COLONY PARK - PHASE II- 12KV UNDERGROUNDING

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]



ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION:



1 5 EA 8'x20'x9'-6" VAULT WITH (2) MANHOLE, COMPLETE $34,000.00 $170,000.00

VAULT INSTALLATION AND SURFACE

RESTORATION PER CU1600-3H



2 2 EA 8'x10'x7' TUB VAULT FOR VFI SWITCH, COMPLETE $17,000.00 $34,000.00

VAULT INSTALLATION AND SURFACE

RESTORATION PER CU 1600-18



3 1 EA 5'x8'-6"x7' VAULT WITH (1) MANHOLE, COMPLETE $18,000.00 $18,000.00

VAULT INSTALLATION AND SURFACE

RESTORATION PER CU 1600-3D.



4 5 EA (2)-10" PVC NATURAL AIR VENTILATION DUCTS $1,500.00 $7,500.00

PER VAULT PER CU 1700-6



5 500 LF (1)-2" PVC SCHEDULE 40 CONDUIT WITH 2-#6 CU $20.00 $10,000.00

FOR 120V SUMP PUMP OPERATION



6 4 EA PROVIDE ALLOWANCE FOR STUBBING OUT (1)-2" & $500.00 $2,000.00

(4)-4" PVC CONDUIT FOR AUTOMATION FOR VAULT

PER CU-2010. (LOCATIONS AND NECESSITY TO BE

DETERMINED DURING CONSTRUCTION PHASE).



7 4 EA PROVIDE ALLOWANCE TO INSTALL 2'X6' PAD WITH $2,500.00 $10,000.00

(2) 13"x24" PULL BOX FOR RTU INSTALLATION PER

CU2020 (LOCATIONS AND NECESSITY TO BE

DETERMINED DURING CONSTRUCTION PHASE).



8 4 EA RISER POLE SWEEP (1)-4" CONDUIT ENCASED IN $230.00 $920.00

CONCRETE FOR RS-797, RS- 801, RS-808 & RS-813



9 8 EA RISER POLE SWEEP (2)-6" & (2)-4" CONDUIT $250.00 $2,000.00

ENCASED IN CONCRETE FOR RS-794, RS-795, RS-796,

RS-798, RS-799, RS-800, RS-801 & RS-862.



10 0 EA RISER POLE SWEEP (4)-6" & (2)-4"CONDUIT $350.00 $0.00

ENCASED IN CONCRETE.



11 7 EA STUB, CAP & MARK CONDUIT (S) (1)-4" $20.00 $140.00



12 6 EA STUB, CAP & MARK CONDUIT (S) (3)-4" $25.00 $150.00



13 0 EA STUB, CAP & MARK CONDUIT (S) (2)-6"& (2)-4" $22.00 $0.00



14 1 EA STUB, CAP & MARK CONDUIT (S) (6)-6"& (2)-4" $37.00 $37.00



15 19200 LF FURNISH AND INSTALL (1)-4" DB100 PVC CONDUIT $6.50 $124,800.00



16 21700 LF FURNISH AND INSTALL (1)-6" DB100 PVC CONDUIT $9.50 $206,150.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 1 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL







17 7600 LF ENCASED CONDUIT DUCT BANK WITH 4/0 BARE $25.00 $190,000.00

COPPER



18 42000 LF MANDREL CONDUITS AND INSTALL PULL ROPES $1.00 $42,000.00

PER CITY REQUIREMENTS



19 7600 LF SAW CUT, EXCAVATE, BACKFILL, COMPACT, BASE $110.00 $836,000.00

PAVE SURFACE STREET PER PW STD #132.



20 7600 LF SHORING FOR MAIN DUCT BANK $9.00 $68,400.00



21 3 LOC FURNISH AND INSTALL 15 GALLONS SHRUBS $500.00 $1,500.00

SCREENING AROUND ELECTRICAL EQUIPMENT

PER UTILITY DEVICE/GUIDELINES, CONCEPT 1;

SHRUBS SHALL BE HALF AS TALL AS THE

EQUIPMENT BEING SCREENED AT THE TIME OF



22 1700 LF REMOVE & REPLACE CURB & GUTTER PER PW STD $35.00 $59,500.00

120



23 5100 SF REMOVE AND REPLACE SIDEWALK PER PW STD 113- $10.00 $51,000.00

1



24 1000 SF REMOVE & REPLACE DRIVEWAY PER PW STD 113-1 $10.00 $10,000.00

AND/OR 114



25 120000 SF PAVE AND GRIND PER CITY OF ANAHEIM PW STD $2.50 $300,000.00

132.

(NOTE: THERE IS A REHABITATION PROJECT ON

OLIVE STREET, THUS THE ACTUAL QUANTITY FOR

THIS BID ITEM MAY BECOME LESS).



25A 100000 SF ON WATER STREET (WEST OF OLIVE STREET), $0.50 $50,000.00

ELLSWORTH STREET, AND CLAUDINA AVE,

SLURRY SEAL AND STRIPE ALL TRAFFIC LANES

PER PUBLIC WORKS SPECIFICATION AND SLURRY

SPECIFICATION.



26 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)- $850.00 $102,000.00

6" + (2)-4" PVC CONDUITS ON SOUTH STREET, WEST

OF OLIVE STREET.



27 60 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)- $650.00 $39,000.00

6" + (4)-4" PVC CONDUITS ON WATER STREET, WEST

OF OLIVE STREET.



28 40 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)- $650.00 $26,000.00

6" + (4)-4" PVC CONDUITS ON ELLSWORTH STREET,

WEST OF OLIVE STREET.



29 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)- $650.00 $59,800.00

6" + (6)-4" + (1)-2" PVC CONDUITS ON SANTA ANA

STREET, EAST OF ATCHISON STREET.









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 2 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





30 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)- $750.00 $86,250.00

6" + (1)-4" + (2)-2" PVC CONDUITS ON SOUTH

STREET, EAST OF ATCHISON STREET.



31 5 LS ALLOWANCE TO ACCOMMODATE ACTUAL COST $5,000.00 $25,000.00

OF RAILROAD ENCROACHMENT PERMIT FEES



31A 1 LS RESTORE ALL LANDSCAPING IN KIND AND $5,000.00 $5,000.00

MATURITY.



31B 1 LS RE-STRIPING LANES AND LEGEND $3,000.00 $3,000.00



31C 8 EA REPLACE AND RESTORE TRAFFIC LOOPS AS $500.00 $4,000.00

DIRECTED BY CITY



31D 20 EA PROVIDE ADDITIONAL POTHOLING AS DIRECTED $900.00 $18,000.00

BY CITY, 3X4 OPENING, UP TO 15' DEEP.



31E 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET, $15,000.00 $15,000.00

CONTRACTOR SHALL RELOCATE FIRE HYDRANT

TO PROVIDE ROOM FOR PLACEMENT OF BORE PIT

(SEE SHEET ES-10). THE DESIGN PLAN WILL BE

PROVIDED TO THE CONTRACTOR BEFORE THE

CONSTRUCTION STARTS.



32 1 LS MOBILIZATION $50,000.00 $50,000.00



33 6 EA CONSTRUCTION SIGNS $500.00 $3,000.00



33A 4 EA CMS SIGNS PROVIDED FOR PRIOR NOTIFICATION $3,000.00 $12,000.00

AND DURING CIVIL (TRENCHING, PAVING, ETC.)

CONSTRUCTION ACTIVITIES.



34 1 LS ALLOWANCE TO ACCOMMODATE ACTIVITIES $100,000.00 $100,000.00

NECESSARY FOR GOOD CUSTOMER RELATIONS AS

DIRECTED BY THE CITY ON A T&M BASIS.



35 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $100,000.00 $100,000.00

UNKNOWN UNDERGROUND OBSTRUCTION ON A

T&M BASIS, AS DIRECTED BY THE CITY.



SUBTOTAL (ITEM 1 TO 35) =

$2,842,147.00



CONDUIT AND SUBSTRUCTURE SERVICE CONVERSION WORK:



36 1 LS PSC-42: INSTALL 6'X8' CAPACITOR PAD PER CU 1600- $3,400.00 $3,400.00

2 AND EXTEND (1)-4" PVC CONDUIT PER CU 1600-25

INTO PSC VAULT.



37 1 LS RC-1585 : INSTALL (1)-4" PVC CONDUIT PER CU 1600- $1,000.00 $1,000.00

25 & SWEEP INTO EXISTING PMT VAULT









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 3 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





38 1 LS R-1767: INSTALL TRANSFORMER HOLELINER PER $6,500.00 $6,500.00

CU 1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL

BOX PER CU 1500-1B. INSTALL 34"X40' FUSE

CABINET PER CU 1600-61. INSTALL 2" & 4'

CONDUITS & 17'X30' PULL BOX TO INTERCEPT

EXISTING HOUSING LOADS AND EXISTING RR

METER PEDESTALS.

39 1 LS R-1769: INSTALL TRANSFORMER HOLELINER PER $6,500.00 $6,500.00

CU 1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL

BOX PER CU 1500-1B. INSTALL 34"X40' FUSE

CABINET PER CU 1600-61. INSTALL 2" CONDUIT TO

INTERCEPT STREET LIGHTS AND RR METER



40 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $10,000.00 $10,000.00

UNKNOWN UNDERGROUND OBSTRUCTION FOR

THE SERVICE CONVERSION PLAN, ON A T&M

BASIS, AS DIRECTED BY THE CITY.



SUBTOTAL (ITEM 36 TO 40) =

$10,780.00



STREET LIGHT AND CONDUIT INSTALLATION:



41 64 EA FURNISH AND INSTALL CITY OF ANAHEIM STREET $3,500.00 $224,000.00

LIGHT STANDARD 742 PER CONSTRUCTION

STANDARD L-129-1.



42 64 EA FURNISH AND INSTALL 13"x24" FIBERGLASS $350.00 $22,400.00

STREET LIGHT PULL BOX PER CU1500-1A (REV 0)

AND TERMINATE FUSE KIT WITH SQUID

CONNECTOR, COMPLETE STREET LIGHT

CONNECTION PER L-104.



43 3 EA FURNISH AND INSTALL 17"x30" FIBERGLASS $400.00 $1,200.00

STREET LIGHT PULL BOX PER CU 1500-1B AND

TERMINATE FUSE KIT WITH SQUID CONNECTOR,

COMPLETE STREET LIGHT WIRING PER L-104.



44 3600 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT $14.00 $50,400.00

SCHEDULE 40 WITH (3)-#2 CU XHHW-2 CABLE



45 700 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY $24.00 $16,800.00

GALVANIZED STEEL CONDUIT WITH (3)-#2 CU

XHHW-2 CABLE



46 4700 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT $17.00 $79,900.00

SCHEDULE 40 WITH (3)-1/0 CU XHHW-2 CABLE



47 1200 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY $30.00 $36,000.00

GALVANIZED STEEL CONDUIT WITH (3)-1/0 CU

XHHW-2 CABLE



48 3 EA REMOVE AND SALVAGE EXISTING STREET LIGHT $800.00 $2,400.00

STANDARD AND ARM, DISPOSE PULL BOX IN

PLACE.









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 4 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





49 4 EA INTERCEPT EXISTING METER PEDESTAL WITH (1)- $1,400.00 $5,600.00

2" PVC CONDUIT AND (3)-1/0 CU XHHW-2 CABLE,

COMPLETE SERVICE CUTOVER AND ENERGIZE.



49 1 LS PROVIDE TRAFFIC CONTROL PLANS, INCLUDING $15,000.00 $15,000.00

PROCESSING PLAN THROUGH CITY AND

EXECUTING TRAFFIC CONTROL IN FIELD.





SUBTOTAL (ITEM 41 TO 49) =

$453,700.00



12KV ELECTRICAL INSTALLATION:



50 21,000 LF PULL TRI 1000 KCMIL AL/CU 15KV EPR CABLE $6.00 $126,000.00



51 3300 LF PULL 4/0 AL EPR TRI 15KV CABLE $4.00 $13,200.00



52 1200 LF PULL 2/0 AL EPR TRI 15KV CABLE $4.00 $4,800.00



53 3300 LF PULL 1/0 AL EPR TRI 15KV CABLE $4.00 $13,200.00



54 8 EA INSTALL 4-WAY VGS-9 OR VGS-10 SWITCH PER CU $1,200.00 $9,600.00

1600-31(Rev 0) & CU 1600-41 & CU 1600-42 (Rev0).



55 8 EA FURNISH & INSTALL PLATFORM/UNISTRUT SET $3,500.00 $28,000.00

FOR PLACEMENT OF VGS SWITCHES PER CU 1600-41

& CU 1600-42 (Rev 0).



56 2 EA INSTALL VFI-9 OR VFI-10 VACUUMED $1,000.00 $2,000.00

INTERRUPTER SWITCH



57 9 EA INSTALL STRAIGHT SPLICE ON 1000 AL EPR CABLE. $1,000.00 $9,000.00

[NOTE: SPLICING ON ONE TRI CABLE IN EACH

VAULT COUNT AS ONE SPLICE]



58 94 EA INSTALL 600AMP T-BODY AND CONDUCTOR $450.00 $42,300.00

CONTACT ON 1000 KCMIL AL EPR CABLE



59 0 EA INSTALL 600AMP INSULATING RECEPTACLE WITH $95.00 $0.00

TEST POINT



60 20 EA INSTALL 600AMP BUSHING EXTENSION $95.00 $1,900.00





61 114 EA INSTALL 600AMP TO 200AMP REDUCING TAP PLUG $95.00 $10,830.00

600 ETP



62 120 EA INSTALL 200AMP INSULATING RECEPTACLE WITH $110.00 $13,200.00

TEST POINT



63 6 EA INSTALL 200AMP LOADBREAK PLUG BUSHING $110.00 $660.00





64 0 EA INSTALL 200AMP LOADBREAK ELBOW ON #2, 1/0 $110.00 $0.00

AL, 2/0 AL AND 4/O AL CABLE









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 5 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





65 12 EA INSTALL (3)-800AMP FAULT INDICATOR ON $280.00 $3,360.00

1000KCMIL CABLE



66 5 EA FRAME AND DEAD END EXISTING POLE, INSTALL $3,000.00 $15,000.00

ANCHOR, GUY WIRE FOR SYSTEM RISER, CORRECT

G.O. 95 INFRACTION AS NEEDED



67 5 EA INSTALL 12KV WOOD POLE 45' TO 80' HEIGHT $3,200.00 $16,000.00

INCLUDING ALL FRAMING, DEADENDING,

ANCHORS AND GUYING



68 3 EA INSTALL 600 AMP POLE SWITCH OR PD AT SYSTEM $3,000.00 $9,000.00

RISER POLE. [IN SOME CASES, REINSTALL

EXISTING PD AT A DIFFERENT LOCATION.]



69 7 EA INSTALL 6" RISER SCHEDULE 80 PVC CONDUIT $500.00 $3,500.00



70 4 EA INSTALL 4" RISER SCHEDULE 80 PVC CONDUIT $400.00 $1,600.00



71 21 EA INSTALL TERMINATOR (3M QT III) ON 1000KCMIL $280.00 $5,880.00

AL EPR CABLE PER RISER POLE DRAWING

72 12 EA INSTALL TERMINATOR (3M QT III) ON 1/0 AL AND #2 $250.00 $3,000.00

AL EPR CABLE



73 12 EA INSTALL OH FUSE AND FUSE HOLDER $180.00 $2,160.00



74 33 EA INSTALL 15KV POLE CLASS ARRESTERS $120.00 $3,960.00



75 180 LF ON THE N.W. CORNER OF SANTA ANA ST & $8.00 $1,440.00

MELROSE ST (IN THE ALLEY AREA), INSTALL NEW

#6 CONDUCTORS BETWEEN PP#708627H &

PP#11246D, INCLUDING ALL ASSOCIATED DEVICES

FOR A COMPLETE INSTALLATION & ENERGIZE.



76 450 LF TO THE EAST OF EXISTING ANAHEIM SUB (IN $5.00 $2,250.00

FRONT OF THE WAREHOUSE AREA), INSTALL NEW

#4 ACSR CONDUCTORS BETWEEN PP#28367D &

PP#11701D, INCLUDING ALL ASSOCIATED DEVICES

FOR A COMPLETE INSTALLATION & ENERGIZE.



77 21 EA INSTALL 750 CU STR. TAP WIRE FROM THE POLE $300.00 $6,300.00

MOUNTED CABLE TERMINATOR TO THE

OVERHEAD LINE AND ENERGIZING UG CABLES.



78 12 EA INSTALL 1/0 CU STR. TAP WIRE FROM POLE $250.00 $3,000.00

MOUNTED CABLE TERMINATOR TO THE

OVERHEAD LINE AND ENERGIZING UG CABLE.



79 11 EA INSTALL GROUND CONDUIT, MOLDING & $200.00 $2,200.00

CONDUCTOR ON POLE AND CONNECT.



80 1 LS SEALING CONDUITS OCCUPIED WITH CABLE $3,000.00 $3,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 6 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





80A 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET, $5,500.00 $5,500.00

CONTRACTOR SHALL RELOCATE THREE DOWN-

GUYS & ANCHORS TO PROVIDE ROOM FOR

PLACEMENT OF BORE PIT (SEE SHEET ES-10). THE

DESIGN PLAN WILL BE PROVIDED TO THE

CONTRACTOR BEFORE THE CONSTRUCTION

STARTS.



81 6 EA FURNISH & INSTALL OPERABLE SUMP PUMP PER $1,000.00 $6,000.00

CU 1700-5



82 1 LS EXEMPT MATERIAL $5,000.00 $5,000.00



83 1 LS MOBILIZATION $25,000.00 $25,000.00



84 1 LS COORDINATE OUTAGE WITH CUSTOMERS. $10,000.00 $10,000.00



84A 1 LS COORDINATION WITH CITY OPERATION FOR 12KV $10,000.00 $10,000.00

SYSTEM CUTOVER.



85 1 LS ALLOWANCE TO ACCOMDATE UNFORSEEN SITE $50,000.00 $50,000.00

CONDITIONS ON A TIME AND MATERIAL BASIS AS

DIRECTED BY COA



SUBTOTAL (ITEM 50 TO 85) =

$467,840.00



ELECTRICAL SERVICE CONVERSION WORK:



86 1 LS PSC-42: INSTALL (1) 900KVAR 12KV SWITCHED $1,200.00 $1,200.00

CAPACITOR AND MAKE ALL NECESSARY PRIMARY

& GROUNDING CONNECTION.



87 1 LS RC-1585: REMOVE EXISTING PRIMARY RISER AND $1,000.00 $1,000.00

EXISTING U.G. CABLE, PULL & INSTALL NEW

CABLES FROM NEW VGS SWITCH, MAKE PRIMARY

CABLE & GROUNDING CONNECTION AS REQUIRED.



88 1 LS RC-1767: INSTALL 6.9KV FUSE CABINET & FUSE PER $2,000.00 $2,000.00

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V,

SINGLE PHASE TRANSFORMER IN TRANSFORMER

HOLELINER PER CU 1500-12, 13, & 14. FURNISH AND

INSTALL ALL SECONDARY CABLES TO EXISTING

HOUSING AND RR METER PEDESTAL LOADS AND

COMPETE ALL PRIMARY, SECONDARY, SERVICE

AND GROUND CONNECTION AS REQUIRED.



89 1 LS RC-1769: INSTALL 6.9KV FUSE CABINET & FUSE PER $2,000.00 $2,000.00

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V,

SINGLE PHASE TRANSFORMER IN TRANSFORMER

HOLELINER PER CU 1500-12, 13, & 14. FURNISH AND

INSTALL ALL SECONDARY CABLES AND COMPETE

ALL PRIMARY, SECONDARY, SERVICE AND

GROUND CONNECTION AS REQUIRED.









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 7 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





89A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $10,000.00 $10,000.00

UNKNOWN UNDERGROUND OBSTRUCTION FOR

THE SERVICE CONVERSION PLAN, ON A T&M

BASIS, AS DIRECTED BY THE CITY.





SUBTOTAL (ITEM 86 TO 89A) =

$6,200.00



12KV ELECTRICAL DEMOLITION:



90 1 LS REMOVE 12KV OVERHEAD SYSTEM: $150,000.00 $150,000.00

INCLUDING REMOVE CONDUCTORS, INSULATORS,

POLE SWITCHES, FIBER OPTICS & COPPER CABLES,

TRANSFORMERS AND CAPS, STREET LIGHT ARMS,

ETC PER DEMO PLAN



91 64 EA PULL, TRANSPORT AND DISPOSE (PTD) NON- $600.00 $38,400.00

SERVICE POLES.



