how to use this report - SQA

Document Sample
how to use this report - SQA Powered By Docstoc
					NQGA STATUS UPDATE REPORT
There are four individual worksheets in this report:

How to use this report: this is what you are looking at now!

Summary: Awards split by NC / NPA. Highlights using red, amber and green the status of
the award in terms of development. Provides data per academic year per award on due to
start and due to validate. It also highlights potential early validations. It shows what activities
took place during the reporting period (normally a calendar month), and what is planned for
the upcoming two reporting periods.


Schedule: Will list every award being developed as part of the project, and indicates when
they are planned to start, due to Validate, has validated, if there is any slippage and planned
availability to centres, etc.

Consortium (formerly called ‘national’ awards), ie those for which SQA is primarily
responsible.
All of the columns in the schedule worksheet have the Excel Autofilter facility, which enables
you to view the schedule in the manner most appropriate to your particular requirements, eg
all engineering awards, all available in 07/08, all starting in 06/07.

Proposals:
This sheet provides a summary of the development proposal forms (P1s) submitted to SQA.
It also includes information on prposed 'consortium' developments.

If you have any queries or suggestions about the content of this status report or how to use it, please
email brian.raghoobur@sqa.org.uk Should you require further information about a particular award
(or group of related awards) please contact the relevant Qualifications Manager.
Status Report for the National Qualification Group Award Development Programme is aimed at providing general information (as opposed to
the detail which appears within the other worksheets).

                                                                     SUMMARY page:


Section 1: Summary by Status and by Time. It summarises Group Award numbers by award type across Development, Validation and Implementation
Status, and by time. The section on Project Performance provides the number of upcoming starts, validations and forecasts early validations.

Section 2: Project Performance Statistics. This section gives information on the project's performance, by analysing starts and validations for each
award type over early / on time / late. A notes box provides additional narrative where required.

Section 3: Breakdown of Summary Totals in Section 1. This section provides a breakdown of the figures in the Section 1 of the report, listing the
individual awards that make up the key summary totals.


Section 4: Activity Report for the Current Period and Planned Activities for the Following Two Reporting Periods. The final section lists any
awards which are not going to be progressed (with reasons), awards where the original titles have been changed, and any awards which have changed
proposed SCQF Level. It then lists the awards which started or validated in the current reporting period, and those which are due to start or validate in the
following two reporting periods.


Any feedback or queries regarding the layout and contents of the report should be directed to brian.raghoobur@sqa.org.uk. Queries about individual
awards should be directed to the Qualifications Manager.
                                                                                                 NATIONAL QUALIFICATION GROUP AWARD PROJECT: STATUS SUMMARY as at Monday, August 22, 2011
                                                                                                                             SECTION 1: SUMMARY by STATUS
                                                          Development                  Mid Point Review                 GA Validation                                     Implementation                          Notes
               Category of                                                                                                                                     On APS,          ARD                     Current
   Type                       total no of                                              Held        Planned                                   not yet on                                    Arr Doc on   Entries   61 National Certificates and 180 NPAs
              Development                   not started   on track      slippage                               conds set        validated                      ARD in         slipped /
                                 GAs                                                                                                            APS                                         website     against   have been validated. Arrangements
                                                                                      Dec-10        Dec-10                                                      build         deferred
                                                                                                                                                                                                        Award     Documents are currently available for
              Consortium          51                0        2             0            0             2             0              49               2               0             0            47        10528    51 National Certificates, and 158
    NC        Spec. Coll.         26                1        9             0            0             20            5              11               4               4             0            3           71     NPAs these can be found at
               Spec. SC           10                0        0             0            0             5             9              1                0               0             0            1          TBC     www.sqa.org.uk/nqga

              Consortium         172                1        5             0             0            25           0           166        2         4                            15           145        11205
   NPA        Spec. Coll.        23                 0        6             0             0            4            3            14        0         1                            0             13          73
               Spec. SC           2                 0        0             0             0            2            2            0         0         0                            0             0          TBC
                                                                                                                  SECTION 2: PROJECT PERFORMANCE STATISTICS
                                                              > 6 months early         4 - 6 months early          1 - 3 months early                    on time                1 - 3 months late         4 - 6 months late        > 6 months late               Totals:            Notes
                                                            no           %age           no          %age           no           %age               no              %age          no         %age           no        %age          no        %age          no              %age     Conditions
                                    actual starts            0             0             1            2             0             0                37               73            5           10            2           4           6          12          51               100     imposed at
    NC            cons             actual GA val             3             6             0            0             3             6                 4               8            16           33           15          31           7          15          48               100     Group Award
                                  forecast GA val            0             0             0            0             0             0                 1               50            0           0             0           0           1          50           2               100     Validation have
                                    actual starts            2             1             0            0             2             1                161              96            0           0             3           2           0           0          168              100     resulted in
   NPA            cons             actual GA val             3             2             2            1             3             2                97               61           16           10           28          18          10           6          159              100     delivering
                                                                                                                                                                                                                                                                                    1 - 3 months
                                  forecast GA val            0             0             0            0             0             0                 5               83            0           0             0           0           1          17           6               100
                                                                                                                                                                                                                                                                                    late on actual
                                                                                   SECTION 3: BREAKDOWN of SLIPPAGE, CONDITIONS and EARLY GAs VALIDATION FORECASTS:                                                                                                                 Group Award
GAs EXPERIENCING SLIPPAGE:                                  Due          F'cast    GAs WITH CONDITIONS TO BE LIFTED:                                               Due         F'cast               GAs FORECAST EARLY VALIDATIONS                        Due              F'cast   Validation.
Consortium:                                         0                              Consortium:                                                      0                                          Forecast early validations (2010-2011)           0


Specialist Collaborative:                           0                              Specialist Collaborative:                                       19
                                                                                   Activity Tourism, NC , 6                                    Sep-11      Sep-11
                                                                                   Bakery, NC , 5                                              Sep-11      Sep-11
                                                                                   Beauty and Image Design: An Introduction, NPA , 4           Sep-11      Sep-11
                                                                                   Beauty Techniques And Creative Image, NPA , 5               Sep-11      Sep-11
                                                                                   Computer Aided Design & Technology, NC, 6                   Aug-11      Aug-11
                                                                                   Computer Arts and Animation, NC , 5                         Aug-11      Aug-11
                                                                                   Computer Arts and Animation, NC , 6                         Aug-11      Aug-11
                                                                                   Computing Technical Support, NC , 5                         Sep-11      Sep-11
                                                                                   Computing Technical Support, NC , 6                         Sep-11      Sep-11
                                                                                   Countryside Management, NC , 5                              Aug-11      Aug-11
                                                                                   Creative Beauty and Digital Design, NPA , 5                 Sep-11      Sep-11
                                                                                   Creative Printmaking with Photography, NC , 6               Sep-11      Sep-11
                                                                                   Engineering Systems, NC , 5                                 Sep-11      Sep-11
                                                                                   Horse Care, NC , 5                                          Sep-11      Sep-11
                                                                                   Model Making for Film and TV                                Aug-11      Aug-11
                                                                                   Rural Skills                                                Jan-12      Jan-12
                                                                                   Screenprinting, NC, 5                                       Sep-11      Sep-11
                                                                                   Water Operations: An Introduction, NPA , 5                  Sep-11      Sep-11
                                                                                   Water Operations, NPA , 6                                   Sep-11      Sep-11
                                                                                   SECTION 4: ACTIVITY REPORT for the CURRENT PERIOD and PLANNED ACTIVITY for the UPCOMING MONTHS:
              Development
                 Started:                                                                                                                   GA
                          NONE                                                                                                                               NONE
                (nominal                                                                                                                    Validations:
                  titles)

