMI

1885 Primary Beam



1959 BOE for WBS 1.0.3.1 - NuMI Profile Monitor Design & Review



1492 BOE for WBS 1.0.3.2 NuMI Hadron Monitor Beam Abort Design



1721 BOE for WBS 1.0.3.2 - NuMI Hadron Monitor Design



1737 BoE for WBS 1.0.3.2 - NuMI Target Carrier Design



1738 BoE for WBS 1.0.3.2 - NuMI Baffle Design

BOE for WBS 1.0.3.2 - NuMI Target/Baffle/Carrier/Hadron Monitor

1792 Design Reviews

BOE for WBS 1.0.3.3 - Revision & Review of NuMI Shielding

1493 Assessment Document (SAD)



1767 BoE for WBS 1.0.3.3 - NuMI TH Operations Space Planning



1791 BOE for WBS 1.0.3.3 - NuMI Target Hall Infrastructure Reviews



1797 BoE for WBS 1.0.3.3 - NuMI Target Chase/Radiant Heat Loads Design

BOE for WBS 1.0.3.4 - NuMI Decay Pipe/Hadron Absorber/Utilities

1790 Reviews



1805 BOE for WBS 1.0.3.4 - NuMI Utilities Electrical Infrastructure Design

BoE for WBS 1.0.3.1, 2.0.3.1 - Upgrade to NumI Primary Quadrupole

1804 Magnets





1736 BoE for WBS 1.0.3.2, 2.0.3.2 - NuMI Medium Energy Target Design



1465 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Target Chase Cooling Design

BoE for WBS 1.0.3.3, 2.0.3.3 - Horn 2 Relocation to ME/Shielding

1700 Reconfiguration & Design

BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block

1719 Design



1734 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Horn 2 Stripline Extension Design







1701 5000 CR176 BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI RAW Water Systems Design







BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI Non-RAW Water Cooling

1740 5001 CR173 Systems Design



BoE for WBS 2.0.3.1 - NuMI Extraction Kicker Charging Supply

1754 Construction

BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Dipole Power

1755 Supplies Construction





BoE for WBS 2.0.3.1 - Upgraded NuMI Primary Transport Profile

1756 Monitors Construction



BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Quadrupole Power

1757 Supplies Construction

BoE for WBS 2.0.3.1 - Upgraded NuMI Quadrupole Cables Procure

1803 Install





1884 BoE for WBS 2.0.3.1 - NuMI Extraction Kicker PS Upgrade Design

BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Beam Abort

1494 Procure/Install







1709 4999 CR177 BOE for WBS 2.0.3.2 - NuMI Target Carrier Construction

1722 BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Construction





1729 BoE for WBS 2.0.3.2 - NuMI Medium Energy Target Procurement

1730 BoE for WBS 2.0.3.2 NuMI Baffle Procurement









1466 BoE for WBS 2.0.3.3 - NuMI Target Chase Cooling Construction

BoE for WBS 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block

1720 Procure/Assemble

BoE for WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig

1731 Procure/Assemble



1744 BoE WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig Install

BoE for WBS 2.0.3.3 - NuMI TH Operations Space Planning

1768 Procure/Install



1796 BoE for WBS 2.0.3.3 - NuMI Horn 2 Stripline Extension Procure/Install

BoE for WBS 2.0.3.3 - NuMI Target Chase/Radiant Heat Loads

1798 Procure/Install



1715 BoE for WBS 2.0.3.4 - NuMI Target RAW System Construction



1727 BoE for WBS 2.0.3.4 - NuMI Horns RAW Systems construction

BoE for WBS 2.0.3.4 - NuMI Horn 2 RAW Piping Extension

1728 Construction



1735 BoE for WBS 2.0.3.4 - NuMI Decay Pipe RAW Construction

BoE for WBS 2.0.3.4 - NuMI Hadron Absorber RAW Systems

1739 Construction

1742 BoE for WBS 2.0.3.4 - NuMI Non-RAW LCW System Construction

BoE for WBS 2.0.3.4 - NuMI Non-RAW CUB Cooling Water System

1758 Construction

BoE for WBS 2.0.3.4 - NuMI Non-RAW Sump Cooling Water System

1759 Construction

BoE for WBS 2.0.3.4 - NuMI Non-RAW Secondary Chilled Water

1760 System Construction

BOE for WBS 2.0.3.4 - NuMI Utilities Electrical Infrastructure

1806 Construction

Status Comment

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year



Completed, no change necessary

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year



Not changed, no new information Not changed, no new information



Not changed, no new information No new information is available.



Not changed, shutdown related Shutdown task, planning underway



Not changed, Needs updating but

Not changed, no new information awaiting information from IHEP.

Not changed, should be complete

Not changed, CY10 complete this year

Not changed, should be complete

Not changed, CY10 complete this year



Completed, no change necessary

Not changed, should be complete

Not changed, CY10 complete this year

Changed. CR 176 has been

submitted to add tasks for a RAW

exchange system and shielding of

Updated, CR exists the DI bottles

Changed. CR 173 has been

submitted to remove the NuMI

Sump Cooling System. It is being

done as part of an upgrade for the

Updated, CR exists MINERvA experiment.

Not changed, may need CR for

schedule adjustment due to

Not changed, no new information resource availability.

Not changed, should be complete

Not changed, CY10 complete this year



Not Changed, May need updating,

awaiting results from running after

Not changed, no new information summer 2010 shutdown.

Not changed, procurement

complete & shutdown tasks

Not changed, shutdown related remaining, planning underway



Not changed, no new information Not changed, no new information

Not changed, may need CR for

schedule adjustment due to

Not changed, no new information resource availability.



Not changed, no new information Not changed, no new information

Changed. CR 177 has been

submitted to account for the new

target carrier design, prototyping,

Updated, CR exists and construction.

Not changed, no new information Not changed, no new information



Not changed, Needs updating but

Not changed, no new information awaiting information from IHEP.

Not changed, no new information Not changed, in progress.



Not changed, no new information.

Waiting on completion of the Target

Chase Cooling Review. May need

additional tasks due to an observed

increase in the humidity levels in the

Not changed, no new information target chase.



Completed, no change necessary

Not changed, no new information.

Not changed, no new information Internal review in progress.

Not changed, no new information.

Not changed, no new information Internal review in progress.

Not changed, should be complete

Not changed, CY10 complete this year



Not changed, CY10 complete Not changed, no new information



Not changed, CY10 complete Not changed, no new information

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, no new information,

Not changed, shutdown related shutdown task

Not changed, no new information,

Not changed, shutdown related shutdown task

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, shutdown task,

Not changed, shutdown related planning underway

Not changed, shutdown task,

Not changed, shutdown related planning underway



Row Labels Count



Completed, no change necessary 3

Not changed, shutdown related 13

Not changed, CY10 complete 16

Not changed, no new information 14

Updated, CR exists 3

Grand Total 49

new

docid docid BOE title



1763 BoE for WBS 1.0.4.1 - Beam Physics - ANU Demands on Proton Plan



1764 BoE for WBS 1.0.4.2 - Beam Physics - Machine & Process Analysis

1765 BoE for WBS 1.0.4.3 - Beam Physics - ANU Proton Projections

Status Comment

Not changed, in progress, will be done this

Not changed, CY10 complete year

Not changed, in progress, will be done this

Not changed, CY10 complete year

No changes required Not changed, in progress



Row Labels Count

Not changed, CY10 complete 2

No changes required 1

Grand Total 3

new

docid docid Change RequestsBOE title

4909 BoE - WBS 1.1.5 - Near Detector Surface Building

2679 BoE for WBS 2.1.1.2.5 Wetland Banking Credits

2693 4905 CR084 CR103 CR147 BoE - WBS 2.1.1.4 Site Preparation Build Phase

2081 4908 CR103 CR108 BoE for WBS 2.1.1.5 EDIA

2694 4906 CR084 CR095 CR103 BoE for WBS 2.1.2.3 Far Detector Building Build Phase

2689 4907 CR103 BoE for WBS 2.1.2.4 EDIA

2691 BoE for WBS 2.1.4.1 Permits

2692 BoE for WBS 2.1.4.4 Quality Control

Status Comment

New, CR exists

Not Changed, Complete

Updated, CR exists

Updated, CR exists

Updated, CR exists

Updated, CR exists

Not Changed, Complete

No changes required No changes required



Row Labels Count

No changes required 1

Not Changed, Complete 2

New, CR exists 1

Updated, CR exists 4

Grand Total 8

new

docid docid CR BOE title



2421 BoE for WBS 1.2.9.1.4 ISO Tank Delivery and Leasing



2443 BoE for WBS 1.2.9.2.1.1 Purchase secondary containment

BoE for WBS 1.2.9.2.2.2 Procure blending system parts (pumps, hoses,

2442 instrumentation, scales)

BoE for WBS 2.2.1.5.2 - 2.2.1.5.4 Mineral Oil Production, Delivery, and Storage -

2094 5048 CR175 FY10, FY11, FY12

2095 BoE for WBS 2.2.1.6 - QC-Mineral Oil

BoE for WBS 2.2.2.5- Pseudocumene Production, Delivery, and Storage-FY10,

2096 FY11 and FY12

2097 BoE for WBS 2.2.2.6- QC Pseudocumene

BoE for WBS 2.2.3.5.2, 2.2.3.5.3, 2.2.3.7 - Waveshifters Production and Delivery

2098 (low-rate FY08/full-rate FY09)



2099 BoE for WBS 2.2.3.6.1 QC -Waveshifters-FY08, FY09

2100 BoE for WBS 2.2.4.2.1- Prepare preproduction batch of fluor concentrate

2102 BoE for WBS 2.2.4.2.2 - QC preproduction batch of flour concentrate

2103 BoE for WBS 2.2.4.2.3- Production Blending of Flour Concentrate

2108 BoE for WBS 2.2.4.2.4- QC-Production Fluor Concentrate

2104 BoE for WBS 2.2.4.3.1 - Prepare preproduction batch of scintillator blend

2106 BoE for WBS 2.2.4.3.2-QC preproduction batch of scintillator blend

2107 BoE for WBS 2.2.4.3.3 - Production Blending of Scintillator

2109 BoE for WBS 2.2.4.3.4- QC-Production Scintillator Blend

2408 BoE for WBS 2.2.4.4 Production Blending Development

2110 BoE for WBS 2.2.5.3 - Far Detector Scintillator Transport

2144 BoE for WBS 2.2.6 Liquid Scintillator Management

Status Comment



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Updated, CR exists

Not changed, no new information



Not changed, no new information

Not changed, no new information



Not changed, below threshold for CR



Completed, no change necessary

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, CY10 complete

Not changed, no new information

Not changed, no new information



Status Count

Completed, no change necessary 4

Not changed, CY10 complete 1

Not changed, no new information 13

Updated, CR exists 1

Not changed, below threshold for CR 1

Grand Total 20

new

docid docid CR BOE title

2717 BOE for WBS 1.3.4 Development of QA Methods



2716 4883 CR145 BoE for WBS 1.3.5 BoE Integration Prototype Detector Fiber Production

