ANNEX B: PROJECT MONITORING AND EVALUATION PLAN
Purpose
To help project applicants develop a Monitoring and Evaluation roadmap for the proposed grant activities. When properly completed, reviewed, and approved, this BACP Project M&E Plan serves for
project monitoring and evaluation to ensure i) quality and effectiveness of project implementation, ii) progress against targets, iii) achievement of project goals and objectives, and iv) consistency in
delivery.

Instructions
Refer back to Question 1 under Section I: Project Overview in Annex A to complete the M&E Plan. List all of the objectives by number and their related activities exactly as you identified them in
Question 1. For all activities and their corresponding objectives that you listed in Question 1, fill in the cells in the BACP Project M&E Plan with the following items. Use the example in Worksheet 3
for additional guidance.
Project Objective Number - Refer back to Section I, Question 1 of the Application (Annex A), where you defined your project objectives and activities. In the spreadsheet, please fill in the number of
the Objective that is associated with each activitiy that you will identify in column 2, Project Activity.
Project Activity - Refer back to Section I, Question 1 of the Application (Annex A), where you defined your project objectives and activities and copy from this section each of the activities listed.
Please note that only one activity should be reference per row. You do not need to copy into this spreadsheet the contextual information provided for each activity in Section I. If activities are too
cumbersome (ie. too many discrete activities discribed together), please refine your activity list in Section I. and disaggregate as necessary. Clear, concise, discrete activities will facilitate a more
managable M&E system.
Start date / End date - The start and end dates should represent the period of performance for each discrete activity. Start dates should not occur prior to grant signing and end dates should reflect
the completion of the output/outcome associated with that activity. See below for information related to Outputs and Outcomes.
Output – This refers to a product or service that results directly from a project activity, e.g., training events held, reports produced, strategic plans developed, studies completed, publications
produced. The outputs listed here should be direct results of the project activities stated in your Grant Application Form. Some examples of outputs for each BACP Component can be found on
Worksheet 2 of this Excel file.
Outcome – This refers to a change, benefit, learning or other effect that happen as a result of the use of an output, e.g. change in knowledge, skills, behavior, productivity or performance. Some
examples of outcomes for each BACP Component can be found on Worksheet 2 of this Excel file.

Indicator – This refers to a single, quantitative or qualitative measure that is used to demonstrate change and details the extent to which project results (i.e., outputs and outcomes) are being
achieved. The indicators listed here should be in accordance with your Grant Application Form. Some examples of output and outcome indicators for each BACP Component can be found on
Worksheet 2 of this Excel file.
Unit of Measurement – This refers to the unit which is used to measure the indicator (e.g., number, %, hectare, tons, etc.)
Means of Verification – This refers to the proposed source or method used to gather information on the state of the proposed indicator.
Baseline – This refers to the condition or performance of an indicator prior to treatment or project intervention. Include here the value of the indicator before the start of the project.
Target – Include here the desired goal to be reached at the end of the project.
Responsible person – Include here the name of the person responsible for collecting the information necessary for monitoring this particular indicator.
Data collection frequency – Indicate here how often the information will be collected.
                                                                                    Implementation Procedures Manual


Critial Assumptions - This refers to a general condition under which the development hypothesis or strategy for achieving an outcome will hold true. Critical assumptions are outside the control or
influence of BACP and its partners, but they reflect conditions likely to affect the achievement of outcomes in the Results Framework, e.g. the level of world prices, or the openness of export markets.
Critical assumptions can be determined by asking “What conditions should exist in addition to my objectives in order to achieve the outcome?”. They are factors that grantees should anticipate, try to
influence, and develop contingency plans for in case things go wrong.
BACP Component – Indicate here to which BACP component (1 to 4) the indicator will contribute.
                                                                       Implementation Procedures Manual

 Project                                                                             Unit of                                                       Data     Critical
Objective                                                            Performance    Measure-    Means of                          Responsible   collection Assumptio   BACP
Number      Project Activity   Start Date   End Date       Results    Indicators      ment     Verification   Baseline   Target     person      frequency     ns     Component
                                                       Outputs



                                                       Outcomes
                                                                    Implementation Procedures Manual


