					                         Bharat Sanchar Nigam Ltd.
                        (A Govt. of India Enterprise)
          [Statesman House, B-148, Barakhambha Road, New Delhi-1]
                               (MMT Section)

     F.No. 11-14/2004-MMT (SW)                              Dated 30.09.2004

To
        All prospective bidders

Subject :- Tender No. MM/SW/072004/000277 issued on dated 15.7.2004 for
procurement of 10.5 lakh lines of WLL-CDMA 2000 1X equipment (Package-I)
and 10.5 lakh WLL-CDMA 2000 1X integrated FWTs (Package-II).

Dear Sirs,

       Please refer the above mentioned subject tender. Kindly find enclosed
herewith clarifications to the technical and commercial queries raised by some of
the prospective bidders. The clarifications to the queries are as per Annexures
attached.

     1. Commercial – queries / clarifications.
                       Attached as Annexure-I.
     2. Technical – queries / clarifications.
                       Attached as Annexure-II.
     3. Details of compliance to be submitted for package I & II –
        Annexure - III

Please acknowledge the receipt.


                                                                    (SC.Thakur)
                                                                     ADG (MMX)
Section-II:                                                        ANNEXURE-1
Query No. 1(a): Clause-2(a) :
The eligible bidders should be Indian companies registered to manufacture…….
having Memorandum of Understanding (MOU) with the manufacturer for
maintenance support of the equipment during the life span……
Pl clarify that what is period of life span
Clarification: Life span may be taken as 07years from the date of commissioning.

Query No.1(b): Clause 2(a) :- The bidder or his collaborator who have got
experience to supply minimum 3 lakh lines of WLL CDMA 2000 1x equipment
comprising of equipment like MSCs, BSCs, BTS and packet core network etc. in
the world and working satisfactorily for the last one year prior to the date of
opening of tender are only eligible to participate in this tender.
Kindly make it clear that 3 lakh is the total number of all WLL CDMA 20001X
equipments or it means number of each equipment such as BSC,MSC,BTS,PCN
separately.
Clarification: Clause is clear needs no further clarification.

Query No. 2: Clause-9.1 : …….Prices of incidental services should also be
quoted. The offer shall be firm in Indian rupees. No foreign exchange will be
made available by the purchaser.
        Pl. clarify that what are the components of incidental services. It is not
included in Sec-VII.
Clarification: Prices are to be quoted as per Schedule of requirement given in
Section-V ,Package-I and Package-II.
Query No. 3: Clause-14&15:
        Format and signing:
        As the bidders are allowed to bid for package-I or package –II or both
separately, is it necessary to mention the name of the package on each of the
bids.
Clarification: Yes please. Please refer amendment issued vide letter No. 11-
14/2004-MMT(SW) Dated 15.09.2004
Query No. 4: Clause-16.3:
        However not more than one independent and complete offer shall be
permitted from the bidder.
        If a bidder bids separately for package I and package II , will he be rejected
as per the provision of this clause?
Clarification: Please refer reply at query No.-4.
Section-III:
Query No. 5: Clause-5.5 : When the performance tests…”Taking over certificate”
It is assumed performance test is same as per section IV/88. Pl clarify.
Clarification: Clause -88 of Section-IV deals with Acceptance testing which is
one of the clauses of Performance of Contract.
Query No. 6: Clause-9.1(b) (i) : In the event of termination of production of spare
parts ……
       Advance notification not less than two years is a too long time.
Upgradation takes place much faster. It may be for six month.
Clarification: Request is regretted please.
Section-IV:
Query No. 7: Clause-6(i):         Placement of orders:
       If only two bidders participate in the tender for package-I with two different
technologies, will the 100% order be placed on the L-1 bidder?
Clarification: L-1 will be considered for 70% of the order only.

Query No. 8(a) : Clause-12.1.1 &12.1.2 : The bidder who are issued purchase
orders for commercial supplies shall have to get their WLL equipment types
approved /validated from TEC.or a team nominated by BSNL. The WLL
equipment for type approval / validation shall be supplied within a period of two
months…..
       Supply of validation eqpt. may be considered two months from the date of
P.O. instead of A. P.O. And completion of validation within 5 months from the
date of P.O. Total supply of eqpt. may be considered 08 months from the date of
P.O.
Clarification: Request is regretted please.

Query No. 8(b) : In case of successful validation of equipments, these
equipments will form part of the main supplies. Pl clarify.
Clarification: Yes please.
   .
Query No. 9(a): Clause-13.1:
       (i)    50% on supply of equipment.
       (ii)   30% on successful Type approval…..
       (iii)  20% after one year…..

       (i)    This may be considered for 80% on supply of all equipments.
       (ii)   This may be considered for 10% on commissioning & AT
       (iii)  This may be considered for 10% after one year and signing of AMC.
Clarification: Request is regretted please.

Query No. 9(b): Clause 13 :- Payment terms : The payment shall be made in
Indian Rupees only. The mode of payment against Package-I and Package-II
shall be as follows :
Package-II
Query No.9(c) Clause 13.4 :- For the cost of equipment ordered in the purchase
order :
   i)        80% on supply of all equipment at site in satisfactory condition.
                 Please confirm “Supply of equipment at site” means supply of FWTs
        in lot at one nodal location in each circle.
   ii)       20% after one year of supply subject to satisfactory performance and
             signing of AMC agreement along with submission of performance bank
             guarantee.
                 Can this 20% be paid immediately after acceptance against bank
        guarantee ?
Clarification: Request is regretted please.

Query No. 10: Clause-13.3:
     Payment for AMC:
       This may be considered for six months basis in advance, as vendor is to
invest huge amount for infrastructure, spares and man-power etc. In addition
vendor is also giving 5% PBG.
Clarification: Request is regretted please.


Query No. 11: Clause-89 :
        Delivery period:
        The total delivery period for package-I is eight months from the date of
Purchase Order. We presume that two months additional period after the
completion of total delivery will be given for installation & commissioning for BSNL
sites as per clause 58 of section IV . We also presume that the same is
applicable for non-BSNL sites.
Clarification: Both Clauses 58 and 89 of Section-IV are clear needs no further
clarification.

Query No. 12(a): Clause 90:- The warranty of the Stores/Equipment supplied
shall be 12 months from the date of commissioning after successful acceptance
testing of the CDMA equipment under package-I and 12 months from the date of
supply and receipt at site of last batch of IFWTs in each Circle in good condition
under Package-II. The proof of receipt of last batch in a Circle shall be provided to
the Circle concerned and SW and NM (WLL) branches of BSNL Corporate Office.
       Since the delivery is distributed to 6 months it is not justified to warrant the
material already supplied and may be in use for six month to warrant for. Pls
modify this clause to 12 months warranty for each lot from the date of last date of
receipt of the lot.
Clarification: Request is regretted please.

Query No.12(b): Clause 90 :- The warranty of the Stores/Equipment supplied
shall be 12 months from the date of commissioning after successful acceptance
testing of the CDMA equipment under package-I and 12 months from the date of
supply and receipt at site of last batch of IFWTs in each Circle in good condition
under Package-II.
       Our understanding is 12 months including warranty and commissioning
otherwise commissioning must have a definite time.
Clarification: warranty under Package-II will be 12 months from date of supply
and receipt of last batch of IFWTs in each circle in good condition.

Query No. 13: Clause 91.9 :-The bidder shall submit a performance bank
guarantee in each Circle equivalent to 2% of the cost of equipment as per P.O. or
the first year AMC charge pertaining to that Circle which ever is higher in a
prescribed performa. The PBG shall be submitted at least two months in advance
of date of start of AMC. The PBG shall be valid for a period of six years. The PBG
shall be extendable for a further period as required if there is a delay in start of
AMC for any reason for the whole MSC-BSC package or one of the BSC packages
under the same MSC. For the additional/expansion equipment, the amount of
PBG shall be increased at the same rate as indicated above, within a time period
of one month of the date of such equipment getting covered under AMC.
Pls confirm that this is applicable to Package-I only.
Clarification: For performance bank guarantee for AMC of Package-II will be as
per Clause-12.2 of Annexure-II to Section-IV.