2196 4884 CR145 BoE for WBS 2.3.2.1 Fiber Production

2217 4895 CR145 BoE for WBS 2.3.2.12 Fiber Quality Assurance

2495 BoE for WBS 2.3.2.13 Shipping Fiber to Module Factory

2549 BoE for WBS 2.3.2.14 Infrastructure Improvements

2497 BoE for WBS 2.3.3 Fiber Management

Status Comment

Completed, no change necessary QA methods completed, on budget



Updated, CR exists

Updated, CR exists

Updated, CR exists

No changes required Shipment estimate still valid

Completed, no change necessary Infrastructure completed on budget

No changes required Management proceeding on budget



Status Count

Completed, no change necessary 2

Updated, CR exists 3

No changes required 2

Grand Total 7

new

docid docid B OE title Status Com m ent

BoE for WBS 1.4.3.4.5.10, 1,4,3,5,11, 1.4.3.6.3, 1.4.3.7.2 and 1.4.3.7.3

2505 Fabricate remaining Extrusions Completed, no change necessary

2504 BoE for WBS 1.4.2.3.2.3, 1.4.2.4.2.3 and 1.4.2.5.3 Produce PVC Resin Completed, no change necessary

2782 BoE for WBS 2.4.1.2.3.3 Obtain Vendor Samlpes Completed, no change necessary

2783 BoE for WBS 2.4.1.2.3.4 Extrude Samples using NOvA Prototype Dies Completed, no change necessary



2300 BoE for WBS 2.4.1.3.2 "Purchase Commercial QC Instruments" Not changed, CY10 complete In progress, done by end of CY10



2301 BoE for WBS 2.4.1.3.3 "Build Custom QC Instruments" Not changed, CY10 complete In progress, done by end of CY10



2539 BoE for WBS 2.4.1.3.4 Setup QC Instruments Not changed, CY10 complete In progress, done by end of CY10



2500 BoE for WBS 2.4.2.1.3 and 2.4.2.1.8 Produce Test Extrusions (Horizontal) Not changed, CY10 complete In progress, done by end of CY10

BoE for WBS 2.4.2.1.5, 2.4.2.1.9 and 2.4.2.1 15 Evaluation of Extrusions:

2540 Horizontal Not changed, CY10 complete In progress, done by end of CY10



2178 BoE for WBS 2.4.2.1.1 Vendor Setup (Horizontal Extrusion Pre-production) Not changed, CY10 complete In progress, done by end of CY10



2502 BoE for WBS 2.4.2.1.14.1 Produce PVC Extrusions (Horizontal Pre-production) Not changed, CY10 complete In progress, done by end of CY10

BoE for WBS 2.4.2.1.2 Obtain PVC resin for trest and pre-production

2498 (Horizontal) Completed, no change necessary



2501 BoE for WBS 2.4.2..2.3 and 2.4.2.2.8 Not changed, CY10 complete In progress, done by end of CY10

BoE for WBS 2.4.2.2.5, 2.4.2.2.9 and 2.4.2.2.15 Evaluate Test Extrusions:

2541 Vertical Not changed, CY10 complete In progress, done by end of CY10



2458 BoE for WBS 2.4.2.2.1 Vertical Extrusion Production: Vendor Setup Not changed, CY10 complete In progress, done by end of CY10



2503 BoE for WBS 2.4.2.2.14.1 Produce PVC Extrusions (Vertical Pre-production) Not changed, CY10 complete In progress, done by end of CY10



2499 BoE for WBS 2.4.2.2.2 Obtain PVC resin for test and pre-production (Vertical) Completed, no change necessary



2496 BoE for WBS 2.4.3.1 Extrusion Production: Near Detector Not changed, CY10 complete In progress, done by end of CY10

BoE for WBS 2.4.3.2.1.1.2, 2.4.3.2.1.2.2, 2.4.3.2.2.1.1, 2,4,3,2.2.2.1 Far

1342 4926 Detector Extrusion Production: Obtain PVC Resin Block 1 H, etc. Updated, no CR

BoE for WBS 2.4.3.2.1.1.3, 2.4.3.2.1.2.3, 2.4.3.2.2.1.2, 2.4.3.2.2.2.2 Far

Detector Extrusion Production: Produce PVC Extrusions Block 1 H (type A),

2479 4927 etc. Updated, no CR

BoE for WBS 2.4.3.2.1.1.4, 2.4.3.2.1.2.4, 2.4.3.2.2.1.3, 2.4.3.2.2.2.3 and

2179 others; Ship PVC Extrusions To Module Factory Not changed, no new information No change; RFP being written

BoE for WBS 2.4.3.2.1.1.5, 2.4.3.2.1.2.5, 2.4.3.2.2.1.4, 2.4.3.2.2.2.4

2485 4931 Extrusion Production: Quality Control and Documentation of Extrusions Updated, no CR

BoE for WBS 2.4.4.2, 2.4.4.3, 2.4.4.4, 2.4.4.5, 2.4.4.6 Setup Hardware; Data

2486 Taking Not changed, no new information

2451 BoE for WBS 2.4.4.8, 2.4.4.9, 2.4.4.10 and 2.4.4.11 Ship Samples for QA Not changed, no new information



2299 BoE for WBS 2.4.4.1 Procure Hardware (Quality Assurance Instruments) Not changed, CY10 complete In progress, done by end of CY10

2180 4929 BoE for WBS 2.4.5.2 Pallet System Updated, no CR

BoE for WBS 2.4.5.3.1.1, 2.4.5.3.3.1, 2.4.5.3.4.1 Procure Motion System

2492 Components Not changed, no new information



2493 BoE for WBS 2.4.5.4.1, 2.4.5.4.2 and 2.4.5.4.3 Extrusion Storage at Vendor Not changed, no new information

2457 BoE for WBS 2.4.5.5.1 Extrusion Sorting Device Completed, no change necessary

2453 BoE for WBS 2.4.5.5.2 Make Vacuum Lifting Fixtures Completed, no change necessary

2302 BoE for WBS 2.4.6 for Management - Construction Not changed, no new information





Status Count

Completed, no change necessary 8

Not changed, CY10 complete 13

Not changed, no new information 6

Updated, no CR 4

Grand Total 31

new

docid docid CR BOE title



BoE for WBS 1.5.5.9 / 2.5.3.1.11 / 2.5.3.2.6.8 Develop quality assurance

8/31 tracking system procedures, software, and training / Procure quality

2366 5029 review assurance system hardware / Install quality assurance tracking system





see see

above 5036 above same as above





see see

above 5045 above same as above



2515 BoE for WBS 1.5.6 Module Shipping and Storage R&D



2687 BoE for WBS 1.5.10 Management – R&D Phase



2202 BoE for WBS 1.5.2.1.1 Fiber Manifold Component R&D



BoE for WBS 1.5.2.1.1.10 Integration Prototype Manifold Manufacturing (not

2206 IPND)



2200 BoE for WBS 1.5.2.2 End Plate R&D







8/31

2195 5032 review BoE for WBS 1.5.2.3 Joining Technology R&D



2439 BoE for WBS 1.5.3 Photo Detector Interface R&D



2437 BoE for WBS 1.5.4.2 Factory Material Handling, Tooling, & Fixtures R&D



3810 BOE for WBS 1.5.4.3 -- FHEP Module Production

BoE for WBS 1.5.5 Quality Assurance and Quality Control Methods

2438 Development

BoE for WBS 1.5.7.1.3 Install and Setup Additional Infrastructure and Factory

2440 Machines



2395 BoE for WBS 1.5.7.1.1 Identify and acquire factory space

BoE for WBS 1.5.7.1.2 Acquire and Install Factory Tools, Fixtures, and Other

2189 Infrastructure

BoE for WBS 1.5.7.1.4 Develop Initial Versions of Machine Operating

2441 Procedures

BoE for WBS 1.5.7.3.1 and 1.5.7.3.2 IPND Manifold Production and

2192 Assemble and test IPND Manifolds



BoE for WBS 1.5.7.3.3 and 1.5.7.3.4 IPND End Plate Components /

2203 Assemble and test preproduction prototype (IPND) end plates and seals

BoE for WBS 1.5.7.3.5 Manufacture preproduction prototype (IPND) optical

2201 conectors

2446 BoE for WBS 1.5.7.3.6 Produce IPND Modules



2448 BoE for WBS 1.5.8 Initial Production Module Specifications



2449 BoE for WBS 1.5.9 Initial Factory Tooling Specifications

8/31

2211 5022 review BoE for WBS 2.5.1.1: Fiber Manifold Production (drawing files in v2)



2212 2212 BoE for WBS 2.5.1.2: End Plate And Seal Production



2188 2188 BoE for WBS 2.5.1.2.6 Procure edge stiffeners



2213 2213 BoE for WBS 2.5.2 Optical Connector Production

BoE for WBS 2.5.3.1.1 and 2.5.3.2.6.7 Fabricate and deliver extrusion lifters

2186 2186 / Install and setup extrusion lifters

8/31 BoE for WBS 2.5.3.1.10 and 2.5.3.2.6.4 Fabricate fiber facing machines /

2215 5024 review Install and setup fiber facing machines

BoE for WBS 2.5.3.1.12, 2.5.3.2.7, 2.5.3.3.2.1.7 Review factory tooling

machines and fixtures / Review factory setup and operation for full

2514 2514 production readiness / Review construction of Block 1 modules

BoE for WBS 2.5.3.1.4 and 2.5.3.2.6.2 Fabricate and deliver pressure testing

2198 2198 equipment/Install and setup pressure testing equipment

BoE for WBS 2.5.3.1.5 and 2.5.3.2.6.6 Fabricate material handling and

2190 2190 storage equipment/Install material handling and storage equipment

BoE for WBS 2.5.3.1.6 and 2.5.3.2.6.5 Procure gluing machines / Install and

2205 2205 setup gluing machines

BoE for WBS 2.5.3.1.7 and 2.5.3.2.6.1 Fabricate fiber stringing machines /

2216 2216 Install and setup fiber stringing machines

BoE for WBS 2.5.3.1.8 and 2.5.3.2.6.3 Fabricate and deliver fiber checking

2214 2214 machine and Install and setup fiber checking machine

BoE for WBS 2.5.3.1.9 and 2.5.3.2.6.9 Floor Crane Procurement and

2207 Install floor cranes

8/31

2365 5023 review BoE for WBS 2.5.3.1.3 Fabricate and deliver tooling and fixtures

BoE for WBS 2.5.3.2.5 and 2.5.3.2.8 Operating factory space /Closeout

2367 2367 factory space



2193 2193 CR122 BoE for WBS 2.5.3.2.1 Factory Lease



2383 BoE for WBS 2.5.3..2.1 Identify factory space



2354 BoE for WBS 2.5.3.2.3 Additional factory HVAC



2368 BoE for WBS 2.5.3.2.4 Additional Factory Utilities and Preparation

8/31

2218 5014 review BoE for WBS 2.5.3.3.2.*.*.1 Assemble and test far detector modules

