Iowa State University - Facilities Planning and Management
Capital Project Directory Report
10/10/2011
BOR Final CD
Project Cost Phase Initial SD for Begin Comp Project Const Project
CP# Project Title ($) Phase % Approval Approval Review Bid/Quote Date Const /Occ Manager Manager Administrator Design Professional Contractor Fund Source
1828 2012 Institutional Roads- 600,508 Pre 5/11 Formal Bid Solberg Compton 2010 Institutional Roads Funds
Pavement Preservation Design 2011 Institutional Roads Funds
2012 Institutional Roads Funds
1295 Agriculture Pavilion 7,000,000 * On Hold 9/03 Huss Not Assigned
Ames Intermodal Facility 8,900,050 Const 55 10/12/10 1/18/11 2/11 5/12 Harvey Stephenson Compton
Bid
through
City of
Ames
1837 Armory-Remodel Various 105,000 Const 99 6/11 7/11 12/11 Latterell University Funds
Studio Spaces
1847 Beardshear Hall-Suite 235,000 Design- 50 8/11 10/11 12/11 Rentschler Private Giving
1750 Office Area CD
Modifications
1844 Bessey Hall-Suites 0201, 122,000 Design- 60 8/11 10/11 1/12 Reedholm Reedholm Liberal Arts & Sciences
0251, 0253 & Room 0255- CD University Funds
Remodel
1802 BioCentury Research Farm- 150,000 Const 35 02/11 Quote 6/11 10/11 Huss Huss Iowa Department of Economic
Biomass Processing Development
Equipment
1410 Biorenewables Complex- 16,550,000 * On Hold 12/07 2/08 Huss/Harvey Not Assigned
West Campus Parking
Structure
1409 Biorenewables Complex- 74,500,000 Design- 50 9/06 2/08 Formal Bid 3/08/12 4/12 7/14 Huss Fields Fisher OPN Architects Capital Appropriation
Agricultural and CD Private Giving
Biosystems Engineering
1848 Buchanan Hall-Replace 160,000 Pre 8/11 Graden Not Assigned Compton Dormitory System Improvement
Roof Design Fund
1820 Catt Hall-South Exterior 245,477 Const 10 5/11 Formal Bid 7/28/11 8/11 1/12 Grief Catus Fisher Baldwin White HPC, L.L.C. University Funds
Stairs Architects Deferred Maintenance/
Academic Bldg Rev Bonds
1207 Chemistry Facilities (Hach 74,147,090 Post 5/06 10/07 5/08 Formal Bid 7/31/08 6/08 6/10 Grief Stephenson Fisher OPN Architects Multiple Primes - Capital Appropriation
Hall)-Issuance #1, 2, 3, 4 Const see comment Private Giving/Univ Resources
1207 Chemistry Facilities (Hach Complete Formal Bid 5/12/09 6/09 8/09 Grief Stephenson OPN Architects Jensen Builders Capital Appropriation
Hall)-Issuance #5-BP#20- Private Giving/Univ Resources
Site Paving
1207 Chemistry Facilities (Hach Complete Formal Bid 2/11/10 3/10 9/10 Grief Stephenson OPN Architects Brycon LLC
Hall)-Issuance #6-BP#21-
Exterior walks, curbs,
paving & misc. grading
1207 Chemistry Facilities (Hach 3,000,000 Complete 12/13/07 Formal Bid 5/8/08 5/08 7/09 Grief Stephenson Peterson Capital Appropriation
Hall)-West Utility Corridor Construction Private Giving/Univ Resources
1207 Chemistry Facilities-Metals 320,000 Complete 10/07 7/07 Formal Bid 10/23/07 11/07 3/08 Grief Stephenson HPC, L.L.C. Capital Appropriation
Lab Remodeling-Davidson Private Giving/Univ Resources
Hall
1207 Chemistry Facilities-Old 250,000 Complete 10/07 Formal Bid 3/27/08 4/08 8/08 Grief/Harvey Stephenson/ Benjamin Design Bergstrom Capital Appropriation
Library Storage Dobson Collaborative Construction Private Giving/Univ Resources
Remodeling
1207 Chemistry Facilities-Old 40,000 Complete Small Project 11/19/07 Grief/Harvey Harvey Kinzler Capital Appropriation
Library Storage Remodel- Construction Private Giving/Univ Resources
Insulation Services
1207 Chemistry Facilities-Shop 350,000 Complete 10/07 7/07 Small Project 9/07 10/07 2/08 Grief Dobson Capital Appropriation
Relocation-Industrial Private Giving/Univ Resources
Education 2
1186 College of Design- 6,619,197 Post 2/06 2/07 7/07 Formal Bid 2/28/08 3/08 7/09 Dixon-Fox Burnett RDG Planning & Miron Construction Private Giving
Foundations Pavilion Const Design Inc fr Treas Temp Invstmts
University Funds
1622 College of Design-Lighting 290,000 Post 7/09 Formal Bid 4/1/10 5/10 8/10 Dixon-Fox Burnett Compton MEP Assocs., LLC ABC Electrical College of Design
Retrofit Const Contractors, LLC Private Giving
1766 College of Veterinary 1,355,000 Const 15 9/10 Formal Bid 06/02/11 6/11 1/12 Prater L. Brown Fisher INVISION Prostruct University Funds
Medicine-Bovine Stall Architecture Construction, Inc.