92 9 EA TOPPING POLE TO 12KV LEVEL, TRANSPORT AND $400.00 $3,600.00

DISPOSE THE TOPPED PORTION. (NOTE: IN THE

VICINITY OF EXISTING ANHEIM SUBSTATION; ON

SANTA ANA ST & IN THE ALLEY IN FRONT OF THE

WAREHOUSE)





SUBTOTAL (ITEM 90 TO 92) =

$192,000.00



CITY COMMUNICATION CABLE INSTALLATION:





93 5900 LF INSTALL UNDERGROUND 96 STRAND FIBER OPTICS $2.50 $14,750.00

COMM. CABLE.



94 4 EA INSTALL 6"X22' COYOTE CLOSURE & SPLICE 96 $1,000.00 $4,000.00

STRAND FIBER OPTICS CABLE SEGMENTS.



95 5700 LF FURNISH AND INSTALL (3) 1-1/4" INNER DUCTS $6.00 $34,200.00

WITH COLORS OF BLUE, ORANGE, & GREEN, WITH

PULL ROPE AND A LOCATE WIRE (1 PAIR BELDEN

27080A WIRE AWG 14).



96 192 EA SPLICE FIBER OPTIC STRANDS TOGETHER $10.00 $1,920.00



97 2 EA FURNISH AND INSTALL 4" PVC CONDUIT $650.00 $1,300.00

COMMUNICATION RISER FOR COPPER AND/OR 96

STRAND F.O. CABLE INCL. DEADENDING, GUYING,

TENSIONING, ETC.



98 1 LS TESTING F.O. CABLE. REEL BEFORE INSTALLATION $3,000.00 $3,000.00



99 50 EA TEST FIBER OPTICS STRANDS FOLLOWING $30.00 $1,500.00

SPLICING







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 8 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





100 1500 LF REMOVE COPPER COMMUNICATION CABLE $1.00 $1,500.00

FROM OH POLES



101 3 EA FURNISH AND INSTALL ARMORFAST 3'X5'X3' $2,500.00 $7,500.00

COMM. VAULT PER CITY OF ANAHEIM



SUBTOTAL (ITEM 93 TO 101) =

$69,670.00





102 1 LS DISCREPANCES: THIS BID ITEM IS TO $50,000.00 $50,000.00

ACCOMMODATE THOSE PORTIONS OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS,

WHOSE METHOD OF PAYMENT IS NOT INCLUDED

IN OTHER BID ITEMS OR ELSEWHERE.



TOTAL (ITEM 1 THRU ITEM 102): $4,118,957.00





OTHER TELECOMMUNICATIONS COMPANIES

(SEE BOTTOM OF SPREASHEET FOR SHARED STEEL CASING BID ITEMS)



ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





ATT/SBC TELEPHONE CONDUIT SYSTEM



6'x12'x7' MANHOLE WITH 30" F&C, LADDER, AND $9,500.00 $9,500.00

COMPRESSION DUCT PLUGS - PAINT INTERIOR

WHITE, COMPLETE MH INSTALLATION AND

1 1 EA SURFACE RESTORATION PER ATT/SBC STANDARDS





4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH $6,500.00 $6,500.00

INSTALLATION AND SURFACE RESTORATION PER

2 1 EA ATT/SBC STANDARDS



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN $2,500.00 $2,500.00

3 1 EA GALVANIZED LID PER ATT/SBC STANDARDS



$8.00 $164,400.00

4" CONDUIT; TYPE "C"; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

4 20550 LF SURFACE RESTORATION PER ATT/SBC STANDARDS





MANDREL CONDUITS AND INSTALL PULL ROPES $1.50 $31,500.00

5 21000 LF PER ATT/SBC STANDARDS.



FURNISH AND INSTALL COMPRESSION DUCT $25.00 $900.00

6 36 EA PLUGS PER ATT/SBC STANDARDS.



PROVIDE AS-BUILT PLANS FOR ATT/SBC TO $500.00 $500.00

TELEPHONE INSPECTOR AND CITY

REPRESENTATIVE WITH ATT/SBC SIGNATURE OF

7 1 EA APPROVAL



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 9 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL









Subtotal items 1 through 7 $215,800.00



XO COMMUNICATIONS CONDUIT SYSTEM:



4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH $6,500.00 $19,500.00

INSTALLATION AND SURFACE RESTORATION PER

8 3 EA XO COMM. STANDARDS



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN $3,500.00 $0.00

9 0 EA GALVANIZED LID PER ATT/SBC STANDARDS



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL $8.00 $19,600.00

FACILITIES NECESSARY FOR INSTALLATION AND

SURFACE RESTORATION PER XO COMM.

10 2450 LF STANDARDS



MANDREL CONDUITS AND INSTALL PULL ROPES $1.00 $2,600.00

11 2600 LF PER XO COMM. STANDARDS.



FURNISH AND INSTALL COMPRESSION DUCT $25.00 $200.00

12 8 EA PLUGS PER XO COMM. STANDARDS.



PROVIDE AS-BUILT PLANS FOR XO COMM. TO XO $500.00 $500.00

INSPECTOR AND CITY REPRESENTATIVE WITH XO

13 1 EA COMM. SIGNATURE OF APPROVAL



Subtotal items 8 through 13 $42,400.00





VERIZON BUSINESS/MCI CONDUIT SYSTEM:



4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH $6,500.00 $19,500.00

INSTALLATION AND SURFACE RESTORATION PER

14 3 EA MCI STANDARDS



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL $8.00 $19,600.00

FACILITIES NECESSARY FOR INSTALLATION AND

15 2450 LF SURFACE RESTORATION PER MCI STANDARDS



MANDREL CONDUITS AND INSTALL PULL ROPES $1.00 $2,600.00

16 2600 LF PER MCI STANDARDS.



FURNISH AND INSTALL COMPRESSION DUCT $25.00 $200.00

17 8 EA PLUGS PER MCI STANDARDS.



PROVIDE AS-BUILT PLANS FOR VERIZON/MCI $500.00 $500.00

FACILITIES TO MCI INSPECTOR AND CITY

REPRESENTATIVE WITH MCI SIGNATURE OF

18 1 EA APPROVAL



Subtotal items 14 through 18 $42,400.00





AT&T LOCAL SERVICES FIBER-OPTIC CONDUIT SYSTEM:









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 10 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH $6,500.00 $19,500.00

INSTALLATION AND SURFACE RESTORATION PER

19 3 EA ATT/LS STANDARDS



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL $8.00 $19,600.00

FACILITIES NECESSARY FOR INSTALLATION AND

20 2450 LF SURFACE RESTORATION PER ATT/LS STANDARDS



MANDREL CONDUITS AND INSTALL PULL ROPES $1.00 $2,600.00

21 2600 LF PER ATT/LS STANDARDS.



FURNISH AND INSTALL COMPRESSION DUCT $25.00 $225.00

22 9 EA PLUGS PER ATT/LS STANDARDS.



$500.00 $500.00

PROVIDE AS-BUILT PLANS FOR ATT/LS FACILITIES

TO ATT/LS INSPECTOR AND CITY REPRESENTATIVE

23 1 EA WITH ATT/LS SIGNATURE OF APPROVAL



Subtotal items 19 through 23 $42,425.00





TIME-WARNER CABLE CONDUIT SYSTEM:



FURNISH AND INSTALL "INTERCEPT" 2X3X3 PULL $5,000.00 $5,000.00

BOX EQUIPPED WITH HINGED, BOLT-DOWN

GALVANIZED LID. PULL BOX TO BE APPROVED BY

TIME-WARNER PRIOR TO CONTRACTOR ORDERING

24 1 EA MATERIAL.



FURNISH AND INSTALL 2X3X3 PULL BOX PER TIME- $1,500.00 $6,000.00

25 4 EA WARNER STANDARDS



26 0 EA COORDINATE CABLE TV CUTOVER $2,000.00 $0.00



3" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL $4.00 $25,680.00

FACILITIES NECESSARY FOR INSTALLATION AND

SURFACE RESTORATION PER TIME-WARNER

27 6420 LF STANDARDS



MANDREL CONDUITS AND INSTALL PULL ROPES $1.00 $6,500.00

28 6500 LF PER TIME-WARNER STANDARDS.



FURNISH AND INSTALL COMPRESSION DUCT $25.00 $450.00

29 18 EA PLUGS PER TIME-WARNER STANDARDS.



PROVIDE AS-BUILT PLANS FOR TIME-WARNER TO $500.00 $500.00

CATV INSPECTOR AND CITY REPRESENTATIVE

30 1 EA WITH TIME-WARNER SIGNATURE OF APPROVAL



Subtotal items 24 through 30 $44,130.00



SUNESYS FIBER-OPTIC CONDUIT SYSTEM:



PROVIDE AND INSTALL 2X3X3 VAULT/PULLBOX; $750.00 $5,250.00

COMPLETE WITH ALL FACILITIES NECESSARY FOR

INSTALLATION AND SURFACE RESTORATION PER

31 7 EA SUNESYS AND CITY STANDARDS



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 11 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL







2" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL $3.00 $3,060.00

FACILITIES NECESSARY FOR INSTALLATION AND

SURFACE RESTORATION PER SUNESYS AND CITY

32 1020 LF STANDARDS



1.25" CONDUIT; COMPLETE WITH ALL FACILITIES $2.00 $11,400.00

NECESSARY FOR INSTALLATION AND SURFACE

RESTORATION PER SUNESYS AND CITY

33 5700 LF STANDARDS



MANDREL CONDUITS AND INSTALL PULL ROPES $1.00 $6,800.00

34 6800 LF PER SUNESYS STANDARDS.



FURNISH AND INSTALL COMPRESSION DUCT $25.00 $700.00

35 28 EA PLUGS PER SUNESYS STANDARDS.



PROVIDE AS-BUILT PLANS FOR SUNESYS $500.00 $500.00

FACILITIES TO SUNESYS INSPECTOR AND CITY

REPRESENTATIVE WITH SUNESYS SIGNATURE OF

36 1 EA APPROVAL



Subtotal items 31 through 36 $27,710.00





TRENCHING FOR TELECOMMUNICATIONS CONDUIT SYSTEMS:





37 7100 LF JOINT-TRENCH; STANDARD-DUAL-STEP $16.00 $113,600.00



38 3200 LF ATT/LS AND ATT REGIONAL TRENCHS ONLY $14.00 $44,800.00



39 140 LF TIME-WARNER TRENCH ONLY $8.00 $1,120.00



40 590 LF OTHER FI BER-OPTIC TRENCHES ONLY $8.00 $4,720.00



41 1 LS REMOVE AND RESTORE ASPHALT PER CITY STDS. $24,000.00 $24,000.00



42 1 LS REMOVE AND RESTORE CONC. SW. PER CITY STDS. $46,000.00 $46,000.00



43 1 LS PROVIDE TRAFFIC CONTROL PER CITY STDS. $35,000.00 $35,000.00



Subtotal items 37 through 43 $269,240.00





STEEL CASING FOR TELECOMMUNICATION COMPANIES:





44 120 LF FURNISH AND INSTALL 18" STEEL CASING WITH (3)- $650.00 $78,000.00

6" + (2)-3" PVC CONDUITS ON SANTA ANA STREET,

BETWEEN CLAUDINA STREET AND OLIVE STREET.

(NOTE: THIS 18" STEEL CASING TO BE SHARED

BETWEEN ATT/LNS, T/W, X/O & MCI).









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 12 of 100 10/25/2011

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL





45 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (7)- $650.00 $59,800.00

6" + (2)-3" + (2 )1 1/4" PVC CONDUITS ON SANTA ANA

STREET, WEST OF VINE STREET.

(NOTE: THIS 28" STEEL CASING TO BE SHARED

BETWEEN ATT CALIF, ATT/LNS, T/W, X/O, MCI &

SUNESYS).



46 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)- $850.00 $102,000.00

4" PVC CONDUITS ON SOUTH STREET, AT OLIVE

STREET.

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF.

USE ONLY).



47 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)- $750.00 $86,250.00

4" PVC CONDUITS ON SOUTH STREET, EAST OF

DAKOTA STREET.

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF.

USE ONLY).



Subtotal items 44 through 47 $326,050.00





TOTAL (ITEM 1 THRU ITEM 47): $1,010,155.00





GRAND TOTAL: $5,129,112.00







Amount written in words

The undersigned bidder certifies that he/she has thoroughly checked the figures set forth in this proposal,

that they are correct to the best of his/her knowledge and constitutes his/her proposal to perform all of the

work called out & implied throughout these contract documents.









Signature of Bidder









Name Printed/Typed









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 13 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION:

1 5 EA 8'x20'x9'-6" VAULT WITH (2) MANHOLE, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU1600-3H $ 29,700.00 $ 148,500.00 $ 29,000.00 $ 145,000.00 $ 150,000.00



2 2 EA 8'x10'x7' TUB VAULT FOR VFI SWITCH, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU 1600-18 $ 13,700.00 $ 27,400.00 $ 14,500.00 $ 29,000.00 $ 50,000.00



3 1 EA 5'x8'-6"x7' VAULT WITH (1) MANHOLE, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU 1600-3D. $ 12,100.00 $ 12,100.00 $ 13,000.00 $ 13,000.00 $ 5,000.00



4 5 EA (2)-10" PVC NATURAL AIR VENTILATION DUCTS PER

$ $

VAULT PER CU 1700-6 $ 3,300.00 $ 16,500.00 $ 2,900.00 $ 14,500.00 $ 5,000.00



5 500 LF (1)-2" PVC SCHEDULE 40 CONDUIT WITH 2-#6 CU FOR

$ $

120V SUMP PUMP OPERATION $ 25.00 $ 12,500.00 $ 24.50 $ 12,250.00 $ 1,500.00



6 6 EA PER CU2100-2 FOR AUTOMATION, INSTALL (1)-2" & (4)-

4" RIGID GALVANIZED CONDUIT OR CONCRETE

$ $

ENCASED PVC FOR VAULTS V-958, 959, 961, 962, 963, &

965. (NOTE: V-962 & 963 ARE EXISTING VAULTS). $ 1,600.00 $ 9,600.00 $ 1,800.00 $ 10,800.00 $ 6,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 14 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

7 6 EA PER CU 2020 FOR AUTOMATION, INSTALL 2'X6' PAD

WITH (2) 13"x24" PULL BOX FOR RTU INSTALLATION

$ $

AT VAULTS V-958, 959, 961, 962, 963 & 965. (NOTE: V-

962 & 963 ARE EXISTING VAULTS). $ 1,600.00 $ 9,600.00 $ 1,500.00 $ 9,000.00 $ 3,000.00



8 4 EA RISER POLE SWEEP (1)-4" CONDUIT ENCASED IN

$ $

CONCRETE FOR RS-797, RS- 801, RS-808 & RS-813 $ 400.00 $ 1,600.00 $ 1,000.00 $ 4,000.00 $ 2,000.00



9 8 EA RISER POLE SWEEP (2)-6" & (2)-4" CONDUIT ENCASED

IN CONCRETE FOR RS-794, RS-795, RS-796, RS-798, RS- $ $

799, RS-800, RS-801 & RS-862. $ 900.00 $ 7,200.00 $ 1,500.00 $ 12,000.00 $ 40,000.00



10 0 EA RISER POLE SWEEP (4)-6" & (2)-4"CONDUIT ENCASED

$ $

IN CONCRETE. $ 3,850.00 $ - $ - $ - $ -



11 7 EA STUB, CAP & MARK CONDUIT (S) (1)-4"

$ $

$ 60.00 $ 420.00 $ 200.00 $ 1,400.00 $ 1,400.00



12 6 EA STUB, CAP & MARK CONDUIT (S) (3)-4"

$ $

$ 75.00 $ 450.00 $ 250.00 $ 1,500.00 $ 2,400.00



13 0 EA STUB, CAP & MARK CONDUIT (S) (2)-6"& (2)-4"

$ $

$ 1,200.00 $ - $ - $ - $ -



14 1 EA STUB, CAP & MARK CONDUIT (S) (6)-6"& (2)-4"

$ $

$ 200.00 $ 200.00 $ 500.00 $ 500.00 $ 100.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 15 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

15 19,200 LF FURNISH AND INSTALL (1)-4" DB100 PVC CONDUIT

$ $

$ 2.25 $ 43,200.00 $ 2.60 $ 49,920.00 $ 96,000.00



16 21,700 LF FURNISH AND INSTALL (1)-6" DB100 PVC CONDUIT

$ $

$ 2.60 $ 56,420.00 $ 3.60 $ 78,120.00 $ 108,500.00



17 7,600 LF ENCASED CONDUIT DUCT BANK WITH 4/0 BARE

$ $

COPPER $ 13.25 $ 100,700.00 $ 23.30 $ 177,080.00 $ 129,200.00



18 42,000 LF MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

CITY REQUIREMENTS $ 0.20 $ 8,400.00 $ 0.20 $ 8,400.00 $ 84,000.00



19 7,600 LF SAW CUT, EXCAVATE, BACKFILL, COMPACT, BASE

$ $

PAVE SURFACE STREET PER PW STD #132. $ 58.00 $ 440,800.00 $ 69.00 $ 524,400.00 $ 532,000.00



20 7,600 LF SHORING FOR MAIN DUCT BANK

$ $

$ 3.00 $ 22,800.00 $ 4.55 $ 34,580.00 $ 30,400.00



21 3 LOC FURNISH AND INSTALL 15 GALLONS SHRUBS

SCREENING AROUND ELECTRICAL EQUIPMENT PER

UTILITY DEVICE/GUIDELINES, CONCEPT 1; SHRUBS $ $

SHALL BE HALF AS TALL AS THE EQUIPMENT BEING

SCREENED AT THE TIME OF PLANTING. $ 800.00 $ 2,400.00 $ 550.00 $ 1,650.00 $ 300.00



22 1,700 LF REMOVE & REPLACE CURB & GUTTER PER PW STD 120 $ $ $ 20.00 $ 34,000.00 $ 33.00 $ 56,100.00 $ 51,000.00



23 5,100 SF REMOVE AND REPLACE SIDEWALK PER PW STD 113-1 $ $ $ 3.60 $ 18,360.00 $ 7.45 $ 37,995.00 $ 30,600.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 16 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



24 1,000 SF REMOVE & REPLACE DRIVEWAY PER PW STD 113-1

$ $

AND/OR 114 $ 5.70 $ 5,700.00 $ 15.00 $ 15,000.00 $ 5,000.00



25 120,000 SF PAVE AND GRIND PER CITY OF ANAHEIM PW STD 132.

(NOTE: THERE IS A REHABITATION PROJECT ON OLIVE

$ $

STREET, THUS THE ACTUAL QUANTITY FOR THIS BID

ITEM MAY BECOME LESS). $ 1.40 $ 168,000.00 $ 1.40 $ 168,000.00 $ 168,000.00



25A 100,000 SF ON WATER STREET (WEST OF OLIVE STREET),

ELLSWORTH STREET, AND CLAUDINA AVE, SLURRY

SEAL AND STRIPE ALL TRAFFIC LANES PER PUBLIC $ $

WORKS SPECIFICATION AND SLURRY SPECIFICATION.

$ 0.50 $ 50,000.00 $ 0.25 $ 25,000.00 $ 100,000.00



26 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)-6"

+ (2)-4" PVC CONDUITS ON SOUTH STREET, WEST OF $ $

OLIVE STREET. $ 545.00 $ 65,400.00 $ 800.00 $ 96,000.00 $ 60,000.00



27 60 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (4)-4" PVC CONDUITS ON WATER STREET, WEST OF $ $

OLIVE STREET. $ 895.00 $ 53,700.00 $ 750.00 $ 45,000.00 $ 30,000.00



28 40 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (4)-4" PVC CONDUITS ON ELLSWORTH STREET, WEST $ $

OF OLIVE STREET. $ 1,140.00 $ 45,600.00 $ 750.00 $ 30,000.00 $ 20,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 17 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



29 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (6)-4" + (1)-2" PVC CONDUITS ON SANTA ANA $ $

STREET, EAST OF ATCHISON STREET. $ 500.00 $ 46,000.00 $ 815.00 $ 74,980.00 $ 46,000.00



30 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)-6"

+ (1)-4" + (2)-2" PVC CONDUITS ON SOUTH STREET, $ $

EAST OF ATCHISON STREET. $ 530.00 $ 60,950.00 $ 750.00 $ 86,250.00 $ 57,500.00



31 5 LS ALLOWANCE TO ACCOMMODATE ACTUAL COST OF $ 5,000.00 $ 25,000.00

RAILROAD ENCROACHMENT PERMIT FEES $ 5,000.00 $ 25,000.00 $ 5,000.00 $ 25,000.00 $ 25,000.00



31A 1 LS RESTORE ALL LANDSCAPING IN KIND AND MATURITY.