8/31 BoE for WBS 2.5.3.3.2.1.1.2, 2.5.3.3.2.38.2.2 Ship completed far detector

2357 5025 review modules to far site -Block 1H-38V



2447 BoE for WBS 2.5.3.3.3 Near Detector and 1.5.7.3.6 Produce IPND Modules



BoE for WBS 2.5.3.3.3.5 and 1.5.7.3.6 Ship Completed Near Detector

2445 Modules to ANL and Ship IPND Modules

2686 BoE for WBS 2.5.4 Management – Construction Phase

8/31

5030 review BOE WBS 2.5.3.1.13 Fabricate and Deliver Module Flatness QA/QC device

8/31

5026 review BOE WBS 2.5.3.2.6.15 Train module factory student technicians

5042 BOE WBS 2.5.3.2.6.14 Train module factory technicians

Status Comment

Title of updated BOE is "BOE

WBS 2.5.3.3.4 Maintain

Module quality assurance

Updated, CR pending tracking system"

Title of updated BOE is "BOE

WBS 2.5.3.1.11 Procure

quality assurance system

Updated, CR pending hardware"



Title of updated BOE is "BOE

WBS 2.5.3.2.6.8 Install quality

Updated, CR pending assurance tracking system"



Completed, no change necessary



Update pending



Completed, no change necessary





Completed, no change necessary



Completed, no change necessary



Updated BOE has title "BOE

WBS 2.5.3.3.5 Materials

strength and chemical

Updated, CR pending interactions testing"



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Update pending



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary





Completed, no change necessary



Completed, no change necessary

Update pending



Update pending



Update pending



Updated, CR pending

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #



Updated, CR pending



Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, below threshold for CR #



Completed, no change necessary



Updated, CR pending

Update was put in same docid

Updated, below threshold for CR #

Update was put in same docid

Updated, CR exists #



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Updated, CR pending



Updated, CR pending

I.5 complete, 2.5 needs policy

Future update decision





Update pending

Update pending



New, CR pending



New, CR pending

New, CR pending



Status Count

Completed, no change necessary 18

Update pending 7

Updated, CR pending 9

Updated, below threshold for CR 11

Updated, CR exists 1

Future update 1

New, CR pending 2

Grand Total 49

new

docid docid BOE title

2684 BoE for WBS 1.6.1.3 Water Cooling

2682 BoE for WBS 1.6.1.2 QA/QC Stations

2657 BoE WBS 1.6.1.6.1.2 APD Engineering Run

2418 BoE for WBS 1.6.1.6.2.1 Procure Manifolds

2422 BoE for WBS 1.6.1.6.2.2 Procure Other Components

2673 BoE for WBS 1.6.1.6.2.3 Assemble and Test Hardware

2718 BoE for WBS 1.6.3.1 - Low Voltage Power Supplies

2719 BoE for WBS 1.6.3.2 - High Voltage Power Supply

2720 BoE for WBS 1.6.3.3 - Power Cables

2721 BoE for WBS 1.6.3.4 - Power Distribution Box

2722 BoE for WBS 1.6.3.5.1 - Low Voltage Power Supplies

2723 BoE for WBS 1.6.3.5.2 - High Voltage Power Supply

2724 BoE for WBS 1.6.3.5.3 - Power Cables

2725 BoE for WBS 1.6.3.5.4 - Power Distribution Boxes

BoE for WBS 1.6.3.5.5 - Ship PDBs, cables, and power

2726 supplies to Fermilab





2249 BoE for WBS 2.6.1.1.1 Manufactured Parts



2251 BoE for WBS 2.6.1.1.2 TE Coolers





2252 BoE for WBS 2.6.1.1.3 Assemble and Test APD housings

2133 BoE for WBS 2.6.1.2.3 - APD Array





2253 BoE for WBS 2.6.1.3 APD Module Testing



2254 BoE for WBS 2.6.1.4.1-33 APD Module Shipping

2255 BoE for WBS 2.6.2.1.1 Far Detector ASIC Production

2257 BoE for WBS 2.6.2.1.3 ADC



2259 BoE for WBS 2.6.2.1.4 COTs



2260 BoE for WBS 2.6.2.1.5 PC Boards







2261 BoE for WBS 2.6.2.1.6 Electronics Box





2262 BoE for WBS 2.6.2.1.7.1-3 TEC Controller Modules



2264 BoE for WBS 2.6.2.2.1 FEB Assembly

2265 BoE for WBS 2.6.2.4 Firmware Maintenance

2266 BoE for WBS 2.6.2.5.1-2 QA/QC

2221 4984 BoE for WBS 2.6.3.1.3-Procure LV pwer supplies

2219 BoE for WBS 2.6.3.1.1-Specify relay racks

2220 4983 BoE for WBS for 2.6.3.1.2-Procure relay racks

2222 4985 BoE for WBS 2.6.3.1.4-Test LV power supplies

2223 4986 BoE for WBS 2.6.3.2.1-Procure HV power supplies

2224 BoE for WBS 2.6.3.2.2-Test HV power supplies

2230 BoE for WBS 2.6.3.3.6-Procure ground cables

2225 4987 BoE for WBS 2.6.3.3.1-Procure PDB to FEB cables

2226 BoE for WBS 2.6.3.3.2-Procure LV supply to PDB cables

2227 BoE for WBS 2.6.3.3.3-Procure LV supply sense cables

2228 BoE for WBS 2.6.3.3.4-Procure HV supply to PDB cables

2229 BoE for WBS 2.6.3.3.5-Procure PDB to DCM cables

2231 BoE for WBS 2.6.3.3.7-Specify cable trays

2232 4988 BoE for WBS 2.6.3.3.8-Procure cable trays

2233 BoE for WBS 2.6.3.4.1-Procure PDB parts

2234 BoE for WBS 2.6.3.4.2-Assemble and test PDBs

2165 BoE for WBS 2.6.3.5.1.1.1-33 Procure Manifolds

2425 BoE for WBS 2.6.3.5.1.2.1-33 Ship Manifolds Block 1-33

2248 BoE for WBS 2.6.3.5.2 Procure Other Components

2268 BoE for WBS 2.6.3.5.4 Fill and Test Equipment

2256 BoE for WBS 2.6.3.5.5 Auxiliary Panel Readout

2236 BoE for WBS 2.6.3.6-Ship power distribution system

Status Comment

Not changed, CY10 complete

Not changed, CY10 complete

Completed, no change necessary

Not changed, CY10 complete

Not changed, CY10 complete

Not changed, CY10 complete

Completed, no change necessary

Completed, no change necessary

Completed, no change necessary

Completed, no change necessary

Not changed, CY10 complete

Not changed, CY10 complete

Not changed, CY10 complete

Not changed, CY10 complete



Not changed, CY10 complete

BOE needs to be updated to account for current bids and PO's

for heat sink parts, quotes for all parts not yet completed so far,

Update pending on track

BOE needs to be updated to account fot TEC PO, BOE 11.10

Update pending quote 7.60 for first 6,500, needs update



BOE needs to be updated to account for labor estimates based

Update pending on construction of Near Detector heat sink assemblies

Not changed, no new information



BOE needs to be updated to account for labor estimates based

Update pending on construction of Near Detector heat sink assemblies

BOE needs to be updated to account for pricing of current

Update pending shipping plans

Not changed, no new information

Not changed, no new information

parts for 600 boards in line with quotes, larger quantity not yet

Update pending complete

parts for 600 boards in line with quotes, larger quantity not yet

Update pending complete

BOE needs to be updated to account for the current PO for Near

Detector electronics boxes. Costs assumed the same for Far

Detector boxes, even though the Far Detector manifolds are yet

Update pending to be designed.

BOE needs to be updated to account for the PO's issued, but

Visser is "too busy" to do it. To the extent I have time, I will try to

Update pending update the BOE.