Addition
Page 1 of 11
1795 College of Veterinary 760,000 Const 95 2/11 Formal Bid 6/7/11 6/11 10/11 Prater L. Brown Compton Boone University Funds
Medicine-Classroom 2226 Construction
Remodel
1704 College of Veterinary 4,800,000 Const 8 4/10 Not 03/11 Formal Bid 6/16/11 9/11 10/12 Huss L. Brown Fisher INVISION Woodruff National Institutes of Health
Medicine-LAR HVAC Required Architecture Construction (NIH) Grant (ARRA)
Improvements VP for Research & Economic
Development
University Funds
1804 College of Veterinary 1,375,000 Design- 70 2/11 05/12 Prater L. Brown Murphy HRSA Grant
Medicine-Modular ABSL-3 SD University Funds
Laboratory Facility Private Giving
1394 College of Veterinary 2,352,900 Post 11/07 Quote 1/30/09 9/09 8/10 Prater L. Brown Capital Appropriation
Medicine-Modular BSL-3 Const Iowa State Research
Laboratory Foundation
US Health and Human Sciences
University Funds
IDED-Iowa Values Funds
1394 College of Veterinary 95,000 Complete Small Project 10/9/09 10/09 9/10 Prater L. Brown INVISION Con-Struct Capital Appropriation
Medicine-Modular BSL-3 Architecture Iowa State Research
Laboratory-Site Work Foundation
US Health and Human Sciences
University Funds
IDED-Iowa Values Funds
1394 College of Veterinary 80,000 Complete Small Project 11/09/10 11/10 3/11 Prater L. Brown INVISION Bergstrom Capital Appropriation
Medicine-Modular BSL-3 Architecture Construction Iowa State Research
Laboratory-Site Fencing Foundation
US Health and Human Sciences
University Funds
IDED-Iowa Values Funds
1689 College of Veterinary 542,000 Close Out 3/10 Formal Bid 4/27/10 7/10 4/11 Prater L. Brown Compton INVISION Jensen Builders University Funds
Medicine-Performance Architecture Private Giving
Evaluation Facility and
Farrier
1689 College of Veterinary 218,000 Const 98 Formal Bid 02/15/11 11/10 7/11 Prater L. Brown Compton INVISION Boone University Funds
Medicine-Performance Architecture Construction Private Giving
Evaluation Facility and
Farrier-Interiors
1523 College of Veterinary 38,850,000 Const 90 9/08 8/09 Formal Bid 03/23/10 4/10 4/12 Prater L. Brown Murphy Multiple Primes - Acad Bldg Rev Bonds
Medicine-Phase 2-Small see comment State Appropriation-RIIF
Animal Hospital State Bonds
Renovation and Addition Private Giving
State Appropriation-Planning
University Funds
1523 College of Veterinary 6,250,000 Close Out 9/08 8/09 Formal Bid 9/16/10 10/10 8/11 Witt Wanderscheid Murphy Farris Engineering Woodruff Acad Bldg Rev Bonds
Medicine-Phase 2-Small Construction State Appropriation-RIIF
Animal Hospital State Bonds
Renovation and Addition- Private Giving
Utilities State Appropriation-Planning
University Funds
1523 College of Veterinary Const 99 9/08 8/09 Small Project 08/05/11 08/11 9/11 Prater Brown Black West Plains Acad Bldg Rev Bonds
Medicine-Phase 2-Small Engineering State Appropriation-RIIF
Animal Hospital State Bonds
Renovation and Addition- Private Giving
Imaging Electrical State Appropriation-Planning
University Funds
1737 Curtiss, Heady and East 200,000 Const 99 6/10 10/10 04/11 Larabee University Funds
Halls-Replace Emergency
Power System
1656 Curtiss Hall-Phase 1 1,788,000 Pre 20 9/10 6/11 12/13? Dixon-Fox Fields Compton Architects Smith Private Giving
Design Metzger University Funds
Facilities Overhead Use
Allowance
Deferred
Maintenance/Academic Building
Revenue Bonds
1656 Curtiss Hall-Phase 1-Harl 5,796,000 Design- 50 9/10 6/11 Formal Bid 3/12 5/12 12/13? Dixon-Fox Fields Compton Architects Smith Private Giving
Commons CD Metzger University Funds
Facilities Overhead Use
Allowance
Deferred
Maintenance/Academic Building
Revenue Bonds
Page 2 of 11
1656 Curtiss Hall-Phase 1-Install 693,000 Const 18 10/10 Formal Bid 04/26/11 05/11 12/11 Dixon-Fox Fields Compton Architects Smith CPMI Construction Private Giving
Sprinkler System Metzger University Funds
Facilities Overhead Use
Allowance
Deferred
Maintenance/Academic Building
Revenue Bonds