Example Outputs, Outcomes, and Indicators for each BACP Component

The tables below provide examples of key outputs, outcomes, and performance indicators that applicants could use to monitor
and evaluate their project activities. The following questions may serve as additional guidance for developing a project-specific
Monitoring and Evaluation Plan:
- Establishing the purpose and scope – Why do we need M&E and how comprehensive should the M&E system be?
- Identifying performance questions, information needs and indicators – What do we need to know for monitoring and
evaluating the project in order to manage it well?
- Planning data collection and organization – How will the required information be gathered and organized?
- Planning data analysis, critical reflection processes and events – How will we make sense of the information gathered and

COMPONENT 1 - Support activities for an enabling environment
                                                                                                                                                       Frequency of
Project outputs and outcomes       Example Performance Indicators                              Means of Verification                                  data collection
Outputs                            Output Indicators
Proposals of new policies or       Number of documents completed that identify policy-         Project progress reports, policy briefs                   quarterly
regulations elaborated by the      related barriers
BACP activities where relevant,    Number of consultations and meetings with public            Project progress reports, monitoring by BACP country      quarterly
and conveyed to appropriate        authorities in charge of targeted policies or regulations   focal points or selected institutions
authorities
                                   Number of procedures proposed for new policies or           Project progress reports, published policy documents      quarterly
                                   regulations
                                   Number of media appearances                                 Project progress reports                                  quarterly
                                   Number of copies of project materials distributed or        Project progress reports                                  quarterly
                                   downloaded
Outcomes                           Outcome Indicators
Policy-related barriers to the     Number of relevant policy documents (e.g. white papers,     Project progress reports                                  quarterly
adoption of BMPs in the targeted   policy analyses) completed that indicate government’s
commodity sectors and countries    commitment to removal of barriers
are removed or in an obvious
process of being removed
                                                                      Implementation Procedures Manual

COMPONENT 2 - Support better production
                                                                                                                                                            Frequency of
Project outputs and outcomes          Example Performance Indicators                              Means of Verification                                    data collection
Outputs                               Output Indicators
Biodiversity-friendly practices for   Number of documents (studies, reports) completed            Project progress reports, publications                      quarterly
production and on-farm processing     documenting field tests of BMPs, or agricultural impacts on
are developed and tested              biodiversity and HCV habitats
                                      Number of documents (studies, reports) completed on P&C Project progress reports, publications                          quarterly
                                      and systems of certification acceptable to BACP
                                      Number of documents (studies, reports) completed on land Project progress reports, publications                         quarterly
                                      use changes as a result of BMPs
                                      Number of workshops, training events, seminars,           Project progress reports                                      quarterly
                                      conferences etc. on agricultural impacts on biodiversity,
                                      HCV habitats, and BMPs
                                      Number of workshops, training events, seminars,          Project progress reports                                       quarterly
                                      conferences etc. on land use changes as a result of BMPs
                                      Number of participants in workshops, training events,    Project progress reports                                       quarterly
                                      seminars, conferences etc. on agricultural impacts on
                                      biodiversity, HCV habitats, and BMPs
                                      Number of participants in workshops, training events,        Project progress reports                                   quarterly
                                      seminars, conferences etc. on land use changes as a
                                      result of BMPs
                                      Number of media appearances                                  Project progress reports                                   quarterly
                                      Number of copies of project materials distributed or         Project progress reports                                   quarterly
                                      downloaded
                                      Biodiversity management plans in companies                   Company documentation, project progress reports            quarterly
                                      Land set aside by companies as reserve or for                Remote sensing and habitat quality measures                annually
                                      conservation
                                      Reserve management plan in companies                         Company documentation, project progress reports            quarterly
                                      Agricultural land managed for biodiversity: presence and     Remote sensing and habitat quality measures                annually
                                      quality of native habitats with agricultural systems
                                      Identification and protection of HCV habitats                HCV assessment, land management plans, company            6-monthly
                                                                                                   documentation
                                      Road construction, management, mileage and density           Remote sensing and habitat quality measures                 annual
                                      Fragmentation and connectivity: size, shape, and             Spatial analysis using Fragstat, connectivity indices       annual
                                      connectivity of patches of natural and semi-natural habitat
                                      Land cover: Identification and classification of land patches Remote sensing with ground-truthing                        annual
                                      (e.g., natural habitat, moderate use, intensive use)

                                      Indicator species: presence and abundance of multi-habitat Observation or censusing by experts and/or local            6-monthly
                                      species that integrate over many landscape variables       laypersons

                                      Native pollinators: diversity and abundance of native crop   Field surveys of pollinators                                annual
                                      pollinators
                                                                        Implementation Procedures Manual