parts for 600 boards in line with quotes, larger quantity not yet

Update pending complete

Not changed, no new information

Not changed, no new information

Updated, no CR

Not changed, no new information

Updated, no CR

Updated, no CR

Updated, no CR

Not changed, no new information

Not changed, no new information

Updated, no CR

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Updated, no CR

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information



Status Count

Completed, no change necessary 5

Not changed, CY10 complete 10

Not changed, no new information 21

Update pending 10

Updated, no CR 6

Grand Total 52

new

docid docid Change Requests BOE title



2145 BoE for WBS 1.7.1.1 DAQ Software Standards and Tools

2154 BoE for WBS 1.7.1.10 Online Databases

2146 BoE for WBS 1.7.1.2 Error Handling System

2147 BoE for WBS 1.7.1.3 Message Passing System

2148 BoE for WBS 1.7.1.4 Run Control System



2149 BoE for WBS 1.7.1.5 DAQ Software Architecture Overview

2150 CR144 CR165 BoE for WBS 1.7.1.6 Event Buffer Farm Software

2151 BoE for WBS 1.7.1.7 Data Logger

2152 BoE for WBS 1.7.1.8 Global Trigger System

2153 BoE for WBS 1.7.1.9 DAQ Monitor System

2459 BoE for WBS 1.7.2.1.3 Data Concentrator Prototype

2460 BoE for WBS 1.7.2.1.6 Data Concentrator for IPND



2461 BoE for WBS 1.7.2.2 Control and Timing System Prototype



2462 BoE for WBS 1.7.2.3.2 DAQ Network Prototype Hardware



2477 BoE for WBS 1.7.2.3.3 DAQ Network Prototype Hardware

BoE for WBS 1.7.2.4 Control Room Equipment and

2463 Infrastructure

BoE for WBS 1.7.2.5 DAQ Buffer Farm Evaluation

2464 Components

BoE for WBS 1.7.2.6 DAQ Data Storage Evaluation

2465 Components

2466 BoE for WBS 1.7.2.7 DAQ Cabling for IPND

2467 BoE for WBS 1.7.2.8 Database Computers for IPND



2415 BoE for WBS 1.7.3.1 Install and Test Integration Test Facility

2414 BoE for WBS 1.7.3.2 Buffer Farm Evaluation

BoE for WBS 1.7.3.3 Readout Electronics Integration

2413 Testing

2412 BoE for WBS 1.7.3.4 Software Integration Testing

2411 BoE for WBS 1.7.3.5 End user consultation

2155 4969 CR110 CR144 CR165 BoE for WBS 2.7.1.1 Error Handling System

2164 5006 CR165 CR169 BoE for WBS 2.7.1.10 Online Databases

2156 4970 CR144 BoE for WBS 2.7.1.2 Message Passing System

2157 4972 CR136 CR144 CR165 BoE for WBS 2.7.1.3 Run Control System

2158 BoE for WBS 2.7.1.4 Event Buffer Farm Software

2159 CR136 BoE for WBS 2.7.1.5 Data Logger

2160 CR136 BoE for WBS 2.7.1.6 Data File Transfer System

2161 4979 CR121 CR136 BoE for WBS 2.7.1.7 DAQ Monitor System



2162 BoE for WBS 2.7.1.8 Event Monitor System



2163 BoE for WBS 2.7.1.9 Event Display System



2468 BoE for WBS 2.7.2.1 Data Concentrator Production

BoE for WBS 2.7.2.2.2 Control and Timing System

2469 Preproduction

BoE for WBS 2.7.2.2.6.2.7 Control and Timing System

2470 Production



2471 BoE for WBS 2.7.2.3 DAQ Network Production Components



2472 BoE for WBS 2.7.2.4 Control Room Infrastructure Production

2473 BoE for WBS 2.7.2.5 Buffer Farm Production Computers



2474 BoE for WBS 2.7.2.6 Data Storage Production Components

2475 BoE for WBS 2.7.2.7 DAQ Cabling for Production



2476 BoE for WBS 2.7.2.8 Database Computers for Production



2410 BoE for WBS 2.7.3.1 Readout Electronics Integration Testing

2409 BoE for WBS 2.7.3.2 Software Integration Testing

2287 BoE for WBS 2.7.3.3 Consultation

2083 BoE for WBS 2.7.4.1.1.1 - DCS Master Control servers

2084 BoE for WBS 2.7.4.1.1.2 - DCS readout IOC nodes



2085 BoE for WBS 2.7.4.1.1.3 - DCS local logging station with raid

2086 BoE for WBS 2.7.4.1.1.4 - DCS monitoring displays

BoE for WBS 2.7.4.1.1.5 - DCS electronics room rack

2089 enclosures

BoE for WBS 2.7.4.1.1.9 - DCS Power protection (10KVA

2090 UPS)



2087 BoE for WBS 2.7.4.1.2.1 - DCS system Compact field points

BoE for WBS 2.7.4.1.2.3 - DCS system Compact field point

2828 sensor packs

Status Comment



Completed, no change necessary

Completed, no change necessary

Completed, no change necessary

Completed, no change necessary

Completed, no change necessary



Completed, no change necessary

Not changed, CY10 complete

Completed, no change necessary

Not changed, CY10 complete

Completed, no change necessary

Completed, no change necessary

Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary



Completed, no change necessary

Not changed, CY10 complete

Completed, no change necessary



Completed, no change necessary

Completed, no change necessary



Completed, no change necessary

Completed, no change necessary

Completed, no change necessary

Updated, CR exists

Updated, CR exists

Updated, CR exists

Updated, CR exists

Not changed, no new information

Not changed, CY10 complete

Not changed, CY10 complete

Updated, CR exists



Not changed, no new information No changes. No BOE update



Not changed, no new information No changes. No BOE update.

Projections from IPND within

No changes required 10%



Not changed, no new information

Not changed, no new information



Not changed, no new information



Not changed, no new information

Not changed, no new information



Not changed, no new information

Not changed, no new information



Not changed, no new information



Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information

Not changed, no new information



Not changed, no new information

Not changed, no new information



Not changed, no new information



Not changed, no new information



Not changed, no new information



Not changed, no new information



Status Count

Completed, no change necessary 22

Not changed, CY10 complete 5

Not changed, no new information 22

Updated, CR exists 5

No changes required 1

Grand Total 55

new

docid docid BOE title

2532 BoE for WBS 1.8.2 - Structural Design and Validation



2533 BoE for WBS 1.8.3 -- Liquid Scintillator Filling and Handling R&D

2534 BoE for WBS 1.8.4 -- Near Detector Assembly R&D

2391 BoE for WBS 1.8.5.2 IPND Systems Design

2359 BoE for WBS 1.8.5.3 IPND Equipment

2406 BoE for WBS 1.8.5.4 IPND Block Assembly Facility Setup

2360 BoE for WBS 1.8.5.5 IPND Block Fabrication

2399 BoE for WBS 1.8.5.6 MINOS Service Building Contracts

BOE for WBS 1.8.5.7 Installation, Commissioning and Operation in

2424 MINOS Service Building

2536 BoE for WBS 1.8.6 -- Far Detector Assembly Engineering

2361 BoE for WBS 1.8.8.1 Full Scale Block Assembly Prototype

2362 BoE for WBS 1.8.8.2 Full Height Engineering Prototype

2537 BoE for WBS 1.8.9 -- Management, R&D Phase

Status Comment

No change, no new information



Completed, no change necessary

Completed, no change necessary

No change, no new information

No change, no new information

Completed, no change necessary

No change, no new information

Completed, no change necessary



No change, no new information

No change, no new information

Completed, no change necessary

No change, no new information

No change, no new information



Row Labels Count

Completed, no change necessary 5

No change, no new information 8

Grand Total 13

new

docid docid BOE title

BoE for WBS 2.8.1.1 & 2.8.1.2 Cave Excavation Design and Engineering, Tunnel and

2348 Cave Infrastructure Design and Engineering



2241 4952 BoE for WBS 2.8.1.3 - Tunnel Infrastructure Contract



2111 4953 BoE for WBS 2.8.1.4 - Excavation contract

2355 BoE for WBS 2.8.2.1 Containment of ND Full Volume

2240 BoE for WBS 2.8.2.2 - Muon Catcher

2347 BoE for WBS 2.8.2.3, Active Detector

BoE for WBS 2.8.2.4 - 2.8.2.6 South Bookend, Survey and Align Muon Catcher and

2452 Six Blocks, All Blocks and Bookend in Place

2313 BoE for WBS 2.8.3 Liquid Scintillator Filling Equipment

2423 BoE for WBS 2.8.4 Installation Coordination

2484 BoE for WBS 2.8.5 - Management - Construction Phase - Labor

Status Comment



No change, no new information



Updated, no CR Changed to reflect new estimate



Updated, no CR Changed to reflect new estimate

No change, no new information

No change, no new information

No change, no new information



No change, no new information

No change, no new information

No change, no new information

No change, no new information



Row Labels Count

No change, no new information 8

Updated, no CR 2

Grand Total 10

new

docid docid BOE title

2056 4934 BoE for WBS 2.9.1.1 - Module Lifting Fixture

2057 BoE for WBS 2.9.1.2 - Adhesive Dispenser

2058 BoE for WBS 2.9.1.3 - Block Safety Constraint Beam

2059 BoE for WBS 2.9.1.4 - Block Pivoter Table

2120 BoE for W.B.S. 2.9.1.5 - Survey Equipment for the Far Detector

2060 BoE for WBS 2.9.2.1 - Electrical Infrastructure

2061 BoE for WBS 2.9.2.2 - Far Detector Bookends

2319 BoE for WBS 2.9.2.3 - Detector Structure Monitoring Equipment

2068 BoE for WBS 2.9.3.1 - Scintillator Transfer Facility

2069 BoE for WBS 2.9.3.2 - Scintillator Plumbing

2070 BoE for WBS 2.9.3.3 - Scintillator fill machines

2071 BoE for WBS 2.9.3.4 - Vapor recovery system

2326 BoE for WBS 2.9.3.5 - Scintillator Filling System Commissioning

2072 4933 BoE for WBS 2.9.4.1 - Assembly Infrastructure

2073 4935 BoE for WBS 2.9.4.2 - Block components

2074 4932 BoE for WBS 2.9.4.3 - Block Assembly and Alignment

2426 BoE WBS 2.9.4.4 - Detector Block Filling

2427 BoE for WBS 2.9.4.5 - Detector Block Outfitting

2531 BoE for WBS 2.9.4.6 - Detector Turn-on and Checkout

2506 BoE for WBS 2.9.4.7 -- Far detector assembly crew management

2435 4936 BoE for WBS 2.9.5 - Management

Status Comment

Updated, no CR Changed, new estimate since IPND work

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

No change, no new information

Updated, no CR Changed, new estimate since IPND work

Updated, no CR Changed, new estimate since IPND work

Updated, no CR Changed, new estimate since IPND work

No change, no new information

No change, no new information

No change, no new information

No change, no new information

Updated, no CR Changed, new estimate since IPND work



Row Labels Count

No change, no new information 16

Updated, no CR 5

Grand Total 21

new

docid docid CR BOE title

2275 BoE for WBS 1.9 - Project Management FY06 &FY07

2276 5019 CR185 BoE for WBS 2.10 - Project Management FY10 - FY14

Status

Completed, no change necessary

Updated, CR exists



Status Count

Completed, no change necessary 1

Updated, CR exists 1

Grand Total 2

new

docid docid Change Requests BOE title

1513 BoE for WBS 1.0.1.1 - RR Cooling Systems Capacity

1514 BoE for WBS 1.0.1.1 - Design Reviews for RR Cooling Systems

1527 BoE for WBS 1.0.1.1 - RR alignment

1530 BOE for WBS 1.0.1.1 RR Mods Stochastic Cooling Decommissioning

1845 BoE for WBS 1.0.1.1 RR Device Removal

1873 BoE for WBS 1.0.1.1 - Trim Magnet Corrector Reassignment

1900 4954 BoE for WBS 1.0.1.1 - Test Recycler 53 MHz RF

1913 BoE for WBS 1.0.1.1 - RR 53 Mhz Design Review

2592 BOE for WBS 1.0.1.1 - Recycler Transfer Lines Design Review

1456 BOE for WBS 1.0.1.2 - AD Oversight of TD Magnet Construction

1480 BoE for WBS 1.0.1.2 - Gap Clearing Prototype Bumper PS Beam Test

1481 BOE for WBS 1.0.1.2 - RR Inj Gap Clearing Pulse Forming Networks

1482 BOE for WBS 1.0.1.2 - RR Injection Gap Clearing Resonant Chargers Procure/Asse

1773 BOE for WBS 1.0.1.2 - RR Extr/MI Inj/RR Abort Line Kickers Design & Review

1780 BoE for WBS 1.0.1.2 RR Inj & Gap Clearing Kickers Prototype

1781 BoE for WBS 1.0.1.2 - RR Inj Gap Clearing Kickers Prototype Testing

1927 BOE for WBS 1.0.1.3 - RR Instr Design BPM Cables and Transition Boards

1928 BOE for WBS 1.0.1.3 - RR Instru Design Transverse Dampers

1929 BOE for WBS 1.0.1.3 - RR Instr Design Longitudinal Damper

1930 BOE for WBS 1.0.1.3 - RR Instrumentation Design Review

1463 BOE for WBS 1.0.1.4 - Recycler Ring Radiation Safety

1516 BoE for WBS 1.0.1.1, 2.0.1.1 RR Extraction Line Cooling System Design

1517 BoE for WBS 1.0.1.1, 2.0.1.1 - RR Injection Line Cooling System Design

1518 BoE for WBS 1.0.1.1, 2.0.1.1 - RR Abort Line Cooling System Design

1519 BoE for WBS 1.0.1.1, 2.0.1.1 - RR RF Cavities Cooling Systems

1526 5002 BOE for WBS 1.0.1.1, 2.0.1.1 - Vertical Dipole Magnet Power Supply Design

1537 BoE for WBS 1.0.1.1, 2.0.1.1 - RR MI-8 Pump Room Design

1707 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Installation Planning

1725 BOE for WBS 1.0.1.1, 2.0.1.1 - RR Stand Design

1793 BoE for 1.0.1.1, 2.0.1.1 - PDD magnets for Recycler transfer lines

1794 BoE for WBS 1.0.1.1, 2.0.1.1 PDS magnets RR transfer lines

1795 BoE for WBS 1.0.1.1, 2.0.1.1 Reduced Field PDD (PDDW) magnets for RR Transfe

1800 4990 BoE for WBS 1.0.1.1, 2.0.1.1 - MGS Gradient Magnets RR Transfer Lines

1809 BoE for WBS 1.0.1.1, 2.0.1.1 - Common Tooling - Refurbish Perm Magnets RR Tra

1812 4945 CR168 BoE for WBS 1.0.1.1, 2.0.1.1 - RQNx Perm Gradient Magnets RR Transfer Lines