1656 Curtiss Hall-Phase 1- 3,573,000 Const 20 10/09 9/10 12/10 Formal Bid 03/24/11 3/11 2/12 Dixon-Fox Fields Compton Architects Smith CPMI Construction Private Giving
Student Services Mall Metzger University Funds
Facilities Overhead Use
Allowance
Deferred
Maintenance/Academic Building
Revenue Bonds
1656 Curtiss Hall-Phase 1- 150,000 Complete 9/10 6/11 6/11 9/11 Dixon-Fox Latterell Compton FPM Design Services
Crawford Complex
1774 Cyclone Sports Complex 12,961,940 Const 10 10/10 3/11 5/11 Formal Bid 07/21/11 8/11 09/12 Harvey Burnett Fisher RDG Planning & HPC, L.L.C. Athletic Debt Financing/Private
Design Giving
1803 Extension 4-H Youth 138,600 Close Out 2/11 Formal Bid 04/14/11 6/11 7/11 Murray Murray Fisher FP&M Ames Trenching & Utility Infrastructure
Building-Replace Chilled Excavating, Inc. University Funds
Water System (Exterior)
1803 Extension 4-H Youth 107,478 Close Out 2/11 6/11 9/11 Currie Reedholm FP&M Utility Infrastructure
Building-Replace Chilled University Funds
Water System (Interior)
1775 FCCC-Hawthorn Market 830,100 Close Out 10/10 Formal Bid 04/21/11 5/11 8/11 Graden Parsons Fisher Baldwin White Larson Contracting ISU Dining
and Café Reconfiguration Architects Central LLC Dormitory System Improvement
Fund
1777 Farm House Lane 130,000 Close Out 10/10 6/11 Solberg Snyder & Associates, Institutional Roads Funds 2011
Feasibility Study Architects Smith Parking Systems
Metzger, Genus University Funds
1745 Flood 2010-General 30,000 Bid Small Project 11/11 12/11 Martin Martin Black Snyder & Associates
Services Flood Protection-
Wall
1757 Flood 2010-Hilton 11,380,575 * Close Out 8/10 06/11 Catus/Fields Compton
Coliseum and Scheman
Building Reconstruction
1757 Flood 2010-Hilton 45,000 Const 70 08/10 Small Project 08/10/11 08/11 09/11 Latterell Catus Black RDG Planning &
Coliseum and Scheman Design
Building Reconstruction-
Old Ticket Office
1800 Flood 2010-Flood * Pre 1 Dixon-Fox Compton Snyder & Associates Ranger Fire, Inc.
Mitigation (Lied and Bruner Design (Flood Analysis),
Drive) Ayres Associates
1776 Food Science-Deferred 155,000 Const 99 10/10 5/11 8/11 Grief FP&M University Funds
Maintenance
1776 Food Science-Deferred 70,000 Const 90 10/10 Small Project 08/15/11 08/11 09/11 Latterell Latterell Black FP&M Comfort Systems University Funds
Maintenance-Various USA Midwest
HVAC Repairs
1785 Football Training Facility 20,600,000 5/08 6/11 6/11 Formal Bid 8/11 10/12 Goss Catus Compton Substance Athletic Debt Financing/Private
Architecture Interiors Giving
Design
1785 Football Training Facility- Const 6 5/08 6/11 Formal Bid 8/18/11 8/11 8/12 Goss Catus Compton Substance Multiple Primes -
Iss #1-Site Demo, Utilities, Architecture Interiors see comment
Grading, NPDES Design
1785 Football Training Facility- Const 0 5/08 Formal Bid 9/22/11 Goss Catus Compton Substance BP2.1-Northwest
Iss #2-Structure, Precast Architecture Interiors Steel Erection
Design
1785 Football Training Facility- Bid 5/08 Formal Bid 10/27/11 Goss Catus Compton Substance
Iss #2b-Concrete Architecture Interiors
(foundations, SOG and Design
SOD)
1785 Football Training Facility- Design- 100 5/08 Formal Bid 11/22/11 Goss Catus Compton Substance
Iss #3-MEP & Building Skin CD Architecture Interiors
Design
1785 Football Training Facility- Design- 50 5/08 Formal Bid 01/19/12 Goss Catus Compton Substance
Iss #4-Site, Tunnel & CD Architecture Interiors
Landscaping, Interiors Design
1730 Forker Building-Replace 725,000 Close Out 6/10 Formal Bid 11/18/10 3/11 8/11 Harvey Fields Fisher FP&M - Fogue Central States University Funds
Roof Roofing
Page 3 of 11
1832 Freeman Hall, Linden 120,000 Quote 6/11 Quote 11/11 1/12 DOR Dormitory System Improvement
Shop and Fund
Maple/Willow/Larch
Complex-Elevator Safety
Bulkheads
1354 Friley Hall-Fire Safety 516,795 Complete 6/07 10/07 10/07 Formal Bid 12/20/07 1/08 7/08 Holzwarth Stephenson HR Green Menninga Electric Dormitory System Improvement
