Motion Capture Planning Sheet

Reviews
Shared by: LionelSmith
Stats
views:
3
rating:
not rated
reviews:
0
posted:
8/18/2009
language:
English
pages:
0
Motion Capture Planning Sheet Date for the capture(s): / / - / / Number and type of subject(s) to be captured: __2 working/fighting men Names of subject(s): ___man A and man B Number of props to be captured: ____9__ date: 04 / 03 /07 Description of prop(s): Two hammers,12-14 inches long Two chisels 8-10 inches long x 1 inch wide, One 2ft x 3ft x 1ft Styrofoam "rock" One horizontal surface, large enough to lay the "rock" upon, able to be elevated from table height to head height One 2 inch x 1 inch x 4 ft form, curved to match proposed bridge arch. One long board(2x4x8) to carry clamp/rock One Rock clamp Name/location of marker set: _____ set1,= rock (5 markers) set 2=hammer(6 markers) set 3=chisel(3 markers) set 4 = wagon bed/rock wall (8 markers) set 5= long pole for carrying rock.(8 markers) set 6=rock clamp(11markers) location__ set 1=center of floor./ each corner of “rock”__ set2=1each end of hammer face, three along hammer shaft___ set 3 = 3 markers alond shaft of “Chisel” one each end and a center point just above handgrip location._ set 4 =wagon height =3 ft off center of floor SW cornor,36”high___, rockwall height=3 ft off center of floor SW cornor, 72”high set 5=at each end and spaced along the length of 2’x4’x8’ stud/pole set 6= along the length of rock clamp,following its shape,markers at each of the 4 ends as well as one at the center pivot. Volume description(s)/size(s): _ _??? I don’t know what to say here?_ Description and number of suits needed: __ 2_full body suits. 2 closeup hand gloves. Total number of markers needed: _41______ Special Equipment: none______________ Capture Rate: ‫03ڤ‬Hz ‫06ڤ‬Hz ‫021ڤ‬Hz ‫052ڤ‬Hz Final Rate: ‫03ڤ‬Hz ‫06ڤ‬Hz ‫021ڤ‬Hz ‫052ڤ‬Hz Skeletal Considerations: _______ typical skeleton__ Other Considerations: _____________________________________________________________ _____________________________________________________________ _____________________________________________________________ _____________________________________________________________ _____________________________________________________________

Related docs
Motion Capture Planning Sheet
Views: 6  |  Downloads: 0
Compression of Motion Capture Databases
Views: 4  |  Downloads: 0
capture
Views: 0  |  Downloads: 0
What is Motion Capture
Views: 17  |  Downloads: 2
MOTION SHEET
Views: 3  |  Downloads: 0
Motion_capture
Views: 25  |  Downloads: 1
The_Technical_Terms_in_Motion_Capture
Views: 1  |  Downloads: 0
VICON essentials of motion capture
Views: 494  |  Downloads: 6
3d Motion Capture
Views: 151  |  Downloads: 8
Motion capture game engine design
Views: 9  |  Downloads: 0
premium docs
Other docs by LionelSmith
Sample Business Plan NewWave Software
Views: 257  |  Downloads: 9
ADOPT 226
Views: 157  |  Downloads: 2
Sample Business Plan HealthWare Solutions
Views: 332  |  Downloads: 5
Sample Executive Summary expressions
Views: 794  |  Downloads: 12
OSHA QUICK CARD PORTABLE LADDER SAFETY TIPS
Views: 1191  |  Downloads: 11
Sample Business Plan Froghop
Views: 361  |  Downloads: 9
FORM 6 COMMITTEE NOTE
Views: 97  |  Downloads: 0
FORM 10
Views: 154  |  Downloads: 0
Sample Business Description Airex
Views: 2085  |  Downloads: 16