Query No. 14: Clause 83 :- BSNL ….. for undertaking the repairs of FWTs. The
selected bidders shall also give the specialized training to the staff of telecom
factory (at least 15 numbers) on repair of the IFWTs/FWTs without any cost. The
supplier shall provide continuous support for a period of 7 years in supplying the
spare parts at the same rates or negotiated lower rates. BSNL also reserves the
right, not to procure the repairing infrastructure each SSA headquarter, where
supplier’s equipment is installed. The date of handing over faulty terminals to such
courier service/agency shall be construed as the date of handing over the same to
the supplier concerned.
Please consider the alteration as follows :
The date of delivery of faulty terminals by such courier service/agency at the nodal
centre shall be construed as the date of handing over the same to the supplier
concerned.
Clarification: Request is regretted please.




                         LEFT INTENTIONALLY BLANK
LEFT INTENTIONALLY BLANK
                                                                                                                      ANNEXURE-II

         Clarifications on Queries raised by bidders against tender No. MM/SW/0722004/000277 for procurement of 10.5 Lakh
     CDMA 2000 1X Integrated FWTs ( Package II)

S. No. Query (Clause / Section )                                                   Clarification
1.     Clause 82/ Section IV of the bid document - Kindly clarify whether three    The bidder has to submit 3 models of IFWTs (any colour)
       models should be submitted to TEC for validation approval or only need to   meeting the tender condition and the TEC specifications
       be submitted to Switching.                                                  as follows:

                                                                                   (i) IFWT’s having three different models i.e. Shape &
                                                                                   Size and meeting the tender condition & TEC
                                                                                   specifications shall be submitted to TEC for type
                                                                                   approval/validation and Switching Planning Branch
                                                                                                         OR
                                                                                   IFWTs having 3 different models with different features
                                                                                   but minimum features complying to tender conditions and
                                                                                   TEC specifications can be submitted.

                                                                                   (ii) A total of 3 models of IFWTs with five each i.e 15
                                                                                   IFWTs are to be submitted to TEC. In addition 3 models
                                                                                   of IFWTs with one each is to be submitted to Switching
                                                                                   Planning Branch.

                                                                                   The Total IFWT’s to be submitted to TEC is 5x3=15 &
                                                                                   1x3=3 to Switching Planning Branch.

                                                                                (iii) The above models to TEC and Switching Planning
                                                                                branch may be submitted one day before the opening of
                                                                                tender.
2.      Item 3 / Sec. V Package-II of the bid document. Kindly clarify Fax mean Please refer clause 1.31.2.1 (ii) (b) of TEC GR No.
        G3 analog Fax or data fax ?                                             GR/RST-01/01. JUNE 2004. The interface to integrated
                                                                                FWT is Group 3 FAX conforming to TEC IR No.
                                                                                IR/FAX-01. However, PC fax is also acceptable. The
                                                                                bidder shall indicate the type of interface being provided.
3.      Clause 3.6.6 regarding Adopter & Battery 12 V in TEC GR - World wide Refer Part 1 Clause 3.6.2 & 3.6.6 of TEC GR.
     there is no standardization regarding battery. Every manufacturer has their    There is no restriction regarding Battery Voltage.
     own power supply and battery design as per the main circuit of WLL             The only requirement is that the IFWT shall be capable of
     Terminals. In the same fashion in GSM CDMA handsets also every                 operating with a charger-cum-eliminator providing 12 V
     manufacturer has their own specifications. Therefore, sincerely we feel        output.
     that TEC can standardized talk time and stand by time instead of
     regulating the input voltage and current. Kindly clarify.
4.   Clause 1.31 regarding USB & Ethernet Interface in TEC GR - USB cables          The bidders shall supply USB cable with suitable
     are much expensive world wide. Therefore, to make it available for             connectors for connecting to PC/laptop as per clause
     common public we have incorporated RS 232 port for data connectivity           1.31.2.2 of TEC GR. This cable shall be supplied for only
     instead of USB. Kindly clarify what kind of data cable needs to supply         10 % of IFWTs mentioned under Item No. 1, 2 & 3 of
     along with IFWT.                                                               schedule of requirement ( Package II). The length of the
                                                                                    cable should be 3 Meters.

5.   Parallel RJ 11 jack in TEC GR - In integrated FWP, already dial pad is in      Refer part 2, Clause1.1 B and 1.31.2.2 of TEC GR
     built and more over this is equivalent to mobile handset. We feel that in      Suitable interface may be required for connecting FAX
     mobile phone no user prefers to use parallel connection. Therefore, no         machine and PC/Laptop. It is not a parallel port to
     manufacturer provides such kind of parallel connection facility in FWP.        connect another IFWT. The requirement of this interface
     Kindly clarify whether Parallel RJ 11 port need to be provided in IFWT or      will depend on application/type of IFWT.
     not.
6.   Simple IP support- WAP enable - This is basically WAP related feature.         Simple IP and WAP are not related requirement.
     In FWT and FWP may not be applicable. Kindly clarify ?
7.   Clause 02 of Section II of the bid document - i) As the tender is floated      i) Please refer the amendment issued vide MM section
     for Infra & Terminal together under same document, it may cause some           letter No. 11-14/2004-MMT (SW) dt. 15.9.2004. The
     misunderstanding & confusion on judging criterion of each clauses. So          offers for both the packages have to be submitted
     please kindly float the tender separately for Infra & Terminal.                separately.
     ii) Since the tender is called for CDMA 2000 1X IFWTs, it may please be
     noted that eligibility criteria should be made applicable for the supply and   ii) Clause 2 (b) Section II of the bid document is clear. No
     sufficiently working in CDMA 2000 1X Infra, as the real intra-operability      clarification is required.
     issues should have been addressed by the vendor to the user.
8.   Clause 13.1(a)/Section III of the bid document - As per the clause, the        Clause is clear. No clarification is required. Hence the
     purchaser may, at any time, by a written order given to a supplier make        request is regretted please.
     changes for drawings, designs or specification. However as and when the
     contract is made, drawings, designs or specification of the model have
     already finalized. So it is impossible to change them after opening of
     tender. Therefore please delete this clause.
9.   Clause 15 & 70 / Section IV of the bid document – i) We don’t think some       Please refer clarification given at S. No. 4.
      accessories such as RF cable, data cable & patch panel antenna are
      required for whole area. In case of data cable, the actual usage % is not
      exceeding 3-5% even in Australia & U.S. So please let bidders propose
      those items as optional items.
      ii) As per the clause, the bidder is required to offer the data cable.
      However, the length of data cable has not been mentioned in tender
      document. Please specify the length of required data cable clearly.
10.   Clause 73 / Section IV of the bid document - As per the clause, the bidder   Please refer clause 73 / Section IV of the bid and Clause
      is required to submit the certificate/test results of CDG2 before type       3.11 (Part I) & Clause 1.30.1 (Part II) of TEC GR. The
      approval/validation of equipment. Kindly note: BSNL is asking 3 types of     bidders have to submit the models as clarified under S.
      IFWTs, with 3 colours, meaning a vendor has to submit (3x3x6) = 54           No. 1 above.          The CDG test results regarding
      samples.                                                                     interoperability have to be submitted during the type
      Kindly make sure how many samples are needed. If every type of sample        approval/ validation process.         The type approval /
      has to go thru CDG II test then any body would need at least 1 and half      validation certificate shall not be granted in the absence of
      year to get CDG II test done. Normally a CDG II test cycle is 9 months       above said CDG test results.
      (including waiting period). If one model after another sequenced for CDG
      II, it will take lot of time.
      Our suggestion is;

         1. KINDLY allow us time for CDG II tests to be carried out. We
            request the date of submission of tender be kindly extended by at
            least 2 months to help us prepare the samples required by BSNL.
         2. Please allow us that the CDG II test report be submitted during the
            type approval process as these samples will be new meeting the
            BSNL/TEC requirement, and not at the time of submitting
            samples/B form. The CDG II testing requires certain amount to be
            paid in USD, and if there is no commitment and so many samples
            are being asked, there should be some relaxation some where.