1813 CR115 BoE for WBS 1.0.1.1, 2.0.1.1 - MLAW Lambertsons RR Transfer Lines

1842 BOE for WBS 1.0.1.1, 2.0.1.1 RR Vert Dipole ADC Magnets Transfer Lines

1899 BoE for WBS 1.0.1.1, 2.0.1.1 - Design Recycler 53MHz RF

1462 BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Ceramic Beamtubes Procure Fab Proces

1771 BOE for WBS 1.0.1.2, 2.0.1.2 - RR Ext/MI Inj Line Kickers Procure Parts & Assemb

1774 BoE for WBS 1.0.1.2, 2.0.1.2 RR Ext/MI Inj/Beam Abort Power Supply Pulsers proc

1782 BoE for WBS 1.0.1.2, 2.0.1.2 - RR Inj Gap Clearing Power Supply Pulsers

1783 BoE for WBS 1.0.1.2, 2.0.1.2 RR Inj Gap Clearing Pulser Testing

1784 BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems design, procure parts, assemble

1785 BOE for WBS 1.0.1.2, 2.0.1.2 - RR Kicker Systems PFL Frames & Cable

1786 BOE for WBS 1.0.1.2, 2.0.1.2 RR Kicker Systems Installation, Testing, and Checko

1683 4944 CR120 BOE for WBS 1.0.5, 2.0.4.2 - PM Costs for ANU Portion of NOvA

1484 BOE for WBS 2.0.1.1 - Injection, Extraction, Beam Abort Lines Controls/Timing inclu

1528 BoE for WBS 2.0.1.1 - RR Instrumentation Stand Fabrication

1540 BoE for WBS 2.0.1.1RR Injection Line Cooling System Constn

1687 BoE for WBS 2.0.1.1 - Recycler 53MHz RF Construction

1723 BOE for WBS 2.0.1.1 - RR Magnet Installations

1724 BOE for WBS 2.0.1.1 - RR Instrumentation Installation

1733 5002 BoE for WBS 2.0.1.1 - RR Vert Dipole Magnet PS procurement

1752 5002 BOE for WBS 2.0.1.1 - TL Vert Dipole Cable & Power Supply Installation

1753 BOE for WBS 2.0.1.1 Transfer Line Cable procurements

1788 BOE for WBS 2.0.1.1 - RR Magnet Stand Fabrication

1818 BoE for WBS 2.0.1.1 - RR Extraction Line Cooling System Constn

1819 BoE for WBS 2.0.1.1 - RR Abort Line Cooling System Construction

1823 BoE for WBS 2.0.1.1 - RR RF Cavities Cooling Systems Construction

1825 BoE for WBS 2.0.1.1 - RR Vacuum Equipment Procurement

1826 BoE for WBS 2.0.1.1 - RR Vacuum System Installation

1851 BoE for WBS 2.0.1.1 - RR MI8 Pump Room Upgrade constn

1905 BoE for WBS 2.0.1.1 - Trim Magnet Power Supply Placement

1907 BoE for WBS 2.0.1.1 - MI60 Anode Power Supply Room

2352 BOE for WBS 2.0.1.1 - Accel Shutdown Rad Comp Removal

1769 BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Procure Parts and Assemble

1770 BOE for WBS 2.0.1.2 - Beam Abort Line Kicker Testing

1772 BOE for WBS 2.0.1.2 - RR Ext/MI Inj Line Kickers Testing

1775 BoE for WBS 2.0.1.2 - RR Extraction MI Injection Beam Abort Power Supply Pulser

1776 BoE for WBS 2.0.1.2 RR Inj Kicker Pre-Production LV HV Life Testing

1777 BoE for WBS 2.0.1.2 - RR Inj Kickers Preprod & Prod Assembly

1778 BoE for WBS 2.0.1.2 - RR Injection Kickers Preprod & Prod Procurement

1862 BOE for WBS 2.0.1.3 - RR Instr Transfer Line Torroid Relocation

1863 BOE for WBS 2.0.1.3 - RR Instr Install Transfer Dampers

1864 BOE for WBS 2.0.1.3 - RR Instr Install Longitudinal Damper

1865 BOE for WBS 2.0.1.3 - RR Instr Procure/Test Longitudinal Damper

1866 BOE for WBS 2.0.1.3 - RR Instr Procure/Test Transverse Dampers

1897 BOE for WBS 2.0.1.3 RR Instr BPM Cable/Connector Procure & Install

1898 BOE for WBS 2.0.1.3 RR Instr Transfer Line Cable Installation

1906 BOE for WBS 2.0.1.3 - RR Instr BPM Transition Board Procure and Test

1470 4958 BOE for WBS 1.0.2.1 - MI Mods Machine Timing Modifications

1472 BOE for WBS 1.0.2.1 - MI Mods A1 Extraction Line Decommissioning

1473 BOE for WBS 1.0.2.1 - MI Mods 2.5 MHz RF Cavities Decommissioning

1507 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Analysis

1508 BoE for WBS 1.0.2.1 - MI LCW & PW Cooling Systems Design Review

1822 4957 BOE for WBS 1.0.2.1 - MI Mods Recycler Beamline Controls

1486 BoE for WBS 1.0.2.2 - MI RF Cavities Utility Modifications

1503 BoE for WBS 1.0.2.2 - MI RF Cavity Pre-install Testing

1504 BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design

1505 BoE for WBS 1.0.2.2 - MI RF Cavity Water Cooling Systems Design Reviews

1511 BoE for WBS 1.0.2.2 - MI RF Cavities Design Bus Bar

1454 BOE for WBS 1.0.2.3 - MI Radiation Safety

1684 BOE for WBS 2.0.2.1 - MI Mods Upgrade Vertical Quad Bus

1743 BOE for WBS 2.0.2.1 - MI-14 Communications & Controls Infrastructure

1747 BOE for WBS 2.0.2.1 - MI-39 Communications & Controls Infrastructure

1748 BOE for WBS 2.0.2.1 - MI Mods Design & Modify RR LL RF System

1749 5005 BOE for WBS 2.0.2.1 - MI Mods Design & Modify MI LL RF System

1475 BoE for WBS 2.0.2.2 - MI RF Cavities Final System Test

1476 BoE for WBS 2.0.2.2 - MI RF Cavities Align Cavities

1477 BoE for WBS 2.0.2.2 - MI RF Install Cavities

1478 BoE for WBS 2.0.2.2 - MI RF Move Cavities 4 & 15

1479 BoE for WBS 2.0.2.2 - MI RF Cavities Cabling

1498 BoE for WBS 2.0.2.2 - MI RF Software Programming

1506 BoE for WBS 2.0.2.2 - MI RF Cavity Water Cooling Systems Install

1509 BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Raw Material Procurement

1512 BoE for WBS 2.0.2.2 - MI RF Cavities Bus Bar Fab & Install

1710 BoE for WBS 2.0.2.2 - MI RF Cavities Power Amplifiers

1711 BoE for WBS 2.0.2.2 - MI RF Cavities Series Tube Modulators

1712 4989 BoE for WBS 2.0.2.2 - MI RF Cavities Solid State Amplifiers

1713 BoE for WBS 2.0.2.2 - MI RF Cavities Controls

1714 BoE for WBS 2.0.2.2 - MI RF Cavities Ferrite Bias Supplies

1885 BoE for WBS 1.0.3.1 - A150 Quadrupole Magnet Recovery for NuMI Primary Beam

1959 BOE for WBS 1.0.3.1 - NuMI Profile Monitor Design & Review

1492 BOE for WBS 1.0.3.2 NuMI Hadron Monitor Beam Abort Design

1721 BOE for WBS 1.0.3.2 - NuMI Hadron Monitor Design

1737 BoE for WBS 1.0.3.2 - NuMI Target Carrier Design

1738 BoE for WBS 1.0.3.2 - NuMI Baffle Design

1792 BOE for WBS 1.0.3.2 - NuMI Target/Baffle/Carrier/Hadron Monitor Design Reviews

1493 BOE for WBS 1.0.3.3 - Revision & Review of NuMI Shielding Assessment Documen

1767 BoE for WBS 1.0.3.3 - NuMI TH Operations Space Planning

1791 BOE for WBS 1.0.3.3 - NuMI Target Hall Infrastructure Reviews

1797 BoE for WBS 1.0.3.3 - NuMI Target Chase/Radiant Heat Loads Design

1790 BOE for WBS 1.0.3.4 - NuMI Decay Pipe/Hadron Absorber/Utilities Reviews

1805 BOE for WBS 1.0.3.4 - NuMI Utilities Electrical Infrastructure Design

1804 BoE for WBS 1.0.3.1, 2.0.3.1 - Upgrade to NumI Primary Quadrupole Magnets

1736 BoE for WBS 1.0.3.2, 2.0.3.2 - NuMI Medium Energy Target Design

1465 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Target Chase Cooling Design

1700 BoE for WBS 1.0.3.3, 2.0.3.3 - Horn 2 Relocation to ME/Shielding Reconfiguration &

1719 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block Design

1734 BoE for WBS 1.0.3.3, 2.0.3.3 - NuMI Horn 2 Stripline Extension Design

1701 5000 CR176 BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI RAW Water Systems Design

1740 5001 CR173 BoE for WBS 1.0.3.4, 2.0.3.4 - NuMI Non-RAW Water Cooling Systems Design

1754 BoE for WBS 2.0.3.1 - NuMI Extraction Kicker Charging Supply Construction

1755 BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Dipole Power Supplies Constructio

1756 BoE for WBS 2.0.3.1 - Upgraded NuMI Primary Transport Profile Monitors Construc

1757 BoE for WBS 2.0.3.1 - Upgrade to NuMI Primary Quadrupole Power Supplies Cons

1803 BoE for WBS 2.0.3.1 - Upgraded NuMI Quadrupole Cables Procure Install

1884 BoE for WBS 2.0.3.1 - NuMI Extraction Kicker PS Upgrade Design

1494 BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Beam Abort Procure/Install

1709 4999 CR177 BOE for WBS 2.0.3.2 - NuMI Target Carrier Construction

1722 BOE for WBS 2.0.3.2 - NuMI Hadron Monitor Construction

1729 BoE for WBS 2.0.3.2 - NuMI Medium Energy Target Procurement

1730 BoE for WBS 2.0.3.2 NuMI Baffle Procurement

1466 BoE for WBS 2.0.3.3 - NuMI Target Chase Cooling Construction

1720 BoE for WBS 2.0.3.3 - NuMI Modules/Horn 1 Stripline Block Procure/Assemble

1731 BoE for WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig Procure/Assem

1744 BoE WBS 2.0.3.3 - NuMI Horn 2 Relo to ME/Shielding Reconfig Install

1768 BoE for WBS 2.0.3.3 - NuMI TH Operations Space Planning Procure/Install

1796 BoE for WBS 2.0.3.3 - NuMI Horn 2 Stripline Extension Procure/Install

1798 BoE for WBS 2.0.3.3 - NuMI Target Chase/Radiant Heat Loads Procure/Install

1715 BoE for WBS 2.0.3.4 - NuMI Target RAW System Construction

1727 BoE for WBS 2.0.3.4 - NuMI Horns RAW Systems construction

1728 BoE for WBS 2.0.3.4 - NuMI Horn 2 RAW Piping Extension Construction

1735 BoE for WBS 2.0.3.4 - NuMI Decay Pipe RAW Construction

1739 BoE for WBS 2.0.3.4 - NuMI Hadron Absorber RAW Systems Construction

1742 BoE for WBS 2.0.3.4 - NuMI Non-RAW LCW System Construction

1758 BoE for WBS 2.0.3.4 - NuMI Non-RAW CUB Cooling Water System Construction

1759 BoE for WBS 2.0.3.4 - NuMI Non-RAW Sump Cooling Water System Construction

1760 BoE for WBS 2.0.3.4 - NuMI Non-RAW Secondary Chilled Water System Construct

1806 BOE for WBS 2.0.3.4 - NuMI Utilities Electrical Infrastructure Construction

1763 BoE for WBS 1.0.4.1 - Beam Physics - ANU Demands on Proton Plan

1764 BoE for WBS 1.0.4.2 - Beam Physics - Machine & Process Analysis

1765 BoE for WBS 1.0.4.3 - Beam Physics - ANU Proton Projections

4909 BoE - WBS 1.1.5 - Near Detector Surface Building

2679 BoE for WBS 2.1.1.2.5 Wetland Banking Credits

2693 4905 CR084 CR103 CR147 BoE - WBS 2.1.1.4 Site Preparation Build Phase

2081 4908 CR103 CR108 BoE for WBS 2.1.1.5 EDIA

2694 4906 CR084 CR095 CR103 BoE for WBS 2.1.2.3 Far Detector Building Build Phase