 period to                Wellness Therapies, NC, 5 (was Wellbeing Therapies)
                          Wellness Therapies, NC, 6 (was Wellbeing Therapies)                                                               Level
above date title changes:                                                                                                                                    NONE
                          Contemporary Gaelic Songwriting and Production NPA, 5 (was Gaelic Songwriting with Technology)                    Change:
                          Computer Games Development, NC, 5 (was Games Development)


              New Titles:    NONE                                                                                                           Removed:         NONE


                                                                                                                                             Upcoming
                                                                                                                                            Validations: NONE
                                                                                                                                              August
               Upcoming
                             Celtic Studies NC, 5                                                                                                        Advertising and Public Relations, NC, 6
                Starts:
                                                                                                                                             Upcoming Fish Health and Feeding, NPA, 5                                                     Mobile Technology, NPA, 5
                                                                                                                                            Validations: HRM and the Law, NPA, 6                                                          Mobile Technology, NPA, 6
                                                                                                                                            September Legal Services, NC, 6                                                               Photography, NC, 6
                                                                                                                                                         Legal Studies, NPA, 6




                   NQGA Status Report
                   as at 22 August 2011

                   NC denotes National Certificate
                   NPA denotes National Progression Award                                                                                      3
                                                    NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                    22 August 2011
                                    QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                           Development and Validation:              Implementation:
                                                                                                  SCQF
Active                   Subject Area                  Dev. type        Lead          Type (3)                            Group Award Working Title               QM/PM                                                                         Notes
                                                                                                 Level (1)
                                                                                                                                                                                 Status            Date             Status             Date
 yes     Business, Admin, Account & Finance           spec. collab City of Glasgow     NC            5       Accounting                                            EF          validated           May-11    ARD planned for          Jun-11   GD0L 45
 yes     Sport and Leisure                                cons            SQA          NPA           6       Achieving Excellence in Sport                         PG          validated           Apr-09   Arr. Doc.on website       Apr-10   G9G5 46
 yes     Performing Arts                                  cons            SQA          NPA           6       Acting and Performance                               MMD          validated           Nov-09   Arr. Doc.on website       Feb-10   G9KM 46
 yes     Performing Arts                                  cons            SQA          NC            6       Acting and Theatre Performance                       MMD          validated           Feb-09   Arr. Doc.on website       Apr-09   G98A 46
 yes     Travel and Tourism                           spec. collab      Oatridge       NC            6       Activity Tourism                                     GMcC    conditions due to lift   Sep-11    ARD planned for          Oct-11
 yes     Travel and Tourism                           spec. collab      Oatridge       NPA           4       Activity Tourism                                     GMcC         validated           Jan-11    ARD planned for          Sep-11   GC8T 44
 yes     Business, Admin, Account & Finance               cons            SQA          NC            5       Administration                                       AWY          validated           Dec-08   Arr. Doc.on website       Mar-09   G99P 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           5       Administration: Information Technology and Audio     AWY          validated           Mar-09   Arr. Doc.on website       Jul-09   G9CE 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           5       Administration: Medical (Administrative Secretary)   AWY          validated           Jun-10   Arr. Doc.on website       Aug-10   G9WV 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           5       Administration: Medical (Receptionist)               AWY          validated           Jan-11   Arr. Doc.on website       Feb-11   GA4C 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           5       Administration: Office Skills and Services           AWY          validated           Mar-09   Arr. Doc.on website       Jul-09   G9CF 45
 yes     Communications, Media & Journalism           spec. collab City of Glasgow     NC            6       Advertising and Public Relations                      ES     on track to validate     Sep-11    ARD planned for          Oct-11
 yes     Engineering                                      cons            SQA          NC            6       Aeronautical Engineering                             DMcN         validated           Oct-08   Arr. Doc.on website       Aug-09   G97H 46
 yes     Land and Environment                         spec. collab       Barony        NC            5       Agriculture                                           EF     on track to validate     May-11    ARD planned for          Mar-12
 yes     Hairdressing and Beauty                      spec. collab John Wheatley       NPA           5       Beauty and Image Design: An Introduction              JS     conditions due to lift   Aug-11    ARD planned for          Sep-11
 yes     Land and Environment                         spec. collab     Elmwood         NC            5       Animal Care                                           AB          validated           May-09   Arr. Doc.on website       Oct-09   G9D7 45
 yes     Science and Maths                                cons            SQA          NPA           6       Animal Technology                                    DMcN         validated           Jul-10   Arr. Doc.on website       Jan-11   G9XY 46
 yes     Science and Maths                                cons            SQA          NC            5       Applied Sciences                                     DMcN         validated           May-08   Arr. Doc.on website       Sep-08   G90M 45
 yes     Science and Maths                                cons            SQA          NC            6       Applied Sciences                                     DMcN         validated           May-08   Arr. Doc.on website       Sep-08   G90N 46
 yes     Land and Environment                         spec. collab       Barony        NPA           4       Aquaculture                                           AB          validated           Apr-09   Arr. Doc.on website       Aug-09   G9D8 44
 yes     Land and Environment                         spec. collab       Barony        NPA           5       Aquaculture                                           AB          validated           Apr-09   Arr. Doc.on website       Aug-09   G9D9 45
 yes     Public Services, Security and Armed Forces       cons            SQA          NC            4       Army Preparation                                      ES          validated           Feb-09   Arr. Doc.on website       Jun-09   G970 44
 yes     Art                                              cons            SQA          NPA           5       Art and Design: Digital Media                         LC          validated           Nov-08   Arr. Doc.on website       Mar-09   G96V 45
 yes     Art                                              cons            SQA          NPA           6       Art and Design: Digital Media                         LC          validated           Nov-08   Arr. Doc.on website       Mar-09   G96W 46
 yes     Art                                              cons            SQA          NC            6       Art and Design                                        LC          validated           Nov-08   Arr. Doc.on website       Mar-09   G96X 46
 yes     Hospitality                                      cons            SQA          NPA           4       Bakery                                                GF          validated           Dec-08   Arr. Doc.on website       Jan-09   G9T5 44
 yes     Hospitality                                  spec. collab City of Glasgow     NC            5       Bakery                                                GF     conditions due to lift   Aug-11    ARD planned for          Sep-11
 yes     Hairdressing and Beauty                          cons            SQA          NPA           4       Barbering                                             PG     on track to validate     Dec-11    ARD planned for          Mar-12
 yes     Hairdressing and Beauty                          cons            SQA          NC            6       Beauty Care                                           PG          validated           Sep-09   Arr. Doc.on website       Apr-10   G9K2 46
 yes     Hairdressing and Beauty                          cons            SQA          NC            5       Beauty Care and Make up                               PG          validated           Jun-08   Arr. Doc.on website       Oct-08   G92F 45
 yes     Hairdressing and Beauty                      spec. collab John Wheatley       NPA           5       Beauty Techniques And Creative Image                  JS     conditions due to lift   Aug-11    ARD planned for          Sep-11
 yes     Construction                                     cons            SQA          NC            6       Building Services Engineering                         DA          validated           Mar-07   Arr. Doc.on website       Jul-07   G8GD 46
 yes     Construction                                     cons            SQA          NC            6       Built Environment                                     DA          validated           Mar-08   Arr. Doc.on website       May-08   G8Y3 46
 yes     Business, Admin, Account & Finance               cons            SQA          NC            5       Business                                             AWY          validated           Jan-08   Arr. Doc.on website       Jul-08   G8WT 45
 yes     Business, Admin, Account & Finance               cons            SQA          NC            4       Business                                             AWY          validated           Feb-09   Arr. Doc.on website       Apr-09    G973 44
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           4       Business and Marketing                               AWY          validated           Jan-11   Arr. Doc.on website       Feb-11   GA4D 44
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           5       Business and Marketing                               AWY          validated           Jan-11   Arr. Doc.on website       Feb-11   GA4R 45
 yes     Business Improvement Techniques                  cons            SQA          NPA           5       Business Improvement Techniques                      DMcN         validated           May-08   Arr. Doc.on website       Jul-09   G8YY 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           5       Business with IT                                     AWY          validated           Jun-10   Arr. Doc.on website       Aug-10   G9X0 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           6       Business with IT                                     AWY          validated           Jun-10   Arr. Doc.on website       Aug-10   G9WW 46
 yes     Creative Industries                          spec. collab     Newbattle       NC            5       Celtic Studies                                        MA       planning to start      Sep-11   planned availability      Aug-12
 yes     Child, Health & Social Care                      cons            SQA          NC            5       Child, Health and Social Care                         MH          validated           Feb-08   Arr. Doc.on website       Jun-08   G8XP 45
 yes     Enterprise and Employability                 spec. collab John Wheatley       NPA           3       Employability and Citizenship                         JS          validated           Aug-11    ARD planned for          Sep-11   GD1M 43
 yes     Construction                                     cons            SQA          NC            6       Civil Engineering                                     DA          validated           Mar-08   Arr. Doc.on website       Jun-08   G8Y2 46
 yes     Computing, IT & Related Areas                single centre City of Glasgow    NC            5       Computer Arts and Animation                          GMcC    conditions due to lift   Aug-11    ARD planned for          Sep-11
 yes     Computing, IT & Related Areas                single centre City of Glasgow    NC            6       Computer Arts and Animation                          GMcC    conditions due to lift   Aug-11    ARD planned for          Sep-11
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           4       Computer Games Development                            BE          validated           Jun-10   Arr. Doc.on website       Aug-10   G9PR 44