                                      Monitoring plan for waste water from plantations and mills      Documented impact assessment                              quarterly
                                      Nutrient loading: concentrations of nutrients in surface        Chemical analysis                                         6-monthly
                                      water or groundwater
                                      Chemical contamination: quantity of toxic chemicals in          Chemical analysis                                         6-monthly
                                      surface water or groundwater
                                      Erosion and sedimentation: quantity of sediments washing        Turbidity measurements                                    6-monthly
                                      into water bodies
                                      Protection of water courses and wetlands through riparian       Aerial photography and/or ground observation              6-monthly
                                      buffers: width and integrity of riparian buffers along all
                                      bodies of water at or before replanting
                                      Conservation of soil fertility and biodiversity, reduced soil   Censuses of soil indicator species (invertebrates), SOM   6-monthly
                                      degradation: composts from farm and mill by-products            analysis
                                      Soil health: OM, bulk density, nutrients, CEC, chemical         Sampling and analysis                                      annual
                                      composition, and biota
                                      Protection from soil erosion: contour planting on steep         Ground observation                                        quarterly
                                      slopes, use of cover crops
                                      Use of fire avoided (except in specific situations as           Fire prevention plan, training for employees              quarterly
                                      identified in the ASEAN guidelines or other regional best
                                      practice)
                                      Use of Integrated Pest Management (IPM) to manage               Documented IPM Plan                                       quarterly
                                      pests, diseases, weeds and invasive species
Outcomes                              Outcome Indicators
Alternative production methods        Number of recommended practices/standards with a                Project progress reports                                  quarterly
implemented that have a proven        proven positive impact on biodiversity
positive impact on biodiversity and   Hectares of land managed sustainably directly (e.g.,            Project progress reports, land management plans,          quarterly
significant potential for             implementing BMPs for biodiversity conservation)                company documentation, RT reports
development and replication, both     Hectares of land beyond the BACP project sites managed          Project progress reports, RT reports, industry reports    quarterly
at the farm and landscape level       sustainably through replication
                                      Number of companies committing to no further expansion          Project progress reports, land management plans,          quarterly
                                      into high conservation value (HCV) habitat, by commodity        company documentation
                                      and across all commodities
                                      % of global production (volume) (that is) by companies who      Project progress reports, RT reports, industry reports    quarterly
                                      have committed to not expand further into HCV habitat

                                      Hectares of land set aside by companies as reserve or for       Remote sensing                                            annually
                                      conservation
                                      % of global land area allocated to production of target         Project progress reports, land management plans,          quarterly
                                      commodities (that is used) by companies who have                company documentation
                                      committed to not expand further into HCV habitat
                                      Number of companies committing to adhering to principles, Project progress reports, company documentation                 quarterly
                                      criteria, and verification/certification systems acceptable to
                                      BACP
                                      % of global production (that is) by companies that have        Project progress reports, RT reports, industry reports     quarterly
                                      adopted land management plans that protect globally
                                      important biodiversity on/near or off-site
                                   Implementation Procedures Manual

Number of project partners and RT/industry associations           Project progress reports, RT reports, industry reports   quarterly
adopting BMPs beyond the BACP project sites (through
replication)
Rate of deforestation at agricultural frontier                    Remote sensing, company documentation                    6-monthly
Greenhouse gas (GHG) emissions avoided directly                   Calculations, field sampling                               annual
GHG emissions avoided through replication                         Calculations                                               annual
Value of savings from recommended land use changes as             Company documentation                                     annually
result of BACP projects (e.g. changes in productivity,
projected vs. actual savings, etc.)
Poverty alleviation: crop productivity, quality & profitability   Household surveys                                        annually
Income generation: household income                               Household surveys                                        annually
                                                                      Implementation Procedures Manual