2689 4907 CR103 BoE for WBS 2.1.2.4 EDIA

2691 BoE for WBS 2.1.4.1 Permits

2692 BoE for WBS 2.1.4.4 Quality Control

2421 BoE for WBS 1.2.9.1.4 ISO Tank Delivery and Leasing

2443 BoE for WBS 1.2.9.2.1.1 Purchase secondary containment

2442 BoE for WBS 1.2.9.2.2.2 Procure blending system parts (pumps, hoses, instrumen

2094 BoE for WBS 2.2.1.5.2 - 2.2.1.5.4 Mineral Oil Production, Delivery, and Storage - FY

2095 BoE for WBS 2.2.1.6 - QC-Mineral Oil

2096 BoE for WBS 2.2.2.5- Pseudocumene Production, Delivery, and Storage-FY10, FY1

2097 BoE for WBS 2.2.2.6- QC Pseudocumene

2098 BoE for WBS 2.2.3.5.2, 2.2.3.5.3, 2.2.3.7 - Waveshifters Production and Delivery (lo

2099 BoE for WBS 2.2.3.6.1 QC -Waveshifters-FY08, FY09

2100 BoE for WBS 2.2.4.2.1- Prepare preproduction batch of fluor concentrate

2102 BoE for WBS 2.2.4.2.2 - QC preproduction batch of flour concentrate

2103 BoE for WBS 2.2.4.2.3- Production Blending of Flour Concentrate

2108 BoE for WBS 2.2.4.2.4- QC-Production Fluor Concentrate

2104 BoE for WBS 2.2.4.3.1 - Prepare preproduction batch of scintillator blend

2106 BoE for WBS 2.2.4.3.2-QC preproduction batch of scintillator blend

2107 BoE for WBS 2.2.4.3.3 - Production Blending of Scintillator

2109 BoE for WBS 2.2.4.3.4- QC-Production Scintillator Blend

2408 BoE for WBS 2.2.4.4 Production Blending Development

2110 BoE for WBS 2.2.5.3 - Far Detector Scintillator Transport

2144 BoE for WBS 2.2.6 Liquid Scintillator Management

2717 BOE for WBS 1.3.4 Development of QA Methods

2716 4883 CR145 BoE for WBS 1.3.5 BoE Integration Prototype Detector Fiber Production

2196 4884 CR145 BoE for WBS 2.3.2.1 Fiber Production

2217 4895 CR145 BoE for WBS 2.3.2.12 Fiber Quality Assurance

2495 BoE for WBS 2.3.2.13 Shipping Fiber to Module Factory

2549 BoE for WBS 2.3.2.14 Infrastructure Improvements

2497 BoE for WBS 2.3.3 Fiber Management

BoE for WBS 1.4.3.4.5.10, 1,4,3,5,11, 1.4.3.6.3, 1.4.3.7.2 and

2505 1.4.3.7.3 Fabricate remaining Extrusions

BoE for WBS 1.4.2.3.2.3, 1.4.2.4.2.3 and 1.4.2.5.3 Produce PVC

2504 Resin

2782 BoE for WBS 2.4.1.2.3.3 Obtain Vendor Samlpes

BoE for WBS 2.4.1.2.3.4 Extrude Samples using NOvA Prototype

2783 Dies

2300 BoE for WBS 2.4.1.3.2 "Purchase Commercial QC Instruments"

2301 BoE for WBS 2.4.1.3.3 "Build Custom QC Instruments"

2539 BoE for WBS 2.4.1.3.4 Setup QC Instruments

BoE for WBS 2.4.2.1.3 and 2.4.2.1.8 Produce Test Extrusions

2500 (Horizontal)

BoE for WBS 2.4.2.1.5, 2.4.2.1.9 and 2.4.2.1 15 Evaluation of

2540 Extrusions: Horizontal

BoE for WBS 2.4.2.1.1 Vendor Setup (Horizontal Extrusion Pre-

2178 production)

BoE for WBS 2.4.2.1.14.1 Produce PVC Extrusions (Horizontal Pre-

2502 production)

BoE for WBS 2.4.2.1.2 Obtain PVC resin for trest and pre-production

2498 (Horizontal)

2501 BoE for WBS 2.4.2..2.3 and 2.4.2.2.8

BoE for WBS 2.4.2.2.5, 2.4.2.2.9 and 2.4.2.2.15 Evaluate Test

2541 Extrusions: Vertical



2458 BoE for WBS 2.4.2.2.1 Vertical Extrusion Production: Vendor Setup

BoE for WBS 2.4.2.2.14.1 Produce PVC Extrusions (Vertical Pre-

2503 production)

BoE for WBS 2.4.2.2.2 Obtain PVC resin for test and pre-production

2499 (Vertical)

2496 BoE for WBS 2.4.3.1 Extrusion Production: Near Detector

BoE for WBS 2.4.3.2.1.1.2, 2.4.3.2.1.2.2, 2.4.3.2.2.1.1,

2,4,3,2.2.2.1 Far Detector Extrusion Production: Obtain PVC Resin

1342 4926 Block 1 H, etc.

BoE for WBS 2.4.3.2.1.1.3, 2.4.3.2.1.2.3, 2.4.3.2.2.1.2, 2.4.3.2.2.2.2

Far Detector Extrusion Production: Produce PVC Extrusions Block 1

2479 4927 H (type A), etc.

BoE for WBS 2.4.3.2.1.1.4, 2.4.3.2.1.2.4, 2.4.3.2.2.1.3, 2.4.3.2.2.2.3

2179 and others; Ship PVC Extrusions To Module Factory

BoE for WBS 2.4.3.2.1.1.5, 2.4.3.2.1.2.5, 2.4.3.2.2.1.4,

2.4.3.2.2.2.4 Extrusion Production: Quality Control and

2485 4931 Documentation of Extrusions

BoE for WBS 2.4.4.2, 2.4.4.3, 2.4.4.4, 2.4.4.5, 2.4.4.6 Setup

2486 Hardware; Data Taking

BoE for WBS 2.4.4.8, 2.4.4.9, 2.4.4.10 and 2.4.4.11 Ship Samples

2451 for QA

BoE for WBS 2.4.4.1 Procure Hardware (Quality Assurance

2299 Instruments)

2180 4929 BoE for WBS 2.4.5.2 Pallet System

BoE for WBS 2.4.5.3.1.1, 2.4.5.3.3.1, 2.4.5.3.4.1 Procure Motion

2492 System Components

BoE for WBS 2.4.5.4.1, 2.4.5.4.2 and 2.4.5.4.3 Extrusion Storage

2493 at Vendor

2457 BoE for WBS 2.4.5.5.1 Extrusion Sorting Device

2453 BoE for WBS 2.4.5.5.2 Make Vacuum Lifting Fixtures

2302 BoE for WBS 2.4.6 for Management - Construction

2366 5029 8/31 review BoE for WBS 1.5.5.9 / 2.5.3.1.11 / 2.5.3.2.6.8 Develop quality assurance tracking s

5036

2515 BoE for WBS 1.5.6 Module Shipping and Storage R&D

2687 BoE for WBS 1.5.10 Management – R&D Phase

2202 BoE for WBS 1.5.2.1.1 Fiber Manifold Component R&D

2206 BoE for WBS 1.5.2.1.1.10 Integration Prototype Manifold Manufacturing (not IPND)

2200 BoE for WBS 1.5.2.2 End Plate R&D

2195 5032 8/31 review BoE for WBS 1.5.2.3 Joining Technology R&D

2439 BoE for WBS 1.5.3 Photo Detector Interface R&D

2437 BoE for WBS 1.5.4.2 Factory Material Handling, Tooling, & Fixtures R&D

3810 BOE for WBS 1.5.4.3 -- FHEP Module Production

2438 BoE for WBS 1.5.5 Quality Assurance and Quality Control Methods Development

2440 BoE for WBS 1.5.7.1.3 Install and Setup Additional Infrastructure and Factory Mach

2395 BoE for WBS 1.5.7.1.1 Identify and acquire factory space

2189 BoE for WBS 1.5.7.1.2 Acquire and Install Factory Tools, Fixtures, and Other Infras

2441 BoE for WBS 1.5.7.1.4 Develop Initial Versions of Machine Operating Procedures

2192 BoE for WBS 1.5.7.3.1 and 1.5.7.3.2 IPND Manifold Production and Assemble and

2203 BoE for WBS 1.5.7.3.3 and 1.5.7.3.4 IPND End Plate Components / Assemble a

2201 BoE for WBS 1.5.7.3.5 Manufacture preproduction prototype (IPND) optical conecto

2446 BoE for WBS 1.5.7.3.6 Produce IPND Modules

2448 BoE for WBS 1.5.8 Initial Production Module Specifications

2449 BoE for WBS 1.5.9 Initial Factory Tooling Specifications

2211 5022 8/31 review BoE for WBS 2.5.1.1: Fiber Manifold Production (drawing files in v2)

2212 BoE for WBS 2.5.1.2: End Plate And Seal Production

2188 BoE for WBS 2.5.1.2.6 Procure edge stiffeners

2213 BoE for WBS 2.5.2 Optical Connector Production

2186 BoE for WBS 2.5.3.1.1 and 2.5.3.2.6.7 Fabricate and deliver extrusion lifters / Insta

2215 5024 8/31 review BoE for WBS 2.5.3.1.10 and 2.5.3.2.6.4 Fabricate fiber facing machines / Install and