Improvements-Heat and Fund
Smoke Detection System-
Phase 1
1354 Friley Hall-Fire Safety 471,084 Complete 6/07 10/07 7/08 Formal Bid 10/2/08 10/08 7/09 Holzwarth Stephenson/ HR Green Nikkel & Dormitory System Improvement
Improvements-Heat and Sargent Associates Fund
Smoke Detection System-
Phase 2
1354 Friley Hall-Fire Safety 441,560 Complete 6/07 10/07 7/09 Formal Bid 9/17/09 10/09 7/10 Grief Catus HR Green Nikkel & Dormitory System Improvement
Improvements-Heat and (Sargent) Associates
Smoke Detection System-
Phase 3
1354 Friley Hall-Fire Safety 926,431 Close Out 6/07 10/07 7/10 Formal Bid 7/29/10 10/10 7/11 Grief Catus Compton HR Green IES Commercial Dormitory System Improvement
Improvements-Heat and (Sargent) Fund
Smoke Detection System-
Phase 4
1734 General Services Building- 225,000 Const 10 6/10 1/12 Latterell Latterell University Funds
Remodel Portions of 1st &
2nd Floors
1790 General Services Building- 150,000 Const 1 1/11 Small Project 09/23/11 09/11 12/11 Reedholm Reedholm Black FP&M Boone University Funds
Replace Exterior Windows- Construction
West Wing
1831 Gilman Hall-Remodel 141,000 Const 5/11 Small Project 10/17/11 10/11 1/12 Dobson Dobson Black FP&M Story Construction University Funds
Room 1051
1838 Gilman Hall-Rooms 1201 & 140,000 Pre 6/11 6/12 Dobson Dobson University Funds
1202-Replace Fume Design
Hoods
1833 Gilman Hall-Remodel 150,000 Pre 10 6/11 6/12 Dobson Dobson University Funds
Rooms 2271, 2273, 2275, Design
2277 & 2279
1826 Gilman Hall-Remodel 450,000 Design- 80 5/11 5/11 8/12 Dobson University Funds
Rooms 2202A, 2204, CD
2205, 2209, 2216 & 2305
1826 Gilman Hall-Remodel 60,000 Const 10 05/11 Small Project 9/23/11 09/11 01/12 Dobson Dobson Black FP&M Pip Built University Funds
Rooms 2202A, 2204,
2205, 2209, 2216 & 2305 -
Room 2305 Remodel
1829 Gilman Hall-Remodel 349,970 Design- 95 5/11 Small Project 10/11 1/12 Dobson Dobson Black University Funds
Rooms 2272, 2656 & CD
2734A
1827 Gilman Hall-Remodel 367,000 Design- 95 5/11 Small Project 10/11 1/12 Dobson Dobson Black FP&M University Funds
Room 2352 CD
1787 Gilman Hall-Remodel 660,000 Close Out 12/10 2/11 Formal Bid 4/5/11 4/11 8/11 Grief Burnett Fisher Boone University Funds
Rooms 3201, 3206 & 3251 Construction
1702 Helser Hall-Fire Sprinkler 1,890,000 Post 4/10 8/10 Formal Bid 10/21/10 11/10 7/11 Holzwarth Parsons Compton HR Green Ranger Fire, Inc. Dormitory System Improvement
System Improvements Const Fund
1816 Hilton Coliseum- 97,133 Const 80 5/11 8/11 8/11 10/11 Latterell Latterell Black Athletic Department
Concession Stand
Upgrades
1816 Hilton Coliseum- 117,867 Const 3 5/11 Small Project 09/23/11 10/11 11/11 Latterell Latterell Black Heartland Athletic Department
Concession Stand Finishes, Inc.
Upgrades
1710 Hilton Coliseum- 1,110,000 Post 5/10 Formal Bid 9/9/10 9/10 1/11 Goss Catus Compton J-Corp Bergstrom Athletics Capital Projects Fund
Remodeling for Volleyball Const Construction
Offices and Club Section
(Club Section)
1710 Hilton Coliseum- Complete 5/10 Small Project 06/24/10 06/10 12/10 Latterell Latterell Henneman Tri-City Electric Athletics Capital Projects Fund
Remodeling for Volleyball Engineering & FP&M Company of Iowa
Offices and Club Section -
Volleyball Offices
1212 Horticulture-Greenhouse 4,590,000 Post 6/06 5/07 Formal Bid 5/6/10 5/10 6/11 Huss Burnett Fisher Baldwin White Story Construction Agriculture Experiment Station
Replacement-2006 Const Architects University Funds
(formerly Horticulture Private Giving
Greenhouse Replacement) Inc fr Treas Temp Invstmts
Page 4 of 11
1789 Iowa Braille and Sight 170,000 Const 99 1/11 2/11 Formal Bid 03/29/11 4/11 6/11 Holzwarth Catus Compton FP&M Renaissance Iowa Braille and Sight Saving
Saving School-Old Roofing, Inc. School
Hospital-Roof
Replacement
1791 Iowa Braille and Sight 380,000 Const 99 1/11 3/11 Formal Bid 05/03/11 5/11 8/11 Holzwarth Catus Compton FP&M Porter & Porter Iowa Braille and Sight Saving