$ $

$ 4,500.00 $ 4,500.00 $ 10,000.00 $ 10,000.00 $ 10,000.00



31B 1 LS RE-STRIPING LANES AND LEGEND

$ $

$ 2,500.00 $ 2,500.00 $ 15,000.00 $ 15,000.00 $ 10,000.00



31C 8 EA REPLACE AND RESTORE TRAFFIC LOOPS AS

$ $

DIRECTED BY CITY $ 400.00 $ 3,200.00 $ 575.00 $ 4,600.00 $ 4,000.00



31D 20 EA PROVIDE ADDITIONAL POTHOLING AS DIRECTED BY

$ $

CITY, 3X4 OPENING, UP TO 15' DEEP. $ 400.00 $ 8,000.00 $ 550.00 $ 11,000.00 $ 20,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 18 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

31E 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET,

CONTRACTOR SHALL RELOCATE FIRE HYDRANT TO

PROVIDE ROOM FOR PLACEMENT OF BORE PIT (SEE

$ $

SHEET ES-10). THE DESIGN PLAN WILL BE PROVIDED

TO THE CONTRACTOR BEFORE THE CONSTRUCTION

STARTS. $ 6,000.00 $ 6,000.00 $ - $ - $ 10,000.00



32 1 LS MOBILIZATION

$ $

$ 40,000.00 $ 40,000.00 $ 80,000.00 $ 80,000.00 $ 50,000.00



33 6 EA CONSTRUCTION SIGNS

$ $

$ 450.00 $ 2,700.00 $ 500.00 $ 3,000.00 $ 1,000.00



33A 4 EA CMS SIGNS PROVIDED FOR PRIOR NOTIFICATION AND

DURING CIVIL (TRENCHING, PAVING, ETC.) $ $

CONSTRUCTION ACTIVITIES. $ 4,500.00 $ 18,000.00 $ 8,000.00 $ 32,000.00 $ 4,000.00



34 1 LS ALLOWANCE TO ACCOMMODATE ACTIVITIES $ 50,000.00 $ 50,000.00

NECESSARY FOR GOOD CUSTOMER RELATIONS AS

DIRECTED BY THE CITY ON A T&M BASIS. $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00



35 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $ 75,000.00 $ 75,000.00

UNKNOWN UNDERGROUND OBSTRUCTION ON A T&M

BASIS, AS DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00





SUBTOTAL (ITEMS 1 TO 35) : $ 150,000.00 $ 1,703,400.00 $ 2,067,025.00 $ 2,073,900.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 19 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





CONDUIT AND SUBSTRUCTURE SERVICE CONVERSION WORK:

36 1 LS PSC-42: INSTALL 6'X8' CAPACITOR PAD PER CU 1600-2

AND EXTEND (1)-4" PVC CONDUIT PER CU 1600-25 $ $

INTO PSC VAULT. $ 7,625.00 $ 7,625.00 $ 7,755.00 $ 7,755.00 $ 7,000.00



37 1 LS RC-1585 : INSTALL (1)-4" PVC CONDUIT PER CU 1600-25

$ $

& SWEEP INTO EXISTING PMT VAULT $ 2,000.00 $ 2,000.00 $ 3,800.00 $ 3,800.00 $ 1,000.00



38 1 LS R-1767: INSTALL TRANSFORMER HOLELINER PER CU

1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL BOX

PER CU 1500-1B. INSTALL 34"X40' FUSE CABINET PER

$ $

CU 1600-61. INSTALL 2" & 4' CONDUITS & 17'X30' PULL

BOX TO INTERCEPT EXISTING HOUSING LOADS AND

EXISTING RR METER PEDESTALS. $ 12,700.00 $ 12,700.00 $ 15,950.00 $ 15,950.00 $ 15,000.00



39 1 LS R-1769: INSTALL TRANSFORMER HOLELINER PER CU

1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL BOX

PER CU 1500-1B. INSTALL 34"X40' FUSE CABINET PER $ $

CU 1600-61. INSTALL 2" CONDUIT TO INTERCEPT

STREET LIGHTS AND RR METER PEDESTAL LOADS. $ 7,500.00 $ 7,500.00 $ 9,900.00 $ 9,900.00 $ 18,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 20 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

40 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $75,000 $75,000

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00





SUBTOTAL (ITEMS 36 TO 40) : $ 75,000.00

$ 104,825.00 $ 112,405.00 $ 116,000.00



STREET LIGHT AND CONDUIT INSTALLATION:



41 65 EA FURNISH AND INSTALL CITY OF ANAHEIM STREET

LIGHT STANDARD 742 PER CONSTRUCTION $ $

STANDARD L-129-1. $ 5,110.00 $ 332,150.00 $ 4,000.00 $ 260,000.00 $ 227,500.00



42 65 EA FURNISH AND INSTALL 13"x24" FIBERGLASS STREET

LIGHT PULL BOX PER CU1500-1A (REV 0) AND

$ $

TERMINATE FUSE KIT WITH SQUID CONNECTOR,

COMPLETE STREET LIGHT CONNECTION PER L-104. $ 310.00 $ 20,150.00 $ 400.00 $ 26,000.00 $ 22,750.00



43 3 EA FURNISH AND INSTALL 17"x30" FIBERGLASS STREET

LIGHT PULL BOX PER CU 1500-1B AND TERMINATE

$ $

FUSE KIT WITH SQUID CONNECTOR, COMPLETE

STREET LIGHT WIRING PER L-104. $ 420.00 $ 1,260.00 $ 575.00 $ 1,725.00 $ 15,000.00



44 3,600 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT

$ $

SCHEDULE 40 WITH (3)-#2 CU XHHW-2 CABLE $ 18.50 $ 66,600.00 $ 15.10 $ 54,360.00 $ 3,600.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 21 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



45 700 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY

GALVANIZED STEEL CONDUIT WITH (3)-#2 CU XHHW-2 $ $

CABLE $ 26.70 $ 18,690.00 $ 25.50 $ 17,850.00 $ 7,000.00



46 4,700 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT

$ $

SCHEDULE 40 WITH (3)-1/0 CU XHHW-2 CABLE $ 19.90 $ 93,530.00 $ 18.00 $ 84,600.00 $ 9,400.00



47 1,200 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY

GALVANIZED STEEL CONDUIT WITH (3)-1/0 CU XHHW- $ $

2 CABLE $ 28.50 $ 34,200.00 $ 30.00 $ 36,000.00 $ 12,000.00



48 3 EA REMOVE AND SALVAGE EXISTING STREET LIGHT

$ $

STANDARD AND ARM, DISPOSE PULL BOX IN PLACE. $ 500.00 $ 1,500.00 $ 1,400.00 $ 4,200.00 $ 3,000.00



49 4 EA INTERCEPT EXISTING METER PEDESTAL WITH (1)-2"

PVC CONDUIT AND (3)-1/0 CU XHHW-2 CABLE, $ $

COMPLETE SERVICE CUTOVER AND ENERGIZE. $ 862.00 $ 3,448.00 $ 1,000.00 $ 4,000.00 $ 2,000.00



49 1 LS PROVIDE TRAFFIC CONTROL PLANS, INCLUDING

PROCESSING PLAN THROUGH CITY AND EXECUTING $ $

TRAFFIC CONTROL IN FIELD. $ 4,000.00 $ 4,000.00 $ 3,500.00 $ 3,500.00 $ 5,000.00



49A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $75,000 $75,000

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 22 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





SUBTOTAL (ITEMS 41 TO 49A) : $ 75,000 $ 650,528.00 $ 567,235.00 $ 382,250.00



12KV ELECTRICAL INSTALLATION:

50 21,000 LF PULL TRI 1000 KCMIL AL/CU 15KV EPR CABLE

$ $

$ 4.00 $ 84,000.00 $ 4.50 $ 94,500.00 $ 89,250.00



51 3,300 LF PULL 4/0 AL EPR TRI 15KV CABLE

$ $

$ 3.85 $ 12,705.00 $ 2.53 $ 8,349.00 $ 14,025.00



52 1,200 LF PULL 2/0 AL EPR TRI 15KV CABLE

$ $

$ 2.00 $ 2,400.00 $ 2.25 $ 2,700.00 $ 12,000.00



53 3,300 LF PULL 1/0 AL EPR TRI 15KV CABLE $ $ $ 4.25 $ 14,025.00 $ 2.11 $ 6,963.00 $ 13,200.00



54 8 EA INSTALL 4-WAY VGS-9 OR VGS-10 SWITCH PER CU 1600-

$ $

31(Rev 0) & CU 1600-41 & CU 1600-42 (Rev0). $ 1,125.00 $ 9,000.00 $ 1,125.00 $ 9,000.00 $ 12,000.00



55 8 EA FURNISH & INSTALL PLATFORM/UNISTRUT SET FOR

PLACEMENT OF VGS SWITCHES PER CU 1600-41 & CU $ $

1600-42 (Rev 0). $ 2,125.00 $ 17,000.00 $ 2,095.00 $ 16,760.00 $ 8,000.00



56 2 EA INSTALL VFI-9 OR VFI-10 VACUUMED INTERRUPTER

$ $

SWITCH $ 1,125.00 $ 2,250.00 $ 2,250.00 $ 4,500.00 $ 4,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 23 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

57 9 EA INSTALL STRAIGHT SPLICE ON 1000 AL EPR CABLE.

[NOTE: SPLICING ON ONE TRI CABLE IN EACH VAULT $ $

COUNT AS ONE SPLICE] $ 2,370.00 $ 21,330.00 $ 1,687.00 $ 15,183.00 $ 9,000.00



58 94 EA INSTALL 600AMP T-BODY AND CONDUCTOR CONTACT

$ $

ON 1000 KCMIL AL EPR CABLE $ 400.00 $ 37,600.00 $ 422.00 $ 39,668.00 $ 37,600.00



59 0 EA INSTALL 600AMP INSULATING RECEPTACLE WITH

$ $

TEST POINT $ 85.00 $ - $ - $ - $ -



60 20 EA INSTALL 600AMP BUSHING EXTENSION $ $ $ 85.00 $ 1,700.00 $ 141.00 $ 2,820.00 $ 2,000.00



61 114 EA INSTALL 600AMP TO 200AMP REDUCING TAP PLUG 600

$ $

ETP $ 85.00 $ 9,690.00 $ 281.00 $ 32,034.00 $ 11,400.00



62 120 EA INSTALL 200AMP INSULATING RECEPTACLE WITH

$ $

TEST POINT $ 85.00 $ 10,200.00 $ 211.00 $ 25,320.00 $ 30,000.00



63 6 EA INSTALL 200AMP LOADBREAK PLUG BUSHING $ $ $ 85.00 $ 510.00 $ 141.00 $ 846.00 $ 600.00



64 0 EA INSTALL 200AMP LOADBREAK ELBOW ON #2, 1/0 AL,

$ $

2/0 AL AND 4/O AL CABLE $ 375.00 $ - $ - $ - $ -



65 12 EA INSTALL (3)-800AMP FAULT INDICATOR ON 1000KCMIL

$ $

CABLE $ 730.00 $ 8,760.00 $ 703.00 $ 8,436.00 $ 12,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 24 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

65A 30 EA INSTALL MOTOR OPERATOR WITH IT'S ASSOCIATED

CONTROL CABLES, VOLTAGE TRANSFORMERS,

ELBOWS, AND REQUIRED BRACKETS, PER CU 2100-1, $ $

AT VAULTS V-958, 959, 961, 962, 963 & 965. (NOTE: V-

962 & 963 ARE EXISTING VAULT). $ 1,350.00 $ 40,500.00 $ 1,266.00 $ 37,980.00 $ 15,000.00



66A 8 EA INSTALL CITY SUPPLIED RTU CONTROLLER

ENCLOSURE, CABLE LEADS, AND COMPLETE

$ $

CONNECTIONS AS REQUIRED, AT VAULTS V-958, 959,

961, 962, 963 & 965. (NOTE: V-962 & 963 ARE EXISTING). $ 2,250.00 $ 18,000.00 $ 2,250.00 $ 18,000.00 $ 4,000.00



66 5 EA FRAME AND DEAD END EXISTING POLE, INSTALL

ANCHOR, GUY WIRE FOR SYSTEM RISER, CORRECT $ $

G.O. 95 INFRACTION AS NEEDED $ 2,700.00 $ 13,500.00 $ 4,922.00 $ 24,610.00 $ 25,000.00



67 5 EA INSTALL 12KV WOOD POLE 45' TO 80' HEIGHT

INCLUDING ALL FRAMING, DEADENDING, ANCHORS $ $

AND GUYING $ 4,615.00 $ 23,075.00 $ 3,094.00 $ 15,470.00 $ 25,000.00



68 3 EA INSTALL 600 AMP POLE SWITCH OR PD AT SYSTEM

RISER POLE. [IN SOME CASES, REINSTALL EXISTING $ $

PD AT A DIFFERENT LOCATION.] $ 1,350.00 $ 4,050.00 $ 984.00 $ 2,952.00 $ 4,500.00



69 7 EA INSTALL 6" RISER SCHEDULE 80 PVC CONDUIT

$ $

$ 675.00 $ 4,725.00 $ 1,125.00 $ 7,875.00 $ 7,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 25 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

70 4 EA INSTALL 4" RISER SCHEDULE 80 PVC CONDUIT

$ $

$ 565.00 $ 2,260.00 $ 844.00 $ 3,376.00 $ 2,000.00



71 21 EA INSTALL TERMINATOR (3M QT III) ON 1000KCMIL AL

$ $

EPR CABLE PER RISER POLE DRAWING $ 395.00 $ 8,295.00 $ 562.00 $ 11,802.00 $ 8,925.00



72 12 EA INSTALL TERMINATOR (3M QT III) ON 1/0 AL AND #2 AL

$ $

EPR CABLE $ 280.00 $ 3,360.00 $ 562.00 $ 6,744.00 $ 4,200.00



73 12 EA INSTALL OH FUSE AND FUSE HOLDER

$ $

$ 255.00 $ 3,060.00 $ 352.00 $ 4,224.00 $ 4,200.00



74 33 EA INSTALL 15KV POLE CLASS ARRESTERS

$ $

$ 168.00 $ 5,544.00 $ 281.00 $ 9,273.00 $ 6,600.00



75 180 LF ON THE N.W. CORNER OF SANTA ANA ST & MELROSE

ST (IN THE ALLEY AREA), INSTALL NEW #6

CONDUCTORS BETWEEN PP#708627H & PP#11246D, $ $

INCLUDING ALL ASSOCIATED DEVICES FOR A

COMPLETE INSTALLATION & ENERGIZE. $ 25.50 $ 4,590.00 $ 28.00 $ 5,040.00 $ 1,800.00



76 450 LF TO THE EAST OF EXISTING ANAHEIM SUB (IN FRONT

OF THE WAREHOUSE AREA), INSTALL NEW #4 ACSR

CONDUCTORS BETWEEN PP#28367D & PP#11701D, $ $

INCLUDING ALL ASSOCIATED DEVICES FOR A

COMPLETE INSTALLATION & ENERGIZE. $ 15.30 $ 6,885.00 $ 28.00 $ 12,600.00 $ 4,500.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 26 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

77 21 EA INSTALL 750 CU STR. TAP WIRE FROM THE POLE

MOUNTED CABLE TERMINATOR TO THE OVERHEAD $ $

LINE AND ENERGIZING UG CABLES. $ 565.00 $ 11,865.00 $ 562.00 $ 11,802.00 $ 42,000.00



78 12 EA INSTALL 1/0 CU STR. TAP WIRE FROM POLE MOUNTED

CABLE TERMINATOR TO THE OVERHEAD LINE AND $ $

ENERGIZING UG CABLE. $ 450.00 $ 5,400.00 $ 422.00 $ 5,064.00 $ 12,000.00



79 11 EA INSTALL GROUND CONDUIT, MOLDING &

$ $

CONDUCTOR ON POLE AND CONNECT. $ 450.00 $ 4,950.00 $ 562.00 $ 6,182.00 $ 11,000.00



80 1 LS SEALING CONDUITS OCCUPIED WITH CABLE

$ $

$ 3,940.00 $ 3,940.00 $ 1,125.00 $ 1,125.00 $ 3,000.00



80A 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET,

CONTRACTOR SHALL RELOCATE THREE DOWN-GUYS

& ANCHORS TO PROVIDE ROOM FOR PLACEMENT OF

$ $

BORE PIT (SEE SHEET ES-10). THE DESIGN PLAN WILL

BE PROVIDED TO THE CONTRACTOR BEFORE THE

CONSTRUCTION STARTS. $ 3,035.00 $ 3,035.00 $ 4,500.00 $ 4,500.00 $ 1,000.00



81 6 EA FURNISH & INSTALL OPERABLE SUMP PUMP PER CU

$ $

1700-5 $ 1,925.00 $ 11,550.00 $ 1,088.00 $ 6,528.00 $ 12,000.00



82 1 LS EXEMPT MATERIAL

$ $

$ 20,000.00 $ 20,000.00 $ 5,000.00 $ 5,000.00 $ 2,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 27 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

83 1 LS MOBILIZATION

$ $

$ 42,622.00 $ 42,622.00 $ 30,000.00 $ 30,000.00 $ 100,000.00



84 1 LS COORDINATE OUTAGE WITH CUSTOMERS.

$ $

$ 3,375.00 $ 3,375.00 $ 15,000.00 $ 15,000.00 $ 5,000.00



84A 1 LS COORDINATION WITH CITY OPERATION FOR 12KV

$ $

SYSTEM CUTOVER. $ 4,500.00 $ 4,500.00 $ 15,000.00 $ 15,000.00 $ 5,000.00



85 1 LS ALLOWANCE TO ACCOMDATE UNFORSEEN SITE $50,000 $50,000

CONDITIONS ON A TIME AND MATERIAL BASIS AS

DIRECTED BY THE CITY $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00





SUBTOTAL (ITEMS 50 TO 85) : $ 50,000.00 $ 530,251.00 $ 577,226.00 $ 610,800.00



ELECTRICAL SERVICE CONVERSION WORK:



86 1 LS PSC-42: INSTALL (1) 900KVAR 12KV SWITCHED

CAPACITOR AND MAKE ALL NECESSARY PRIMARY & $ $

GROUNDING CONNECTION. $ 1,350.00 $ 1,350.00 $ 14,322.00 $ 14,322.00 $ 30,000.00



87 1 LS RC-1585: REMOVE EXISTING PRIMARY RISER AND

EXISTING U.G. CABLE, PULL & INSTALL NEW CABLES

$ $

FROM NEW VGS SWITCH, MAKE PRIMARY CABLE &

GROUNDING CONNECTION AS REQUIRED. $ 900.00 $ 900.00 $ 5,020.00 $ 5,020.00 $ 20,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 28 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

88 1 LS RC-1767: INSTALL 6.9KV FUSE CABINET & FUSE PER

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V, SINGLE

PHASE TRANSFORMER IN TRANSFORMER HOLELINER

PER CU 1500-12, 13, & 14. FURNISH AND INSTALL ALL

$ $

SECONDARY CABLES TO EXISTING HOUSING AND RR

METER PEDESTAL LOADS AND COMPETE ALL

PRIMARY, SECONDARY, SERVICE AND GROUND

CONNECTION AS REQUIRED. $ 4,650.00 $ 4,650.00 $ 3,400.00 $ 3,400.00 $ 30,000.00



89 1 LS RC-1769: INSTALL 6.9KV FUSE CABINET & FUSE PER

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V, SINGLE

PHASE TRANSFORMER IN TRANSFORMER HOLELINER

PER CU 1500-12, 13, & 14. FURNISH AND INSTALL ALL $ $

SECONDARY CABLES AND COMPETE ALL PRIMARY,

SECONDARY, SERVICE AND GROUND CONNECTION

AS REQUIRED. $ 2,600.00 $ 2,600.00 $ 3,400.00 $ 3,400.00 $ 50,000.00



89A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $25,000.00 $25,000.00

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00





SUBTOTAL (ITEMS 86 TO 89A) : $ 25,000 $ 34,500.00 $ 51,142.00 $ 155,000.00



12KV ELECTRICAL DEMOLITION:



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 29 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



90 1 LS REMOVE 12KV OVERHEAD SYSTEM:

INCLUDING REMOVE CONDUCTORS, INSULATORS,

POLE SWITCHES, FIBER OPTICS & COPPER CABLES, $ $

TRANSFORMERS AND CAPS, STREET LIGHT ARMS,

ETC PER DEMO PLAN $ 184,375.00 $ 184,375.00 $ 84,500.00 $ 84,500.00 $ 400,000.00



91 64 EA PULL, TRANSPORT AND DISPOSE (PTD) NON-SERVICE

$ $

POLES. $ 1,185.00 $ 75,840.00 $ 1,000.00 $ 64,000.00 $ 32,000.00



92 9 EA TOPPING POLE TO 12KV LEVEL, TRANSPORT AND

DISPOSE THE TOPPED PORTION. (NOTE: IN THE

VICINITY OF EXISTING ANHEIM SUBSTATION; ON $ $

SANTA ANA ST & IN THE ALLEY IN FRONT OF THE

WAREHOUSE) $ 480.00 $ 4,320.00 $ 550.00 $ 4,950.00 $ 9,000.00





SUBTOTAL (ITEMS 90 TO 92) : $ - $ 264,535.00 $ 153,450.00 $ 441,000.00



CITY COMMUNICATION CABLE INSTALLATION:

93 5,900 LF INSTALL UNDERGROUND 96 STRAND FIBER OPTICS

$ $

COMM. CABLE. $ 1.75 $ 10,325.00 $ 1.27 $ 7,493.00 $ 59,000.00



94 4 EA INSTALL 6"X22' COYOTE CLOSURE & SPLICE 96

$ $

STRAND FIBER OPTICS CABLE SEGMENTS. $ 4,270.00 $ 17,080.00 $ 3,500.00 $ 14,000.00 $ 4,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 30 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





95 5,700 LF FURNISH AND INSTALL (3) 1-1/4" INNER DUCTS WITH

COLORS OF BLUE, ORANGE, & GREEN, WITH PULL

$ $

ROPE AND A LOCATE WIRE (1 PAIR BELDEN 27080A

WIRE AWG 14). $ 4.55 $ 25,935.00 $ 3.00 $ 17,100.00 $ 5,700.00



96 192 EA SPLICE FIBER OPTIC STRANDS TOGETHER $ $ $ 45.00 $ 8,640.00 $ 23.00 $ 4,416.00 $ 19,200.00



97 2 EA FURNISH AND INSTALL 4" PVC CONDUIT

COMMUNICATION RISER FOR COPPER AND/OR 96

$ $

STRAND F.O. CABLE INCL. DEADENDING, GUYING,

TENSIONING, ETC. $ 1,875.00 $ 3,750.00 $ 1,500.00 $ 3,000.00 $ 1,000.00



98 1 LS TESTING F.O. CABLE. REEL BEFORE INSTALLATION

$ $

$ 540.00 $ 540.00 $ 1,000.00 $ 1,000.00 $ 1,000.00



99 50 EA TEST FIBER OPTICS STRANDS FOLLOWING SPLICING

$ $

$ 59.00 $ 2,950.00 $ 40.00 $ 2,000.00 $ 5,000.00



100 1,500 LF REMOVE COPPER COMMUNICATION CABLE FROM OH

$ $

POLES $ 2.50 $ 3,750.00 $ 1.95 $ 2,925.00 $ 1,500.00



101 3 EA FURNISH AND INSTALL ARMORFAST 3'X5'X3' COMM.