            NQGA Development Schedule
            as at 22 August 2011                                                                                                     4
                                                    NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                22 August 2011
                                    QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                       Development and Validation:                  Implementation:
                                                                                                  SCQF
Active                   Subject Area                  Dev. type        Lead          Type (3)                            Group Award Working Title           QM/PM                                                                             Notes
                                                                                                 Level (1)
                                                                                                                                                                             Status            Date                 Status             Date
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       Computer Games Development                        BE          validated           Jun-10        ARD planned for
                                                                                                                                                                                                            Arr. Doc.on website       Aug-10   G9RR 45
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           6       Computer Games Development                        BE          validated           Jun-10       Arr. Doc.on website       Aug-10   G9RT 46
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       Computers and Digital Photography                 BE          validated           Sep-09       Arr. Doc.on website       Nov-09   G9J7 45
 yes     Computing, IT & Related Areas                single centre Motherwell         NC            6       Computer Aided Design & Technology                 JS    conditions due to lift   Aug-11        ARD planned for          Sep-11
 yes     Computing, IT & Related Areas                spec. collab Forth Valley        NC            5       Computer Games Development                       GMcC         validated           Aug-11        ARD planned for          Aug-11   GC8R 45
 yes     Computing, IT & Related Areas                spec. collab Forth Valley        NC            6       Games Development                                GMcC    on track to validate     Jun-12        ARD planned for          Jun-12
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       Computer Networks and Systems                     BE          validated           Sep-09       Arr. Doc.on website       Nov-09   G9J8 45
 yes     Computing, IT & Related Areas                single centre City of Glasgow    NC            5       Computing Technical Support                      GMcC    conditions due to lift   Aug-11        ARD planned for          Sep-11
 yes     Computing, IT & Related Areas                single centre City of Glasgow    NC            6       Computing Technical Support                      GMcC    conditions due to lift   Aug-11        ARD planned for          Sep-11
 yes     Construction                                     cons            SQA          NPA           6       Conservation of Masonry                           DA          validated           Oct-07       Arr. Doc.on website       Apr-08   G8RC 46
 yes     Construction                                     cons            SQA          NPA           5       Construction                                      DA          validated           May-07       Arr. Doc.on website       Jul-07   G8H4 45
 yes     Construction                                     cons            SQA          NPA           5       Construction Operations                           DA          validated           Apr-09       Arr. Doc.on website       Jun-09   G9AT 45
 yes     Hairdressing and Beauty                          cons            SQA          NPA           4       Cosmetology                                       PG          validated           Feb-07       Arr. Doc.on website       Nov-07   G8GX 44
 yes     Land and Environment                         spec. collab     Elmwood         NC            5       Countryside Management                           GMcC    conditions due to lift   Sep-11        ARD planned for          Oct-11
 yes     Hairdressing and Beauty                      spec. collab John Wheatley       NPA           5       Creative Beauty and Digital Design                 JS    conditions due to lift   Aug-11        ARD planned for          Sep-11
 yes     Creative Industries                          single centre City of Glasgow    NC            6       Creative Printmaking with Photography            GMcC    conditions due to lift   Sep-11        ARD planned for          Sep-11
 yes     Land and Environment                             cons            SQA          NPA           5       Crofting                                          AB          validated           Oct-09        ARD planned for          Aug-11   G9K6 45
 yes     Performing Arts                                  cons            SQA          NPA           5       Dance                                            MMD          validated           Jan-11       Arr. Doc.on website       May-11   GA7E 45
 yes     Laundry & Dry Cleaning                           cons            SQA          NPA           6       Dealing with Solvent Emissions in Dry Cleaning    DA          validated           May-08       Arr. Doc.on website       May-09   G8Y7 46
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           3       Digital Literacy                                  BE          validated           May-07       Arr. Doc.on website       Aug-07   G8HE 43
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       Digital Media Animation                           BE          validated           May-09       Arr. Doc.on website       Sep-09   G9FC 45
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           4       Digital Media Basics                              BE          validated           May-09       Arr. Doc.on website       Sep-09   G9FD 44
 yes     Computing, IT & Related Areas                    cons            SQA          NC            4       Digital Media Computing                           BE          validated           May-07       Arr. Doc.on website       Jul-07   G8JM 44
 yes     Computing, IT & Related Areas                    cons            SQA          NC            5       Digital Media Computing                           BE          validated           May-07       Arr. Doc.on website       Jul-07   G8JK 45
 yes     Computing, IT & Related Areas                    cons            SQA          NC            6       Digital Media Computing                           BE          validated           Feb-08       Arr. Doc.on website       Aug-08   G9GK 46
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       Digital Media Editing                             BE          validated           May-09       Arr. Doc.on website       Sep-09   G9FF 45
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           6       Digital Media Production                          BE          validated           Sep-09       Arr. Doc.on website       Nov-09   G9J5 46
 yes     Communications, Media & Journalism               cons            SQA          NPA           5       Digital Production Skills                         AWI         validated           Mar-10       Arr. Doc.on website       May-10   G9MA 45
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       Doing Business Online                             BE          validated           Aug-10       Arr. Doc.on website       Nov-10   GA12 45
 yes     Early Education & Childcare                      cons            SQA          NC            6       Early Education and Childcare                     MH          validated           Jun-07       Arr. Doc.on website       Jun-07   G8K1 46
 yes     Engineering                                      cons            SQA          NC            5       Electrical Engineering                           DMcN         validated           Oct-08       Arr. Doc.on website       Aug-09   G988 45
 yes     Engineering                                      cons            SQA          NC            6       Electrical Engineering                           DMcN         validated           Oct-08       Arr. Doc.on website       Aug-09   G988 46
 yes     Engineering                                      cons            SQA          NC            5       Electronic Engineering                           DMcN         validated           Oct-08       Arr. Doc.on website       Aug-09   G98D 45
 yes     Engineering                                      cons            SQA          NC            6       Electronic Engineering                           DMcN         validated           Oct-08       Arr. Doc.on website       Aug-09   G98D 46
 yes     Engineering                                  spec. collab     Inverness       NPA           5       Engineering Practice                              JS          validated           Aug-11        ARD planned for          Sep-11
 yes     Engineering                                      cons            SQA          NC            6       Engineering Systems                              DMcN         validated           May-09       Arr. Doc.on website       Aug-09   G9CC 46
 yes     Engineering                                  spec. collab      Dundee         NC            5       Engineering Systems                               JS     conditions due to lift   Aug-11        ARD planned for          Sep-11
 yes     Enterprise and Employability                     cons            SQA          NPA           4       Enterprise and Employability                     SON          validated           Mar-09       Arr. Doc.on website       Mar-09   G976 44
 yes     Enterprise and Employability                     cons            SQA          NPA           5       Enterprise and Employability                     SON          validated           Mar-09       Arr. Doc.on website       Mar-09   G976 45
 yes     Enterprise and Employability                     cons            SQA          NPA           6       Enterprise and Business                          SON          validated           Mar-11       Arr. Doc.on website       Apr-11   GA84 46
 yes     Hospitality                                  spec. collab City of Glasgow     NC            5       Events Coordination                               EF          validated           Jul-11        ARD planned for          Aug-11   GD0M 45
 yes     Sport and Leisure                                cons            SQA          NPA           6       Exercise and Fitness Leadership                   PG          validated           Apr-09       Arr. Doc.on website       Apr-10   G9GC 46
 yes     Engineering                                      cons            SQA          NC            5       Fabrication and Welding                          DMcN         validated           Oct-08       Arr. Doc.on website       Aug-09   G981 45
 yes     Engineering                                      cons            SQA          NC            6       Fabrication and Welding                          DMcN         validated           Oct-08       Arr. Doc.on website       Aug-09   G984 46
 yes     Fashion Design and Textiles                      cons            SQA          NC            6       Fashion, Design and Textiles                      ES          validated           Apr-11       Arr. Doc.on website       Jun-11   GD0P 45
 yes     Business, Admin, Account & Finance               cons            SQA          NPA           6       Financial Services                               SON          validated           Dec-05       Arr. Doc.on website       Jun-06   G8H5 46
 yes     Land and Environment                         spec. collab       Barony        NPA           5       Fish Health and Feeding                          GMcC    on track to validate     Sep-11        ARD planned for          Oct-11