Saving School-Natatorium Const. LLC School
Improvements
1840 Iowa Braille and Sight * Bid 8/11 Small Project 10/11 10/11 12/11 Holzwarth Catus Black HR Green, Inc.
Saving School-Storm
Damage 2011-Roof
Repairs
1840 Iowa Braille and Sight Const 5 8/11 Formal Bid 9/15/11 10/11 12/11 Holzwarth Catus Compton HR Green, Inc. Porter & Porter
Saving School-Storm Const. LLC
Damage 2011-Building
Repairs
1840 Iowa Braille and Sight Const 50 10/11 11/11 Holzwarth Catus Compton HR Green, Inc.
Saving School-Storm
Damage 2011-Old Main
Temporary Roof
1840 Iowa Braille and Sight Complete Holzwarth Compton HR Green, Inc.
Saving School-Storm
Damage 2011-Old Main
Feasibility Study
1768 Iowa School for the Deaf- 403,000 Const 1 9/10 Formal Bid 8/18/11 Graden Stephenson Fisher Farris Engineering Ray Martin Iowa Office of Energy
Elementary School- Cx-Alvine Company of Independence (ARRA)
Replace Chiller Engineering Omaha
Iowa School for the Deaf
1563 Iowa School for the Deaf- 353,000 Const 80 3/09 Formal Bid 6/30/11 7/11 10/11 Graden Stephenson Compton Farris Engineering Capital City Boiler Iowa School for the Deaf
Replace Boiler #3 & Machine Works, Iowa Office of Energy
Inc. Independence (ARRA)
1846 Iowa School for the Deaf- * Graden Stephenson Murphy
Storm Damage 2011
1783 Iowa State Center Elevated 1,000,000 Design- 50 12/10 Morton Not Assigned Facilities Overhead Use
Walkway Repairs CD Allowance
Jack Trice Stadium 5,000,000 Close Out 10/10 4/11 8/11 Catus Daktronics, Inc.
Scoreboard & Sound
System
1845 Knoll Modifications 182,000 Const 9/11 10/11 12/11 Van Wyk Dobson FP&M Boone Private Giving
Construction
1845 Knoll Modifications 98,000 Bid 9/11 Small Project 10/11/11 10/11 12/11 Dobson Dobson Black FP&M Private Giving
(Exterior)
1845 Knoll Modifications 95,000 Bid 9/11 Small Project 10/11 11/11 12/11 Dobson Dobson Black FP&M Private Giving
(Bathrooms and 1st/2nd
Floor)
1485 Lagomarcino Hall-Repair 200,000 Const 85 6/08 7/08 11/11 Rentschler Rentschler University Funds
Water Damage and
Mitigate Water Problems
1851 Larch Hall-Fire 3,760,440 Pre 9/11 Grief Not Assigned Murphy Dormitory System Improvement
Suppression Installation Design Fund
and Exterior Improvements
1574 MacKay Hall-Remodel 130,000 On Hold 4/09 Rentschler Rentschler University Funds
Room 0118
1674 MacKay Hall-Room 117 250,000 Close Out 1/10 Formal Bid 1/20/11 5/11 8/11 Dixon-Fox Burnett Compton Haila Story Construction Def Maint/Academic
Install Sprinklers Bldg Rev Bonds
1611 Morrill Hall-Acoustic and 80,000 Post 6/09 Small Project 12/07/09 5/10 6/10 Dixon-Fox Catus RDG Planning & Olympic University Funds
Lighting Modifications - Const Design Companies, Inc.
