New Game Works Strategy

Sustainable Practice for Local Sports Delivery





1. Increasing Facility Capacity

(a) Identification and Development of New Facilities



Project / Strategy / Issue Works Strategy

School Sites The following strategies have been suggested to enhance the development of school sites for

community use for training and weekend use:



 Investigate potential primary school sites

 Organise a meeting with the Mayor and regional DET directors

 Gain Council endorsement and a commitment to the level of resource provided by Council – ie

base maintenance / facility provision

 Review the current Community Use Agreement

 Prepare a heads of agreement between the Mayor and the local superintendent

 Present to the local principals at the district meeting

 Map the potential use of all Sutherland Shire school sites

o Categorise green space opportunities, training / playing field / green space

 Conduct further investigation into schools with existing playing fields

 The PROCESS for establishing community use on school facilities:

o Create initial proposal (meet with principal)

o Write a report to Council for endorsement and budget commitment

o Design the master plan with Design Unit – funding update

o Seek an agreement with the DET (principal – DET)

o Design – DA – Construction – Implementation

o Investigate user management onsite

o Allocate the playing fields in seasonal ground allocation process



Current Available Budget

$400,000 Cronulla High School- upgrade school facilities for community use

$500,000 (2009/2010 Sport and Recreation Infrastructure budget)

2011/2012 – Discretionary Program - for upgrade school facilities for community use

Project / Strategy / Issue Works Strategy

Expansion of The Ridge 9 & 10 COMPLETED

Exiting Sites Sylvania Hockey  Develop a design brief

(development of a  Meet with the Design unit to determine the considerations

new synthetic pitch)  The Design Unit is to develop a master plan for whole site

 The project is to be costed

 Determine the level of commitment from Hockey

 Investigate the possible funding options

 Present a report to Council detailing need for budget commitment

Sutherland Oval 3  Consult with Football to determine need

(extension of existing  Develop a design brief for the project

field to full size)  Meet with the Design unit to determine the considerations

 The Design Unit is to develop a plan for extension

 The project is to be costed

 Determine the level of commitment from Football

 Present a report to Council detailing need for budget commitment

Waratah AFL Facility Waiting on AFL to submit formal plans and proposal to expand and develop Waratah AFL site

Other Sites Kurnell Peninsula To be developed when voluntary planning agreement has been signed by relevant parties

(10 field

development)

F6 Corridor Further investigation is required to determine feasibility of additional F6 Corridor sites



Lucas Heights Further negotiation is required with ANSTO regarding access to the Lucas Heights Conservation Area

Mountain Bike Park





(b) Advancements in Technology



Project / Strategy / Issue Works Strategy

Development of regional synthetic Investigate establishing 3 or 4 synthetic facilities at different points throughout the Shire to cater for high

training and playing venues intense use, regional training or competition or where high club numbers have limited alternate field

options in the vicinity

(c) Development of facility maintenance standards

Project / Strategy / Issue Works Strategy

BUMP  Results from URS and BUMP will be captured and used for improved operating standards, for

setting carrying capacities and sustainability perimeters for different sites

 The results of BUMP and URS are to be understood and assessed

 Develop a comparison table of recommendations, to include costings, implementation and

URS schedule

 Usage needs must also be established. These can possibly be based on the UK ‘Playing Pitch

Model’ for utilisation







(d) Improvement of existing facilities



Project / Strategy / Issue Works Strategy

Surface quality By developing facility maintenance standards, as discussed above with the BUMP and URS studies, the

quality of playing fields surfaces will be improved in area such as new turf, growing medium, etc

Water access  An agreement needs to be established on the amount of water that is required per site

 Utilise URS water usage graphs for direction on watering amounts and duration

 Investigate alternate methods for efficient use of water

Review current DA conditions that  A systematic review of DA conditions on each sites is to be carried out

restrict reasonable usage on facilities  The most efficient process for review must be investigate

 The process must identify not only land owner and zoning restrictions, but also exempt and

complying development

Review of current horticultural practices  This section refers to the BUMP and URS. These reports will assess current horticultural practices,

as well as recommend additional or different procedures.

 Gather feedback from the sports on the challenges and issues they face on fields in regards to

horticultural practices.

 Carry out a sports club Survey including horticultural issues that were faced. This will ensure the

sports play an active role in playing fields management.

Project / Strategy / Issue Works Strategy

Infrastructure improvement and  Development of a system for managing sporting club infrastructure requests.

extension  Develop a council policy on floodlight usage and provision

 Develop a council policy on infrastructure provision

 An agreement is to be established with the sports to ensure consistency and transparency across

all arrangements

 Review the Sport and Recreation Unit Service Plan

 Develop Masterplans for sites

 Undertake project management of large projects

o Gymea Bay Oval

o Boystown

o Kareela Playing Field Floodlights

o Gwawley Playing Field Floodlights

 2009/2010 Sport and Recreation infrastructure budget (see following page)







2. Demand Redistribution/Reduction Strategy



Works Strategy

1. Introduce a field ranking system for guiding sustainable hours of use.

2. Cap usage hours per site based on structural capacity of the field infrastructure

3. Rotate higher impact sports across various sites

4. Review the seasonal ground allocation procedure

5. Develop a sports reference group

6. Develop field use guides. Further investigation is required into the following possible strategies:

a. Sports to revert back to traditional seasons

b. Sports season to align with school holidays (NSROC)

c. Shortening of seasons

d. The possible introduction of compulsory breaks between seasons (summer & winter) for maintenance and regrowth.

e. The possibility of no make up games if cancelled due to wet weather

2009/2010 Sport and Recreation Infrastructure Budget





Project Description Budget Proposed jobs

Akuna Rd Oval, Tonkin Oval, Captain Cook

Garbage Bin Cages at Ovals 2009/10 30,000

Playing Fields, Woronora Heights, Caringbah oval

Oval Irrigation Systems 2009/10 100,000 To be confirmed

Oval Drainage 2009/10 50,000 To be confirmed

Oval Fencing Upgrades 2009/10 50,000 To be confirmed

Floodlight Upgrades 2009/10 50,000 To be confirmed

Gymea lower net upgrade, Pitch rebuilds at

Cricket Wicket Upgrades/Replacements

30,000 Akuna Rd Oval, Marton Park, Gwawley South

2009/10

(east and west pitch)

Anzac Rugby League Posts– other to be

Goal Post Replacements 2009/10 20,000

confirmed

Soldiers Rd Baseball Safety 2009/10 90,000

Sylvania Waters Athletics Resurface

300,000

2009/10

Awaiting information from Sutherland Shire

Netball Court Upgrade 2009/10 25,000

Netball Association

Netball Court Provision Planning Est

20,000

2009/10

Oval Surfaces Upgrades 2009/10 200,000 To be confirmed

Playing Fields/Ovals Refurbishment

100,000 To be confirmed

2009/10



Related docs
Other docs by yaosaigeng
_49AEFA4B-4737-43A3-9750-5AAF48CC4E0F_
Views: 0  |  Downloads: 0
_micros_ltda_listado_general_de_productos
Views: 0  |  Downloads: 0
Z_Extra_0211
Views: 0  |  Downloads: 0
ZVL Subcontractor Bid List Registration Form
Views: 0  |  Downloads: 0
ZipDomains
Views: 0  |  Downloads: 0
zemin davranisiSİYAH BEYAZ
Views: 0  |  Downloads: 0
zakon_za_zdraveto
Views: 0  |  Downloads: 0
Z1ServiceContract
Views: 0  |  Downloads: 0
YPLAResponsibilities
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!