11.   Clause 74 / Section IV of the bid document : As per the clause, the          Refer Part 2, Clause 1.10 of TEC GR
      required frequency band has been mentioned as follow.                        The IFWT may be designed for 25 MHz bandwidth but it
         824-844 MHz(Tx) and 869-889 MHz(Rx) h                                     shall operate in the frequency band / carrier frequency as
      However, it has been mentioned in GR that “the frequency band 824-849        specified under clause 74 / Section IV of the bid as
      MHz paired with 869-894 MHz is acceptable.”                                  allocated by WPC to BSNL.
      We think that 25 MHz bandwidth is normal in the world. Please accept
      25MHz band.
12.   Clause 78 / Section IV of the bid document - As we requested above,            Please refer clarification at S. No. 4
      please let bidders propose those items as optional items.
13.   Clause 80 / Section IV - As per the clause the bidder is required to supply    1 & 2 - The details of the colors and the Logo etc. shall be
      3 attractive colours. Even though the colour and logo has been mentioned       intimated at the time of Purchase Order
      in clause 3.12 of Part I of TEC GR, we would like to request you
      regarding the colour and logo as follow.                                       3 - Please refer clarification at S.No.1
          1. Please specify 3 attractive colours clearly.
          2. Please send BSNL logo (three coloured BSNL Logo & Black or
              White coloured BSNL Logo) and specify the center or left or right
              on top of the IFWT body.
          3. Please clarify whether all three color IFWTs should be submitted
              for TA/validation or not. Also please note the time given for
              submitting these many samples is not sufficient, we need at least 2
              more months to comply to your requirement of submitting samples,
              accordingly the date for submission may please be extended.
14.   Clause 82 of Section IV of the bid document. As per the clause, the bidder     Please refer clarification at S No. 1
      is required to quote at least three models of IFWTs having same feature
      and same cost. Also the bidder is required to deposit the sample of each
      model of the IFWT to Switching Planning Cell before offer to TEC for
      type approval/validation. Regarding this clause, we would like to request
      BSNL as follow.
          1. Please change three models into one model.
          2. If three models should be suggested, please confirm whether 5
              IFWTs of each model should be submitted for TA/Validation as
              per clause No. 12.2 and TEC will take TA/validation for each
              model.
          3. Please clarify the time to be submitted to Switching Planning Cell
              more clearly.
15.   Clause 83 of Section IV of the bid document - As per the clause, the           The repairing infrastructure comprising of test jig or fault
      bidder is required to quote the requisite repairing infrastructure. Each       analyser to diagnose the fault upto component/IC level
      position is required to repair minimum 100 FWTs per day.                       and the requisite tools for repair/replacement of faulty
      We think that the required repairing infrastructure will be different as per   item shall be provided for each test position. The bidders
      the faulty type of 100 FWTs.                                                   shall give the list of recommended spares along with
      Accordingly, each vendor will offer the different details as per the vendor    quantity and itemised price for one year requirement for
      situation.                                                                     repair of IFWTs in all the three test positions. Any item
                                                                                     not quoted but required for repair of IFWTs during one
      So, the criteria on the faulty type should be given in tender document for year period from the date of setting up of the repair
      the fair evaluation and the item-wise details should be mentioned in price facility shall be supplied on free of cost basis within 15
      schedule of Section VII for the fair evaluation. Please clarify it.        days of the demand being placed by BSNL. In case of
                                                                                 non compliance in this regard, the penalties as stipulated
      Also note that technology changes so fast that no body can keep/predict in terms and conditions of AMC shall be applicable with
      spares inventory for 7 years. BSNL has to decide in the beginning how respect to delay in repair of FWTs. The date of demand
      much inventory they need to buy and keep for how many years. This placed by BSNL shall be the reference date for calculation
      clause should not be made applicable for Terminals, for Infra Systems it of penalties. The cost of these spares must be included
      might be OK.                                                               in the quote of repairing infrastructure facilities for each
                                                                                 Telecom Factory.

                                                                                  The BOQ for two sets of repair facility i.e. at Bhillai and
                                                                                  Mumbai shall be as under :

                                                                                  i) Repair test jig / fault analyzer -             6 nos.

                                                                                  ii) Repair tool kit including all accessories -   6 nos.

                                                                                  iii) Spare parts sets for one year      -         2 sets

                                                                                  The support for supplying of spares for 7 years as
                                                                                  stipulated in clause 83 / Section IV of the bid is
                                                                                  mandatory.

16.   Please refer Section V, item No. 4. Please clarify if it is necessary to The bidders should quote NICs as per provisions made in
      quote for network Interface Card also ? It may be possible that only few the schedule of requirement/price schedule (Package II).
      niche vendors may have this card available with them.                      However, the purchaser shall have the right to purchase
                                                                                 NICs in full or part or not procure at all.
17.   Please refer Section VII, Part II, Item 3. The fax has been mentioned in Please refer clarification at S. No. 2
      description of this item. Please specify whether, it is G3 fax or PC fax.
      The integrated FWT cannot support G3 FAX.
18.   Please refer clause 4.1 / Section III of the bid document - This specifies Request is regretted please.
      performance Bank Guarantee of 5% value of the Purchase Order to be
      placed on 2/3 or three successful bidders. The bank guarantee value will
      be more than 5 crores. We feel there should be ceiling of 3 crores or 5%
      of PO value which ever is less. Kindly consider modification of the
      clause.
19.   Clauses under technical requirement has been combined for Package I & II      Yes, please. The details of compliance statement
      in the tender document under Section IV of the tender document. Kindly        required for package I and package II with respect to
      clarify whether we can comply only those clauses applicable to Package II     Section IV of the bid document is enclosed at Annexure II
      as we are bidding for Package II. Is it OK if clauses pertaining to Package   for reference of the bidders.
      I need not be mentioned in the compliance statement ? Kindly confirm.
20.   In clause no. 13.4 of section IV, the payment terms has been mentioned as     Request is regretted please.
      80% against supply and 20% after one year of supply subject to
      satisfactory performance. Our request is whether 20% can be released
      against submission of additional Bank Guarantee for equivalent value.
      Blocking of 20% money for such large volume of supply will be big
      financial burden for any company and Bank Guarantee gives equal
      security to BSNL. BSNL can consider this as done in other items
      procurement.
21.   For Package II under section VI, is it enough to give compliance to TEC       Yes, please.
      GR for terminal and 12 V SMPS power supply ? Kindly confirm.
22.   In the schedule of Quantity under Section V of Package II it has been         Please refer clarification at S. No. 4
      mentioned that IFWT should be supplied with data cable. We presume the
      length of the cable for 2 mtrs as done in the last tender procurement.
      Kindly confirm.
23.   As per clause 78 of Technical Requirement for Package II it has been          The IFWTs shall be supplied as a complete package as
      mentioned that Patch Panel Antenna along with 10 mtrs feeder cable shall      per the details given in the purchase order.
      be supplied with each IFWT. Here we would like to mention that these
      two accessory items shall be sourced from Type Approved BPC cleared
      sub-vendors who shall send the material directly to the BSNL consignee
      after BSNL QA bulk testing clearance at their factory against offer sent
      from IFWT manufacturers QA center. Kindly confirm this approved
      procedure of BSNL.
24.   In the clause 79 of Technical Requirement for Package II it has been          The clause is clear. No clarification required.
      mentioned that IFWT shall have 150 memory locations. Here we would
      like to request BSNL that they may consider 99 nos. of memory location
      as IFWT going to be used as a table top phone with limited mobility.
      Kindly consider our request and clarify for the same.
25.   Vide clause no. 81 of Technical Requirement of Package II it has been         The clause is clear. No clarification required.
      mentioned, external charging of IFWT through external source by the
      subscriber should not be encouraged. We welcome this stand of BSNL as
      damages to the instrument can be minimized and we presume that battery
      charging cable for charging from external source need not be supplied
      unlike the last tender procurement. Kindly confirm for the above.
26.   Clause 82 of the Technical requirement for package II calls for quoting for      Please refer clarification at S No.1
      atleast 3 models having same features and same cost. Our submission here
      is, the overseas technical partners are offering the latest model, which can
      meet the GR and tender conditions, and they may not have additional
      model at the same cost and features. Hence we request BSNL reconsider
      this clause and allow us to submit one latest model, which is fully meeting
      Technical and Tender requirement with a best price tag.
27.   Clauses under Technical requirement have been combined for both the              Please refer clarification at S. No. 19.
      packages (I & II) in the tender document under Section IV of the tender
      document. Please clarify that a bidder bidding only for the package –II
      can only comply to those clauses relevant to Package II & mention as “Not
      Applicable” for other clauses pertaining to Package-I. Please clarify &
      confirm.
28.   Clause No. 1.1 B of the TEC specifications mentions that the IFWT shall          Please refer clarification at S. No. 2.
      support Fax and also mentions that suitable interface for connecting
      PC/Laptop shall be provided. We presume that only Digital PC Fax is
      required which is supported by IFWT. Please clarify & confirm.
29.   Clause No. 82 technical requirement (Package-II) requires for quoting for        Please refer clarification at S No.1
      atleast 3 models having same features and same cost. We will be offering
      one model in three different colors. Please clarify that our interpretation of
      this clause is correct.
30.   Call Charge Meter: The IFWT supports Call Charge Meter on the LCD                Refer Part 2, Clause 1.1 B of TEC GR
      screen, Please clarify & confirm that it is acceptable.                          As per GR Call Charge Meter is in-built feature.