Acoustical Treatment
1778 Parking Lot 59D 409,000 Close Out 10/10 Formal Bid 03/31/11 5/11 6/11 Solberg Parsons Fisher Snyder & Associates Manatt's Inc. Parking Systems
Rehabilitation (Beyer Ct.) Dormitory System Improvement
Fund
1784 Parks Library-Remodel 171,200 Close Out 98 12/10 Small Project 07/14/11 07/11 09/11 Dobson Dobson Black Lientz Construction Private Giving
Room 401
1834 Physics Hall-Remodel 150,000 Design- 30 6/11 6/12 Latterell University Funds
Rooms 37 and 38 CD
1454 Poultry Farm-Layer * On Hold 5/08 Huss
Research Facility
Page 5 of 11
1453 Recreation Facilities 2,400,000 Complete 5/08 3/09 3/09 Formal Bid 5/5/09 5/09 2/10 Holzwarth Ebel RDG Planning & HPC, L.L.C. Bond Proceeds
Expansion and Renovation- Design
Lied RAC A/C & Ventilation
Improvements
1453 Recreation Facilities 52,000 Complete 05/08 03/09 07/10 Small Project 07/23/10 08/10 6/11 Holzwarth Ebel Black RDG Planning & Jaspering Electric Bond Proceeds
Expansion and Renovation- Design
Lied RAC A/C & Ventilation
Improvements-Fire Alarm
Upgrade
1453 Recreation Facilities 1,850,000 Close Out 5/08 3/09 6/10 Formal Bid 12/16/10 3/11 8/11 Holzwarth Fields Compton FP&M Central States Bond Proceeds
Expansion and Renovation- Roofing
Lied Roof Replacement
1453 Recreation Facilities 4,000,000 Complete 5/08 3/09 5/09 Formal Bid 6/30/09 7/09 9/10 Holzwarth Ebel Compton RDG Planning & Edge Commercial Bond Proceeds
Expansion and Renovation- Design
State Gym Exterior and
Beyer Hall Remodeling
1453 Recreation Facilities 37,950,000 Const 90 5/08 3/09 8/09 Formal Bid 11/12/09 12/09 8/11 Holzwarth Ebel Compton RDG Planning & Shaw-Lundquist Bond Proceeds
Expansion and Renovation- Design Associates, Inc.
State Gym Renovation and
West Addition
1782 Recreation Fields 752,000 Const 0 11/30 Formal Bid 9/22/11 9/11 5/12 Strawhacker Burnett Compton Snyder & Associates Mid-America Golf Inc fr Treas Temp Investments
Improvements 2010 and Landscape, Athletic Department
Inc. Recreation Services
1708 Reiman Gardens-Repair 165,000 Const 80 5/10 7/10 12/11 Huss Huss University Funds
and Maintenance FY10
1708 Reiman Gardens-Repair 85,000 Complete 5/10 Small Project 11/15/10 1/11 2/11 Huss Huss FP&M United University Funds
and Maintenance FY10- Greenhouse
Shade Curtain Systems
Replacement
1708 Reiman Gardens-Repair 20,000 Complete 05/10 Small Project 03/18/11 03/11 04/11 Huss Huss FP&M Stony Creek University Funds
and Maintenance FY10- Landscapes
Garden Post
Reinforcement
1645 Roy J. Carver Co-Lab-Lab 115,000 Const 15 9/09 12/11 Huss Huss Private Giving
Remodeling 2009-Lab
Airflow Reduction
1484 Science Hall- 100,000 Const 85 6/08 6/10 9/11 Reedholm University Funds
Repair/Replace Fume
Hoods
1606 Sloss House-Deferred 141,000 Const 85 6/09 9/09 12/11 Rentschler University Funds
Maintenance FY10
1606 Sloss House-Deferred Complete 6/09 Small Project 05/10 07/10 10/10 Rentschler Dobson Black FP&M DeJear
Maintenance FY10-Roof & Enterprises, LLC
Gutter Repairs
1843 Student Innovation Center- 200,000 DP 8/11 Morton University Funds
Feasibility Study Selection
1770 Sweeney Hall-Remodel for 2,204,995 Const 15 9/10 3/11 Formal Bid 6/02/11 8/11 7/13 Goss Fields Compton Baldwin White CPMI Construction National Science Foundation
BioMaP Laboratories Architects University Funds
Private Giving
1814 Sweeney Hall-Remodel 133,000 Close Out 5/11 6/11 8/11 Latterell FP&M University Funds
Rooms 1123, 1129, 1133
& 3149
1516 Telecommunications-Inside 1,500,000 Complete 8/08 Formal Bid 12/18/08 1/09 8/09 Larabee Fields Alvine Engineering Tri-City Electric Telecommunications
Plant System Upgrade- Company of Iowa Improvement & Extension Fund
Phase 7A (Helser, Larch,
Willow, Maple, Martin,
Eaton, Buchanan)
Page 6 of 11
1516 Telecommunications-Inside 2,000,000 Close Out 8/08 Formal Bid 4/21/09 5/09 12/10 Larabee Fields Fisher Alvine Engineering Tri-City Electric Telecommunications
Plant System Upgrade- Company of Iowa Improvement & Extension Fund
Phase 7B (All other
Residence Facilities)
1808 Telecommunications-Inside 1,810,000 Bid 3/11 Formal Bid 11/17/11 12/11 12/12 Larabee Parsons Fisher Alvine Engineering Telecommunications
Plant System Upgrade- Improvement & Extension Fund
Phase 8
1808 Telecommunications-Inside 40,000 Const 98 3/11 Small Project 06/06/11 06/11 07/11 Larabee Larabee Fisher Alvine Engineering Tri-City Electric Telecommunications
Plant System Upgrade- Company of Iowa Improvement & Extension Fund
Phase 8-Howe Hall
1808 Telecommunications-Inside 80,000 Const 95 3/11 Small Project 06/16/11 06/11 08/11 Larabee Larabee Fisher Alvine Engineering Communication Telecommunications
Plant System Upgrade- Innovators, Inc Improvement & Extension Fund
Phase 8-Outside Plant
Improvements
1792 Thielen Student Health 595,000 Const 90 1/11 Formal Bid 4/19/11 5/11 10/11 Harvey Ebel Compton Rohrbach Associates Boone Student Health Center
Center-Second Floor Construction
Remodeling
1823 Town Engineering- 100,000 Const 10 5/11 7/11 12/11 Latterell University Funds
Remodel Room 134 Civil, Construction, &
Environmental Engineering
1722 Town Engineering Building- 400,000 Const 99 6/10 Formal Bid 10/28/10 11/10 10/11 Grief Burnett Fisher Henneman Manning-Seivert University Funds
Replace Mains, Piping & Engineering Mechanical Contr
Equipment
1741 Troxel Hall (East Campus 10,114,500 Design- 99 8/10 4/11 7/11 Formal Bid 12/15/11 1/12 3/13 Grief Parsons Compton BNIM
Auditorium) CD
1741 Troxel Hall (East Campus 885,500 Const 1 4/11 6/11 Formal Bid 9/15/11 10/11 12/11 Grief Parsons Compton BNIM HPC, L.L.C.