            NQGA Development Schedule
            as at 22 August 2011                                                                                                    5
                                                    NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                  22 August 2011
                                    QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                         Development and Validation:                Implementation:
                                                                                                 SCQF
Active                   Subject Area                  Dev. type       Lead          Type (3)                            Group Award Working Title              QM/PM                                                                           Notes
                                                                                                Level (1)
                                                                                                                                                                               Status            Date               Status             Date
 yes     Construction                                     cons           SQA          NPA           5       Fitted Interiors                                     DA          validated           May-10      ARD planned for
                                                                                                                                                                                                            Arr. Doc.on website       Apr-10   G9NP 45
 yes     Supply Chain / Logistics & Transport             cons           SQA          NPA           5       Food Safety Logistics                                CK          validated           Oct-10     Arr. Doc.on website       Jan-11   GA17 45
 yes     Construction                                     cons           SQA          NPA           5       Formwork                                             DA          validated           Apr-09     Arr. Doc.on website       Jun-09   G9AN 45
 yes     Creative Industries                          spec. collab City of Glasgow    NC           4/5      Furniture Making                                      JS    on track to validate     Feb-12      ARD planned for          Mar-12
 yes     Creative Industries                          spec. collab Lews Castle        NPA           5       Contemporary Gaelic Songwriting and Production       MA          validated           Jun-11     Arr. Doc.on website       Aug-11   GC7Y 45
 yes     Land and Environment                         spec. collab     Elmwood        NC            5       Gamekeeping                                         GMcC         validated           Jul-11      ARD planned for          Aug-11   GC82 45
 yes     Computing, IT & Related Areas                single centre     Moray         NPA           6       Geographical Information Systems: An Introduction     EF         validated           Jun-11     Arr. Doc.on website       Aug-11   GC80 46
 yes     Land and Environment                         spec. collab     Elmwood        NC            5       Greenkeeping                                         AB          validated           Jun-09     Arr. Doc.on website       Aug-09   G9D6 45
 yes     Hairdressing and Beauty                          cons           SQA          NPA           4       Hair                                                 PG     on track to validate     Dec-11      ARD planned for          Mar-12
 yes     Hairdressing and Beauty                          cons           SQA          NC            5       Hairdressing                                         PG          validated           Jun-08     Arr. Doc.on website       Mar-09   G95H 45
 yes     Hairdressing and Beauty                          cons           SQA          NC            6       Hairdressing                                         PG          validated           Sep-09     Arr. Doc.on website       Feb-10   G9K3 46
 yes     Fashion Design and Textiles                      cons           SQA          NPA           5       Harris Tweed                                         ES          validated           Apr-10     Arr. Doc.on website       Sep-10   G9T4 45
 yes     Health & Social Care                             cons           SQA          NC            6       Health and Social Care                               MH          validated           Mar-07     Arr. Doc.on website       Jul-07   G8K3 46
 yes     Land and Environment                         spec. collab     Oatridge       NC            5       Horse Care                                          GMcC    conditions due to lift   Sep-11      ARD planned for          Oct-11
 yes     Land and Environment                             cons           SQA          NC            6       Horticulture                                         AB     on track to validate     Oct-11      ARD planned for          Nov-11
 yes     Hospitality                                      cons           SQA          NC            4       Hospitality                                          GF          validated           Sep-08     Arr. Doc.on website       Feb-09   G93V 44
 yes     Hospitality                                      cons           SQA          NC            5       Hospitality                                          GF          validated           May-09     Arr. Doc.on website       Aug-09   G9FL 45
 yes     Construction                                     cons           SQA          NPA           5       Interior Systems                                     DA          validated           Apr-10     Arr. Doc.on website       May-10   G9NR 45
 yes     Construction                                     cons           SQA          NPA           5       Insulation and Building Treatments                   DA          validated           Apr-10     Arr. Doc.on website       May-10   G9P2 45
 yes     Computing, IT & Related Areas                    cons           SQA          NPA           4       Internet Technology                                  BE          validated           May-07     Arr. Doc.on website       Aug-07   G8HC 44
 yes     Computing, IT & Related Areas                    cons           SQA          NPA           5       Internet Technology                                  BE          validated           May-07     Arr. Doc.on website       Aug-07   G8H8 45
 yes     Energy and Utilities                         single centre Cardonald         NPA           5       Water Operations: An Introduction                     JS    conditions due to lift   Sep-11      ARD planned for          Oct-11
 yes     Creative Industries                          spec. collab North Glasgow      NC            6       Jewellery                                             JS    on track to validate     Mar-12      ARD planned for          Apr-12
 yes     Communications, Media & Journalism               cons           SQA          NPA           6       Journalism                                           AWI         validated           Mar-10     Arr. Doc.on website       May-10   G9MC 46
 yes     Science and Maths                                cons           SQA          NPA           6       Laboratory Science                                  DMcN         validated           Jun-09     Arr. Doc.on website       Oct-09   G9G6 46
 yes     Engineering                                      cons           SQA          NC            6       Land-based Engineering                              DMcN         validated           Jun-10     Arr. Doc.on website       Jul-10   G9RV 46
 yes     Legal Services/Paralegal                     spec. collab City of Glasgow    NC            6       Legal Services                                        EF    on track to validate     Sep-11      ARD planned for          Oct-11
 yes     Legal Services/Paralegal                     spec. collab City of Glasgow    NPA           6       Legal Studies                                         EF    on track to validate     Sep-11      ARD planned for          Oct-11
 yes     Legal Services/Paralegal                     spec. collab City of Glasgow    NPA           6       HRM and the Law                                       EF    on track to validate     Sep-11      ARD planned for          Oct-11
 yes     Hairdressing and Beauty                          cons           SQA          NPA           5       Make Up                                              PG     on track to validate     Dec-11      ARD planned for          Mar-12
 yes     Hairdressing and Beauty                          cons           SQA          NC            6       Make - Up Artistry                                   PG          validated           Sep-09     Arr. Doc.on website       Apr-10   G9K4 46
 yes     Engineering                                      cons           SQA          NC            5       Mechanical Maintenance Engineering                  DMcN         validated           Oct-08     Arr. Doc.on website       Aug-09   G983 45
 yes     Hairdressing and Beauty                          cons           SQA          NPA          tbc      Manicure and Pedicure                                PG     on track to validate     Dec-11      ARD planned for          Mar-12
 yes     Engineering                                      cons           SQA          NC            5       Manufacturing Engineering                           DMcN         validated           Oct-08     Arr. Doc.on website       Aug-09   G982 45
 yes     Engineering                                      cons           SQA          NC            6       Manufacturing Engineering                           DMcN         validated           Oct-08     Arr. Doc.on website       Aug-09   G97L 46
 yes     Engineering                                      cons           SQA          NC            6       Measurement and Control Engineering                 DMcN         validated           Oct-08     Arr. Doc.on website       Aug-09   G987 46
 yes     Engineering                                      cons           SQA          NC            6       Mechanical Engineering                              DMcN         validated           Oct-08     Arr. Doc.on website       Aug-09   G97J 46
 yes     Communications, Media & Journalism               cons           SQA          NC            6       Media                                                AWI         validated           Feb-09     Arr. Doc.on website       Apr-09   G974 46
 yes     Computing, IT & Related Areas                spec. collab Anniesland         NPA           4       Mobile Technology                                     JS    on track to validate     Aug-11      ARD planned for          Sep-11
 yes     Computing, IT & Related Areas                spec. collab Anniesland         NPA           5       Mobile Technology                                     JS    on track to validate     Aug-11      ARD planned for          Sep-11
 yes     Creative Industries                          single centre John Wheatley     NPA           5       Model Making for Film and TV                          JS    conditions due to lift   Aug-11      ARD planned for          Sep-11
 yes     Performing Arts                                  cons           SQA          NC            6       Music                                               MMD          validated           Nov-08     Arr. Doc.on website       Apr-09   G978 46
 yes     Performing Arts                                  cons           SQA          NPA           6       Music Business                                      MMD          validated           Nov-09     Arr. Doc.on website       Feb-10   G9KN 46
 yes     Creative Industries                          single centre Anniesland        NC            5       Musical Instrument Making                             EF    on track to validate     Dec-11      ARD planned for          Jan-12
 yes     Creative Industries                          single centre   Anniesland      NC            6       Musical Instrument Making                             EF    on track to validate     Jan-12      ARD planned for          Feb-12
 yes     Performing Arts                                  cons           SQA          NPA           6       Musical Theatre                                     MMD          validated           Nov-09     Arr. Doc.on website       Feb-10   G9KP 46
 yes     Performing Arts                                  cons           SQA          NPA           6       Music Performing                                    MMD          validated           Mar-10     Arr. Doc.on website       Feb-10   G9L6 46


