LTI Hardware Infrastructure Requirements for the BPM System
Tunnel Space per Number Power per Front-end Network Remote Fast Slow
Location of front-
Electronics F.E. front-end processor connections reboot Timing Timing
ends
TT40 1m x 5U 4 240V : 150W NONE NONE NONE NO NO
TT60 Under each 1m x 5U 4 240V : 150W NONE NONE NONE NO NO
TI2 BPM 1m x 5U 48 240V : 150W NONE NONE NONE NO NO
TI8 1m x 5U 43 240V : 150W NONE NONE NONE NO NO
Acquisition Total Number Power per Front-end Network Remote Fast Slow
Location
Electronics Space of crates crate processor connections reboot Timing Timing
TT40/TI8 ECA4 2 racks 3 crates 450-500 VA 3 3 3 YES NO
TT60/TI2 BA7 2 racks 4 crates 450-500 VA 4 4 4 YES NO
Fibre- Number of Fibres per Number of 25mm
Location
Optics drop-offs drop-off outer tubes
TT40/TI8 ECA4 to Each BPM 47 3 7
TT60/TI2 BA7 to Each BPM 52 3 8
Number of Connections Number of World-
World-FIP Location
FIP cables
connections per cable
TT40/TI8 ECA4 to Each BPM 47 16 3
TT60/TI2 BA7 to Each BPM 52 16 4
LTI Hardware Infrastructure Requirements for the BCT System
Tunnel Space per Number of Power Front-end Network Remote Fast Slow
Location F.E. front-ends required per processor connections reboot Timing Timing
Electronics
front-end
TT40 40034X 70x70x70cm 1 NONE NONE NONE NONE NO NO
TT60 2912X 70x70x70cm 1 NONE NONE NONE NONE NO NO
TI2 2025X 70x70x70cm 1 NONE NONE NONE NONE NO NO
TI8 8774X 70x70x70cm 1 NONE NONE NONE NONE NO NO
Acquisition Total Space Number of Power per Front-end Network Remote Fast Slow
Location Required crates crate processor connections reboot Timing Timing
Electronics
TT40 ECA4 20U 1 200 VA 1 1 1 YES NO
TT60 BA7 20U 1 200 VA 1 1 1 YES NO
TI2 UA23 20U 1 200 VA 1 1 1 YES NO
TI8 UA87 20U 1 200 VA 1 1 1 YES NO
Cables Location CKS50 NF12
TT40 ECA4 to 40034X 2 1
TT60 BA7 to 2025X 2 1
TI2 UA23 to 2912X 2 1
TI8 UA87 to 8774X 2 1
LTI/CNGS Hardware Infrastructure Requests
for the BPM and BCT Systems
Tunnel Space per Number of Power per Front-end Network Remote Fast Slow
Location
Electronics F.E. front-ends front-end processor connections reboot Timing Timing
TT40 1m x 5U 4 240V : 150W NONE NONE NONE NO NO
TT60 Under each 1m x 5U 4 240V : 150W NONE NONE NONE NO NO
TI2 BPM 1m x 5U 48 240V : 150W NONE NONE NONE NO NO
TI8 1m x 5U 43 240V : 150W NONE NONE NONE NO NO
ECA4 Rack Space Power Front-end Network Remote Fast Timing Slow
Barracks Request consumption processor connections reboot (TTC) Timing
LTI BPM 2 1500 VA 3 3 3 YES NO
CNGS BPM 1 ? 1 1 1 YES YES
BCT 20U 200 VA 1 1 1 YES NO
Power Front-end Network Remote Fast Timing Slow
Rack Space
BA7 consumption processor connections reboot (TTC) Timing
Request
LTI BPM 2 2000 VA 4 4 4 YES NO
BCT 20U 200 VA 1 1 1 YES NO
Number of Fibres per Number of 25mm outer
Fibre-Optics From To
tubes
drop-offs drop-off
TT40/TI8 ECA4 Each BPM 47 3 7 (~10.5km)
TT60/TI2 BA7 Each BPM 52 3 8 (~12km)
Cables Type From To Number
BPM TT40/TI8 WorldFIP ECA4 Each BPM 3 (~4.5km)
BPM TT60/TI2 WorldFIP BA7 Each BPM 4 (~6km)
BCT TT40 CKS50 ECA4 40034X 2
BCT TT40 NF12 ECA4 40034X 1
BCT TI8 CKS50 UA87 8774X 2
BCT TI8 NF12 UA87 8774X 1
BCT TT60 CKS50 BA7 2025X 2
BCT TT60 NF12 BA7 2025X 1
BCT TI2 CKS50 UA23 2912X 2
BCT TI2 NF12 UA23 2912X 1
CNGS BPM CKS50 ECA4 Each BPM 2 per BPM <-To be foreseen but NOT ordered
BCT87749 at TI 8 end, control electronics in UA87, cable <250m (hopefully), 2 CKS50 + 1 NF12.