$ $

VAULT PER CITY OF ANAHEIM STANDARD $ 3,200.00 $ 9,600.00 $ 3,300.00 $ 9,900.00 $ 15,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 31 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 93 TO 101) : $ -

$ 82,570.00 $ 61,834.00 $ 111,400.00



102 1 LS DISCREPANCES: THIS BID ITEM IS TO

ACCOMMODATE THOSE PORTIONS OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS, WHOSE $ $

METHOD OF PAYMENT IS NOT INCLUDED IN OTHER

BID ITEMS OR ELSEWHERE. $ - $ - $ - $ - $ 10,000.00





12KV CONDUIT AND SUBSTRUCTURE TOTAL $ 375,000

(ITEM 1 THRU ITEM 102): $ 3,370,609.00 $ 3,590,317.00 $ 3,900,350.00





TELECOMMUNICATION COMPANIES

(SEE BOTTOM OF SPREASHEET FOR SHARED STEEL CASING BID ITEMS)



ESTIMATED

QUANTITY

ITEM OF WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





ATT/SBC TELEPHONE CONDUIT SYSTEM







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 32 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

6'x12'x7' MANHOLE WITH 30" F&C, LADDER, AND

COMPRESSION DUCT PLUGS - PAINT INTERIOR WHITE,

$ $

COMPLETE MH INSTALLATION AND SURFACE

1 1 EA RESTORATION PER ATT/SBC STANDARDS $ 13,600.00 $ 13,600.00 $ 13,000.00 $ 13,000.00 $ 15,000.00



4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER $ $

2 1 EA ATT/SBC STANDARDS $ 4,350.00 $ 4,350.00 $ 4,500.00 $ 4,500.00 $ 5,000.00



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN

3 1 EA GALVANIZED LID PER ATT/SBC STANDARDS

$ $ $ 2,900.00 $ 2,900.00 $ 3,460.00 $ 3,460.00 $ 2,000.00



4" CONDUIT; TYPE "C"; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

4 20,550 LF SURFACE RESTORATION PER ATT/SBC STANDARDS $ 2.50 $ 51,375.00 $ 3.00 $ 61,650.00 $ 61,650.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

5 21,000 LF ATT/SBC STANDARDS.

$ $ $ 0.20 $ 4,200.00 $ 0.20 $ 4,200.00 $ 21,000.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

6 36 EA PER ATT/SBC STANDARDS.

$ $ $ 6.00 $ 216.00 $ 10.00 $ 360.00 $ 3,600.00



PROVIDE AS-BUILT PLANS FOR ATT/SBC TO

TELEPHONE INSPECTOR AND CITY REPRESENTATIVE $ $

7 1 EA WITH ATT/SBC SIGNATURE OF APPROVAL $ 700.00 $ 700.00 $ 550.00 $ 550.00 $ 1,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 33 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 1 TO 7): $ - $ 77,341.00 $ 87,720.00 $ 109,250.00



XO COMMUNICATIONS CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER XO $ $

8 3 EA COMM. STANDARDS $ 4,500.00 $ 13,500.00 $ 4,500.00 $ 13,500.00 $ 15,000.00



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN

$ $

9 0 EA GALVANIZED LID PER ATT/SBC STANDARDS $ 4,500.00 $ - $ - $ - $ -





4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

$ $

FACILITIES NECESSARY FOR INSTALLATION AND

10 2,450 LF SURFACE RESTORATION PER XO COMM. STANDARDS $ 2.90 $ 7,105.00 $ 1.50 $ 3,675.00 $ 7,350.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

11 2,600 LF XO COMM. STANDARDS. $ 0.25 $ 650.00 $ 0.20 $ 520.00 $ 2,600.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

12 8 EA PER XO COMM. STANDARDS. $ 6.00 $ 48.00 $ 10.00 $ 80.00 $ 800.00



PROVIDE AS-BUILT PLANS FOR XO COMM. TO XO

INSPECTOR AND CITY REPRESENTATIVE WITH XO $ $

13 1 EA COMM. SIGNATURE OF APPROVAL $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 1,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 34 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 8 TO 13): $ - $ 21,803.00 $ 18,325.00 $ 26,750.00



VERIZON BUSINESS/MCI CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER MCI $ $

14 3 EA STANDARDS $ 4,500.00 $ 13,500.00 $ 4,500.00 $ 13,500.00 $ 15,000.00



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

15 2,450 LF SURFACE RESTORATION PER MCI STANDARDS $ 3.00 $ 7,350.00 $ 1.50 $ 3,675.00 $ 7,350.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

16 2,600 LF MCI STANDARDS. $ 0.25 $ 650.00 $ 0.20 $ 520.00 $ 2,600.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

17 8 EA PER MCI STANDARDS. $ 6.00 $ 48.00 $ 10.00 $ 80.00 $ 800.00



PROVIDE AS-BUILT PLANS FOR VERIZON/MCI

FACILITIES TO MCI INSPECTOR AND CITY

$ $

REPRESENTATIVE WITH MCI SIGNATURE OF

18 1 EA APPROVAL $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 1,000.00





SUBTOTAL (ITEMS 14 TO 18): $ - $ 22,048.00 $ 18,325.00 $ 26,750.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 35 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

AT&T LOCAL SERVICES FIBER-OPTIC CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER $ $

19 3 EA ATT/LS STANDARDS $ 4,500.00 $ 13,500.00 $ 4,500.00 $ 13,500.00 $ 15,000.00



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

20 2,450 LF SURFACE RESTORATION PER ATT/LS STANDARDS $ 3.00 $ 7,350.00 $ 1.50 $ 3,675.00 $ 7,350.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

21 2,600 LF ATT/LS STANDARDS. $ 0.25 $ 650.00 $ 0.20 $ 520.00 $ 2,600.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

22 9 EA PER ATT/LS STANDARDS. $ 6.00 $ 54.00 $ 10.00 $ 90.00 $ 900.00



PROVIDE AS-BUILT PLANS FOR ATT/LS FACILITIES TO

ATT/LS INSPECTOR AND CITY REPRESENTATIVE WITH $ $

23 1 EA ATT/LS SIGNATURE OF APPROVAL $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 1,000.00



SUBTOTAL (ITEMS 19 TO 23): $ - $ 22,054.00 $ 18,335.00 $ 26,850.00



TIME-WARNER CABLE CONDUIT SYSTEM:







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 36 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



FURNISH AND INSTALL "INTERCEPT" 2X3X3 PULL BOX

EQUIPPED WITH HINGED, BOLT-DOWN GALVANIZED $ $

LID. PULL BOX TO BE APPROVED BY TIME-WARNER

24 1 EA PRIOR TO CONTRACTOR ORDERING MATERIAL. $ 3,600.00 $ 3,600.00 $ 3,500.00 $ 3,500.00 $ 1,000.00



FURNISH AND INSTALL 2X3X3 PULL BOX PER TIME-

$ $

25 4 EA WARNER STANDARDS $ 2,600.00 $ 10,400.00 $ 2,150.00 $ 8,600.00 $ 6,000.00



26 0 EA COORDINATE CABLE TV CUTOVER $ $ $ - $ - $ - $ - $ -



3" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

$ $

SURFACE RESTORATION PER TIME-WARNER

27 6,420 LF STANDARDS $ 2.00 $ 12,840.00 $ 1.40 $ 8,988.00 $ 19,260.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

28 6,500 LF TIME-WARNER STANDARDS. $ 0.20 $ 1,300.00 $ 0.20 $ 1,300.00 $ 6,500.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

29 18 EA PER TIME-WARNER STANDARDS. $ 5.00 $ 90.00 $ 10.00 $ 180.00 $ 1,800.00



PROVIDE AS-BUILT PLANS FOR TIME-WARNER TO

CATV INSPECTOR AND CITY REPRESENTATIVE WITH $ $

30 1 EA TIME-WARNER SIGNATURE OF APPROVAL $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 1,000.00





SUBTOTAL (ITEMS 24 TO 30): $ - $ 28,730.00 $ 23,118.00 $ 35,560.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 37 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





SUNESYS FIBER-OPTIC CONDUIT SYSTEM:

PROVIDE AND INSTALL 2X3X3 VAULT/PULLBOX;

COMPLETE WITH ALL FACILITIES NECESSARY FOR

$ $

INSTALLATION AND SURFACE RESTORATION PER

31 7 EA SUNESYS AND CITY STANDARDS $ 2,600.00 $ 18,200.00 $ 2,000.00 $ 14,000.00 $ 14,000.00



2" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

$ $

SURFACE RESTORATION PER SUNESYS AND CITY

32 1,020 LF STANDARDS $ 2.00 $ 2,040.00 $ 1.50 $ 1,530.00 $ 2,040.00



1.25" CONDUIT; COMPLETE WITH ALL FACILITIES

NECESSARY FOR INSTALLATION AND SURFACE $ $

33 5,700 LF RESTORATION PER SUNESYS AND CITY STANDARDS $ 1.25 $ 7,125.00 $ 1.45 $ 8,265.00 $ 5,700.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

34 6,800 LF SUNESYS STANDARDS. $ 0.25 $ 1,700.00 $ 0.20 $ 1,360.00 $ 6,800.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

35 28 EA PER SUNESYS STANDARDS. $ 5.00 $ 140.00 $ 10.00 $ 280.00 $ 2,800.00



PROVIDE AS-BUILT PLANS FOR SUNESYS FACILITIES

TO SUNESYS INSPECTOR AND CITY REPRESENTATIVE $ $

36 1 EA WITH SUNESYS SIGNATURE OF APPROVAL $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 1,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 38 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

SUBTOTAL (ITEMS 31 TO 36): $ - $ 29,705.00 $ 25,985.00 $ 32,340.00



TRENCHING FOR TELECOMMUNICATIONS CONDUIT SYSTEMS:



$ $

37 7,100 LF JOINT-TRENCH; STANDARD-DUAL-STEP $ 5.00 $ 35,500.00 $ 23.00 $ 163,300.00 $ 355,000.00





$ $

38 3,200 LF ATT/LS AND ATT REGIONAL TRENCHS ONLY $ 24.00 $ 76,800.00 $ 40.00 $ 128,000.00 $ 160,000.00





$ $

39 140 LF TIME-WARNER TRENCH ONLY $ 25.00 $ 3,500.00 $ 65.00 $ 9,100.00 $ 14,000.00





$ $

40 590 LF OTHER FI BER-OPTIC TRENCHES ONLY $ 24.00 $ 14,160.00 $ 65.00 $ 38,350.00 $ 29,500.00





$ $

41 1 LS REMOVE AND RESTORE ASPHALT PER CITY STDS. $ 45,000.00 $ 45,000.00 $ 90,000.00 $ 90,000.00 $ 70,000.00





$ $

42 1 LS REMOVE AND RESTORE CONC. SW. PER CITY STDS. $ 6,000.00 $ 6,000.00 $ 10,000.00 $ 10,000.00 $ 3,000.00





$ $

43 1 LS PROVIDE TRAFFIC CONTROL PER CITY STDS. $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 39 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

SUBTOTAL (ITEMS 37 TO 43): $ - $ 182,960.00 $ 443,750.00 $ 636,500.00



STEEL CASING FOR TELECOMMUNICATION COMPANIES:

44 120 LF FURNISH AND INSTALL 18" STEEL CASING WITH (3)-6"

+ (2)-3" PVC CONDUITS ON SANTA ANA STREET,

BETWEEN CLAUDINA STREET AND OLIVE STREET. $ $

(NOTE: THIS 18" STEEL CASING TO BE SHARED

BETWEEN ATT/LNS, T/W, X/O & MCI). $ 400.00 $ 48,000.00 $ 700.00 $ 84,000.00 $ 60,000.00



45 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (7)-6"

+ (2)-3" + (2 )1 1/4" PVC CONDUITS ON SANTA ANA

STREET, WEST OF VINE STREET.

$ $

(NOTE: THIS 28" STEEL CASING TO BE SHARED

BETWEEN ATT CALIF, ATT/LNS, T/W, X/O, MCI &

SUNESYS). $ 500.00 $ 46,000.00 $ 1,250.00 $ 115,000.00 $ 46,000.00



46 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-4"

PVC CONDUITS ON SOUTH STREET, AT OLIVE STREET.

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF. USE $ $

ONLY).

$ 540.00 $ 64,800.00 $ 700.00 $ 84,000.00 $ 60,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 40 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

47 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-4"

PVC CONDUITS ON SOUTH STREET, EAST OF DAKOTA

STREET. $ $

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF. USE

ONLY). $ 530.00 $ 60,950.00 $ 700.00 $ 80,500.00 $ 57,500.00





SUBTOTAL (ITEMS 44 TO 47): $ - $ 219,750.00 $ 363,500.00 $ 223,500.00





TELECOMMUNICATIONS GRAND TOTAL $ -

(ITEM 1 THRU ITEM 47): $ 604,391.00 $ 999,058.00 $ 1,117,500.00







PROJECT GRAND TOTAL

$375,000 3,975,000.00 4,589,375.00 5,017,850.00

(12KV ITEMS 1 THRU 102 + TEL. COMM.

ITEMS 1 THRU 47:



Subcontractors Items Phone No.

1 All American Asphalt 25 & 25A (951) 757-8026



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 41 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 1 Bidder No. 2 Bidder No. 3







Pouk & Steinle, Inc. Arizona Pipeline Co Minako America Corporation

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: James H. Hagge Jr. Attn: John W. Gulzow Attn: Reffaat H Mina

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ P O Box 3039 1745 Sampson Avenue 522 E. Airline Way

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Riverside, CA 92519 Corona, CA 92879 Gardena, CA 90248

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 576274 A & C-10 License No: 423545 A & C-10 License No: 612429 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 951-682-2982 PHONE: 951-270-3100 PHONE: 949-380-3900

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



2 T & D Services 26,27,28,29 & 30 (951) 304-1190

3 Long Bore 26,27,28,29 & 30 (951) 817-0111









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 42 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION:

1 5 EA 8'x20'x9'-6" VAULT WITH (2) MANHOLE, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU1600-3H $ 38,427.00 $ 192,135.00 $ 36,728.00 $ 183,640.00 $ 42,000.00 $ 210,000.00



2 2 EA 8'x10'x7' TUB VAULT FOR VFI SWITCH, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU 1600-18 $ 16,774.00 $ 33,548.00 $ 15,766.00 $ 31,532.00 $ 11,088.00 $ 22,176.00



3 1 EA 5'x8'-6"x7' VAULT WITH (1) MANHOLE, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU 1600-3D. $ 13,580.00 $ 13,580.00 $ 13,791.00 $ 13,791.00 $ 9,382.00 $ 9,382.00



4 5 EA (2)-10" PVC NATURAL AIR VENTILATION DUCTS PER

$ $

VAULT PER CU 1700-6 $ 3,730.00 $ 18,650.00 $ 2,658.00 $ 13,290.00 $ 1,092.00 $ 5,460.00



5 500 LF (1)-2" PVC SCHEDULE 40 CONDUIT WITH 2-#6 CU FOR

$ $

120V SUMP PUMP OPERATION $ 25.47 $ 12,735.00 $ 1.09 $ 545.00 $ 2.41 $ 1,205.00



6 6 EA PER CU2100-2 FOR AUTOMATION, INSTALL (1)-2" & (4)-

4" RIGID GALVANIZED CONDUIT OR CONCRETE

$ $

ENCASED PVC FOR VAULTS V-958, 959, 961, 962, 963, &

965. (NOTE: V-962 & 963 ARE EXISTING VAULTS). $ 1,351.00 $ 8,106.00 $ 3,573.00 $ 21,438.00 $ 2,160.00 $ 12,960.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 43 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

7 6 EA PER CU 2020 FOR AUTOMATION, INSTALL 2'X6' PAD

WITH (2) 13"x24" PULL BOX FOR RTU INSTALLATION

$ $

AT VAULTS V-958, 959, 961, 962, 963 & 965. (NOTE: V-

962 & 963 ARE EXISTING VAULTS). $ 2,040.00 $ 12,240.00 $ 1,245.00 $ 7,470.00 $ 2,592.00 $ 15,552.00



8 4 EA RISER POLE SWEEP (1)-4" CONDUIT ENCASED IN

$ $

CONCRETE FOR RS-797, RS- 801, RS-808 & RS-813 $ 335.00 $ 1,340.00 $ 254.00 $ 1,016.00 $ 216.00 $ 864.00



9 8 EA RISER POLE SWEEP (2)-6" & (2)-4" CONDUIT ENCASED

IN CONCRETE FOR RS-794, RS-795, RS-796, RS-798, RS- $ $

799, RS-800, RS-801 & RS-862. $ 939.00 $ 7,512.00 $ 712.00 $ 5,696.00 $ 876.00 $ 7,008.00



10 0 EA RISER POLE SWEEP (4)-6" & (2)-4"CONDUIT ENCASED

$ $

IN CONCRETE. $ - $ - $ 1,098.00 $ - $ 1,300.00 $ -



11 7 EA STUB, CAP & MARK CONDUIT (S) (1)-4"

$ $

$ 63.00 $ 441.00 $ 61.00 $ 427.00 $ 22.00 $ 154.00



12 6 EA STUB, CAP & MARK CONDUIT (S) (3)-4"

$ $

$ 90.00 $ 540.00 $ 121.00 $ 726.00 $ 54.00 $ 324.00



13 0 EA STUB, CAP & MARK CONDUIT (S) (2)-6"& (2)-4"

$ $

$ - $ - $ 186.00 $ - $ 33.00 $ -



14 1 EA STUB, CAP & MARK CONDUIT (S) (6)-6"& (2)-4"

$ $

$ 152.00 $ 152.00 $ 242.00 $ 242.00 $ 108.00 $ 108.00

$ -





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 44 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

15 19,200 LF FURNISH AND INSTALL (1)-4" DB100 PVC CONDUIT

$ $

$ 3.31 $ 63,552.00 $ 3.22 $ 61,824.00 $ 2.10 $ 40,320.00



16 21,700 LF FURNISH AND INSTALL (1)-6" DB100 PVC CONDUIT

$ $

$ 5.48 $ 118,916.00 $ 4.37 $ 94,829.00 $ 4.42 $ 95,914.00



17 7,600 LF ENCASED CONDUIT DUCT BANK WITH 4/0 BARE

$ $

COPPER $ 32.11 $ 244,036.00 $ 24.93 $ 189,468.00 $ 50.00 $ 380,000.00



18 42,000 LF MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

CITY REQUIREMENTS $ 0.29 $ 12,180.00 $ 0.25 $ 10,500.00 $ 3.80 $ 159,600.00



19 7,600 LF SAW CUT, EXCAVATE, BACKFILL, COMPACT, BASE

$ $

PAVE SURFACE STREET PER PW STD #132. $ 62.36 $ 473,936.00 $ 89.60 $ 680,960.00 $ 38.00 $ 288,800.00



20 7,600 LF SHORING FOR MAIN DUCT BANK

$ $

$ 6.29 $ 47,804.00 $ 8.63 $ 65,588.00 $ 4.40 $ 33,440.00



21 3 LOC FURNISH AND INSTALL 15 GALLONS SHRUBS

SCREENING AROUND ELECTRICAL EQUIPMENT PER

UTILITY DEVICE/GUIDELINES, CONCEPT 1; SHRUBS $ $

SHALL BE HALF AS TALL AS THE EQUIPMENT BEING

SCREENED AT THE TIME OF PLANTING. $ 2,964.00 $ 8,892.00 $ 439.00 $ 1,317.00 $ 3,240.00 $ 9,720.00



22 1,700 LF REMOVE & REPLACE CURB & GUTTER PER PW STD 120 $ $ $ 85.90 $ 146,030.00 $ 40.49 $ 68,833.00 $ 34.60 $ 58,820.00



23 5,100 SF REMOVE AND REPLACE SIDEWALK PER PW STD 113-1 $ $ $ 11.58 $ 59,058.00 $ 10.10 $ 51,510.00 $ 8.80 $ 44,880.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 45 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



24 1,000 SF REMOVE & REPLACE DRIVEWAY PER PW STD 113-1

$ $

AND/OR 114 $ 16.45 $ 16,450.00 $ 16.36 $ 16,360.00 $ 13.00 $ 13,000.00



25 120,000 SF PAVE AND GRIND PER CITY OF ANAHEIM PW STD 132.