31.   Is it sufficient to give Compliance to TEC GR for Terminal & 12V SMPS            Please refer clarification at S. No. 21.
      Power Supply as required in Section – VI (Package-II) ? Please clarify &
      confirm.
32.    Clause No. 3.6.9.i (b) specifies protection features for 60V DC for 4           The clause 3.6.9 (i) (b) of TEC GR is clear.       No
      hours. For a device working on 12V DC this is extremely high & needs to          clarification is required.
      be deleted. The clause provides for protection feature to withstand 24V
      DC continuously, which is more than sufficient. Please clarify & confirm.
33    Clause 1.30.1(iii) of TEC specifications - It requires for compatibility to      CDG Stage 3 tests would be conducted in BSNL network.
      work with other CDMA systems. Further it mentions that RS vendor shall           However, an undertaking to offer Stage 3 tests and to
      provide certificates/test results of CDG stage 2 inter operability tests and   comply with these shall have to be submitted by the
      CDG stage 3 inter operability tests performed with IS 95 A and CDMA            bidders.
      2000 1X infrastructure network elements. It is pointed out that no
      laboratory or International Agency provides for CDG 3 & only BSNL can
      provide CDG 3 for their network. Please clarify & confirm.
34.   It is suggested that BSNL should specify that IFWTs models quoted in the       Please refer clause 10.1 / Section III of the bid document.
      tender should not be designed/manufactured using Handset/Mobile PCBs.          The supplier shall supply new IFWTs free from all defects
                                                                                     and faults in material used, workmanship and
                                                                                     manufacture and shall be of the highest grade. The
                                                                                     offered IFWTs shall be subjected to rigorous testing for
                                                                                     compliance      to   technical     specification,    quality
                                                                                     requirements and tender conditions.

35.   Clause 2b/Section II and 82/Section IV of the bid document –                   Please refer clarification at S No.1
       Q1) The models are designed for different features with different price
      bands. Three different models with the same features and cost are
      generally not available with manufacturer. It is suggested that for
      qualification to participate in the tender only one model may be
      admissible. However, successful bidder may be asked for submission of
      additional models, if available.
      Q2) If any bidder is having 3 models, is it required for such bidder to
      submit all three for TEC evaluation.
      Q3) Is it necessary to deposit the samples first with Switching Planning
      Cell and then get the type approval processed with TEC.
36.   Clause 71 Section IV of the bid document –                                     The high voltage/surge is the voltage level which is
      Q1) What is specification for high voltage/ surge against which protection     beyond the normal tolerance limit of IFWT.
      is envisaged.
37.   Clause 76 (iv & v) Section IV of the bid document –                            Clause is clear. No clarifications required.
      Q1) This requirement may be made optional as such terminals are not yet
      commercially available.
38.   Clause 81 section IV of the bid document - The FWP has a DC connector          The intention of this clause is to make connection of
      which mates with the FWP charger for charging FWP battery. This                external source other then prescribed SMPS/charger
      arrangement is safe.                                                           difficult.
      Q1) The charger for FWP is an accessory to be connected for charging the
      FWP battery. This has to be done by the end user and the point where
      charger is to be connected viz. DC connector has to be easily accessible.
      Clause may be deleted
39.   Clause 83 section IV of the bid document - As per the clause 5 given in (1) , ( 2) & (3) Please refer clarification at S. No. 15.
      the schedule of requirements given in Section V we are to quote for 2 units
      of repairing infrastructure for repairing of IFWTs/FWTs at Telecom
      factory, Bhillai.

      Q1) Is quotation required for three independent FWT repair set ups at each
      Telecom factory.
      Q2) The spare part requirement should be separated from this as it is not
      known which spare parts would go faulty and in what number. If the spare
      parts are specified with quantities for quotation, the quotations can be
      given by bidders for a known requirement.
      Q3) The bill of material (BOM)/ Quantity (BOQ) for Cl. 5/Sec V so that
      the bids are uniform and evaluation is at par.
40.   Annexure II (AMC) Section IV of the bid –                                    1. The replacement of battery shall be the responsibility
      Q1)FWP battery and 12V SMPS battery is a consumable does not have            of bidder up to the warranty period. After warranty
      warranty/ AMC cover. Life of the battery is a function of charge/discharge   period, the replacement of battery will be the
      cycles and its environment. This should be separated from warranty and       responsibility of BSNL. Accordingly the AMC cost has
      AMC.                                                                         to be quoted by excluding the cost of battery. The bidder
      Q2)FWPs, chargers, 12V SMPS with water seepage , tampering or are            shall give the cost of battery of IFWTs and SMPS
      found burnt are not covered under warranty ( Warranty is for items under     separately.
      proper use) and AMC. With reference to clause 7.9 under annexure II for
      AMC the figure of 99% should exclude the above cases.                        2. The IFWTs including charger and SMPS which are
                                                                                   physically broken or burnt as visible from naked eye at
                                                                                   the time of handing over to suppliers designated courier
                                                                                   for repair shall only be excluded.

                                                                                   3. The bidders shall give itemized rates of individual
                                                                                   items like Battery of IFWTs & SMPS, Battery charger,
                                                                                   Whip antenna, Patch panel antenna, RF feeder cable etc.
                                                                                   BSNL may purchase these items at the rates finalized in
                                                                                   the tender or at lower negotiated rates upto the AMC
                                                                                   period.