2514 BoE for WBS 2.5.3.1.12, 2.5.3.2.7, 2.5.3.3.2.1.7 Review factory tooling machines a

2198 BoE for WBS 2.5.3.1.4 and 2.5.3.2.6.2 Fabricate and deliver pressure testing equip

2190 BoE for WBS 2.5.3.1.5 and 2.5.3.2.6.6 Fabricate material handling and storage equ

2205 BoE for WBS 2.5.3.1.6 and 2.5.3.2.6.5 Procure gluing machines / Install and setup

2216 BoE for WBS 2.5.3.1.7 and 2.5.3.2.6.1 Fabricate fiber stringing machines / Install an

2214 BoE for WBS 2.5.3.1.8 and 2.5.3.2.6.3 Fabricate and deliver fiber checking machine

2207 BoE for WBS 2.5.3.1.9 and 2.5.3.2.6.9 Floor Crane Procurement and Install floo

2365 5023 8/31 review BoE for WBS 2.5.3.1.3 Fabricate and deliver tooling and fixtures

2367 BoE for WBS 2.5.3.2.5 and 2.5.3.2.8 Operating factory space /Closeout factory spa

2193 BoE for WBS 2.5.3.2.1 Factory Lease

2383 BoE for WBS 2.5.3..2.1 Identify factory space

2354 BoE for WBS 2.5.3.2.3 Additional factory HVAC

2368 BoE for WBS 2.5.3.2.4 Additional Factory Utilities and Preparation

2218 5014 8/31 review BoE for WBS 2.5.3.3.2.*.*.1 Assemble and test far detector modules

2357 5025 8/31 review BoE for WBS 2.5.3.3.2.1.1.2, 2.5.3.3.2.38.2.2 Ship completed far detector module

2447 BoE for WBS 2.5.3.3.3 Near Detector and 1.5.7.3.6 Produce IPND Modules

2445 BoE for WBS 2.5.3.3.3.5 and 1.5.7.3.6 Ship Completed Near Detector Modules to

2686 BoE for WBS 2.5.4 Management – Construction Phase

5030 8/31 review BOE WBS 2.5.3.1.13 Fabricate and Deliver Module Flatness QA/QC device