            NQGA Development Schedule
            as at 22 August 2011                                                                                                   6
                                                    NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                22 August 2011
                                    QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                       Development and Validation:                  Implementation:
                                                                                                  SCQF
Active                   Subject Area                  Dev. type        Lead          Type (3)                           Group Award Working Title          QM/PM                                                                               Notes
                                                                                                 Level (1)
                                                                                                                                                                             Status            Date                 Status             Date
 yes     Sport and Leisure                                cons            SQA          NPA           6       Organising Volunteering Events in Sport          PG           validated           Apr-09        ARD planned for
                                                                                                                                                                                                            Arr. Doc.on website       Apr-10   G9GD 46
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           6       PC Passport: Advanced                            BE           validated           May-07       Arr. Doc.on website       Aug-07   G8HA 46
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           4       PC Passport: Beginner                            BE           validated           May-07       Arr. Doc.on website       Aug-07   G8H7 44
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           5       PC Passport: Intermediate                        BE           validated           May-07       Arr. Doc.on website       Aug-07   G8H9 45
 yes     Science and Maths                                cons            SQA          NC            6       Pharmacy Services                               DMcN          validated           Mar-11        ARD planned for          Aug-11   GA6P 46
 yes     Art                                          spec. collab City of Glasgow     NC            6       Photography                                       EF     on track to validate     Sep-11        ARD planned for          Oct-11
 yes     Construction                                     cons            SQA          NPA           5       Plant Maintenance and Repair                     DA           validated           May-10       Arr. Doc.on website       Apr-10   G9NT 45
 yes     Construction                                     cons            SQA          NPA           5       Plant Operations                                 DA           validated           Apr-09       Arr. Doc.on website       Jun-09   G9AV 45
 yes     Sport and Leisure                                cons            SQA          NPA           6       Play in a Sports Environment                     PG           validated           Apr-09       Arr. Doc.on website       Apr-10   G9GE 46
 yes     Sport and Leisure                                cons            SQA          NPA           5       Playwork and Childcare                           PG           validated           Jul-07       Arr. Doc.on website       Dec-07   G8P8 45
 yes     Hospitality                                  spec. collab Motherwell          NC            5       Professional Cookery                             GF           validated           Aug-11        ARD planned for          Sep-11
 yes     Hospitality                                  spec. collab Motherwell          NC            6       Professional Cookery                             GF           validated           Aug-11        ARD planned for          Sep-11
 yes     Performing Arts                                  cons            SQA          NPA           6       Professional Theatre Preparation                MMD           validated           Nov-09       Arr. Doc.on website       Feb-10   G9KT 46
 yes     Communications, Media & Journalism               cons            SQA          NPA           5       Radio Broadcasting                               AWI          validated           Mar-10       Arr. Doc.on website       May-10   G96A 45
 yes     Construction                                     cons            SQA          NPA           5       Roadbuilding                                     DA           validated           Apr-10       Arr. Doc.on website       May-10   G9NV 45
 yes     Construction                                     cons            SQA          NPA           5       Roads Maintenance                                DA           validated           Nov-08       Arr. Doc.on website       Jun-09   G96A 45
 yes     Land and Environment                         spec. collab      Oatridge       NPA           5       Rural Skills                                     AB           validated           May-09       Arr. Doc.on website       Jul-09   G9CD 45
 yes     Land and Environment                         spec. collab City of Glasgow     NC            5       Rural Skills                                     AB      conditions due to lift   Jan-12        ARD planned for          Feb-12
 yes     Laundry & Dry Cleaning                           cons            SQA          NPA           6       Safe Operation of Continuous Batch Washers       DA           validated           May-08       Arr. Doc.on website       May-09   G8Y6 46
 yes     Land and Environment                         spec. collab       Barony        NPA           5       Salmonid Fish Production                        GMcC     on track to validate     Nov-11        ARD planned for          Dec-11
 yes     Performing Arts                                  cons            SQA          NPA           2       Scottish Bagpipes                                PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H5 42
 yes     Performing Arts                                  cons            SQA          NPA           3       Scottish Bagpipes                                PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H6 43
 yes     Performing Arts                                  cons            SQA          NPA           4       Scottish Bagpipes                                PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H7 44
 yes     Performing Arts                                  cons            SQA          NPA           5       Scottish Bagpipes                                PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H8 45
 yes     Performing Arts                                  cons            SQA          NPA           6       Scottish Bagpipes                                PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H9 46
 yes     Performing Arts                                  cons            SQA          NPA           3       Scottish Pipe Band Drumming                      PG           validated           May-09       Arr. Doc.on website       Feb-10   G9GL 43
 yes     Performing Arts                                  cons            SQA          NPA           4       Scottish Pipe Band Drumming                      PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H3 44
 yes     Performing Arts                                  cons            SQA          NPA           5       Scottish Pipe Band Drumming                      PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H4 45
 yes     Performing Arts                                  cons            SQA          NPA           6       Scottish Pipe Band Drumming                      PG           validated           May-09       Arr. Doc.on website       Feb-10   G9H2 46
 yes     Creative Industries                          single centre City of Glasgow    NC            5       Screenprinting                                  GMcC     conditions due to lift   Aug-11        ARD planned for          Sep-11
 yes     Sport and Leisure                                cons            SQA          NPA           5       Scottish Play Certificate                        PG      on track to validate     Dec-12        ARD planned for          Dec-12
 yes     Nautical Studies                                 cons            SQA          NC            6       Shipping and Maritime Operations                DMcN          validated           Jun-09       Arr. Doc.on website       Nov-09   G9GW 46
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           4       Social Software                                  BE           validated           Sep-09       Arr. Doc.on website       Nov-09   G9J4 44
 yes     Computing, IT & Related Areas                    cons            SQA          NPA           4       Software Development                             BE           validated           Sep-09       Arr. Doc.on website       Sep-09   G877 46
 yes     Performing Arts                                  cons            SQA          NC            6       Sound Production                                MMD           validated           Nov-08       Arr. Doc.on website       Apr-09   G977 46
 yes     Performing Arts                                  cons            SQA          NPA           6       Sound Production: Live                          MMD           validated           Mar-10       Arr. Doc.on website       Feb-10   G9L5 46
 yes     Performing Arts                                  cons            SQA          NPA           6       Sound Production: Recording                     MMD           validated           Mar-10       Arr. Doc.on website       Feb-10   G9L4 46
 yes     Sport and Leisure                                cons            SQA          NC            5       Sport and Fitness                                PG           validated           Jun-08       Arr. Doc.on website       Feb-09   G92G 45
 yes     Sport and Leisure                                cons            SQA          NPA           5       Sport and Fitness: Individual Sports             PG           validated           May-09       Arr. Doc.on website       Apr-10   G9GC 45
 yes     Sport and Leisure                                cons            SQA          NPA           5       Sport and Fitness: Outdoor Sports                PG           validated           May-09       Arr. Doc.on website       Apr-10   G9CH 45
 yes     Sport and Leisure                                cons            SQA          NPA           5       Sport and Fitness: Team Sports                   PG           validated           May-09       Arr. Doc.on website       Apr-10   G9CJ 45
 yes     Sport and Leisure                                cons            SQA          NPA           5       Sports Coaching: Angling                         PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G974 45
 yes     Sport and Leisure                                cons            SQA          NPA           6       Sports Coaching: Athletics                       PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8TR 46
 yes     Sport and Leisure                                cons            SQA          NPA           4       Sports Coaching: Athletics                       PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HJ 44
 yes     Sport and Leisure                                cons            SQA          NPA           5       Sports Coaching: Athletics                       PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8JA 45
 yes     Sport and Leisure                                cons            SQA          NPA           6       Sports Coaching: Badminton                       PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8TT 46
 yes     Sport and Leisure                                cons            SQA          NPA           4       Sports Coaching: Badminton                       PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HG 44