41.   Clause 8.2 Annexure II (AMC) - As AMC requires investment payment is Request is regretted please.
      requested in advance.
42.   Item 3 / section V (Package II) - Integrated FWTs with FAX are not              Please refer clarification at S No.2
      commercially available. Bidders may please be permitted to quote for
      FWT with FAX instead of integrated FWT with FAX.
43.   Clause 7.14 annexure II (AMC) - We request that BSNL put some                   Clause is clear. No clarification is required please.
      condition to ensure compliance to this clause at the time of submission of
      bid so that bidders with proper repair infrastructure only may be eligible to
      participate.
44.   Clause 7.17 Annexure II (AMC) –                                                 1) & 2) Clause is clear. No clarification is required please.
      1) Damage due to lightening is a natural calamity and should be treated as
      a force majeure condition.
      2) Substantial protection against lightening is provided if earthing is
      properly done Further, earthing at the subscriber premises cannot be
      guaranteed by the supplier. This clause may please be deleted as it not the
      supplier’s responsibility to ensure proper earthing at subscriber premises.
45.   Clause 3.2.1 (c) of TEC GR No. GR/RST-01/01 June 2004 - Windows 95,             Clause is clear. No clarification is required.
      Windows 98 are out dated and old operating system. Even if the s/w
      support these OS the PC configuration (CPU, Clock, etc) may not support
      the requirement, hence may pls. Be removed from the requirement.
46.   Clause 3.6.1 of TEC GR - There is no standard battery available with            The life of the battery may be taken as one year from the
      "average" life of two years, nor the standard. The standard practice is to      date of supply of IFWTs / SMPS to ultimate consignee.
      define the charge-discharge cycle which also indicate the life of the
      battery. Life in terms of length of time depends purely on the usage by
      individuals therefore may not be defined. Hence the "life of two year may
      pls be changed to number of charge-discharge cycles.
47.   Clause 3.6.3 (a) of TEC GR - In practical condition the Idle time of 22 hrs     Clause is clear. No clarification is required.
      followed by 2hrs talk time usage will never arise. This is not a standard
      practice to define these timings as specified here. Also as per the CDMA
      standards it is measured independently with defined voice activity.
      Therefore, this clause may pls. be modified to Idle time 22 hrs, Talk time 2
      hrs.
48.   Clause 3.6.4 (a) of TEC GR - In normal working condition FWT is always          Clause is clear. No clarification is required.
      used with battery and charger connected. Hence the charging is usually
      designed to charge slowly for improved battery life performance. It is not
      required practically to charge in 5 hrs. Worldwide the FWT charging time
      is higher than 5 hrs. This clause may pls be changed to 10 hrs
49.   Clause 3.6.6 (a) of TEC GR - Charging voltage is design parameter of            Please refer clarification at S. No. 3.
      FWT. The FWT is always suppose to be charged/used with the Charger
      supplied along with FWT. By imposing the fixed 12V it may require
      design change which is unnecessary and does not add any value.
      Therefore, the DC voltage may pls be removed.
50.   Clause 3.6.9 (i) (b) of TEC GR - The DC input voltage to RS is supplied       Clause is clear. No clarification is required.
      by the Charger which is already regulated and in no condition it will
      supply such a high voltage. As such there is no standard which defines the
      higher voltage range which also dilute the specification of nominal voltage
      specification. Usually the input voltages are specified to work at 50% more
      than the nominal voltage. Which may pls be accepted
51.   Clause 3.6.9 ( c ) of TEC GR - The out put voltage is and input DC voltage    Clause is clear. No clarification is required.
      (b) above are same parameter. The DC input voltage to RS is supplied by
      the Charger which is already regulated and in no condition it will supply
      such a high voltage. As such there is no standard which defines the higher
      voltage range which also dilute the specification of nominal voltage
      specification. Usually the input voltages are specified to work at 50% more
      than the nominal voltage. Which may pls be accepted.
52.   Clause 3.6.9 (ii) (a) of TEC GR - AC voltage is always defined as a range     Clause is clear. No clarification is required.
      of regulation which is already specified in clause 3.6.6 (b). Hence this
      clause may pls be removed.
53.   Clause 3.6.9 (ii) (b) of TEC GR - AC short circuit condition will never be    Clause is clear. No clarification is required.
      applicable to charger or RS as in the event of this condition the AC mains
      power will not be applied to Charger/FWT. Therefore this clause may pls
      be removed.
54.   Clause 3.11 of TEC GR - Qualcomm TRAC A may pls be acceptable                 Clause is clear. No clarification is required.

55.   Clause 3.12 (ii) of TEC GR - Either label of operator's logo as per clause    Clause is clear. No clarification is required.
      3.12 ii) a. or screen print may pls be accepted
56.   Clause 1.1 of TEC GR - RUIM is a specific requirement and normally            IFWTs with RUIM are not envisaged in this tender.
      more relevant to Handheld. Therefore may pls be made optional.
57.   Clause 1.1 (B) (i) of TEC GR - The IFWTs are always provided with PC          Please refer clarification at S. No. 2.
      Fax (digital). Pls. Confirm that the Fax mentioned here is PC fax.
58.    Clause 1.1 (B) (ii) of TEC GR - The IFWTs are always provided with PC        Please refer clarification at S. No. 2.
      Fax (digital). Pls. Confirm that the Fax mentioned here is PC fax.
59.    Clause 1.1 (D) of TEC GR - Windows 95, Windows 98 are out dated and          Please refer clarification at S. No. 45.
      old operating system. Even if the s/w support these OS the PC
      configuration (CPU, Clock, etc) may not support the requirement, hence
      may pls be removed from the requirement.
60.   Clause 1.2 of TEC GR - It will make the specs more definitive and clear if        Clause is clear. No clarification is required.
      the required features and services are defined in this specification itself and
      also left to the tendering authority to select the required ones from the list
      as per the service launch plans, user requirement etc. This would avoid
      unnecessary increase in the cost of large volume RS by way of avoiding
      implementation of all the features which may not be required by every
      user.
61.   Clause 1.2.4 of TEC GR - FWT is for fixed application hence the Mobile            Agreed please.
      IP requirement may pls be made optional
62.   Clause 1.2.5 of TEC GR - IP QoS is not the standard implementation in             Agreed please.
      the current CDMA (IS 2000) system. Therefore this may pls be made
      optional
63.   Clause 1.2.6.4 of TEC GR – This is applicable to HHT therefore may                Agreed please.
      please be made optional.
64.   Clause 1.2.6.4 (ii) of TEC GR – Total 99 locations may please be                  Please refer clarifications at S. No. 24.
      acceptable as FWT use does not require high memory being usage at fixed
      location where hard memo pad can easily be used.
65.   Clause 1.2.6.7 of TEC GR – This is applicable to HHT therefore may                Clause is to be complied for IFWTs also.
      please be optional.
66.   Clause 1.2.6.9 (i) of TEC GR – This is applicable to HHT therefore may            Clause is to be complied for IFWTs also.
      please be made optional.
67.   Clause 1.2.6.9 (vii) of TEC GR - This is applicable to HHT therefore may          Clause is to be complied for IFWTs also.
      please be made optional.
68.   Clause 1.2.6.10 (i) of TEC GR - This is applicable to HHT therefore may           Agreed please.
      please be made optional.
69.   Clause 1.2.6.10 (iii) of TEC GR – Please confirm if it is patch panel             Yes please.
      antenna for IFWT.
70.   Clause 1.2.6.10 (iv) of TEC GR – Please elaborate what is this accessory          Clause is clear. No clarification is required.
      and its function ?
71.   Clause 1.2.6.10 (v) of TEC GR – Please elaborate what is meant by                 The IFWTs being supplied against this tender shall be
      equipment.                                                                        supported with this feature.

72.   Clause 1.16 of TEC GR - There is no standard for upgrading the simple IP The requirement is optional.        As per TEC GR only
      handsets to support mobile IP services through over – the – air download possibility to upgrade is to be indicated.
      of mobile IP client software on the handset. This clause may pls be made
      optional or the applicable standard may pls be specified
73.    Clause 1.18 of TEC GR - There is no standard for upgrading the IPv4 to       The requirement is optional.        As per TEC GR only
      support IPv6 services through over – the – air download of mobile IP          possibility to upgrade is to be indicated.
      client software on the handset. This clause may pls be made optional or the
      applicable standard may pls be specified
74.   Clause 1.22 of TEC GR - Pls confirm RUIM is optional? As per clause 10        Please refer clarification at S. No. 56.
      Annexure I, this feature is to be specified if required.
75.   Clause 1.25.2 (e) (i) of TEC GR - The purpose of not allowing even the        Clause is clear. No clarification is required.
      single digit in the buffer is served with locally generated dial tone. The
      support to LE dial tone is redundant and does not add any value, may pls
      be made optional
76.   Clause 1.25.2 (g) of TEC GR - This is applicable to color display HHT.        The IFWTs being supplied shall be provided with grey
      The mode indication and different colr LED/LCD may pls be made                LCD. However, it shall be ensured that all the indications
      optional as it is not applicable to IFWT having grey LCD.                     mentioned in this clause are provided.