COMPONENT 3 - Support increased demand for products with more positive
biodiversity impacts
                                                                                                                                                                Frequency of
Project outputs and outcomes        Example Performance Indicators                                 Means of Verification                                       data collection
Outputs                             Output Indicators
Biodiversity of global importance isNumber of documents (studies, reports) completed on            Project progress reports                                       quarterly
mainstreamed into international RT  biodiversity impacts, indicators, and performance levels for
or equivalent initiatives (process  the indicators disseminated to RT
and result)                         Number of meetings, workshops, training events,                RT meeting minutes and reports                                 quarterly
                                    seminars, conferences etc. of RT, technical committees or
                                    similar bodies on biodiversity
                                    Number of participants in these workshops, training events,    Meeting minutes, other RT publications, participant lists      quarterly
                                    seminars, conferences etc.
Verification/certification systems  Number of procedures/practices/standards proposed for          Project progress reports, RT reports                           quarterly
established that incorporate the    verification/certification systems that incorporate
biodiversity performance targets    biodiversity performance targets defined by RT
defined by the RT                   Number of RT meetings, workshops, seminars etc. in             RT meeting minutes and reports                                 quarterly
                                    which proposals are presented and discussed
                                    Number of participants in workshops, training events,          Meeting minutes, other RT publications, participant lists      quarterly
                                    seminars, conferences etc.
Outcomes                            Outcome Indicators
Buyers of the four targeted         Number of RT that agree upon biodiversity impacts,             Meeting minutes, other RT publications                         quarterly
commodities, and other value-chain indicators, and performance levels for such indicators
participants integrate biodiversity (diagnosis of production systems)
criteria in the value-chain         Number of RT that agree upon landscape-level biodiversity      Meeting minutes, other RT publications                         quarterly
                                    indicators, including the incorporation of zoning and land
                                    use management that protect biodiversity of global
                                    significance
                                    Number of farms/companies obtaining certification due to       RT publications, annual reports from certifiers/verifiers       annual
                                    BACP project activities
                                    Number of RT that adopt and use a verification or              RT meeting reports, other RT publications                      quarterly
                                    certification system that incorporates BACP recommended
                                    biodiversity criteria, indicators, and verifiers
                                       Market value of commodities purchased with certification    Trade statistics from certification bodies, RT, FAO           6-monthly
                                       systems (price/weight, or unit price)
                                       Growth in volume of commodities purchased with              Trade statistics from certification bodies, RT, FAO           6-monthly
                                       certification systems
                                       Price-premium for commodities with certification systems    Company statistics, trade statistics from certification       6-monthly
                                       (as compared to bulk commodity)                             bodies, RT, FAO
                                       Agricultural profits (benefits above variable costs)        Company documentation                                          quarterly
                                       Costs of certification                                      Company documentation                                          quarterly
                                                                        Implementation Procedures Manual


COMPONENT 4 - Encourage the development of financial services to support
biodiversity-friendly practices
                                                                                                                                                             Frequency of
Project outputs and outcomes       Example Performance Indicators                                   Means of Verification                                   data collection
Outputs                            Output Indicators
                                   Documents describing the biodiversity friendly screening
Biodiversity friendly screening tools                                                               Project progress reports, public information from Fis      quarterly
and reward systems that financial  tools and reward systems, and their number
institutions (FI) can readily      Number of FIs involved in the design and development of          Project progress reports, public information from Fis      quarterly
integrate into their operations arescreening tools and reward systems
developed                          Minutes and number of workshops and meetings on                  Project progress reports, public information from FIs      quarterly
                                   dissemination to FIs of biodiversity friendly screening tools
                                   and reward systems
Outcomes                           Outcome Indicators
   Adequate financial services     Number of FI incorporating biodiversity concerns into their      Project progress reports, public information from FIs      quarterly
  supporting biodiversity-friendly investment screens for target commodities
practices are made available by FI % change (= increase) in total annual value of financial         Annual reports to RT, public documentation on policy      6-monthly
   to the actors in the targeted   services/products made by FI to companies that have              and performance standards of FI
    commodities and countries      adopted BMPs, relative to total loans in same sector

                                        % change in growth rate of financial services/products    Annual reports to RT, public documentation on policy        6-monthly
                                        made by these institutions to companies that have adopted and performance standards of FI
                                        BMPs, relative to total loans in same sector

                                        Number of new financial services/products developed that    Reports to RT, public documentation on policy and         6-monthly
                                        support biodiversity friendly practices                     performance standards of FI
                                        Value of financing facilitated by BACP project activities   Reports to RT, public documentation on policy and          annually
                                                                                                    performance standards of FI
                                        Number of media appearances                                 Project progress reports                                   quarterly
                                        Number of copies of project materials distributed or        Project progress reports                                   quarterly
                                        downloaded
                                                                                                   Implementation Procedures Manual