(NOTE: THERE IS A REHABITATION PROJECT ON OLIVE

$ $

STREET, THUS THE ACTUAL QUANTITY FOR THIS BID

ITEM MAY BECOME LESS). $ 1.81 $ 217,200.00 $ 1.55 $ 186,000.00 $ 1.30 $ 156,000.00



25A 100,000 SF ON WATER STREET (WEST OF OLIVE STREET),

ELLSWORTH STREET, AND CLAUDINA AVE, SLURRY

SEAL AND STRIPE ALL TRAFFIC LANES PER PUBLIC $ $

WORKS SPECIFICATION AND SLURRY SPECIFICATION.

$ 0.33 $ 33,000.00 $ 0.25 $ 25,000.00 $ 0.60 $ 60,000.00



26 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)-6"

+ (2)-4" PVC CONDUITS ON SOUTH STREET, WEST OF $ $

OLIVE STREET. $ 653.00 $ 78,360.00 $ 572.80 $ 68,736.00 $ 380.00 $ 45,600.00



27 60 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (4)-4" PVC CONDUITS ON WATER STREET, WEST OF $ $

OLIVE STREET. $ 1,005.00 $ 60,300.00 $ 817.61 $ 49,056.60 $ 380.00 $ 22,800.00



28 40 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (4)-4" PVC CONDUITS ON ELLSWORTH STREET, WEST $ $

OF OLIVE STREET. $ 1,320.00 $ 52,800.00 $ 1,031.38 $ 41,255.20 $ 380.00 $ 15,200.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 46 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



29 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (6)-4" + (1)-2" PVC CONDUITS ON SANTA ANA $ $

STREET, EAST OF ATCHISON STREET. $ 742.00 $ 68,264.00 $ 609.79 $ 56,100.68 $ 380.00 $ 34,960.00



30 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)-6"

+ (1)-4" + (2)-2" PVC CONDUITS ON SOUTH STREET, $ $

EAST OF ATCHISON STREET. $ 660.00 $ 75,900.00 $ 568.79 $ 65,410.85 $ 380.00 $ 43,700.00



31 5 LS ALLOWANCE TO ACCOMMODATE ACTUAL COST OF $ 5,000.00 $ 25,000.00

RAILROAD ENCROACHMENT PERMIT FEES $ 5,000.00 $ 25,000.00 $ 5,000.00 $ 25,000.00 $ 5,000.00 $ 25,000.00



31A 1 LS RESTORE ALL LANDSCAPING IN KIND AND MATURITY.

$ $

$ 15,500.00 $ 15,550.00 $ 7,823.00 $ 7,823.00 $ 16,200.00 $ 16,200.00



31B 1 LS RE-STRIPING LANES AND LEGEND

$ $

$ 6,969.00 $ 6,969.00 $ 8,233.00 $ 8,233.00 $ 6,480.00 $ 6,480.00



31C 8 EA REPLACE AND RESTORE TRAFFIC LOOPS AS

$ $

DIRECTED BY CITY $ 292.00 $ 2,336.00 $ 400.00 $ 3,200.00 $ 432.00 $ 3,456.00



31D 20 EA PROVIDE ADDITIONAL POTHOLING AS DIRECTED BY

$ $

CITY, 3X4 OPENING, UP TO 15' DEEP. $ 560.00 $ 11,200.00 $ 283.00 $ 5,660.00 $ 2,160.00 $ 43,200.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 47 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

31E 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET,

CONTRACTOR SHALL RELOCATE FIRE HYDRANT TO

PROVIDE ROOM FOR PLACEMENT OF BORE PIT (SEE

$ $

SHEET ES-10). THE DESIGN PLAN WILL BE PROVIDED

TO THE CONTRACTOR BEFORE THE CONSTRUCTION

STARTS. $ 10,735.00 $ 10,735.00 $ 5,057.00 $ 5,057.00 $ 3,996.00 $ 3,996.00



32 1 LS MOBILIZATION

$ $

$ 34,183.00 $ 34,183.00 $ 30,051.00 $ 30,051.00 $ 335,000.00 $ 335,000.00



33 6 EA CONSTRUCTION SIGNS

$ $

$ 1,563.00 $ 9,378.00 $ 190.00 $ 1,140.00 $ 6,480.00 $ 38,880.00



33A 4 EA CMS SIGNS PROVIDED FOR PRIOR NOTIFICATION AND

DURING CIVIL (TRENCHING, PAVING, ETC.) $ $

CONSTRUCTION ACTIVITIES. $ 11,177.00 $ 44,708.00 $ 507.00 $ 2,028.00 $ 8,640.00 $ 34,560.00



34 1 LS ALLOWANCE TO ACCOMMODATE ACTIVITIES $ 50,000.00 $ 50,000.00

NECESSARY FOR GOOD CUSTOMER RELATIONS AS

DIRECTED BY THE CITY ON A T&M BASIS. $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00



35 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $ 75,000.00 $ 75,000.00

UNKNOWN UNDERGROUND OBSTRUCTION ON A T&M

BASIS, AS DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00





SUBTOTAL (ITEMS 1 TO 35) : $ 150,000.00 $ 2,362,716.00 $ 2,225,753.33 $ 2,419,719.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 48 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

$225,477.33

CONDUIT AND SUBSTRUCTURE SERVICE CONVERSION WORK:

36 1 LS PSC-42: INSTALL 6'X8' CAPACITOR PAD PER CU 1600-2

AND EXTEND (1)-4" PVC CONDUIT PER CU 1600-25 $ $

INTO PSC VAULT. $ 6,832.00 $ 6,832.00 $ 9,272.00 $ 9,272.00 $ 886.00 $ 886.00



37 1 LS RC-1585 : INSTALL (1)-4" PVC CONDUIT PER CU 1600-25

$ $

& SWEEP INTO EXISTING PMT VAULT $ 5,323.00 $ 5,323.00 $ 2,856.00 $ 2,856.00 $ 540.00 $ 540.00



38 1 LS R-1767: INSTALL TRANSFORMER HOLELINER PER CU

1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL BOX

PER CU 1500-1B. INSTALL 34"X40' FUSE CABINET PER

$ $

CU 1600-61. INSTALL 2" & 4' CONDUITS & 17'X30' PULL

BOX TO INTERCEPT EXISTING HOUSING LOADS AND

EXISTING RR METER PEDESTALS. $ 13,723.00 $ 13,723.00 $ 7,379.00 $ 7,379.00 $ 5,300.00 $ 5,300.00



39 1 LS R-1769: INSTALL TRANSFORMER HOLELINER PER CU

1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL BOX

PER CU 1500-1B. INSTALL 34"X40' FUSE CABINET PER $ $

CU 1600-61. INSTALL 2" CONDUIT TO INTERCEPT

STREET LIGHTS AND RR METER PEDESTAL LOADS. $ 15,969.00 $ 15,969.00 $ 6,570.00 $ 6,570.00 $ 5,300.00 $ 5,300.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 49 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

40 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $75,000 $75,000

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00





SUBTOTAL (ITEMS 36 TO 40) : $ 75,000.00

$ 116,847.00 $ 101,077.00 $ 87,026.00



STREET LIGHT AND CONDUIT INSTALLATION:



41 65 EA FURNISH AND INSTALL CITY OF ANAHEIM STREET

LIGHT STANDARD 742 PER CONSTRUCTION $ $

STANDARD L-129-1. $ 4,683.00 $ 304,395.00 $ 5,279.00 $ 343,135.00 $ 7,344.00 $ 477,360.00



42 65 EA FURNISH AND INSTALL 13"x24" FIBERGLASS STREET

LIGHT PULL BOX PER CU1500-1A (REV 0) AND

$ $

TERMINATE FUSE KIT WITH SQUID CONNECTOR,

COMPLETE STREET LIGHT CONNECTION PER L-104. $ 424.00 $ 27,560.00 $297.00 $ 19,305.00 $ 396.00 $ 25,740.00



43 3 EA FURNISH AND INSTALL 17"x30" FIBERGLASS STREET

LIGHT PULL BOX PER CU 1500-1B AND TERMINATE

$ $

FUSE KIT WITH SQUID CONNECTOR, COMPLETE

STREET LIGHT WIRING PER L-104. $ 442.00 $ 1,326.00 $352.00 $ 1,056.00 $ 650.00 $ 1,950.00



44 3,600 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT

$ $

SCHEDULE 40 WITH (3)-#2 CU XHHW-2 CABLE $ 12.00 $ 43,200.00 $26.72 $ 96,192.00 $ 2.40 $ 8,640.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 50 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



45 700 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY

GALVANIZED STEEL CONDUIT WITH (3)-#2 CU XHHW-2 $ $

CABLE $ 16.00 $ 11,200.00 $39.68 $ 27,776.00 $ 9.30 $ 6,510.00



46 4,700 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT

$ $

SCHEDULE 40 WITH (3)-1/0 CU XHHW-2 CABLE $ 15.00 $ 70,500.00 $29.28 $ 137,616.00 $ 1.64 $ 7,708.00



47 1,200 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY

GALVANIZED STEEL CONDUIT WITH (3)-1/0 CU XHHW- $ $

2 CABLE $ 17.00 $ 20,400.00 $39.43 $ 47,316.00 $ 9.80 $ 11,760.00



48 3 EA REMOVE AND SALVAGE EXISTING STREET LIGHT

$ $

STANDARD AND ARM, DISPOSE PULL BOX IN PLACE. $ 361.00 $ 1,083.00 $372.00 $ 1,116.00 $ 2,160.00 $ 6,480.00



49 4 EA INTERCEPT EXISTING METER PEDESTAL WITH (1)-2"

PVC CONDUIT AND (3)-1/0 CU XHHW-2 CABLE, $ $

COMPLETE SERVICE CUTOVER AND ENERGIZE. $ 405.00 $ 1,620.00 $548.00 $ 2,192.00 $ 650.00 $ 2,600.00



49 1 LS PROVIDE TRAFFIC CONTROL PLANS, INCLUDING

PROCESSING PLAN THROUGH CITY AND EXECUTING $ $

TRAFFIC CONTROL IN FIELD. $ 11,287.00 $ 11,287.00 $3,868.00 $ 3,868.00 $ 21,600.00 $ 21,600.00



49A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $75,000 $75,000

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00 $75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 51 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





SUBTOTAL (ITEMS 41 TO 49A) : $ 75,000 $ 567,571.00 $ 754,572.00 $ 645,348.00



12KV ELECTRICAL INSTALLATION:

50 21,000 LF PULL TRI 1000 KCMIL AL/CU 15KV EPR CABLE

$ $

$ 4.45 $ 93,450.00 $ 4.57 $ 95,970.00 $ 2.62 $ 55,020.00



51 3,300 LF PULL 4/0 AL EPR TRI 15KV CABLE

$ $

$ 2.97 $ 9,801.00 $ 4.09 $ 13,497.00 $ 2.42 $ 7,986.00



52 1,200 LF PULL 2/0 AL EPR TRI 15KV CABLE

$ $

$ 2.23 $ 2,676.00 $ 3.26 $ 3,912.00 $ 2.42 $ 2,904.00



53 3,300 LF PULL 1/0 AL EPR TRI 15KV CABLE $ $ $ 2.97 $ 9,801.00 $ 3.26 $ 10,758.00 $ 12.00 $ 39,600.00



54 8 EA INSTALL 4-WAY VGS-9 OR VGS-10 SWITCH PER CU 1600-

$ $

31(Rev 0) & CU 1600-41 & CU 1600-42 (Rev0). $ 1,108.00 $ 8,864.00 $ 1,947.00 $ 15,576.00 $ 1,200.00 $ 9,600.00



55 8 EA FURNISH & INSTALL PLATFORM/UNISTRUT SET FOR

PLACEMENT OF VGS SWITCHES PER CU 1600-41 & CU $ $

1600-42 (Rev 0). $ 1,691.15 $ 13,529.20 $ 2,315.55 $ 18,524.40 $ 6,000.00 $ 48,000.00



56 2 EA INSTALL VFI-9 OR VFI-10 VACUUMED INTERRUPTER

$ $

SWITCH $ 1,108.00 $ 2,216.00 $ 1,362.58 $ 2,725.16 $ 1,200.00 $ 2,400.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 52 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

57 9 EA INSTALL STRAIGHT SPLICE ON 1000 AL EPR CABLE.

[NOTE: SPLICING ON ONE TRI CABLE IN EACH VAULT $ $

COUNT AS ONE SPLICE] $ 554.00 $ 4,986.00 $ 584.42 $ 5,259.78 $ 3,200.00 $ 28,800.00



58 94 EA INSTALL 600AMP T-BODY AND CONDUCTOR CONTACT

$ $

ON 1000 KCMIL AL EPR CABLE $ 415.50 $ 39,057.00 $ 146.37 $ 13,758.78 $ 800.00 $ 75,200.00



59 0 EA INSTALL 600AMP INSULATING RECEPTACLE WITH

$ $

TEST POINT $ - $ - $ - $ - $ 1,200.00 $ -



60 20 EA INSTALL 600AMP BUSHING EXTENSION $ $ $ 69.25 $ 1,385.00 $ 73.13 $ 1,462.60 $ 330.00 $ 6,600.00



61 114 EA INSTALL 600AMP TO 200AMP REDUCING TAP PLUG 600

$ $

ETP $ 69.25 $ 7,894.50 $ 96.50 $ 11,001.00 $ 300.00 $ 34,200.00



62 120 EA INSTALL 200AMP INSULATING RECEPTACLE WITH

$ $

TEST POINT $ 69.25 $ 8,310.00 $ 73.11 $ 8,773.20 $ 1,200.00 $ 144,000.00



63 6 EA INSTALL 200AMP LOADBREAK PLUG BUSHING $ $ $ 69.25 $ 415.50 $ 73.18 $ 439.08 $ 300.00 $ 1,800.00



64 0 EA INSTALL 200AMP LOADBREAK ELBOW ON #2, 1/0 AL,

$ $

2/0 AL AND 4/O AL CABLE $ - $ - $ - $ - $ 600.00 $ -



65 12 EA INSTALL (3)-800AMP FAULT INDICATOR ON 1000KCMIL

$ $

CABLE $ 554.00 $ 6,648.00 $ 292.39 $ 3,508.68 $ 1,600.00 $ 19,200.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 53 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

65A 30 EA INSTALL MOTOR OPERATOR WITH IT'S ASSOCIATED

CONTROL CABLES, VOLTAGE TRANSFORMERS,

ELBOWS, AND REQUIRED BRACKETS, PER CU 2100-1, $ $

AT VAULTS V-958, 959, 961, 962, 963 & 965. (NOTE: V-

962 & 963 ARE EXISTING VAULT). $ 1,385.00 $ 41,550.00 $ 1,608.32 $ 48,249.60 $ 2,400.00 $ 72,000.00



66A 8 EA INSTALL CITY SUPPLIED RTU CONTROLLER

ENCLOSURE, CABLE LEADS, AND COMPLETE

$ $

CONNECTIONS AS REQUIRED, AT VAULTS V-958, 959,

961, 962, 963 & 965. (NOTE: V-962 & 963 ARE EXISTING). $ 3,324.00 $ 26,592.00 $ 2,193.14 $ 17,545.12 $ 2,200.00 $ 17,600.00



66 5 EA FRAME AND DEAD END EXISTING POLE, INSTALL

ANCHOR, GUY WIRE FOR SYSTEM RISER, CORRECT $ $

G.O. 95 INFRACTION AS NEEDED $ 3,364.00 $ 16,820.00 $ 2,427.80 $ 12,139.00 $ 3,000.00 $ 15,000.00



67 5 EA INSTALL 12KV WOOD POLE 45' TO 80' HEIGHT

INCLUDING ALL FRAMING, DEADENDING, ANCHORS $ $

AND GUYING $ 3,364.00 $ 16,820.00 $ 3,793.54 $ 18,967.70 $ 3,200.00 $ 16,000.00



68 3 EA INSTALL 600 AMP POLE SWITCH OR PD AT SYSTEM

RISER POLE. [IN SOME CASES, REINSTALL EXISTING $ $

PD AT A DIFFERENT LOCATION.] $ 4,485.50 $ 13,456.50 $ 2,731.48 $ 8,194.44 $ 3,000.00 $ 9,000.00



69 7 EA INSTALL 6" RISER SCHEDULE 80 PVC CONDUIT

$ $

$ 841.00 $ 5,887.00 $ 983.00 $ 6,881.00 $ 1,200.00 $ 8,400.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 54 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

70 4 EA INSTALL 4" RISER SCHEDULE 80 PVC CONDUIT

$ $

$ 560.75 $ 2,243.00 $ 607.00 $ 2,428.00 $ 1,200.00 $ 4,800.00



71 21 EA INSTALL TERMINATOR (3M QT III) ON 1000KCMIL AL

$ $

EPR CABLE PER RISER POLE DRAWING $ 560.50 $ 11,770.50 $ 606.98 $ 12,746.58 $ 600.00 $ 12,600.00



72 12 EA INSTALL TERMINATOR (3M QT III) ON 1/0 AL AND #2 AL

$ $

EPR CABLE $ 560.50 $ 6,726.00 $ 455.24 $ 5,462.88 $ 400.00 $ 4,800.00



73 12 EA INSTALL OH FUSE AND FUSE HOLDER

$ $

$ 420.50 $ 5,046.00 $ 303.44 $ 3,641.28 $ 1,200.00 $ 14,400.00



74 33 EA INSTALL 15KV POLE CLASS ARRESTERS

$ $

$ 441.00 $ 14,553.00 $ 227.61 $ 7,511.13 $ 1,200.00 $ 39,600.00



75 180 LF ON THE N.W. CORNER OF SANTA ANA ST & MELROSE

ST (IN THE ALLEY AREA), INSTALL NEW #6

CONDUCTORS BETWEEN PP#708627H & PP#11246D, $ $

INCLUDING ALL ASSOCIATED DEVICES FOR A

COMPLETE INSTALLATION & ENERGIZE. $ 44.00 $ 7,920.00 $ 21.24 $ 3,823.20 $ 64.00 $ 11,520.00



76 450 LF TO THE EAST OF EXISTING ANAHEIM SUB (IN FRONT

OF THE WAREHOUSE AREA), INSTALL NEW #4 ACSR

CONDUCTORS BETWEEN PP#28367D & PP#11701D, $ $

INCLUDING ALL ASSOCIATED DEVICES FOR A

COMPLETE INSTALLATION & ENERGIZE. $ 44.00 $ 19,800.00 $ 8.35 $ 3,757.50 $ 64.00 $ 28,800.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 55 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

77 21 EA INSTALL 750 CU STR. TAP WIRE FROM THE POLE

MOUNTED CABLE TERMINATOR TO THE OVERHEAD $ $

LINE AND ENERGIZING UG CABLES. $ 588.00 $ 12,348.00 $ 606.98 $ 12,746.58 $ 6,000.00 $ 126,000.00



78 12 EA INSTALL 1/0 CU STR. TAP WIRE FROM POLE MOUNTED

CABLE TERMINATOR TO THE OVERHEAD LINE AND $ $

ENERGIZING UG CABLE. $ 588.00 $ 7,056.00 $ 303.44 $ 3,641.28 $ 3,200.00 $ 38,400.00



79 11 EA INSTALL GROUND CONDUIT, MOLDING &

$ $

CONDUCTOR ON POLE AND CONNECT. $ 588.00 $ 6,468.00 $ 1,213.92 $ 13,353.12 $ 2,000.00 $ 22,000.00



80 1 LS SEALING CONDUITS OCCUPIED WITH CABLE

$ $

$ 5,881.50 $ 5,881.50 $ 2,496.66 $ 2,496.66 $ 30,000.00 $ 30,000.00



80A 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET,

CONTRACTOR SHALL RELOCATE THREE DOWN-GUYS

& ANCHORS TO PROVIDE ROOM FOR PLACEMENT OF

$ $

BORE PIT (SEE SHEET ES-10). THE DESIGN PLAN WILL

BE PROVIDED TO THE CONTRACTOR BEFORE THE

CONSTRUCTION STARTS. $ 4,705.00 $ 4,705.00 $ 3,641.27 $ 3,641.27 $ 60,000.00 $ 60,000.00



81 6 EA FURNISH & INSTALL OPERABLE SUMP PUMP PER CU

$ $

1700-5 $ 1,656.50 $ 9,939.00 $ 1,447.88 $ 8,687.28 $ 50,000.00 $ 300,000.00



82 1 LS EXEMPT MATERIAL

$ $

$ 15,674.25 $ 15,674.25 $ 47,967.31 $ 47,967.31 $ 20,000.00 $ 20,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 56 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

83 1 LS MOBILIZATION

$ $

$ 40,000.00 $ 40,000.00 $ 174,263.08 $ 174,263.08 $ 300,000.00 $ 300,000.00



84 1 LS COORDINATE OUTAGE WITH CUSTOMERS.