77.   Clause 1.30.1 (iii) of TEC GR - Pls. See clause Part-I 3.11, Qualcomm         Please refer clarifications at S. No. 54.
      TRAC A may pls be acceptable
78.   Clause 1.31.2.1 (ii) (b) of TEC GR - The IFWTs are always provided with       Please refer clarifications at S. No. 2.
      PC Fax (digital). Pls. Confirm that the Fax mentioned here is PC fax.
79.   Clause 73 / Section IV of the bid document - As per GR cl. 3.11 "The test     The compliance as per clause 3.11 of TEC GR may be
      results from CDG or Qualcomm or any other LAB accredited by                   given.
      CDG/Qualcomm shall be submitted by the supplier." This may pls be
      acceptable.
80    Clause 75 / Section IV of the bid document - The 1 day training is            Clause is clear no clarification is required.
      sufficient to cover all the aspects of for RS (IFWT/FWT), the same may
      pls be accepted for the required number of officials.
81.   Clause 79 / Section IV of the bid document - Total 99 locations may pls be    Please refer clarification at S No.24.
      acceptable as FWT use does not require high memory being usage at fixed
      location where hard memory pad can easily be used
82.   Clause 82 / Section IV of the bid document - It is practically not possible   Please refer clarification at S No.1.
      to design three different model with same features and same cost.
      However, three colors are possible. Pls confirm that three color of the
      same model are acceptable instead.
83.   Clause 83 Section IV of the bid document - The repair facility depends on     Please refer clarification at S No.15.
      the level of repair to be undertaken and it may vary model to model and
      manufacturer to manufacturer. Therefore this clause may pls be made
      optional or for information only.
84.    Clause 86 Section IV (Package II) (a) of the bid document - Please clarify      (1) Please refer clarification at S No.16
      the following:                                                                   (2) Please refer clarification at S.No.15.
      1. NIC is not necessarily manufactured by all the FWT manufacturer. The
      volume requirement of NIC is also low as compare to IFWT. This will
      restrict all the FWT to participate in the tender with less competition.
      Therefore we request to make NIC as an optional item.
      2. The repairing infrastructure depends on the level of repair to be
      undertaken and it may vary model to model and manufacturer to
      manufacturer. Therefore this clause may pls be made optional or for
      information only.
85.   Clause 86 Section IV (Package II) (b) of the bid document - The period of        Clause is clear. No clarification is required.
      may pls be change to 3 years.
86.   Clause 87 (iii) Section IV of bid document - This clause may pls be              Clause is clear. No clarification is required.
      changed to as follows:
      iii) All the Software upgrades and /or patches required for the operation
      and maintenance of the system/IFWTs supplied will be implemented free
      of cost at each site for 4 years by respective bidders and Acceptance
      Testing of the system will be got done by him through authority designated
      by BSNL for all functions of all systems after the implementation of
      Software Upgrades /Patches in each system.
87.   Clause 87 (iv) Section IV of the bid - Pls. Confirm that this is applicable to As far as package II is concerned, the bidder is required to
      Package-I only                                                                 setup software support facility in India with in six month
                                                                                     of award of contract to meet the obligation under the
                                                                                     tender.
88.   Clause 88 (a) Section IV of the bid – Check on ironwork - Pls. Confirm Yes Please.
      that this is applicable to Package-I only
89.   Clause 88 (a) Section IV of the bid – Traffic trial- Pls. Confirm that this is Yes Please.
      applicable to Package-I only
90.   Clause 88 (b) Section IV of the bid - Pls. Confirm that this is applicable to Yes Please.
      Package-I only
91.   Clause 88 ( c ) Section IV of the bid - Pls. Confirm that this is applicable Yes Please.
      to Package-I only
92.   Clause 90 (para 2 ) section IV of the bid - (Pls. Confirm that this is Yes Please.
      applicable to Package-I only
93.    Clause 90 (para 4 ) Section IV of the bid - Since the delivery is distributed    Clause is clear. No clarifications is required.
       to 6 months it is not justified to warant the material already supplied and
       may be in use for six month to warrant for. Pls modify this clause to 12
       months warranty for each lot from the date of last date of receipt of the lot.
94.    Clause 91.5 Section IV of the bid - Pls. Confirm that this is applicable to      Yes Please.
       Package-I only
95.    Clause 91.6 Section IV of the bid - Pls. Confirm that this is applicable to      Yes Please.
       Package-I only
96.    Clause 91.7 Section IV of the bid - Pls. Confirm that this is applicable to      The clause is applicable for both package I & II
       Package-I only
97.    Clause 91.8 Section IV of the bid - Pls. Confirm that this is applicable to      Yes Please.
       Package-I only
98.    Clause 91.9 section IV of the bid - Pls. Confirm that this is applicable to      The clause is applicable for both package I & II
       Package-I only
99.    Clause 92 Section IV of the bid - Package-II: 1 manual per 10,000 may            Clause is clear. No clarifications is required.
       pls. Be accepted
100.   Clause 95 Section IV of the bid - Pls. Confirm that this is applicable to        Yes Please.
       Package-I only
101.   Item 4 Section V ( Package II) of the bid - NIC is not necessarily               Please refer clarification at S.No.16.
       manufactured by all the FWT manufacturers. The volume requirement of
       NIC is also low as compared to IFWT. This will restrict all the FWT to
       participate in the tender with less completion. Therefore, we request to
       make NIC as an optional Item.
102.   Item 5 Section V (Package II) of the bid - The repairing infrastructure          Please refer clarification at S.No.15.
       depends on the level of repair to be undertaken and it may vary model to
       model and manufacturer to manufacturer. Therefore, this clause may
       please be made optional or for information only.
103.   Clause 70/Section IV of the bid document - Is this 12 V SMPS & 7AH               Yes Please. 7AH battery is part of 12V SMPS power
       Battery external from the IFWT                                                   supply.

104.   Clause 76 / Section IV of the bid document - Please elaborate on the All the features prescribed in the standards for OTASP &
       features that should be supported by OTASP & OTAPA                   OTAPA in TEC GR shall be supported.

105.   Clause 76 / Section IV of the bid document - Please clarify whether the OTASP & OTAPA features are not presently supported
       existing systems in BSNL network from LG, Hyundai & Lucent support by existing LG, Hyundai and Lucent CDMA network of
       OTASP & OTAPA.                                                          BSNL. Hence these features shall not be tested in IFWTs
                                                                                   being supplied in these networks.

106.   Clause 79 / Section IV of the bid document - Please clarify whether the 20 20 SMS messages are for both INBOX and OUTBOX
       SMS messages are for INBOX or for OUTBOX or for both. Is the together. The maximum length of each SMS message
       maximum length of SMS message 140 characters or 160 character?             shall be 160 characters.

107.   Clause 82 / Section IV of the bid document - Are these 3 models of          Please refer clarification at S.No.1.
       IFWTs required for differences in Appearance, look & shape of IFWT.
       Can 3 models with different Look & Appearance be shown to BSNL,
       whichever BSNL like we will make modification while DELIVERY.
108.   Clause 82/Section IV of the bid document - Is certificate/test result of    CDG Stage 2 interoperability test results shall have to be
       CDG stage 2 inter operability tests required for all the three models of    submitted for all the three models of IFWTs in case the 3
       IFWTs. Please clarify.                                                      models are different from each other.