            NQGA Development Schedule
            as at 22 August 2011                                                                                                   7
                                                    NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                22 August 2011
                                    QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                       Development and Validation:                  Implementation:
                                                                                              SCQF
Active                   Subject Area                  Dev. type       Lead       Type (3)                           Group Award Working Title              QM/PM                                                                               Notes
                                                                                             Level (1)
                                                                                                                                                                            Status            Date                  Status            Date
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Badminton                           PG           validated         Jan-06          ARD planned for
                                                                                                                                                                                                            Arr. Doc.on website       Jun-08   G8J2 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Basketball                          PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8TV 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Basketball                          PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HK 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Basketball                          PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8JC 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Bowling                             PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9R5 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Bowling                             PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9R7 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Canoeing                            PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8TW 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Canoeing                            PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HL 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Canoeing                            PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8JD 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Cricket                             PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8TX 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Cricket                             PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HH 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Cricket                             PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8J3 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Curling                             PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9PR 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Curling                             PG           validated         Feb-08         Arr. Doc.on website       Jun-08   G913 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Curling                             PG           validated         Feb-08         Arr. Doc.on website       Jun-08   G914 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Dance Sport                         PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9RK 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Dance Sport                         PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9RL 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Cycling                             PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8R3 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Cycling                             PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8R5 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Diving                              PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8R2 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Diving                              PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8R6 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Equestrian                          PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8TY 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Equestrian                          PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HY 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Equestrian                          PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8JG 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Football                            PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8V0 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Football                            PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HM 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Football                            PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8J4 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Golf                                PG           validated         Feb-08         Arr. Doc.on website       Jun-08   G8W4 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Golf                                PG           validated         Feb-08         Arr. Doc.on website       Jun-08   G8W5 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Gymnastics                          PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8V1 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Gymnastics                          PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HN 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Gymnastics                          PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8JE 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Hockey                              PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8V2 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Hockey                              PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HP 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Hockey                              PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8J5 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Judo                                PG           validated         Feb-08         Arr. Doc.on website       Jun-08   G8W2 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Judo                                PG           validated         Feb-08         Arr. Doc.on website       Jun-08   G8W3 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Modern Pentatholon                  PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9RH 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Modern Pentatholon                  PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9RJ 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Mountaineering                      PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9RF 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Mountaineering                      PG           validated         Jan-06         Arr. Doc.on website       Dec-10   G9RG 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Netball                             PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8V3 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Netball                             PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8HR 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Netball                             PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8J6 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Orienteering                        PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G96G 44
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Rowing                              PG           validated         Aug-07         Arr. Doc.on website       Jun-08   G8V4 46
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Rowing                              PG           validated         Jan-06         Arr. Doc.on website       Jun-08   G8J0 45