Auditorium) Iss#1 -Site
Demo, Utilities, Grading,
NPDES
1797 University Village-Window 275,000 Const 35 2/11 Quote 5/11 8/11 DOR Dormitory System Improvement
Replacement FY11 Fund
1771 Utilities-Applied Science 1,500,000 Const 0 9/10 Formal Bid 9/13/11 9/11 12/11 Witt Fisher Energy Services Grp Baker Mechanical, Iowa Office of Energy
Center Chiller Inc. dba Baker Independence (ARRA)
Improvements Group Utility Repair Funds
1771 Utilities-Applied Science 100,000 Const 0 9/10 Small Project 09/20/11 9/11 11/11 Witt Wanderscheid Black Energy Services Grp The Retrofit Iowa Office of Energy
Center Chiller Companies Independence (ARRA)
Improvements - Lighting Utility Repair Funds
1821 Utilities-General Services 67,000 Const 5/11 Small Project 10/04/11 10/11 12/11 Larabee Larabee Black KRS Engineering Stenberg Concrete Utility Repair Funds
Building-Electrical System Utility Infrastructure
Improvements-Phase 1
1821 Utilities-General Services 438,000 Design- 75 5/11 Formal Bid 11/29/11 12/11 8/12 Larabee Larabee Murphy KRS Engineering Utility Repair Funds
Building-Electrical System CD Utility Infrastructure
Improvements-Phase 2
1384 Utilities-High Voltage 575,000 Complete 9/07 Formal Bid 4/29/08 5/08 12/08 Larabee Larabee P&E Engineering Tri-City Electric Utility Repair Funds
System Improvements- Company of Iowa
Switch 14 and 15
Replacement
1384 Utilities-High Voltage 120,000 Const 20 9/07 5/09 12/11 Larabee Larabee Fisher Utility Repair Funds
System Improvements-
Switch 14 and 15
Replacement (Phase 2)
1841 Utilities-Power Plant-2012 150,000 Const 1 7/11 12/11 3/12 Wanderscheid Utility Repair Funds
Chiller #2 Turbine
Overhaul
1842 Utilities-Power Plant-2012 400,000 Const 1 7/11 1/12 3/12 Wanderscheid Utility Repair Funds
Turbine Generator #6
Overhaul
1743 Utilities-Veterinary 5,700,000 Const 30 8/10 Formal Bid 6/2/11 7/11 2/12 Witt Wanderscheid Compton Farris Engineering Woodruff Iowa Office of Energy
Medicine Steam Supply Construction Independence (ARRA)
Improvements - Vet Med Utility Repair Funds
1743 Utilities-Veterinary 1,400,000 Close Out 8/10 Formal Bid 4/28/11 5/11 8/11 Witt Wanderscheid Compton Farris Engineering Baker Mechanical, Iowa Office of Energy
Medicine Steam Supply Inc. Independence (ARRA)
Improvements - Utility Repair Funds
Jacobson/Olsen
1819 Various Building 200,000 Pre 5/11 Thompson University Funds
Automation Improvements Design
FY12
1813 Various Building System 225,000 Pre 20 4/11 6/12 Currie University Funds
Improvements FY12 Design
Page 7 of 11
1620 Various Buildings- 249,000 Const 95 6/09 12/09 6/12 Rentschler University Funds
Classroom Remodels
FY10
1830 Various Buildings- 200,000 Pre 20 5/11 Currie University Funds
Fluorescent Lighting Design
Replacement
1590 Various Buildings- 79,549 Design- 98 5/09 Small Project 6/11 Dixon-Fox FP&M Design University Funds
Handicap Accessibility CD Services
FY09
1590 Various Buildings- 30,000 Complete 05/09 Small Project 04/11 05/11 06/11 Dixon-Fox Dobson Black FP&M Design Apex Construction University Funds
Handicap Accessibility Services
FY09-Sweeney Hall Room
R1224
1718 Various Buildings-Install 69,000 Const 85 5/10 Small Project 05/16/11 05/11 9/11 Rentschler Dobson Black FP&M Design Story Construction American Recovery &
Accessible Doors, Ramp & Services Reinvestment Act of 2009
Lift - Memorial Union (ARRA)
1720 Various Buildings- 150,000 Design- 80 6/10 6/11 12/11 Rentschler University Funds
Restroom Improvements CD