$ $

$ 11,080.00 $ 11,080.00 $ 7,443.66 $ 7,443.66 $ 20,000.00 $ 20,000.00



84A 1 LS COORDINATION WITH CITY OPERATION FOR 12KV

$ $

SYSTEM CUTOVER. $ 11,080.00 $ 11,080.00 $ 11,166.01 $ 11,166.01 $ 20,000.00 $ 20,000.00



85 1 LS ALLOWANCE TO ACCOMDATE UNFORSEEN SITE $50,000 $50,000

CONDITIONS ON A TIME AND MATERIAL BASIS AS

DIRECTED BY THE CITY $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00





SUBTOTAL (ITEMS 50 TO 85) : $ 50,000.00 $ 572,448.95 $ 691,919.36 $ 1,716,230.00

$ 689,819.36

ELECTRICAL SERVICE CONVERSION WORK:



86 1 LS PSC-42: INSTALL (1) 900KVAR 12KV SWITCHED

CAPACITOR AND MAKE ALL NECESSARY PRIMARY & $ $

GROUNDING CONNECTION. $ 5,540.00 $ 5,540.00 $ 2,428.22 $ 2,428.22 $ 3,000.00 $ 3,000.00



87 1 LS RC-1585: REMOVE EXISTING PRIMARY RISER AND

EXISTING U.G. CABLE, PULL & INSTALL NEW CABLES

$ $

FROM NEW VGS SWITCH, MAKE PRIMARY CABLE &

GROUNDING CONNECTION AS REQUIRED. $ 6,610.47 $ 6,610.47 $ 1,517.37 $ 1,517.37 $ 6,000.00 $ 6,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 57 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

88 1 LS RC-1767: INSTALL 6.9KV FUSE CABINET & FUSE PER

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V, SINGLE

PHASE TRANSFORMER IN TRANSFORMER HOLELINER

PER CU 1500-12, 13, & 14. FURNISH AND INSTALL ALL

$ $

SECONDARY CABLES TO EXISTING HOUSING AND RR

METER PEDESTAL LOADS AND COMPETE ALL

PRIMARY, SECONDARY, SERVICE AND GROUND

CONNECTION AS REQUIRED. $ 25,589.00 $ 25,589.00 $ 6,137.94 $ 6,137.94 $ 20,000.00 $ 20,000.00



89 1 LS RC-1769: INSTALL 6.9KV FUSE CABINET & FUSE PER

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V, SINGLE

PHASE TRANSFORMER IN TRANSFORMER HOLELINER

PER CU 1500-12, 13, & 14. FURNISH AND INSTALL ALL $ $

SECONDARY CABLES AND COMPETE ALL PRIMARY,

SECONDARY, SERVICE AND GROUND CONNECTION

AS REQUIRED. $ 25,589.00 $ 25,589.00 $ 3,641.27 $ 3,641.27 $ 20,000.00 $ 20,000.00



89A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $25,000.00 $25,000.00

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00





SUBTOTAL (ITEMS 86 TO 89A) : $ 25,000 $ 88,328.47 $ 38,724.80 $ 74,000.00



12KV ELECTRICAL DEMOLITION:



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 58 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



90 1 LS REMOVE 12KV OVERHEAD SYSTEM:

INCLUDING REMOVE CONDUCTORS, INSULATORS,

POLE SWITCHES, FIBER OPTICS & COPPER CABLES, $ $

TRANSFORMERS AND CAPS, STREET LIGHT ARMS,

ETC PER DEMO PLAN $ 123,354.50 $ 123,354.50 $ 102,346.34 $ 102,346.34 $ 50,000.00 $ 50,000.00

$ -

91 64 EA PULL, TRANSPORT AND DISPOSE (PTD) NON-SERVICE

$ $

POLES. $ 2,243.00 $ 143,552.00 $ 1,315.89 $ 84,216.96 $ 600.00 $ 38,400.00

$ -

92 9 EA TOPPING POLE TO 12KV LEVEL, TRANSPORT AND

DISPOSE THE TOPPED PORTION. (NOTE: IN THE

VICINITY OF EXISTING ANHEIM SUBSTATION; ON $ $

SANTA ANA ST & IN THE ALLEY IN FRONT OF THE

WAREHOUSE) $ 1,121.50 $ 10,093.50 $ 877.26 $ 7,895.34 $ 1,200.00 $ 10,800.00





SUBTOTAL (ITEMS 90 TO 92) : $ - $ 277,000.00 $ 194,458.64 $ 99,200.00



CITY COMMUNICATION CABLE INSTALLATION:

93 5,900 LF INSTALL UNDERGROUND 96 STRAND FIBER OPTICS

$ $

COMM. CABLE. $ 1.24 $ 7,316.00 $ 1.27 $ 7,493.00 $ 3.80 $ 22,420.00



94 4 EA INSTALL 6"X22' COYOTE CLOSURE & SPLICE 96

$ $

STRAND FIBER OPTICS CABLE SEGMENTS. $ 3,230.00 $ 12,920.00 $ 3,173.00 $ 12,692.00 $ 7,780.00 $ 31,120.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 59 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





95 5,700 LF FURNISH AND INSTALL (3) 1-1/4" INNER DUCTS WITH

COLORS OF BLUE, ORANGE, & GREEN, WITH PULL

$ $

ROPE AND A LOCATE WIRE (1 PAIR BELDEN 27080A

WIRE AWG 14). $ 4.23 $ 24,111.00 $ 3.08 $ 17,556.00 $ 4.40 $ 25,080.00



96 192 EA SPLICE FIBER OPTIC STRANDS TOGETHER $ $ $ 35.00 $ 6,720.00 $ 21.06 $ 4,043.52 $ 130.00 $ 24,960.00



97 2 EA FURNISH AND INSTALL 4" PVC CONDUIT

COMMUNICATION RISER FOR COPPER AND/OR 96

$ $

STRAND F.O. CABLE INCL. DEADENDING, GUYING,

TENSIONING, ETC. $ 1,950.00 $ 3,900.00 $ 1,443.00 $ 2,886.00 $ 1,296.00 $ 2,592.00



98 1 LS TESTING F.O. CABLE. REEL BEFORE INSTALLATION

$ $

$ 576.00 $ 576.00 $ 695.00 $ 695.00 $ 5,400.00 $ 5,400.00



99 50 EA TEST FIBER OPTICS STRANDS FOLLOWING SPLICING

$ $

$ 35.00 $ 1,750.00 $ 40.00 $ 2,000.00 $ 97.20 $ 4,860.00



100 1,500 LF REMOVE COPPER COMMUNICATION CABLE FROM OH

$ $

POLES $ 2.33 $ 3,495.00 $ 1.87 $ 2,805.00 $ 11.00 $ 16,500.00



101 3 EA FURNISH AND INSTALL ARMORFAST 3'X5'X3' COMM.

$ $

VAULT PER CITY OF ANAHEIM STANDARD $ 7,204.00 $ 21,612.00 $ 3,484.00 $ 10,452.00 $ 4,644.00 $ 13,932.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 60 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 93 TO 101) : $ -

$ 82,400.00 $ 60,622.52 $ 146,864.00



102 1 LS DISCREPANCES: THIS BID ITEM IS TO

ACCOMMODATE THOSE PORTIONS OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS, WHOSE $ $

METHOD OF PAYMENT IS NOT INCLUDED IN OTHER

BID ITEMS OR ELSEWHERE. $ - $ - $ 39,930.00 $ 39,930.00 50000 50000





12KV CONDUIT AND SUBSTRUCTURE TOTAL $ 375,000

(ITEM 1 THRU ITEM 102): $ 4,067,311.42 $ 4,107,057.65 $ 5,238,387.00

$ 4,104,681.65



TELECOMMUNICATION COMPANIES

(SEE BOTTOM OF SPREASHEET FOR SHARED STEEL CASING BID ITEMS)



ESTIMATED

QUANTITY

ITEM OF WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





ATT/SBC TELEPHONE CONDUIT SYSTEM







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 61 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

6'x12'x7' MANHOLE WITH 30" F&C, LADDER, AND

COMPRESSION DUCT PLUGS - PAINT INTERIOR WHITE,

$ $

COMPLETE MH INSTALLATION AND SURFACE

1 1 EA RESTORATION PER ATT/SBC STANDARDS $ 17,959.00 $ 17,959.00 $ 15,429.00 $ 15,429.00 $ 10,390.00 $ 10,390.00



4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER $ $

2 1 EA ATT/SBC STANDARDS $ 6,365.00 $ 6,365.00 $ 4,689.00 $ 4,689.00 $ 4,530.00 $ 4,530.00



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN

3 1 EA GALVANIZED LID PER ATT/SBC STANDARDS

$ $ $ 3,702.00 $ 3,702.00 $ 2,865.00 $ 2,865.00 $ 2,195.00 $ 2,195.00



4" CONDUIT; TYPE "C"; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

4 20,550 LF SURFACE RESTORATION PER ATT/SBC STANDARDS $ 3.46 $ 71,103.00 $ 2.87 $ 58,978.50 $ 3.10 $ 63,705.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

5 21,000 LF ATT/SBC STANDARDS.

$ $ $ 0.37 $ 7,770.00 $ 0.20 $ 4,200.00 $ 1.62 $ 34,020.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

6 36 EA PER ATT/SBC STANDARDS.

$ $ $ 40.00 $ 1,440.00 $ 3.55 $ 127.80 $ 10.80 $ 388.80



PROVIDE AS-BUILT PLANS FOR ATT/SBC TO

TELEPHONE INSPECTOR AND CITY REPRESENTATIVE $ $

7 1 EA WITH ATT/SBC SIGNATURE OF APPROVAL $ 3,555.00 $ 3,555.00 $ 1,235.57 $ 1,235.57 $ 10,000.00 $ 10,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 62 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 1 TO 7): $ - $ 111,894.00 $ 87,524.87 $ 125,228.80



XO COMMUNICATIONS CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER XO $ $

8 3 EA COMM. STANDARDS $ 6,847.00 $ 20,541.00 $ 3,917.00 $ 11,751.00 $ 3,950.00 $ 11,850.00



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN

$ $

9 0 EA GALVANIZED LID PER ATT/SBC STANDARDS $ - $ - $ 2,865.00 $ - $ 4,200.00 $ -





4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

$ $

FACILITIES NECESSARY FOR INSTALLATION AND

10 2,450 LF SURFACE RESTORATION PER XO COMM. STANDARDS $ 4.30 $ 10,535.00 $ 1.82 $ 4,459.00 $ 3.50 $ 8,575.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

11 2,600 LF XO COMM. STANDARDS. $ 0.38 $ 988.00 $ 0.17 $ 442.00 $ 1.70 $ 4,420.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

12 8 EA PER XO COMM. STANDARDS. $ 44.00 $ 352.00 $ 3.55 $ 28.40 $ 11.00 $ 88.00



PROVIDE AS-BUILT PLANS FOR XO COMM. TO XO

INSPECTOR AND CITY REPRESENTATIVE WITH XO $ $

13 1 EA COMM. SIGNATURE OF APPROVAL $ 3,555.00 $ 3,555.00 $ 201.00 $ 201.00 $ 10,000.00 $ 10,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 63 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 8 TO 13): $ - $ 35,971.00 $ 16,881.40 $ 34,933.00



VERIZON BUSINESS/MCI CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER MCI $ $

14 3 EA STANDARDS $ 6,369.00 $ 19,107.00 $ 3,908.00 $ 11,724.00 $ 3,950.00 $ 11,850.00



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

15 2,450 LF SURFACE RESTORATION PER MCI STANDARDS $ 4.30 $ 10,535.00 $ 1.56 $ 3,822.00 $ 3.10 $ 7,595.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

16 2,600 LF MCI STANDARDS. $ 0.38 $ 988.00 $ 0.17 $ 442.00 $ 0.82 $ 2,132.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

17 8 EA PER MCI STANDARDS. $ 44.00 $ 352.00 $ 3.55 $ 28.40 $ 11.00 $ 88.00



PROVIDE AS-BUILT PLANS FOR VERIZON/MCI

FACILITIES TO MCI INSPECTOR AND CITY

$ $

REPRESENTATIVE WITH MCI SIGNATURE OF

18 1 EA APPROVAL $ 3,555.00 $ 3,555.00 $ 201.00 $ 201.00 $ 10,000.00 $ 10,000.00





SUBTOTAL (ITEMS 14 TO 18): $ - $ 34,537.00 $ 16,217.40 $ 31,665.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 64 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

AT&T LOCAL SERVICES FIBER-OPTIC CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER $ $

19 3 EA ATT/LS STANDARDS $ 6,369.00 $ 19,107.00 $ 3,908.00 $ 11,724.00 $ 3,950.00 $ 11,850.00



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

20 2,450 LF SURFACE RESTORATION PER ATT/LS STANDARDS $ 4.30 $ 10,535.00 $ 1.56 $ 3,822.00 $ 3.10 $ 7,595.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

21 2,600 LF ATT/LS STANDARDS. $ 0.38 $ 988.00 $ 0.17 $ 442.00 $ 0.82 $ 2,132.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

22 9 EA PER ATT/LS STANDARDS. $ 40.00 $ 360.00 $ 3.55 $ 31.95 $ 10.80 $ 97.20



PROVIDE AS-BUILT PLANS FOR ATT/LS FACILITIES TO

ATT/LS INSPECTOR AND CITY REPRESENTATIVE WITH $ $

23 1 EA ATT/LS SIGNATURE OF APPROVAL $ 3,555.00 $ 3,555.00 $ 201.00 $ 201.00 $ 10,000.00 $ 10,000.00



SUBTOTAL (ITEMS 19 TO 23): $ - $ 34,545.00 $ 16,220.95 $ 31,674.20



TIME-WARNER CABLE CONDUIT SYSTEM:







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 65 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



FURNISH AND INSTALL "INTERCEPT" 2X3X3 PULL BOX

EQUIPPED WITH HINGED, BOLT-DOWN GALVANIZED $ $

LID. PULL BOX TO BE APPROVED BY TIME-WARNER

24 1 EA PRIOR TO CONTRACTOR ORDERING MATERIAL. $ 7,199.00 $ 7,199.00 $ 3,090.00 $ 3,090.00 $ 2,200.00 $ 2,200.00



FURNISH AND INSTALL 2X3X3 PULL BOX PER TIME-

$ $

25 4 EA WARNER STANDARDS $ 2,965.00 $ 11,860.00 $ 2,052.00 $ 8,208.00 $ 1,832.00 $ 7,328.00



26 0 EA COORDINATE CABLE TV CUTOVER $ $ $ - $ - $ - $ - $ 10,800.00 $ -



3" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

$ $

SURFACE RESTORATION PER TIME-WARNER

27 6,420 LF STANDARDS $ 2.90 $ 18,618.00 $ 1.34 $ 8,602.80 $ 2.44 $ 15,664.80



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

28 6,500 LF TIME-WARNER STANDARDS. $ 0.38 $ 2,470.00 $ 0.20 $ 1,300.00 $ 0.82 $ 5,330.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

29 18 EA PER TIME-WARNER STANDARDS. $ 40.00 $ 720.00 $ 3.04 $ 54.72 $ 10.80 $ 194.40



PROVIDE AS-BUILT PLANS FOR TIME-WARNER TO

CATV INSPECTOR AND CITY REPRESENTATIVE WITH $ $

30 1 EA TIME-WARNER SIGNATURE OF APPROVAL $ 3,555.00 $ 3,555.00 $ 201.00 $ 201.00 $ 10,000.00 $ 10,000.00





SUBTOTAL (ITEMS 24 TO 30): $ - $ 44,422.00 $ 21,456.52 $ 40,717.20



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 66 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





SUNESYS FIBER-OPTIC CONDUIT SYSTEM:

PROVIDE AND INSTALL 2X3X3 VAULT/PULLBOX;

COMPLETE WITH ALL FACILITIES NECESSARY FOR

$ $

INSTALLATION AND SURFACE RESTORATION PER

31 7 EA SUNESYS AND CITY STANDARDS $ 2,957.00 $ 20,699.00 $ 1,971.00 $ 13,797.00 $ 2,200.00 $ 15,400.00



2" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

$ $

SURFACE RESTORATION PER SUNESYS AND CITY

32 1,020 LF STANDARDS $ 1.60 $ 1,632.00 $ 1.06 $ 1,081.20 $ 1.30 $ 1,326.00



1.25" CONDUIT; COMPLETE WITH ALL FACILITIES

NECESSARY FOR INSTALLATION AND SURFACE $ $

33 5,700 LF RESTORATION PER SUNESYS AND CITY STANDARDS $ 1.30 $ 7,410.00 $ 0.67 $ 3,819.00 $ 1.05 $ 5,985.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

34 6,800 LF SUNESYS STANDARDS. $ 0.28 $ 1,904.00 $ 0.19 $ 1,292.00 $ 0.82 $ 5,576.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

35 28 EA PER SUNESYS STANDARDS. $ 33.00 $ 924.00 $ 2.85 $ 79.80 $ 10.80 $ 302.40



PROVIDE AS-BUILT PLANS FOR SUNESYS FACILITIES

TO SUNESYS INSPECTOR AND CITY REPRESENTATIVE $ $

36 1 EA WITH SUNESYS SIGNATURE OF APPROVAL $ 2,279.00 $ 2,279.00 $ 805.00 $ 805.00 $ 10,000.00 $ 10,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 67 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

SUBTOTAL (ITEMS 31 TO 36): $ - $ 34,848.00 $ 20,874.00 $ 38,589.40



TRENCHING FOR TELECOMMUNICATIONS CONDUIT SYSTEMS:



$ $

37 7,100 LF JOINT-TRENCH; STANDARD-DUAL-STEP $ 7.00 $ 49,700.00 $ 29.23 $ 207,533.00 $ 38.00 $ 269,800.00





$ $

38 3,200 LF ATT/LS AND ATT REGIONAL TRENCHS ONLY $ 52.00 $ 166,400.00 $ 80.50 $ 257,600.00 $ 38.00 $ 121,600.00





$ $

39 140 LF TIME-WARNER TRENCH ONLY $ 50.00 $ 7,000.00 $ 66.11 $ 9,255.40 $ 38.00 $ 5,320.00





$ $

40 590 LF OTHER FI BER-OPTIC TRENCHES ONLY $ 57.00 $ 33,630.00 $ 68.03 $ 40,137.70 $ 38.00 $ 22,420.00





$ $

41 1 LS REMOVE AND RESTORE ASPHALT PER CITY STDS. $ 108,445.00 $ 108,445.00 $ 54,030.00 $ 54,030.00 $ 100,000.00 $ 100,000.00





$ $

42 1 LS REMOVE AND RESTORE CONC. SW. PER CITY STDS. $ 6,181.00 $ 6,181.00 $ 51,091.00 $ 51,091.00 $ 50,000.00 $ 50,000.00





$ $

43 1 LS PROVIDE TRAFFIC CONTROL PER CITY STDS. $ 17,647.00 $ 17,647.00 $ 7,685.00 $ 7,685.00 $ 50,000.00 $ 50,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 68 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

SUBTOTAL (ITEMS 37 TO 43): $ - $ 389,003.00 $ 627,332.10 $ 619,140.00



STEEL CASING FOR TELECOMMUNICATION COMPANIES:

44 120 LF FURNISH AND INSTALL 18" STEEL CASING WITH (3)-6"

+ (2)-3" PVC CONDUITS ON SANTA ANA STREET,

BETWEEN CLAUDINA STREET AND OLIVE STREET. $ $

(NOTE: THIS 18" STEEL CASING TO BE SHARED

BETWEEN ATT/LNS, T/W, X/O & MCI). $ 608.00 $ 72,960.00 $ 598.74 $ 71,848.80 $ 230.00 $ 27,600.00



45 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (7)-6"

+ (2)-3" + (2 )1 1/4" PVC CONDUITS ON SANTA ANA

STREET, WEST OF VINE STREET.

