ROI-Sheet

Reviews
Shared by: coryelJudie
Categories
Tags
Stats
views:
28
rating:
not rated
reviews:
0
posted:
8/18/2009
language:
English
pages:
0
Conestoga College - Welding Technology Department Arc Welding Power Supply Energy Operating Cost Comparison Data Entry: Secondary Welding Output: Planned Operation: Amperes Volts Hrs/Day Days/Yr 260 A 30 V 16 hrs 250 days 20% Arc-On Operating Factor: Energy Cost: $ 0.150 $/kWh Existing Model Efficiency Idle Power Calculations: Idling Arc-On Idling Energy Arc-On Energy 3200 Hrs/yr 800 Hrs/yr 16000 kWh 31200 kWh 20% 5.0 kW Proposed Model Efficiency Idle Power 60% 1.0 kW Idling Arc-On Idling Energy Arc-On Energy 3200 Hrs/yr 800 Hrs/yr 3200 kWh 10400 kWh Total Energy Annual Cost $ 47200 kWh 7,080 Total Energy Annual Cost $ 13600 kWh 2,040 Annual Operating Savings $ 5,040 J. Galloway ( jgalloway@conestogac.on.ca )

premium docs
Other docs by coryelJudie
Exercise Chart
Views: 1242  |  Downloads: 24
fw4
Views: 126  |  Downloads: 0
Holy Holy Holy (new)
Views: 221  |  Downloads: 0
adopt230
Views: 93  |  Downloads: 0
Bibliography of Mindfulness Resources
Views: 438  |  Downloads: 15
at135
Views: 106  |  Downloads: 0
dv126info
Views: 237  |  Downloads: 0
Pokoar Stan Osborne Zeni
Views: 316  |  Downloads: 1
Torts Outline
Views: 779  |  Downloads: 45
Just a Little Talk with Jesus
Views: 237  |  Downloads: 4
Learning 1
Views: 399  |  Downloads: 4
Aronson Evidence Outline
Views: 219  |  Downloads: 3
Child custody and maintenance
Views: 847  |  Downloads: 20
Glossary of Arabic Terms
Views: 1540  |  Downloads: 81
Make Me a Servant
Views: 424  |  Downloads: 2