1608 Various Buildings-Roof 100,000 Const 90 6/09 12/10 6/11 Currie University Funds
Repairs FY10
1717 Various Improvements 150,664 Const 95 5/20 6/11 Currie University Funds
FY11
1591 Various Improvements- 240,000 Const 90 6/09 3/10 6/10 Currie University Funds
FY10
1591 Various Improvements- 80,000 Complete 6/09 Small Project 10/9/09 03/10 05/10 Huss Dobson FP&M Jensen Builders University Funds
FY10-Storage Shed Re-
Skin
1380 Various-Deferred 2,089,942 Const 84 9/07 6/11 Van Wyk Van Wyk Miller Deferred Maintenance/
Maintenance 2007 Academic Bldg Rev Bonds
1380 Various-Deferred 65,000 Complete 9/07 Small Project 4/22/08 5/08 5/09 A&EDS Dobson FP&M Quality Cleaning, Deferred Maintenance/
Maintenance 2007- Inc., dba QC Academic Bldg Rev Bonds
Dog Procurement Building- Companies
Install Acrylic Flooring
1380 Various-Deferred 40,000 Complete 9/07 Small Project 4/30/08 5/08 2/09 Rentschler FP&M Swanson Glass Deferred Maintenance/
Maintenance 2007- Academic Bldg Rev Bonds
Forker Building-Replace
Pool Room Windows
1380 Various-Deferred 70,000 Complete Small Project 7/8/08 10/08 11/08 A&EDS Dobson FP&M Central States Deferred Maintenance/
Maintenance 2007- Roofing Academic Bldg Rev Bonds
Gilman Hall-Replace Chem
Stores Roof
1380 Various-Deferred 80,000 Complete Small Project 3/13/09 4/09 9/10 A&EDS Dobson FP&M Van Maanen Deferred Maintenance/
Maintenance 2007-Install Electric Academic Bldg Rev Bonds
Fire Alarm Strobes
1380 Various-Deferred 80,000 Complete Small Project 11/7/08 11/08 3/09 A&EDS Dobson FP&M Bergstrom Deferred Maintenance/
Maintenance 2007- Construction Academic Bldg Rev Bonds
Replace Exterior Doors-
Iowa State Center
1723 Various-Elevator Code 325,000 Design- 80 6/10 Dixon-Fox Compton Lerch-Bates University Funds
Compliance-FY11 CD
1721 Various-Energy 200,000 Pre 6/10 Reedholm University Funds
Conservation & Lighting Design
Improvements
1481 Various-FY09 Dump Your 50,000 6/08 3/09 6/12 Van Wyk University Funds
Junk Program
1547 Various-Health and Life 90,000 Close Out 1/09 1/09 12/11 Van Wyk University Funds
Safety-FY09
1719 Various-Replace Restroom 245,000 Pre 10 6/10 Dobson Dobson University Funds
Fixtures Design
1637 VMRI Building #40- 730,000 Const 95 8/09 Formal Bid 7/20/10 8/10 11/11 Graden L Brown Compton HPC, L.L.C. Facil Overhead Use Allowance
Renovate East Wing to University Funds
ABSL3 Laboratory
1850 Wallace Hall-Install Fire 1,820,000 Design- 60 9/11 Formal Bid 1/19/12 3/12 8/12 Harvey Parsons Fisher HR Green Dormitory System Improvement
Sprinkler System CD Fund
1824 Wilson Hall-Improvements 810,000 Close Out 5/11 Formal Bid 6/14/11 6/11 8/11 Graden Parsons Murphy Haila Architecture, Bergstrom Dormitory System Improvement
2011-Phase 1 (Restrooms) Structure, Planning, Construction Fund
Ltd.
1824 Wilson Hall-Improvements Design- 99 Formal Bid 11/11 11/11 3/12 Graden Murphy
2011-Phase 4 (W/W CD
Commons Kitchenettes)
1724 Zaffarano Physics Addition- 275,000 Close Out 6/10 Formal Bid 1/27/11 2/11 9/11 Dixon-Fox Fields Fisher FP&M Comfort Systems University Funds
Replace Various Fan Coil (Reedholm) USA Midwest Deferred Maintenance/
Units-FY11 Academic Bldg Rev Bonds
Page 8 of 11
164 Projects
TOTAL PROJECT COSTS $422,602,545
* Budget not yet approved by Board
Projects added since the last CPDR meeting
Page 9 of 11
DP Selection
Pre Design
Design-SD
Design-DD
Design-CD
Bid
Quote
Const
Close Out
Post Const
Complete
On Hold
Formal Bid
Quote
Small Project