$ $

(NOTE: THIS 28" STEEL CASING TO BE SHARED

BETWEEN ATT CALIF, ATT/LNS, T/W, X/O, MCI &

SUNESYS). $ 675.00 $ 62,100.00 $ 605.62 $ 55,717.04 $ 425.00 $ 39,100.00



46 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-4"

PVC CONDUITS ON SOUTH STREET, AT OLIVE STREET.

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF. USE $ $

ONLY).

$ 582.00 $ 69,840.00 $ 568.18 $ 68,181.60 $ 425.00 $ 51,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 69 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

47 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-4"

PVC CONDUITS ON SOUTH STREET, EAST OF DAKOTA

STREET. $ $

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF. USE

ONLY). $ 593.00 $ 68,195.00 $ 564.44 $ 64,910.60 $ 425.00 $ 48,875.00





SUBTOTAL (ITEMS 44 TO 47): $ - $ 273,095.00 $ 260,658.04 $ 166,575.00





TELECOMMUNICATIONS GRAND TOTAL $ -

(ITEM 1 THRU ITEM 47): $ 958,315.00 $ 1,067,165.28 $ 1,088,522.60







PROJECT GRAND TOTAL

$375,000 5,025,626.42 5,174,222.93 6,326,909.60

(12KV ITEMS 1 THRU 102 + TEL. COMM.

ITEMS 1 THRU 47:

$ 5,171,846.93

Subcontractors Items Phone No.

1 All American Asphalt 25 & 25A (951) 757-8026



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 70 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 4 Bidder No. 5 Bidder No. 6







Henkels & McCoy, Inc. Herman Weissker, Inc. MEL Smith Electric, Inc.

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Edward W. Campbell Attn: Ron Politte Attn: Mel Smith

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 2840 Ficus Street 1645 Brown Avenue 10950 Dale Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Pomona, CA 91766 Riverside, CA 92509 Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 183393 A & C-10 License No: 183556 A & C-10 License No: 394741 A & C-10

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10% Bond: 10% Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 909-517-3011 PHONE: 951-826-8800 PHONE: 714-761-3205

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



2 T & D Services 26,27,28,29 & 30 (951) 304-1190

3 Long Bore 26,27,28,29 & 30 (951) 817-0111









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 71 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION:

1 5 EA 8'x20'x9'-6" VAULT WITH (2) MANHOLE, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU1600-3H $ 60,000.00 $ 300,000.00



2 2 EA 8'x10'x7' TUB VAULT FOR VFI SWITCH, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU 1600-18 $ 47,000.00 $ 94,000.00



3 1 EA 5'x8'-6"x7' VAULT WITH (1) MANHOLE, COMPLETE

VAULT INSTALLATION AND SURFACE RESTORATION $ $

PER CU 1600-3D. $ 45,000.00 $ 45,000.00



4 5 EA (2)-10" PVC NATURAL AIR VENTILATION DUCTS PER

$ $

VAULT PER CU 1700-6 $ 1,500.00 $ 7,500.00



5 500 LF (1)-2" PVC SCHEDULE 40 CONDUIT WITH 2-#6 CU FOR

$ $

120V SUMP PUMP OPERATION $ 15.00 $ 7,500.00



6 6 EA PER CU2100-2 FOR AUTOMATION, INSTALL (1)-2" & (4)-

4" RIGID GALVANIZED CONDUIT OR CONCRETE

$ $

ENCASED PVC FOR VAULTS V-958, 959, 961, 962, 963, &

965. (NOTE: V-962 & 963 ARE EXISTING VAULTS). $ 14,000.00 $ 84,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 72 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

7 6 EA PER CU 2020 FOR AUTOMATION, INSTALL 2'X6' PAD

WITH (2) 13"x24" PULL BOX FOR RTU INSTALLATION

$ $

AT VAULTS V-958, 959, 961, 962, 963 & 965. (NOTE: V-

962 & 963 ARE EXISTING VAULTS). $ 25,000.00 $ 150,000.00



8 4 EA RISER POLE SWEEP (1)-4" CONDUIT ENCASED IN

$ $

CONCRETE FOR RS-797, RS- 801, RS-808 & RS-813 $ 2,000.00 $ 8,000.00



9 8 EA RISER POLE SWEEP (2)-6" & (2)-4" CONDUIT ENCASED

IN CONCRETE FOR RS-794, RS-795, RS-796, RS-798, RS- $ $

799, RS-800, RS-801 & RS-862. $ 7,500.00 $ 60,000.00



10 0 EA RISER POLE SWEEP (4)-6" & (2)-4"CONDUIT ENCASED

$ $

IN CONCRETE. $ - $ -



11 7 EA STUB, CAP & MARK CONDUIT (S) (1)-4"

$ $

$ 1,200.00 $ 8,400.00



12 6 EA STUB, CAP & MARK CONDUIT (S) (3)-4"

$ $

$ 3,000.00 $ 18,000.00



13 0 EA STUB, CAP & MARK CONDUIT (S) (2)-6"& (2)-4"

$ $

$ - $ -



14 1 EA STUB, CAP & MARK CONDUIT (S) (6)-6"& (2)-4"

$ $

$ 5,000.00 $ 5,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 73 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

15 19,200 LF FURNISH AND INSTALL (1)-4" DB100 PVC CONDUIT

$ $

$ 4.50 $ 86,400.00



16 21,700 LF FURNISH AND INSTALL (1)-6" DB100 PVC CONDUIT

$ $

$ 4.70 $ 101,990.00



17 7,600 LF ENCASED CONDUIT DUCT BANK WITH 4/0 BARE

$ $

COPPER $ 110.00 $ 836,000.00



18 42,000 LF MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

CITY REQUIREMENTS $ 2.00 $ 84,000.00



19 7,600 LF SAW CUT, EXCAVATE, BACKFILL, COMPACT, BASE

$ $

PAVE SURFACE STREET PER PW STD #132. $ 18.00 $ 136,800.00



20 7,600 LF SHORING FOR MAIN DUCT BANK

$ $

$ 5.00 $ 38,000.00



21 3 LOC FURNISH AND INSTALL 15 GALLONS SHRUBS

SCREENING AROUND ELECTRICAL EQUIPMENT PER

UTILITY DEVICE/GUIDELINES, CONCEPT 1; SHRUBS $ $

SHALL BE HALF AS TALL AS THE EQUIPMENT BEING

SCREENED AT THE TIME OF PLANTING. $ 1,000.00 $ 3,000.00



22 1,700 LF REMOVE & REPLACE CURB & GUTTER PER PW STD 120 $ $ $ 20.00 $ 34,000.00



23 5,100 SF REMOVE AND REPLACE SIDEWALK PER PW STD 113-1 $ $ $ 12.00 $ 61,200.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 74 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



24 1,000 SF REMOVE & REPLACE DRIVEWAY PER PW STD 113-1

$ $

AND/OR 114 $ 15.00 $ 15,000.00



25 120,000 SF PAVE AND GRIND PER CITY OF ANAHEIM PW STD 132.

(NOTE: THERE IS A REHABITATION PROJECT ON OLIVE

$ $

STREET, THUS THE ACTUAL QUANTITY FOR THIS BID

ITEM MAY BECOME LESS). $ 2.00 $ 240,000.00



25A 100,000 SF ON WATER STREET (WEST OF OLIVE STREET),

ELLSWORTH STREET, AND CLAUDINA AVE, SLURRY

SEAL AND STRIPE ALL TRAFFIC LANES PER PUBLIC $ $

WORKS SPECIFICATION AND SLURRY SPECIFICATION.

$ 0.90 $ 90,000.00



26 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)-6"

+ (2)-4" PVC CONDUITS ON SOUTH STREET, WEST OF $ $

OLIVE STREET. $ 350.00 $ 42,000.00



27 60 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (4)-4" PVC CONDUITS ON WATER STREET, WEST OF $ $

OLIVE STREET. $ 450.00 $ 27,000.00



28 40 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (4)-4" PVC CONDUITS ON ELLSWORTH STREET, WEST $ $

OF OLIVE STREET. $ 480.00 $ 19,200.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 75 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



29 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-6"

+ (6)-4" + (1)-2" PVC CONDUITS ON SANTA ANA $ $

STREET, EAST OF ATCHISON STREET. $ 450.00 $ 41,400.00



30 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (6)-6"

+ (1)-4" + (2)-2" PVC CONDUITS ON SOUTH STREET, $ $

EAST OF ATCHISON STREET. $ 350.00 $ 40,250.00



31 5 LS ALLOWANCE TO ACCOMMODATE ACTUAL COST OF $ 5,000.00 $ 25,000.00

RAILROAD ENCROACHMENT PERMIT FEES $ 5,000.00 $ 25,000.00



31A 1 LS RESTORE ALL LANDSCAPING IN KIND AND MATURITY.

$ $

$ 10,000.00 $ 10,000.00



31B 1 LS RE-STRIPING LANES AND LEGEND

$ $

$ 8,000.00 $ 8,000.00



31C 8 EA REPLACE AND RESTORE TRAFFIC LOOPS AS

$ $

DIRECTED BY CITY $ 5,000.00 $ 40,000.00



31D 20 EA PROVIDE ADDITIONAL POTHOLING AS DIRECTED BY

$ $

CITY, 3X4 OPENING, UP TO 15' DEEP. $ 2,500.00 $ 50,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 76 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

31E 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET,

CONTRACTOR SHALL RELOCATE FIRE HYDRANT TO

PROVIDE ROOM FOR PLACEMENT OF BORE PIT (SEE

$ $

SHEET ES-10). THE DESIGN PLAN WILL BE PROVIDED

TO THE CONTRACTOR BEFORE THE CONSTRUCTION

STARTS. $ 30,000.00 $ 30,000.00



32 1 LS MOBILIZATION

$ $

$ 30,000.00 $ 30,000.00



33 6 EA CONSTRUCTION SIGNS

$ $

$ 150.00 $ 900.00



33A 4 EA CMS SIGNS PROVIDED FOR PRIOR NOTIFICATION AND

DURING CIVIL (TRENCHING, PAVING, ETC.) $ $

CONSTRUCTION ACTIVITIES. $ 250.00 $ 1,000.00



34 1 LS ALLOWANCE TO ACCOMMODATE ACTIVITIES $ 50,000.00 $ 50,000.00

NECESSARY FOR GOOD CUSTOMER RELATIONS AS

DIRECTED BY THE CITY ON A T&M BASIS. $ 50,000.00 $ 50,000.00



35 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $ 75,000.00 $ 75,000.00

UNKNOWN UNDERGROUND OBSTRUCTION ON A T&M

BASIS, AS DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00





SUBTOTAL (ITEMS 1 TO 35) : $ 150,000.00 $ 3,003,540.00 $ - $ -



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 77 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





CONDUIT AND SUBSTRUCTURE SERVICE CONVERSION WORK:

36 1 LS PSC-42: INSTALL 6'X8' CAPACITOR PAD PER CU 1600-2

AND EXTEND (1)-4" PVC CONDUIT PER CU 1600-25 $ $

INTO PSC VAULT. $ 15,000.00 $ 15,000.00



37 1 LS RC-1585 : INSTALL (1)-4" PVC CONDUIT PER CU 1600-25

$ $

& SWEEP INTO EXISTING PMT VAULT $ 5,000.00 $ 5,000.00



38 1 LS R-1767: INSTALL TRANSFORMER HOLELINER PER CU

1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL BOX

PER CU 1500-1B. INSTALL 34"X40' FUSE CABINET PER

$ $

CU 1600-61. INSTALL 2" & 4' CONDUITS & 17'X30' PULL

BOX TO INTERCEPT EXISTING HOUSING LOADS AND

EXISTING RR METER PEDESTALS. $ 16,000.00 $ 16,000.00



39 1 LS R-1769: INSTALL TRANSFORMER HOLELINER PER CU

1500-3, 9, 12 & 13 WITH 17"X30" CONCRETE PULL BOX

PER CU 1500-1B. INSTALL 34"X40' FUSE CABINET PER $ $

CU 1600-61. INSTALL 2" CONDUIT TO INTERCEPT

STREET LIGHTS AND RR METER PEDESTAL LOADS. $ 16,000.00 $ 16,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 78 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

40 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $75,000 $75,000

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00





SUBTOTAL (ITEMS 36 TO 40) : $ 75,000.00

$ 127,000.00 $ - $ -



STREET LIGHT AND CONDUIT INSTALLATION:



41 65 EA FURNISH AND INSTALL CITY OF ANAHEIM STREET

LIGHT STANDARD 742 PER CONSTRUCTION $ $

STANDARD L-129-1. $ 6,125.00 $ 398,125.00

$ -

42 65 EA FURNISH AND INSTALL 13"x24" FIBERGLASS STREET

LIGHT PULL BOX PER CU1500-1A (REV 0) AND

$ $

TERMINATE FUSE KIT WITH SQUID CONNECTOR,

COMPLETE STREET LIGHT CONNECTION PER L-104. $ 813.00 $ 52,845.00

$ -

43 3 EA FURNISH AND INSTALL 17"x30" FIBERGLASS STREET

LIGHT PULL BOX PER CU 1500-1B AND TERMINATE

$ $

FUSE KIT WITH SQUID CONNECTOR, COMPLETE

STREET LIGHT WIRING PER L-104. $ 1,250.00 $ 3,750.00

$ -

44 3,600 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT

$ $

SCHEDULE 40 WITH (3)-#2 CU XHHW-2 CABLE $ 20.00 $ 72,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 79 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

$ -

45 700 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY

GALVANIZED STEEL CONDUIT WITH (3)-#2 CU XHHW-2 $ $

CABLE $ 32.50 $ 22,750.00

$ -

46 4,700 LF FURNISH AND INSTALL (1)-2" PVC CONDUIT

$ $

SCHEDULE 40 WITH (3)-1/0 CU XHHW-2 CABLE $ 21.25 $ 99,875.00

$ -

47 1,200 LF FURNISH AND INSTALL (1)-2" HEAVY DUTY

GALVANIZED STEEL CONDUIT WITH (3)-1/0 CU XHHW- $ $

2 CABLE $ 35.00 $ 42,000.00

$ -

48 3 EA REMOVE AND SALVAGE EXISTING STREET LIGHT

$ $

STANDARD AND ARM, DISPOSE PULL BOX IN PLACE. $ 1,875.00 $ 5,625.00

$ -

49 4 EA INTERCEPT EXISTING METER PEDESTAL WITH (1)-2"

PVC CONDUIT AND (3)-1/0 CU XHHW-2 CABLE, $ $

COMPLETE SERVICE CUTOVER AND ENERGIZE. $ 1,250.00 $ 5,000.00

$ -

49 1 LS PROVIDE TRAFFIC CONTROL PLANS, INCLUDING

PROCESSING PLAN THROUGH CITY AND EXECUTING $ $

TRAFFIC CONTROL IN FIELD. $ 25,000.00 $ 25,000.00

$ -

49A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $75,000 $75,000

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 75,000.00 $ 75,000.00



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 80 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





SUBTOTAL (ITEMS 41 TO 49A) : $ 75,000 $ 801,970.00



12KV ELECTRICAL INSTALLATION:

50 21,000 LF PULL TRI 1000 KCMIL AL/CU 15KV EPR CABLE

$ $

$ 6.00 $ 126,000.00



51 3,300 LF PULL 4/0 AL EPR TRI 15KV CABLE

$ $

$ 7.50 $ 24,750.00



52 1,200 LF PULL 2/0 AL EPR TRI 15KV CABLE

$ $

$ 7.50 $ 9,000.00



53 3,300 LF PULL 1/0 AL EPR TRI 15KV CABLE $ $ $ 7.50 $ 24,750.00



54 8 EA INSTALL 4-WAY VGS-9 OR VGS-10 SWITCH PER CU 1600-

$ $

31(Rev 0) & CU 1600-41 & CU 1600-42 (Rev0). $ 4,000.00 $ 32,000.00



55 8 EA FURNISH & INSTALL PLATFORM/UNISTRUT SET FOR

PLACEMENT OF VGS SWITCHES PER CU 1600-41 & CU $ $

1600-42 (Rev 0). $ 6,500.00 $ 52,000.00



56 2 EA INSTALL VFI-9 OR VFI-10 VACUUMED INTERRUPTER

$ $

SWITCH $ 4,000.00 $ 8,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 81 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

57 9 EA INSTALL STRAIGHT SPLICE ON 1000 AL EPR CABLE.

[NOTE: SPLICING ON ONE TRI CABLE IN EACH VAULT $ $

COUNT AS ONE SPLICE] $ 2,500.00 $ 22,500.00



58 94 EA INSTALL 600AMP T-BODY AND CONDUCTOR CONTACT

$ $

ON 1000 KCMIL AL EPR CABLE $ 2,500.00 $ 235,000.00



59 0 EA INSTALL 600AMP INSULATING RECEPTACLE WITH

$ $

TEST POINT $ - $ -



60 20 EA INSTALL 600AMP BUSHING EXTENSION $ $ $ 2,400.00 $ 48,000.00



61 114 EA INSTALL 600AMP TO 200AMP REDUCING TAP PLUG 600

$ $

ETP $ 4,000.00 $ 456,000.00



62 120 EA INSTALL 200AMP INSULATING RECEPTACLE WITH

$ $

TEST POINT $ 4,000.00 $ 480,000.00



63 6 EA INSTALL 200AMP LOADBREAK PLUG BUSHING $ $ $ 6,000.00 $ 36,000.00



64 0 EA INSTALL 200AMP LOADBREAK ELBOW ON #2, 1/0 AL,

$ $

2/0 AL AND 4/O AL CABLE $ - $ -



65 12 EA INSTALL (3)-800AMP FAULT INDICATOR ON 1000KCMIL

$ $

CABLE $ 6,200.00 $ 74,400.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 82 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

65A 30 EA INSTALL MOTOR OPERATOR WITH IT'S ASSOCIATED

CONTROL CABLES, VOLTAGE TRANSFORMERS,

ELBOWS, AND REQUIRED BRACKETS, PER CU 2100-1, $ $

AT VAULTS V-958, 959, 961, 962, 963 & 965. (NOTE: V-

962 & 963 ARE EXISTING VAULT). $ 8,000.00 $ 240,000.00



66A 8 EA INSTALL CITY SUPPLIED RTU CONTROLLER

ENCLOSURE, CABLE LEADS, AND COMPLETE

$ $

CONNECTIONS AS REQUIRED, AT VAULTS V-958, 959,

961, 962, 963 & 965. (NOTE: V-962 & 963 ARE EXISTING). $ 8,000.00 $ 64,000.00



66 5 EA FRAME AND DEAD END EXISTING POLE, INSTALL

ANCHOR, GUY WIRE FOR SYSTEM RISER, CORRECT $ $

G.O. 95 INFRACTION AS NEEDED $ 400.00 $ 2,000.00



67 5 EA INSTALL 12KV WOOD POLE 45' TO 80' HEIGHT

INCLUDING ALL FRAMING, DEADENDING, ANCHORS $ $

AND GUYING $ 1,200.00 $ 6,000.00



68 3 EA INSTALL 600 AMP POLE SWITCH OR PD AT SYSTEM

RISER POLE. [IN SOME CASES, REINSTALL EXISTING $ $

PD AT A DIFFERENT LOCATION.] $ 5,000.00 $ 15,000.00



69 7 EA INSTALL 6" RISER SCHEDULE 80 PVC CONDUIT

$ $

$ 1,500.00 $ 10,500.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 83 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

70 4 EA INSTALL 4" RISER SCHEDULE 80 PVC CONDUIT

$ $

$ 1,400.00 $ 5,600.00



71 21 EA INSTALL TERMINATOR (3M QT III) ON 1000KCMIL AL

$ $

EPR CABLE PER RISER POLE DRAWING $ 2,500.00 $ 52,500.00



72 12 EA INSTALL TERMINATOR (3M QT III) ON 1/0 AL AND #2 AL

$ $

EPR CABLE $ 2,400.00 $ 28,800.00



73 12 EA INSTALL OH FUSE AND FUSE HOLDER

$ $

$ 750.00 $ 9,000.00



74 33 EA INSTALL 15KV POLE CLASS ARRESTERS

$ $

$ 150.00 $ 4,950.00



75 180 LF ON THE N.W. CORNER OF SANTA ANA ST & MELROSE

ST (IN THE ALLEY AREA), INSTALL NEW #6

CONDUCTORS BETWEEN PP#708627H & PP#11246D, $ $

INCLUDING ALL ASSOCIATED DEVICES FOR A

COMPLETE INSTALLATION & ENERGIZE. $ 12.00 $ 2,160.00



76 450 LF TO THE EAST OF EXISTING ANAHEIM SUB (IN FRONT

OF THE WAREHOUSE AREA), INSTALL NEW #4 ACSR

CONDUCTORS BETWEEN PP#28367D & PP#11701D, $ $

INCLUDING ALL ASSOCIATED DEVICES FOR A

COMPLETE INSTALLATION & ENERGIZE. $ 11.00 $ 4,950.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 84 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

77 21 EA INSTALL 750 CU STR. TAP WIRE FROM THE POLE

MOUNTED CABLE TERMINATOR TO THE OVERHEAD $ $

LINE AND ENERGIZING UG CABLES. $ 8,000.00 $ 168,000.00



78 12 EA INSTALL 1/0 CU STR. TAP WIRE FROM POLE MOUNTED

CABLE TERMINATOR TO THE OVERHEAD LINE AND $ $

ENERGIZING UG CABLE. $ 7,500.00 $ 90,000.00



79 11 EA INSTALL GROUND CONDUIT, MOLDING &

$ $

CONDUCTOR ON POLE AND CONNECT. $ 3,000.00 $ 33,000.00



80 1 LS SEALING CONDUITS OCCUPIED WITH CABLE

$ $

$ 500.00 $ 500.00



80A 1 LS ON SOUTH STREET, JUST WEST OF OLIVE STREET,

CONTRACTOR SHALL RELOCATE THREE DOWN-GUYS

& ANCHORS TO PROVIDE ROOM FOR PLACEMENT OF

$ $

BORE PIT (SEE SHEET ES-10). THE DESIGN PLAN WILL

BE PROVIDED TO THE CONTRACTOR BEFORE THE

CONSTRUCTION STARTS. $ 10,000.00 $ 10,000.00



81 6 EA FURNISH & INSTALL OPERABLE SUMP PUMP PER CU

$ $

1700-5 $ 8,000.00 $ 48,000.00



82 1 LS EXEMPT MATERIAL

$ $

$ 5,000.00 $ 5,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 85 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

83 1 LS MOBILIZATION

$ $

$ 30,000.00 $ 30,000.00



84 1 LS COORDINATE OUTAGE WITH CUSTOMERS.