109.   Clause 55 / Section IV of the bid document - As per package 1, bidder       Please refer clarification at S. No. 56.
       shall quote for 1000 Nos of handheld terminals which support R-UIM
       card. If the IFWTs to be quoted as a part of package II also support RUIM
       than it is advantage for BSNL to launch the pre-paid services at anytime.
       RUIM card can be provided along with the IFWTs to be supplied as a part
       of package II. Please elaborate.
110.   Clause 72 / section IV of the bid document - Is this connection of solar    The connection for solar panel may be provided at the
       panel done at the place of power point of IFWT or some separate point is    same place of power point of IFWT.
       required for it. Please clarify.
111.   Clause 71 / Section IV of the bid document - The operating voltage of       The operating voltage of battery charger or SMPS shall be
       battery charger or SMPS is given from 90V – 300V, but clause no.3.6.6 (b)   as per clause 71 Section IV of the bid document.
       of GR/RST-01/01.JUN 2004, the operating voltage is given as 160V –
       270V. Please clarify which operating voltage is to be considered
112.   Clause 82 / Section IV of the bid document - Bidders have to quote for      Please refer clarification at S.No.1.
       atleast three models of IFWTs and have to offer five number (5 Nos) of
       IFWT to TEC. Does that mean a total of 3*5 = 15 Nos of IFWTs have to
       be offered for type approval. Please clarify
113.   Clause 82 / Section IV of the bid document - Is EMC/EMI & safety report     EMC / EMI and safety report are required to be submitted
       required for the three models of IFWT. Please clarify                       for all the three models in case these models are different
                                                                                   from each other.

114.   Item No 1/ Section V (Package II) of the bid document - Does the 12V Yes Please.
       SMPS Power System include the 7AH battery mentioned in Clause 70.
       Please clarify
115.   Clause 78 / Section IV of the bid document - The clause mentions that         Please refer clause 1.9.2 (a) of TEC GR. Each IFWT
       each integrated fixed wireless terminals shall be supplied both with the      shall be supplied with indoor i.e. short whip antenna &
       patch panel antenna and antenna. Shall the bidder supply both the antennas    outdoor i.e. patch panel antenna.
       or is it the antenna connectors and not antenna. Please clarify
116.   Clause 81 / Section IV of the bid document - The exact requirement of the     Please refer clarification at S.No.38.
       location of DC connector is not clear. Please elaborate
117.   Item No. 3 / Section V (Package II) of the bid document - What is the type    Please refer clarification at S.No.2.
       of FAX is needed for 52500 Nos of IFWT. Is it G3 fax or PC fax
118.   Clause 69 / Section IV of the bid document - Is the TEC specification No.     It may be read as GR/RST-01/01. JUNE 2004.
       GR/RST-01/01 Jan. , 2004 correct since the new TEC specifications is No.
       GR/RST-01/01 June 2004. Please clarify
119.   Clause 69 / Section IV of the bid document - In the TEC specification No.     In TEC GR clause No.1.31.2.1 (ii) (a), the S.No. 6.2.1 (a)
       GR/RST-01/01 June, 2004 clause no. 1.31.2.1(ii) ( a) is not clear. There is   & (d) may be read as S. No. 1.31.2.1 (i) (a) & ( d).
       no serial no 6.2.1 (a) & ( d) in GR. Please clarify
120.   For TEC specification No. GR/RST-01/01 June, 2004 clause 3.6.9 (i) (c ).      Clause is clear. No clarification is required.
       Please specify the upper limit on output over-voltage
121.   Clause 10.2 / Section II of the bid document - Can the Indian registered      The Indian companies
       company which is a wholly owned subsidiary of a foreign company,
       submit the Annual reports of the foreign parent company to meet this
       clause. Please clarify
122.   For TEC specification No. GR/RST-01/01 June, 2004 clause 3.6.9(ii)(b).        Clause is clear. No clarification is required.
       Please specify the requirement of AC short circuit protection
123.   Clause 12.2 / Section IV of the bid document - Please clarify the number      Please refer clarification at S.No.1.
       of IFWTs to be offered for type approval. We presume that 5 numbers of
       each type is required to be offered and not 5 numbers of 3
       models/variations of all the 3 types as per schedule of requirement
124.   Clause 1.2.5 / TEC GR No. GR/RST – 01/01 June 2004 - ZTE confirmed            The clause 1.2.5 of TEC GR is optional.
       from Qualcomm that all the CDMA do not have this function for the
       moment.
125.   Clause 1.25.2 (e)(i) / TEC GR - For IFWT, In the state of "off hook", the     Clause is clear. No Clarification is required.
       subscriber only get the locally generated dial tone, but later on the same
       shall be replaced by LE dial tone. This feature is impossible for any one.
126.   Clause 13.1 (a) Section III of the bid - As per the clause, the purchaser     Clause is clear. No Clarification is required.
       may, at any time, by a written order given to a supplier, make changes for
       drawings, designs or specification. However as and when the contract is
       made, drawings, designs or specification of the model have already
       finalized. So it is impossible to change them after opening of tender.
       Therefore please delete this clause.
127.   Clause 15 & 70 Section IV of the bid - We don’t think some accessories Please refer clarification at S.No.4.
       such as RF cable, data cable & patch panel antenna are required for whole
       area. In case of data cable, the actual usage % is not exceeding 3~5% even
       in Australia & U.S. So please let bidders propose those items as optional
       items.

       As per the clause, the bidder is required to offer the data cable. However,
       the length of required data cable has not been mentioned in tender
       document.
       Please specify the length of required data cable clearly.
128.   Clause 73 Section IV of the bid - As per the clause, the bidder is required Please refer clarification at S.No.1.
       to submit the certificate/test results of CDG2 before type
       approval/validation of equipment.
       Kindly note : BSNL is asking 3 types of IFWTs, with 3 colours, meaning a
       vendor has to submit (3x3x6) = 54 samples.

       Kindly makes sure how many samples are needed? If every type of sample
       has to go thru CDG II test than any body would need at least 1 and half
       year to get CDG II test done. Normally a CDG II test cycle is 9 months (
       including waiting period). If one model after another sequenced for CDG
       II, it will take lot of time.

       Our suggestion is;
       1. KINDLY allow us time for CDG II tests to be carried out. We request
       the date of submission of tender be kindly extended by at least 2 months to
       help us prepare the samples required by BSNL.
       2. Please allow us that the CDG II test report be submitted during the type
       approval process as these samples will now be meeting the BSNL/TEC
       requirement, and not at the time of submitting samples/B form. The CDG
       II testing requires certain amount to be paid in USD, and if there is no
       commitment and so many samples are being asked, there should be some
       relaxation some where.
129.   Clause 74 section IV of the bid - As per the clause, the required frequency      Please refer clarification at S.No.11.
       band has been mentioned as follow.
         - 824-844MHz(Tx) and 869-889MHz(Rx)
       However, it has been mentioned in GR that “the frequency band 824-
       849MHz paired with 869-894MHz is acceptable”.
       We think that 25MHz bandwidth is normal in the world. Please accept
       25MHz band.
130.   Clause 80 Section IV of the bid - Please also refer above and ,                  Please refer clarification at S.No.1 & 30.
       as per the clause, the bidder is required to supply 3 attractive colours. Even
       though the colour and logo has been mentioned in No.3.12 of Part I, GR,
       we would like to request you regarding the colour and Logo as follow.
       1. Please specify 3 attractive colours clearly.
       2. Please send BSNL logo(three coloured BSNL Logo & Black or White
         coloured BSNL Logo) and specify the center or left or right on top of
         the IFWT body.
       3. Please clarify whether all three color IFWTs should be submitted for
         TA/Validation or not. BSNL may allow one colour for submission as the
         internal circuitory is the same.
       Also please note the time given for submitting these many samples is not
         sufficient, we need at least 2 more months to comply to your
         requirement of submitting samples, accordingly the date for submission
         may please be extended.
131.   Clause 82 section IV of the bid - As per the clause, the bidder is required      Please refer clarification at S.No.1.
       to quote at least three models of IFWTs having same feature and same
       cost. Also, the bidder is required to deposit the sample of each model of
       the IFWT to Switching Planning Cell before offer to TEC for type
       approval/validation. Regarding this clause, we would like to request BSNL
       as follow.
       1. Please change three models into one model.
       2. If three models should be suggested, please confirm whether 5 IFWTs
         of each model should be submitted for TA/Validation as per Clause
         No.12.2 and TEC will take TA/validation for each model.
       3. Please clarify the time to be submitted to Switching Planning Cell more
         clearly.
132.   Clause 83 section IV of the bid - As per the clause, the bidder is required      Please refer clarification at S.No.15.
       to quote the requisite repairing infrastructure. Each position is required to
       repair minimum 100 FWTs per day.
       We think that the required repairing infrastructure will be different as per
       the faulty type of 100 FWTs.
       Accordingly, each vendor will offer the different details as per the vendor
       situation.