            NQGA Development Schedule
            as at 22 August 2011                                                                                               8
                                                    NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                22 August 2011
                                    QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                       Development and Validation:                  Implementation:
                                                                                              SCQF
Active                   Subject Area                  Dev. type        Lead      Type (3)                           Group Award Working Title              QM/PM                                                                               Notes
                                                                                             Level (1)
                                                                                                                                                                             Status            Date                 Status             Date
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Rugby League                        PG           validated           Jan-06        ARD planned for
                                                                                                                                                                                                            Arr. Doc.on website       Jun-08   G8R1 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Rugby League                        PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8R7 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Rugby Union                         PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8V5 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Rugby Union                         PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HT 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Rugby Union                         PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8J7 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Shooting                            PG           validated           Jan-06       Arr. Doc.on website       Dec-10   G9R8 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Shooting                            PG           validated           Jan-06        ARD planned for          Dec-10   G9R9 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Squash                              PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8V6 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Squash                              PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HV 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Squash                              PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8J8 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Swimming                            PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8V7 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Swimming                            PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HW 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Swimming                            PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8J9 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Synchronised Swimming               PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8PY 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Synchronised Swimming               PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8R8 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Table Tennis                        PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8V8 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Table Tennis                        PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HX 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Table Tennis                        PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8JF 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Tae Kwon Do                         PG           validated           Jan-06       Arr. Doc.on website       Dec-10   G9RD 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Tae Kwon Do                         PG           validated           Jan-06       Arr. Doc.on website       Dec-10   G9RE 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Coaching: Tennis                              PG           validated           Aug-07       Arr. Doc.on website       Jun-08   G8V9 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Tennis                              PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8HF 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Tennis                              PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8J1 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Triathlon                           PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8R4 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Triathlon                           PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8R9 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Volleyball                          PG           validated           Feb-08       Arr. Doc.on website       Jun-08    G9I5 44
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Water Polo                          PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8R0 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Water Polo                          PG           validated           Jan-06       Arr. Doc.on website       Jun-08   G8RA 45
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sports Coaching: Weightlifting                       PG           validated           Jan-06       Arr. Doc.on website       Dec-10   G9RA 44
 yes     Sport and Leisure                                cons          SQA         NPA          5       Sports Coaching: Weightlifting                       PG           validated           Jan-06       Arr. Doc.on website       Dec-10   G9RC 45
 yes     Sport and Leisure                                cons          SQA         NPA          6       Sports Development                                   PG           validated           Apr-09       Arr. Doc.on website       Apr-10   G9GF 46
 yes     Sport and Leisure                                cons          SQA         NPA          4       Sporting Events: Personal Best                       PG           validated           Mar-10        ARD planned for          Sep-11   G9V6 44
 yes     Supply Chain / Logistics & Transport             cons          SQA         NPA          5       Supply Chain Operations                              CK           validated           Aug-08       Arr. Doc.on website       Sep-08   G93X 45
 yes     Performing Arts                                  cons          SQA         NC           6       Technical Theatre                                   MMD           validated           Feb-09       Arr. Doc.on website       Apr-09   G98C 46
 yes     Communications, Media & Journalism               cons          SQA         NPA          5       Television Production                               AWI           validated           Mar-10       Arr. Doc.on website       May-10   G9ME 45
 yes     Performing Arts                                  cons          SQA         NPA          6       Technical Theatre in Practice                       MMD           validated           Nov-09       Arr. Doc.on website       Feb-10   G9KR 46
 yes     Travel and Tourism                               cons          SQA         NC           5       Travel and Tourism                                   CK           validated           Jun-08       Arr. Doc.on website       Jul-08   G8YT 45
 yes     Travel and Tourism                               cons          SQA         NC           6       Travel and Tourism                                   CK           validated           Jun-08       Arr. Doc.on website       Jul-08   G8YV 46
 yes     Community                                    spec. collab     Angus       Award         3       Volunteering Skills                                  EF           validated           Jun-11        ARD planned for          Aug-11   GD1N 43
 yes     Community                                    spec. collab     Angus       Award         4       Volunteering Skills                                  EF           validated           Jun-11        ARD planned for          Aug-11   GD1P 44
 yes     Community                                    spec. collab     Angus       Award         5       Volunteering Skills                                  EF           validated           Jun-11        ARD planned for          Aug-11   GD1R 45
 yes     Energy and Utilities                         single centre   Cardonald     NPA          6       Water Operations                                     JS      conditions due to lift   Sep-11        ARD planned for          Oct-11
 yes     Computing, IT & Related Areas                    cons          SQA         NPA          5       Web Design Fundamentals                              BE           validated           May-07       Arr. Doc.on website       Aug-07   G8HD 45
 yes     Computing, IT & Related Areas                    cons          SQA         NPA          5       Website Enterprise                                   BE           validated           Sep-09       Arr. Doc.on website       Sep-09   G9HM 45
 yes     Hairdressing and Beauty                          cons          SQA         NC           5       Wellness Therapies                                   PG      on track to validate     Dec-11        ARD planned for          Mar-12
 yes     Hairdressing and Beauty                          cons          SQA         NC           6       Wellness Therapies                                   PG           validated           Jul-11        ARD planned for          Mar-12
 yes     Advice & Guidance                                cons          SQA         NPA          5       Working with Asylum Seekers and Refugees             AB           validated           Jun-08       Arr. Doc.on website       Aug-09   G961 45