Example of how to fill out the Template for BACP Project M&E Plan
  Project                                                                                                               Unit of                                                                    Data
 Objective                                                                                      Performance            Measure-      Means of                                    Responsible    Collection      Critical             BACP
 Number           Project Activities      Start Date   End Date         Results                  Indicators              ment       Verification       Baseline       Target       Person       Frequency     Assumptions          Component
                                                                  Outputs
                                                                                           E.g., Number of          No.           Meeting minutes,                0     2 per Anton Abbott      Quarterly    District                          1
                                                                                           consultations held with                project progress                     district                              governments are
               E.g., Hold meetings                                                         key stakeholders to                    reports                                                                    open to
               with public authorities                                                     support inclusion of HCV                                                                                          biodiversity
                                                                  E.g., proposals of
               in charge of targeted                                                       areas within district                                                                                             dialogue
                                                                  new policies or
               policies or regulations                                                     spatial plans
             1                                                    regulations are
               to identify issues with
                                                                  elaborated and           E.g., Number of district   No.         Parliamentary                   0     1 per Bill Benson       Annual       District                          1
               policy regulation and
                                                                  conveyed to              spatial plans proposed for             decree on spatial                    district                              governments take
               implementation, and
                                                                  appropriate              improvement                            plan and                                                                   action and decide
               to brainstorm
                                                                  authorities                                                     ministerial                                                                to change the
               solutions to perceived
                                                                                                                                  approval of forest                                                         regulations as
               problems
                                                                                                                                  function change                                                            proposed
             1
                                                                                           E.g., Number of           No.          Project progress                0            3 Chriss Cross   Quarterly    BMPs are also                     2
                 E.g., Conduct                                                             management practices                   reports,                                                                   increasing
                 literature review of                                                      (BMPs) identified that                 publications                                                               productivity and
                 studies that identify                                                     have a proven positive                                                                                            profitability
                 linkages between                                                          impact on biodiversity
                 BMPs and biodiversity
                 impact. Or: Conduct
                 field trials of x BMPs
                 and assess their
                 biodiversity impact.                             E.g., biodiversity-
             2                                                    friendly practices for
                 E.g., Hold a series of                           production and on-       E.g., Number of           No.          Project progress                0        10 Dan Devos         Quarterly    Producers                         2
                 biodiversity trainings                           farm processing are      workshops, training                    reports                                                                    understand that
                 for palm oil producers                           developed and            events, seminars,                                                                                                 BMPs will also
                 in provinces x and y.                            tested                   conferences etc. on                                                                                               increase
                                                                                           implementation of BMPs                                                                                            productivity
             3                                                                                                                                                                                               andprofitability
                 E.g., Produce and                                                         E.g., Number of training No.           Project progress                0            1 Edward Elder   Quarterly    Certification                     3
                 publish training                                                          manuals for implementing               reports                                                                    system is available
                 manuals for palm oil                                                      P&C that are relevant to                                                                                          and acceptable to
                 producers.                                                                biodiversity at the farm                                                                                          BACP
                                                                                           and landscape scales
             3
                                                                  Outcomes
                                                               Implementation Procedures Manual


    E.g., Hold meetings       E.g., Policy-related   E.g., number of district   No.     Copies of          0    1 per Frank Farmer     Annual      There are               1
    with public authorities   barriers to adoption   spatial plans converted            legislative            district                            incentives to the
    in charge of targeted     of BMPs are            into decrees/                      decisions                                                  district government
    policies or regulations   removed or in an       parlamentary acts for                                                                         to take action
                              obvious process of     forest redesignation and
                              being removed          protection
1
    E.g., Conduct survey      E.g., Alternative      E.g., Number of            No.     Project progress   0     500 George Gealy      Quarterly   BMPs increase           2
    among the producers       production methods     producers implementing             reports                                                    productivity and
    involved in project       are implemented that   the recommended                                                                               profitability, and
    activities                have a proven          management practices                                                                          producers receive
                              positive impact on     (BMPs)                                                                                        TA to operationa-
                              biodiversity                                                                                                         lize the BMPs
2
    E.g., Assess trade        E.g., Buyers and         E.g., trade volume of    Mio t   Project progress   0      1.5 Henry Hamilton   Quarterly   Traders and other       3
    volumes using the         other value-chain        certified commodity              reports, RT                                                buyers see
    roundtable tracking       participants integrate products                           reports                                                    benefits in
    system                    biodiversity criteria in                                                                                             purchasing
                              the value-chain                                                                                                      biodiversity-friendly
                                                                                                                                                   commodities
3
Implementation Procedures Manual

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:3
posted:10/27/2011
language:English
pages:12
xiaohuicaicai xiaohuicaicai
About