$ $

$ 20,000.00 $ 20,000.00



84A 1 LS COORDINATION WITH CITY OPERATION FOR 12KV

$ $

SYSTEM CUTOVER. $ 20,000.00 $ 20,000.00

$ -

85 1 LS ALLOWANCE TO ACCOMDATE UNFORSEEN SITE $50,000 $50,000

CONDITIONS ON A TIME AND MATERIAL BASIS AS

DIRECTED BY THE CITY $ 50,000.00 $ 50,000.00





SUBTOTAL (ITEMS 50 TO 85) : $ 50,000.00 $ 2,548,360.00 $ - $ -



ELECTRICAL SERVICE CONVERSION WORK:



86 1 LS PSC-42: INSTALL (1) 900KVAR 12KV SWITCHED

CAPACITOR AND MAKE ALL NECESSARY PRIMARY & $ $

GROUNDING CONNECTION. $ 5,000.00 $ 5,000.00



87 1 LS RC-1585: REMOVE EXISTING PRIMARY RISER AND

EXISTING U.G. CABLE, PULL & INSTALL NEW CABLES

$ $

FROM NEW VGS SWITCH, MAKE PRIMARY CABLE &

GROUNDING CONNECTION AS REQUIRED. $ 10,000.00 $ 10,000.00







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 86 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

88 1 LS RC-1767: INSTALL 6.9KV FUSE CABINET & FUSE PER

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V, SINGLE

PHASE TRANSFORMER IN TRANSFORMER HOLELINER

PER CU 1500-12, 13, & 14. FURNISH AND INSTALL ALL

$ $

SECONDARY CABLES TO EXISTING HOUSING AND RR

METER PEDESTAL LOADS AND COMPETE ALL

PRIMARY, SECONDARY, SERVICE AND GROUND

CONNECTION AS REQUIRED. $ 15,000.00 $ 15,000.00



89 1 LS RC-1769: INSTALL 6.9KV FUSE CABINET & FUSE PER

CU 1600-60. INSTALL 75KVA, 6.9KV-240/120V, SINGLE

PHASE TRANSFORMER IN TRANSFORMER HOLELINER

PER CU 1500-12, 13, & 14. FURNISH AND INSTALL ALL $ $

SECONDARY CABLES AND COMPETE ALL PRIMARY,

SECONDARY, SERVICE AND GROUND CONNECTION

AS REQUIRED. $ 15,000.00 $ 15,000.00



89A 1 LS ALLOWANCE TO ACCOMMODATE WORK DUE TO $25,000.00 $25,000.00

UNKNOWN UNDERGROUND OBSTRUCTION FOR THE

SERVICE CONVERSION PLAN, ON A T&M BASIS, AS

DIRECTED BY THE CITY. $ 25,000.00 $ 25,000.00





SUBTOTAL (ITEMS 86 TO 89A) : $ 25,000 $ 70,000.00 $ - $ -



12KV ELECTRICAL DEMOLITION:



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 87 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



90 1 LS REMOVE 12KV OVERHEAD SYSTEM:

INCLUDING REMOVE CONDUCTORS, INSULATORS,

POLE SWITCHES, FIBER OPTICS & COPPER CABLES, $ $

TRANSFORMERS AND CAPS, STREET LIGHT ARMS,

ETC PER DEMO PLAN $ 15,000.00 $ 15,000.00



91 64 EA PULL, TRANSPORT AND DISPOSE (PTD) NON-SERVICE

$ $

POLES. $ 500.00 $ 32,000.00



92 9 EA TOPPING POLE TO 12KV LEVEL, TRANSPORT AND

DISPOSE THE TOPPED PORTION. (NOTE: IN THE

VICINITY OF EXISTING ANHEIM SUBSTATION; ON $ $

SANTA ANA ST & IN THE ALLEY IN FRONT OF THE

WAREHOUSE) $ 600.00 $ 5,400.00





SUBTOTAL (ITEMS 90 TO 92) : $ - $ 52,400.00 $ - $ -



CITY COMMUNICATION CABLE INSTALLATION:

93 5,900 LF INSTALL UNDERGROUND 96 STRAND FIBER OPTICS

$ $

COMM. CABLE. $ 8.00 $ 47,200.00



94 4 EA INSTALL 6"X22' COYOTE CLOSURE & SPLICE 96

$ $

STRAND FIBER OPTICS CABLE SEGMENTS. $ 250.00 $ 1,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 88 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





95 5,700 LF FURNISH AND INSTALL (3) 1-1/4" INNER DUCTS WITH

COLORS OF BLUE, ORANGE, & GREEN, WITH PULL

$ $

ROPE AND A LOCATE WIRE (1 PAIR BELDEN 27080A

WIRE AWG 14). $ 12.00 $ 68,400.00



96 192 EA SPLICE FIBER OPTIC STRANDS TOGETHER $ $ $ 25.00 $ 4,800.00



97 2 EA FURNISH AND INSTALL 4" PVC CONDUIT

COMMUNICATION RISER FOR COPPER AND/OR 96

$ $

STRAND F.O. CABLE INCL. DEADENDING, GUYING,

TENSIONING, ETC. $ 6,000.00 $ 12,000.00



98 1 LS TESTING F.O. CABLE. REEL BEFORE INSTALLATION

$ $

$ 5,000.00 $ 5,000.00



99 50 EA TEST FIBER OPTICS STRANDS FOLLOWING SPLICING

$ $

$ 200.00 $ 10,000.00



100 1,500 LF REMOVE COPPER COMMUNICATION CABLE FROM OH

$ $

POLES $ 4.00 $ 6,000.00



101 3 EA FURNISH AND INSTALL ARMORFAST 3'X5'X3' COMM.

$ $

VAULT PER CITY OF ANAHEIM STANDARD $ 2,000.00 $ 6,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 89 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 93 TO 101) : $ -

$ 160,400.00 $ - $ -



102 1 LS DISCREPANCES: THIS BID ITEM IS TO

ACCOMMODATE THOSE PORTIONS OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS, WHOSE $ $

METHOD OF PAYMENT IS NOT INCLUDED IN OTHER

BID ITEMS OR ELSEWHERE. $ - $ -





12KV CONDUIT AND SUBSTRUCTURE TOTAL $ 375,000

(ITEM 1 THRU ITEM 102): $ 6,763,670.00 $ - $ -





TELECOMMUNICATION COMPANIES

(SEE BOTTOM OF SPREASHEET FOR SHARED STEEL CASING BID ITEMS)



ESTIMATED

QUANTITY

ITEM OF WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





ATT/SBC TELEPHONE CONDUIT SYSTEM







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 90 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

6'x12'x7' MANHOLE WITH 30" F&C, LADDER, AND

COMPRESSION DUCT PLUGS - PAINT INTERIOR WHITE,

$ $

COMPLETE MH INSTALLATION AND SURFACE

1 1 EA RESTORATION PER ATT/SBC STANDARDS $ 2,000.00 $ 2,000.00



4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER $ $

2 1 EA ATT/SBC STANDARDS $ 15,000.00 $ 15,000.00



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN

3 1 EA GALVANIZED LID PER ATT/SBC STANDARDS

$ $ $ 9,500.00 $ 9,500.00



4" CONDUIT; TYPE "C"; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

4 20,550 LF SURFACE RESTORATION PER ATT/SBC STANDARDS $ 33.00 $ 678,150.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

5 21,000 LF ATT/SBC STANDARDS.

$ $ $ 1.50 $ 31,500.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

6 36 EA PER ATT/SBC STANDARDS.

$ $ $ 200.00 $ 7,200.00



PROVIDE AS-BUILT PLANS FOR ATT/SBC TO

TELEPHONE INSPECTOR AND CITY REPRESENTATIVE $ $

7 1 EA WITH ATT/SBC SIGNATURE OF APPROVAL $ 5,000.00 $ 5,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 91 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 1 TO 7): $ - $ 748,350.00 $ - $ -



XO COMMUNICATIONS CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER XO $ $

8 3 EA COMM. STANDARDS $ 15,000.00 $ 45,000.00



2'X3'X3' PULL-BOX E/W HINGED, BOLT-DOWN

$ $

9 0 EA GALVANIZED LID PER ATT/SBC STANDARDS $ - $ -





4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

$ $

FACILITIES NECESSARY FOR INSTALLATION AND

10 2,450 LF SURFACE RESTORATION PER XO COMM. STANDARDS $ 35.00 $ 85,750.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

11 2,600 LF XO COMM. STANDARDS. $ 1.50 $ 3,900.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

12 8 EA PER XO COMM. STANDARDS. $ 250.00 $ 2,000.00



PROVIDE AS-BUILT PLANS FOR XO COMM. TO XO

INSPECTOR AND CITY REPRESENTATIVE WITH XO $ $

13 1 EA COMM. SIGNATURE OF APPROVAL $ 5,000.00 $ 5,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 92 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



SUBTOTAL (ITEMS 8 TO 13): $ - $ 141,650.00



VERIZON BUSINESS/MCI CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER MCI $ $

14 3 EA STANDARDS $ 15,000.00 $ 45,000.00



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

15 2,450 LF SURFACE RESTORATION PER MCI STANDARDS $ 33.00 $ 80,850.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

16 2,600 LF MCI STANDARDS. $ 1.50 $ 3,900.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

17 8 EA PER MCI STANDARDS. $ 250.00 $ 2,000.00



PROVIDE AS-BUILT PLANS FOR VERIZON/MCI

FACILITIES TO MCI INSPECTOR AND CITY

$ $

REPRESENTATIVE WITH MCI SIGNATURE OF

18 1 EA APPROVAL $ 5,000.00 $ 5,000.00





SUBTOTAL (ITEMS 14 TO 18): $ - $ 136,750.00 $ - $ -





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 93 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

AT&T LOCAL SERVICES FIBER-OPTIC CONDUIT SYSTEM:

4'x4'x4' MANHOLE WITH 30" F&C, COMPLETE MH

INSTALLATION AND SURFACE RESTORATION PER $ $

19 3 EA ATT/LS STANDARDS $ 15,000.00 $ 45,000.00



4" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND $ $

20 2,450 LF SURFACE RESTORATION PER ATT/LS STANDARDS $ 33.00 $ 80,850.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

21 2,600 LF ATT/LS STANDARDS. $ 1.50 $ 3,900.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

22 9 EA PER ATT/LS STANDARDS. $ 200.00 $ 1,800.00



PROVIDE AS-BUILT PLANS FOR ATT/LS FACILITIES TO

ATT/LS INSPECTOR AND CITY REPRESENTATIVE WITH $ $

23 1 EA ATT/LS SIGNATURE OF APPROVAL $ 5,000.00 $ 5,000.00



SUBTOTAL (ITEMS 19 TO 23): $ - $ 136,550.00 $ - $ -



TIME-WARNER CABLE CONDUIT SYSTEM:







4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 94 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



FURNISH AND INSTALL "INTERCEPT" 2X3X3 PULL BOX

EQUIPPED WITH HINGED, BOLT-DOWN GALVANIZED $ $

LID. PULL BOX TO BE APPROVED BY TIME-WARNER

24 1 EA PRIOR TO CONTRACTOR ORDERING MATERIAL. $ 16,000.00 $ 16,000.00



FURNISH AND INSTALL 2X3X3 PULL BOX PER TIME-

$ $

25 4 EA WARNER STANDARDS $ 9,000.00 $ 36,000.00



26 0 EA COORDINATE CABLE TV CUTOVER $ $ $ - $ -



3" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

$ $

SURFACE RESTORATION PER TIME-WARNER

27 6,420 LF STANDARDS $ 35.00 $ 224,700.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

28 6,500 LF TIME-WARNER STANDARDS. $ 1.50 $ 9,750.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

29 18 EA PER TIME-WARNER STANDARDS. $ 200.00 $ 3,600.00



PROVIDE AS-BUILT PLANS FOR TIME-WARNER TO

CATV INSPECTOR AND CITY REPRESENTATIVE WITH $ $

30 1 EA TIME-WARNER SIGNATURE OF APPROVAL $ 5,000.00 $ 5,000.00





SUBTOTAL (ITEMS 24 TO 30): $ - $ 295,050.00 $ - $ -



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 95 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL





SUNESYS FIBER-OPTIC CONDUIT SYSTEM:

PROVIDE AND INSTALL 2X3X3 VAULT/PULLBOX;

COMPLETE WITH ALL FACILITIES NECESSARY FOR

$ $

INSTALLATION AND SURFACE RESTORATION PER

31 7 EA SUNESYS AND CITY STANDARDS $ 9,000.00 $ 63,000.00



2" CONDUIT; SCHED. 40, PVC; COMPLETE WITH ALL

FACILITIES NECESSARY FOR INSTALLATION AND

$ $

SURFACE RESTORATION PER SUNESYS AND CITY

32 1,020 LF STANDARDS $ 35.00 $ 35,700.00



1.25" CONDUIT; COMPLETE WITH ALL FACILITIES

NECESSARY FOR INSTALLATION AND SURFACE $ $

33 5,700 LF RESTORATION PER SUNESYS AND CITY STANDARDS $ 26.00 $ 148,200.00



MANDREL CONDUITS AND INSTALL PULL ROPES PER

$ $

34 6,800 LF SUNESYS STANDARDS. $ 1.50 $ 10,200.00



FURNISH AND INSTALL COMPRESSION DUCT PLUGS

$ $

35 28 EA PER SUNESYS STANDARDS. $ 200.00 $ 5,600.00



PROVIDE AS-BUILT PLANS FOR SUNESYS FACILITIES

TO SUNESYS INSPECTOR AND CITY REPRESENTATIVE $ $

36 1 EA WITH SUNESYS SIGNATURE OF APPROVAL $ 5,000.00 $ 5,000.00





4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 96 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

SUBTOTAL (ITEMS 31 TO 36): $ - $ 267,700.00 $ - $ -



TRENCHING FOR TELECOMMUNICATIONS CONDUIT SYSTEMS:



$ $

37 7,100 LF JOINT-TRENCH; STANDARD-DUAL-STEP $ 18.00 $ 127,800.00





$ $

38 3,200 LF ATT/LS AND ATT REGIONAL TRENCHS ONLY $ 12.00 $ 38,400.00





$ $

39 140 LF TIME-WARNER TRENCH ONLY $ 20.00 $ 2,800.00





$ $

40 590 LF OTHER FI BER-OPTIC TRENCHES ONLY $ 18.00 $ 10,620.00





$ $

41 1 LS REMOVE AND RESTORE ASPHALT PER CITY STDS. $ 5,000.00 $ 5,000.00





$ $

42 1 LS REMOVE AND RESTORE CONC. SW. PER CITY STDS. $ 10,000.00 $ 10,000.00





$ $

43 1 LS PROVIDE TRAFFIC CONTROL PER CITY STDS. $ 20,000.00 $ 20,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 97 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

SUBTOTAL (ITEMS 37 TO 43): $ - $ 214,620.00 $ - $ -



STEEL CASING FOR TELECOMMUNICATION COMPANIES:

44 120 LF FURNISH AND INSTALL 18" STEEL CASING WITH (3)-6"

+ (2)-3" PVC CONDUITS ON SANTA ANA STREET,

BETWEEN CLAUDINA STREET AND OLIVE STREET. $ $

(NOTE: THIS 18" STEEL CASING TO BE SHARED

BETWEEN ATT/LNS, T/W, X/O & MCI). $ 260.00 $ 31,200.00



45 92 LF FURNISH AND INSTALL 28" STEEL CASING WITH (7)-6"

+ (2)-3" + (2 )1 1/4" PVC CONDUITS ON SANTA ANA

STREET, WEST OF VINE STREET.

$ $

(NOTE: THIS 28" STEEL CASING TO BE SHARED

BETWEEN ATT CALIF, ATT/LNS, T/W, X/O, MCI &

SUNESYS). $ 500.00 $ 46,000.00



46 120 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-4"

PVC CONDUITS ON SOUTH STREET, AT OLIVE STREET.

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF. USE $ $

ONLY).

$ 300.00 $ 36,000.00









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 98 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

47 115 LF FURNISH AND INSTALL 28" STEEL CASING WITH (4)-4"

PVC CONDUITS ON SOUTH STREET, EAST OF DAKOTA

STREET. $ $

(NOTE: THIS 28" STEEL CASING IS FOR ATT CALIF. USE

ONLY). $ 300.00 $ 34,500.00





SUBTOTAL (ITEMS 44 TO 47): $ - $ 147,700.00 $ - $ -





TELECOMMUNICATIONS GRAND TOTAL $ -

(ITEM 1 THRU ITEM 47): $ 2,088,370.00 $ - $ -







PROJECT GRAND TOTAL

$375,000 8,852,040.00

(12KV ITEMS 1 THRU 102 + TEL. COMM.

ITEMS 1 THRU 47: $ - $ -



Subcontractors Items Phone No.

1 All American Asphalt 25 & 25A (951) 757-8026



4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 99 of 100 10/25/2011

City of Anaheim



COLONY PARK - PHASE II

12KV UNDERGROUNDING Bidder No. 7







USS CAL Builders, Inc

[NOTE #1: OTHER TELECOMMUNICATION BIDS ARE SHOWN AT THE BOTTOM OF THE SPREASHEET]

12KV CONDUIT AND SUBSTRUCTURE CONSTRUCTION: ___ Attn: Jennifer Hotrum

STREET LIGHT INSTALLATION: ____

12KV ELECTRICAL INSTALLATION: ___ 8051 Main Street

12kV/69KV ELECTRICAL DEMOLITION: ___

CITY COMMUNICATION FIBER & COPPER INSTALLATION: ____ Stanton, CA 90680

SBC COMMUNICATION CONDUIT INSTALLATION: ____

ADELPHIA COMMUNICATION CONDUIT INSTALLATION: ____ License No: 654454 A & B

ATT COMMUNICATION CONDUIT INSTALLATION: ___ Bond: 10%

[NOTE #2: UNLESS OTHERWISE INDICATED, ALL SUBSTRUCTURE MATERIALS SHALL BE PROVIDED BY CONTRACTOR.]

PHONE: 714-828-4882

ESTIMATED

QUANTITY OF

ITEM WORK DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL



2 T & D Services 26,27,28,29 & 30 (951) 304-1190

3 Long Bore 26,27,28,29 & 30 (951) 817-0111









4fc64929-00e9-40e8-8e49-78f1d5c9894a.xlsx 100 of 100 10/25/2011



Related docs
Other docs by panniuniu
MontrealSideEvent
Views: 0  |  Downloads: 0
WCPD-2002-11-11-Pg1956
Views: 0  |  Downloads: 0
PR_Wachstumskurs
Views: 0  |  Downloads: 0
all time bests - girls
Views: 0  |  Downloads: 0
unit1_day4_02.06.03
Views: 0  |  Downloads: 0
ch15_kinetics
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!