5026 8/31 review BOE WBS 2.5.3.2.6.15 Train module factory student technicians

5042 BOE WBS 2.5.3.2.6.14 Train module factory technicians

2684 BoE for WBS 1.6.1.3 Water Cooling

2682 BoE for WBS 1.6.1.2 QA/QC Stations

2657 BoE WBS 1.6.1.6.1.2 APD Engineering Run

2418 BoE for WBS 1.6.1.6.2.1 Procure Manifolds

2422 BoE for WBS 1.6.1.6.2.2 Procure Other Components

2673 BoE for WBS 1.6.1.6.2.3 Assemble and Test Hardware

2718 BoE for WBS 1.6.3.1 - Low Voltage Power Supplies

2719 BoE for WBS 1.6.3.2 - High Voltage Power Supply

2720 BoE for WBS 1.6.3.3 - Power Cables

2721 BoE for WBS 1.6.3.4 - Power Distribution Box

2722 BoE for WBS 1.6.3.5.1 - Low Voltage Power Supplies

2723 BoE for WBS 1.6.3.5.2 - High Voltage Power Supply

2724 BoE for WBS 1.6.3.5.3 - Power Cables

2725 BoE for WBS 1.6.3.5.4 - Power Distribution Boxes

2726 BoE for WBS 1.6.3.5.5 - Ship PDBs, cables, and power supplies to Fermilab

2249 BoE for WBS 2.6.1.1.1 Manufactured Parts

2251 BoE for WBS 2.6.1.1.2 TE Coolers

2252 BoE for WBS 2.6.1.1.3 Assemble and Test APD housings

2133 BoE for WBS 2.6.1.2.3 - APD Array

2253 BoE for WBS 2.6.1.3 APD Module Testing

2254 BoE for WBS 2.6.1.4.1-33 APD Module Shipping

2255 BoE for WBS 2.6.2.1.1 Far Detector ASIC Production

2257 BoE for WBS 2.6.2.1.3 ADC

2259 BoE for WBS 2.6.2.1.4 COTs

2260 BoE for WBS 2.6.2.1.5 PC Boards

2261 BoE for WBS 2.6.2.1.6 Electronics Box

2262 BoE for WBS 2.6.2.1.7.1-3 TEC Controller Modules

2264 BoE for WBS 2.6.2.2.1 FEB Assembly

2265 BoE for WBS 2.6.2.4 Firmware Maintenance

2266 BoE for WBS 2.6.2.5.1-2 QA/QC

2221 4984 BoE for WBS 2.6.3.1.3-Procure LV pwer supplies

2219 BoE for WBS 2.6.3.1.1-Specify relay racks

2220 4983 BoE for WBS for 2.6.3.1.2-Procure relay racks

2222 4985 BoE for WBS 2.6.3.1.4-Test LV power supplies

2223 4986 BoE for WBS 2.6.3.2.1-Procure HV power supplies

2224 BoE for WBS 2.6.3.2.2-Test HV power supplies

2230 BoE for WBS 2.6.3.3.6-Procure ground cables

2225 4987 BoE for WBS 2.6.3.3.1-Procure PDB to FEB cables

2226 BoE for WBS 2.6.3.3.2-Procure LV supply to PDB cables

2227 BoE for WBS 2.6.3.3.3-Procure LV supply sense cables

2228 BoE for WBS 2.6.3.3.4-Procure HV supply to PDB cables

2229 BoE for WBS 2.6.3.3.5-Procure PDB to DCM cables

2231 BoE for WBS 2.6.3.3.7-Specify cable trays

2232 4988 BoE for WBS 2.6.3.3.8-Procure cable trays

2233 BoE for WBS 2.6.3.4.1-Procure PDB parts

2234 BoE for WBS 2.6.3.4.2-Assemble and test PDBs

2165 BoE for WBS 2.6.3.5.1.1.1-33 Procure Manifolds

2425 BoE for WBS 2.6.3.5.1.2.1-33 Ship Manifolds Block 1-33

2248 BoE for WBS 2.6.3.5.2 Procure Other Components

2268 BoE for WBS 2.6.3.5.4 Fill and Test Equipment

2256 BoE for WBS 2.6.3.5.5 Auxiliary Panel Readout

2236 BoE for WBS 2.6.3.6-Ship power distribution system

2145 BoE for WBS 1.7.1.1 DAQ Software Standards and Tools

2154 BoE for WBS 1.7.1.10 Online Databases

2146 BoE for WBS 1.7.1.2 Error Handling System

2147 BoE for WBS 1.7.1.3 Message Passing System

2148 BoE for WBS 1.7.1.4 Run Control System

2149 BoE for WBS 1.7.1.5 DAQ Software Architecture Overview

2150 CR144 CR165 BoE for WBS 1.7.1.6 Event Buffer Farm Software

2151 BoE for WBS 1.7.1.7 Data Logger

2152 BoE for WBS 1.7.1.8 Global Trigger System

2153 BoE for WBS 1.7.1.9 DAQ Monitor System

2459 BoE for WBS 1.7.2.1.3 Data Concentrator Prototype

2460 BoE for WBS 1.7.2.1.6 Data Concentrator for IPND

2461 BoE for WBS 1.7.2.2 Control and Timing System Prototype

2462 BoE for WBS 1.7.2.3.2 DAQ Network Prototype Hardware

2477 BoE for WBS 1.7.2.3.3 DAQ Network Prototype Hardware

2463 BoE for WBS 1.7.2.4 Control Room Equipment and Infrastructure

2464 BoE for WBS 1.7.2.5 DAQ Buffer Farm Evaluation Components

2465 BoE for WBS 1.7.2.6 DAQ Data Storage Evaluation Components

2466 BoE for WBS 1.7.2.7 DAQ Cabling for IPND

2467 BoE for WBS 1.7.2.8 Database Computers for IPND

2415 BoE for WBS 1.7.3.1 Install and Test Integration Test Facility

2414 BoE for WBS 1.7.3.2 Buffer Farm Evaluation

2413 BoE for WBS 1.7.3.3 Readout Electronics Integration Testing

2412 BoE for WBS 1.7.3.4 Software Integration Testing

2411 BoE for WBS 1.7.3.5 End user consultation

2155 4969 CR110 CR144 CR165 BoE for WBS 2.7.1.1 Error Handling System

2164 5006 CR165 CR169 BoE for WBS 2.7.1.10 Online Databases

2156 4970 CR144 BoE for WBS 2.7.1.2 Message Passing System

2157 4972 CR136 CR144 CR165 BoE for WBS 2.7.1.3 Run Control System

2158 BoE for WBS 2.7.1.4 Event Buffer Farm Software

2159 CR136 BoE for WBS 2.7.1.5 Data Logger

2160 CR136 BoE for WBS 2.7.1.6 Data File Transfer System

2161 4979 CR121 CR136 BoE for WBS 2.7.1.7 DAQ Monitor System

2162 BoE for WBS 2.7.1.8 Event Monitor System

2163 BoE for WBS 2.7.1.9 Event Display System

2468 BoE for WBS 2.7.2.1 Data Concentrator Production

2469 BoE for WBS 2.7.2.2.2 Control and Timing System Preproduction

2470 BoE for WBS 2.7.2.2.6.2.7 Control and Timing System Production

2471 BoE for WBS 2.7.2.3 DAQ Network Production Components

2472 BoE for WBS 2.7.2.4 Control Room Infrastructure Production

2473 BoE for WBS 2.7.2.5 Buffer Farm Production Computers

2474 BoE for WBS 2.7.2.6 Data Storage Production Components

2475 BoE for WBS 2.7.2.7 DAQ Cabling for Production

2476 BoE for WBS 2.7.2.8 Database Computers for Production

2410 BoE for WBS 2.7.3.1 Readout Electronics Integration Testing

2409 BoE for WBS 2.7.3.2 Software Integration Testing

2287 BoE for WBS 2.7.3.3 Consultation

2083 BoE for WBS 2.7.4.1.1.1 - DCS Master Control servers

2084 BoE for WBS 2.7.4.1.1.2 - DCS readout IOC nodes

2085 BoE for WBS 2.7.4.1.1.3 - DCS local logging station with raid

2086 BoE for WBS 2.7.4.1.1.4 - DCS monitoring displays

2089 BoE for WBS 2.7.4.1.1.5 - DCS electronics room rack enclosures

2090 BoE for WBS 2.7.4.1.1.9 - DCS Power protection (10KVA UPS)

2087 BoE for WBS 2.7.4.1.2.1 - DCS system Compact field points

2828 BoE for WBS 2.7.4.1.2.3 - DCS system Compact field point sensor packs

2532 BoE for WBS 1.8.2 - Structural Design and Validation



2533 BoE for WBS 1.8.3 -- Liquid Scintillator Filling and Handling R&D

2534 BoE for WBS 1.8.4 -- Near Detector Assembly R&D

2391 BoE for WBS 1.8.5.2 IPND Systems Design

2359 BoE for WBS 1.8.5.3 IPND Equipment

2406 BoE for WBS 1.8.5.4 IPND Block Assembly Facility Setup

2360 BoE for WBS 1.8.5.5 IPND Block Fabrication

2399 BoE for WBS 1.8.5.6 MINOS Service Building Contracts

BOE for WBS 1.8.5.7 Installation, Commissioning and Operation in

2424 MINOS Service Building

2536 BoE for WBS 1.8.6 -- Far Detector Assembly Engineering

2361 BoE for WBS 1.8.8.1 Full Scale Block Assembly Prototype

2362 BoE for WBS 1.8.8.2 Full Height Engineering Prototype

2537 BoE for WBS 1.8.9 -- Management, R&D Phase



BoE for WBS 2.8.1.1 & 2.8.1.2 Cave Excavation Design and

2348 Engineering, Tunnel and Cave Infrastructure Design and Engineering

2241 4952 BoE for WBS 2.8.1.3 - Tunnel Infrastructure Contract

2111 4953 BoE for WBS 2.8.1.4 - Excavation contract

2355 BoE for WBS 2.8.2.1 Containment of ND Full Volume

2240 BoE for WBS 2.8.2.2 - Muon Catcher

2347 BoE for WBS 2.8.2.3, Active Detector

BoE for WBS 2.8.2.4 - 2.8.2.6 South Bookend, Survey and Align

2452 Muon Catcher and Six Blocks, All Blocks and Bookend in Place

2313 BoE for WBS 2.8.3 Liquid Scintillator Filling Equipment

2423 BoE for WBS 2.8.4 Installation Coordination

2484 BoE for WBS 2.8.5 - Management - Construction Phase - Labor

2056 4934 BoE for WBS 2.9.1.1 - Module Lifting Fixture

2057 BoE for WBS 2.9.1.2 - Adhesive Dispenser

2058 BoE for WBS 2.9.1.3 - Block Safety Constraint Beam

2059 BoE for WBS 2.9.1.4 - Block Pivoter Table

2120 BoE for W.B.S. 2.9.1.5 - Survey Equipment for the Far Detector

2060 BoE for WBS 2.9.2.1 - Electrical Infrastructure

2061 BoE for WBS 2.9.2.2 - Far Detector Bookends

2319 BoE for WBS 2.9.2.3 - Detector Structure Monitoring Equipment

2068 BoE for WBS 2.9.3.1 - Scintillator Transfer Facility

2069 BoE for WBS 2.9.3.2 - Scintillator Plumbing

2070 BoE for WBS 2.9.3.3 - Scintillator fill machines

2071 BoE for WBS 2.9.3.4 - Vapor recovery system

2326 BoE for WBS 2.9.3.5 - Scintillator Filling System Commissioning

2072 4933 BoE for WBS 2.9.4.1 - Assembly Infrastructure

2073 4935 BoE for WBS 2.9.4.2 - Block components

2074 4932 BoE for WBS 2.9.4.3 - Block Assembly and Alignment

2426 BoE WBS 2.9.4.4 - Detector Block Filling

2427 BoE for WBS 2.9.4.5 - Detector Block Outfitting

2531 BoE for WBS 2.9.4.6 - Detector Turn-on and Checkout



2506 BoE for WBS 2.9.4.7 -- Far detector assembly crew management

2435 4936 BoE for WBS 2.9.5 - Management

2275 BoE for WBS 1.9 - Project Management FY06 &FY07

2276 5019 BoE for WBS 2.10 - Project Management FY10 - FY14









New, CR pen

Grand Total

Status Status (Local)

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Updated, CR pending Updated, CR pending

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

No changes required No changes required

Completed Completed, no change necessary

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Updated, CR pending Updated, CR pending

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Updated, no CR Updated, no CR

Completed Completed, no change necessary

Updated, CR exists Updated, CR exists

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, shutdown related Not changed, shutdown related

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, shutdown related Not changed, shutdown related

Updated, CR pending Updated, CR pending

Not changed, shutdown related Not changed, shutdown related

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Updated, CR pending Updated, CR pending

Updated, CR pending Updated, CR pending

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Future update Future update

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Updated, CR pending Updated, CR pending

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

No changes required No changes required

No changes required No changes required

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

No changes required No changes required

Updated, CR pending Updated, CR pending

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Updated, CR pending Updated, CR pending

Not changed, no new information Not changed, no new information

Completed Completed, no change necessary

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, shutdown related Not changed, shutdown related

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, shutdown related Not changed, shutdown related

Updated, CR pending Updated, CR pending

Not changed, below threshold for CR Not changed, below threshold for CR

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

No changes required No changes required

Not changed, shutdown related Not changed, shutdown related

Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Updated, CR pending Updated, CR pending

No changes required No changes required

Not changed, CY10 complete Not changed, CY10 complete

Not changed, shutdown related Not changed, shutdown related

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, shutdown related Not changed, shutdown related

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Not changed, shutdown related Not changed, shutdown related

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Updated, CR exists Updated, CR exists

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Completed Completed, no change necessary

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, shutdown related Not changed, shutdown related

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

No changes required No changes required

New, CR exists New, CR exists

Completed Not Changed, Complete

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Completed Not Changed, Complete

No changes required No changes required

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Updated, CR exists Updated, CR exists

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, below threshold for CR Not changed, below threshold for CR

Completed Completed, no change necessary

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Completed Completed, no change necessary

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

No changes required No changes required

Completed Completed, no change necessary

No changes required No changes required



Completed Completed, no change necessary



Completed Completed, no change necessary

Completed Completed, no change necessary



Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete



Not changed, CY10 complete Not changed, CY10 complete



Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete





Updated, no CR Updated, no CR





Updated, no CR Updated, no CR



Not changed, no new information Not changed, no new information





Updated, no CR Updated, no CR



Not changed, no new information Not changed, no new information



Not changed, no new information Not changed, no new information



Not changed, CY10 complete Not changed, CY10 complete

Updated, no CR Updated, no CR



Not changed, no new information Not changed, no new information



Not changed, no new information Not changed, no new information

Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, no new information Not changed, no new information

Updated, CR pending Updated, CR pending

Updated, CR pending Updated, CR pending

Completed Completed, no change necessary

Update pending Update pending

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Updated, CR pending Updated, CR pending

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Update pending Update pending

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Update pending Update pending

Update pending Update pending

Update pending Update pending

Updated, CR pending Updated, CR pending

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, CR pending Updated, CR pending

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Updated, below threshold for CR Updated, below threshold for CR

Completed Completed, no change necessary

Updated, CR pending Updated, CR pending

Updated, below threshold for CR Updated, below threshold for CR

Updated, CR exists Updated, CR exists

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Updated, CR pending Updated, CR pending

Updated, CR pending Updated, CR pending

Future update Future update

Update pending Update pending

Update pending Update pending

New, CR pending New, CR pending

New, CR pending New, CR pending

New, CR pending New, CR pending

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Update pending Update pending

Update pending Update pending

Update pending Update pending

Not changed, no new information Not changed, no new information

Update pending Update pending

Update pending Update pending

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Update pending Update pending

Update pending Update pending

Update pending Update pending

Update pending Update pending

Update pending Update pending

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Updated, no CR Updated, no CR

Not changed, no new information Not changed, no new information

Updated, no CR Updated, no CR

Updated, no CR Updated, no CR

Updated, no CR Updated, no CR

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Updated, no CR Updated, no CR

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Updated, no CR Updated, no CR

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, CY10 complete Not changed, CY10 complete

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Completed Completed, no change necessary

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Updated, CR exists Updated, CR exists

Not changed, no new information Not changed, no new information

Not changed, CY10 complete Not changed, CY10 complete

Not changed, CY10 complete Not changed, CY10 complete

Updated, CR exists Updated, CR exists

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

No changes required No changes required

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information Not changed, no new information

Not changed, no new information No change, no new information



Completed Completed, no change necessary

Completed Completed, no change necessary

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Completed Completed, no change necessary

Not changed, no new information No change, no new information

Completed Completed, no change necessary



Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Completed Completed, no change necessary

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information





Not changed, no new information No change, no new information

Updated, no CR Updated, no CR

Updated, no CR Updated, no CR

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information



Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Updated, no CR Updated, no CR

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Updated, no CR Updated, no CR

Updated, no CR Updated, no CR

Updated, no CR Updated, no CR

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information

Not changed, no new information No change, no new information



Not changed, no new information No change, no new information

Updated, no CR Updated, no CR

Completed Completed, no change necessary

Updated, CR exists Updated, CR exists



Status Count of Status Status (Local) Count

Not changed, CY10 complete 73 Completed, no change necessary 78

Not changed, no new information 133 Future update 2

Not changed, shutdown related 44 New, CR exists 1

Update pending 17 New, CR pending 3

Completed 80 No change, no new information 32

Updated, CR pending 18 No changes required 11

No changes required 11 Not changed, below threshold for CR 2

Updated, no CR 19 Not Changed, Complete 2

Updated, CR exists 18 Not changed, CY10 complete 73

Future update 2 Not changed, no new information 101

Not changed, below threshold for CR 2 Not changed, shutdown related 44

New, CR exists 1 Update pending 17

Updated, below threshold for CR 11 Updated, below threshold for CR 11

New, CR pending 3 Updated, CR exists 18

Grand Total 432 Updated, CR pending 18

Updated, no CR 19

Grand Total 432

Status values Substitute Color value

Changed to reflect new estimate Changed 14136213

Changed, new estimate since IPND work Changed 14136213

Updated, no CR Updated, no CR 14136213

Updated, CR pending Updated, CR pending 14136213

Updated, below threshold for CR Updated, below threshold for CR 14136213

Updated, CR exists Updated, CR exists 14136213

New New 14136213

New, CR exists New, CR exists 14136213

New, CR pending New, CR pending

Updated Changed 14136213

Completed, no change necessary Completed 5296274

Not Changed, Complete Completed 5296274

Not changed, CY10 complete Not changed, CY10 complete 10147522

In progress, done by end of CY10 Not changed, CY10 complete 10147522

No change, no new information Not changed, no new information 11851260

No change; RFP being written Not changed, no new information 11851260

No changes required No changes required 11851260

Not changed, CY10 complete Not changed, CY10 complete 11851260

Not changed, no new information Not changed, no new information 11851260

Not changed, see comment Not changed, no new information 11851260

Not changed, below threshold for CR Not changed, below threshold for CR 11851260

Future update Future update 11851260

Not changed, shutdown related Not changed, shutdown related 12106214

Update pending Update pending 65535







Updated 14136213

Completed, no change necessary 5296274

Not changed, CY10 complete 10147522

Not changed, see comment 11851260

Not changed, no new information 11851260

Not changed, shutdown related 12106214

Update pending 65535


Shared by: xiaohuicaicai
Other docs by xiaohuicaicai
LOGFRAMES_ MONITORING AND EVALUATION
Views: 0  |  Downloads: 0
JELSApndx3SophLanguage
Views: 0  |  Downloads: 0
1997TrumpetCompetitionNYTimes
Views: 0  |  Downloads: 0
Eng_wk52_31
Views: 0  |  Downloads: 0
ENVIRONMENTAL MONITORING PROGRAMME FOR
Views: 0  |  Downloads: 0
Marketing - Ulster Business School
Views: 0  |  Downloads: 0
speech-swallowing
Views: 1  |  Downloads: 0
May_FY11_Awards_Report_Web
Views: 0  |  Downloads: 0
Related docs
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!