       So, the criteria on the faulty type should be given in tender document for
       the fair evaluation and the item-wise details should be mentioned in Price
       Schedule of Section VII for the fair evaluation. Please clarify it.

       Also note that technology changes so fast that no body can keep/predict
       spares inventory for 7 years. BSNL has to decide in the beginning how
       much inventory they need to buy and keep for how many years. This
       clause should not be made applicable for Terminals, for Infra Systems it
       might be Ok.
133.   Item 3 Section VII Part II of the bid - The fax has been mentioned in             Please refer clarification at S.No.2
       description of this item. Please specify whether it is G3fax or PC fax. For
       reference, the Integrated FWT can not support G3fax.
134.   Clause 82 Section IV of bid document – It is mentioned that bidder has to         Please refer clarification at S.No.1.
       offer minimum three models. Does it mean that bidder has to submit 5
       numbers of samples of each model for approval, which amounts to a total
       of 15 nos.
135.   Clause 13.4 Section IV of bid – Can this 20% be paid immediately after            Please refer clarification at S.No.20.
       acceptance against bank guarantee?
136.   Clause 73 Section IV of bid – Whether Qualcomm TRAC A certification               Please refer clarification at S. No. 54.
       will be acceptable in lieu of CDG Stage 2 certification ?
137.   Clause 77 Section IV of bid – Is it mandatory to establish repair center in       The bidders shall set up at least one repair center in India
       each of the circles ? We are not aware at this point of time how many             for repair of IFWTs during warranty and AMC period.
       circles will be allotted to us, and what quantities in each circle. Repair        They have also to set up at least one nodal center in each
       center in the circle with small quantities cannot be loaded efficiently. Will     circle for minor repairs as well as receipt & dispatch of
       it suffice if we establish logistics and tech support center in each circle and   IFWTs from/to BSNL field units to meet their obligations
       establish the repair centers to meet the requirement of turn around time of       of repairs of FWTs.
       14 days ?
138.   Clause 82 Section IV of bid – Please clarify whether it will suffice if three     Please refer clarification at S.No.1.
       models are of the same outer mould design but are of three different
       colors. Or is it required the design of the outer mould should have
       different design. Do we have to submit 5 samples of each model to TEC
       for type approval.
139.   Clause 83 Section IV of bid – Is the training referred herein, is in addition   Yes, please
       to the 50 weeks training mentioned in para 75 above.
140.   Clause 87 Section .IV of bid – Please confirm “upgrade…. Will be                BSNL will prefer remote loading of software patch in
       implemented at each site means” at one nodal location in each circle            each IFWT. Wherever it is not feasible, such upgradation
       decided by BSNL.                                                                shall be done by the bidders at one location is each city.
       Also please clarify the upgrades will be needed to be done only if it is
       required for operation and maintenance of the system.
       Will it also include the later versions of the SW ?
141.   Clause 90 Section IV of bid – i) With respect to Package II it is assumed          i)      Receipt at site means receipt by ultimate
       that “Receipt at site” means one nodal center in each circle please confirm.               consignee in each telecom circle.
       ii ) Also it is assumed that faulty FWTs to be repaired will be handed over        ii)     Clause 7.5 / Annexure II of the bid may be
       at one nodal location in each circle. Please confirm.                                      referred.

142.   Clause 7.5 Annexure II Section IV of bid – Please consider the alteration Clause is clear. No clarification is required.
       as follows:
       The date of delivery of faulty terminals by such courier service/agency at
       the nodal center shall be construed as the date of handing over the same to
       the supplier concerned.
143.   The clause no.70 under section IV requires the supply of 12V SMPS Clause is clear. No clarification is required.
       power supply with 7 AH Battery to be complied with GR/SMP-02/01
       January, 2004. This product has so far not been developed by any Indian
       vendor or out side India sources and needs to be tested by our collaborator
       before submitting both to TEC before the tender opening date. The tender
       due date of 5th October,2004 is too short a period to develop the product
       confirming to TEC Spec. and sending to our collaborator for compatibility
       check before submission to TEC. The external SMPS with 7AH battery
       needs to be developed and hence BSNL asking to submit the sample
       before the tender submission date looks a very difficult task. We request;
           i.      In Order to make a quality product along with indigenous
                   SMPS power supply with 7AH battery and offer to BSNL at the
                   best possible price, we would request for extension of tender
                   upto month end of October, 2004. Trust BSNL in the best
                   interest of the vendor and to get quality product at competitive
                   price will consider our request favorably.
          ii.     Alternately BSNL can relax the condition of asking to submit
                  the sample to TEC and Switching Planning at the time of tender
                  submission. The sample can be submitted after 1 month. The
                  condition CDG II and CDG III tests to be conducted may
                  remain unchanged.
144.   The Network Inter-face Card (NIC) requirement of 2000 nos. mentioned in Please refer clarification at S.No.15.
       schedule of requirement under Section V is a small quantity and this is not
       being manufactured by any of the CDMA IFWT manufacturing
       companies. This products comes under MOBILE category and since the
       tender is for IFWTS, it looks very difficult to get the support from any
       Mobile CDMA manufacturer for such a small quantity. There are only 2
       or 3 original manufacturers for this product all over the World. They will
       not give us either technical or after sales service support for this small
       quantity. Hence, this product cannot be offered to TEC for validation or
       taken up for AMC. As such we request that this product may please be
       deleted from the schedule of requirement of this tender and whenever
       BSNL decided to Procure Mobile Terminals this may be added that time to
       get the maximum advantage. Trust BSNL understand the difficulty and
       take a second look on the issue.
145.   Clause no.3.6.9 (i) (b) specifies Protection Features for 60 V DC for 4 Clause is clear. No clarification is required.
       Hours. For a device working on 12V DC this is extremely high & needs
       to be deleted. The Clause provides for Protection Feature to withstand
       24V DC continuously, which is more than sufficient. Please Clarify &
       Confirm.
LEFT INTENTIONALLY BLANK
                                                                       Annexure – III

Compliance required against Section IV of the bid for Package I and Package II.


   Clause No. / Section IV           Package I                   Package II
              1                         Yes                          Yes
              2                         Yes                          Yes
              3                         Yes                          Yes
            4 (i)                       Yes                          Yes
           4 (ii)                       Yes                          Yes
           4 (iii)                      Yes                     Not applicable
              5                         Yes                          Yes
              6                         Yes                          Yes
              7                         Yes                     Not applicable
              8                         Yes                     Not applicable
              9                         Yes                     Not applicable
             10                         Yes                          Yes
             11                         Yes                          Yes
             12                         Yes                          Yes
             13                         Yes                          Yes
             14                         Yes                          Yes
             15                         Yes                          Yes
          16 to 68                      Yes                     Not applicable
          69 to 85                 Not applicable                    Yes
             86                         Yes                          Yes
             87                         Yes                          Yes
             88                         Yes                     Not applicable
             89                         Yes                          Yes
             90                         Yes                          Yes
             91                         Yes                          Yes
             92                         Yes                          Yes
             93                         Yes                     Not applicable
             94                         Yes                     Not applicable
             95                         Yes                     Not applicable
             96                         Yes                          Yes

				