            NQGA Development Schedule
            as at 22 August 2011                                                                                              9
                                                   NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT SCHEDULE as at                                 22 August 2011
                                   QUALIFICATIONS MANAGERS
    For specific queries relating to the NQ GA Development Project please forward these to
nqga@sqa.org.uk and we will endeavour to provide you with a response ASAP otherwise you can                                                               NOTES
                          contact the lead QM direct on 0845 213 xxxx                                                                                     1. Where there is more than one SCQF level shown for a
 AB  Anne Boyd x5430                                    AWI             Alan Wilson x5519                                                                 Group Award detailed content scoping will determine the
                                                                                                        This report gives high-level information on the
AWY Alistair Wylie x5488                                 BE            Bobby Elliott x5473                                                                final level
                                                                                                     National Certificate and National Progression Award
 CK  Christine Keenan x5463                              MA            Margaret Allan x5927                                                               2. This development schedule will be dynamic, as more
                                                                                                      developments as part of the Portfolio Review. The
 CH  Carol Hunter x5449                                  DA           Diane Anderson x5441                                                                sectoral mappings are undertaken and when specialist
                                                                                                       'summary' sheet provides a status report on the
 EF  Elda Fleck x5542                                    ES             Elaine Snell x5440                                                                (local) provision is included
                                                                                                      progress of the development and implementation.
 GF  Graeme Findlay x5492                              GMcC             Gen McCabe x5542                                                                  3. National Certificate (NC) National Progression Award
 JS  Joseph Spencer x5542                                LC             Lesley Clark x5616                                                                (NPA)
 MH  Mary Hainey x5502                                  MMD      Mary McDonald 01315616811                                                                4. Arrangements Document (ARD)
DMcN Drew McNeice x5448                                  PG            Paul Gallacher x5436
SON Sharon O'Neil x5448
                                                                                  Use the filters to select any combination of factors you may wish to interrogate.

                                                                                                                                                                       Development and Validation:                  Implementation:
                                                                                              SCQF
Active                  Subject Area                   Dev. type       Lead       Type (3)                           Group Award Working Title              QM/PM                                                                               Notes
                                                                                             Level (1)
                                                                                                                                                                            Status            Date                  Status            Date
 yes     Community                                        cons          SQA          NC          6       Working with Communities                              AB          validated          Jun-10         ARD planned for
                                                                                                                                                                                                            Arr. Doc.on website       Aug-10   G9YN 46




           NQGA Development Schedule
           as at 22 August 2011                                                                                               10
                 NATIONAL QUALIFICATION GROUP AWARD DEVELOPMENT PROJECT: DEVELOPMENT PROPOSALS as at                   22 August 2011


                                                  NOTES
This sheet provides a summary of the              1. Where there is more than one SCQF level shown for a Group Award            DEVELOPMENT PROPOSAL PROCESS
development proposals submitted to SQA            detailed content scoping will determine the final level
                                                  2. National Certificate (NC) National Progression Award (NPA)



Subject Area          Dev. type       Lead        Type (2) SCQF Level Group Award Proposed Title                                           Proposal Status
                                                              (1)
Health Care           cons            SQA           NC          tbc     Dental Technology                                                          TBC
Engineering           single centre   Cardonald     NPA          5      Energy Efficient Awareness                              Back at college, recommendation of BSG
Engineering           single centre   Cardonald     NPA          5      Energy Efficient Advice                                 Back at college, recommendation of BSG




         NQGA Development Schedule
         as at 22 August 2011                                                              11

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:10/21/2011
language:English
pages:11