Implementation Methodology of the Integrated Public Financial Management Systems in Europe and Central Asia

Document Sample
Implementation Methodology of the Integrated Public Financial Management Systems in Europe and Central Asia
Implementation Methodology of the

Integrated Public Financial Management Systems

in

Europe and Central Asia







Cem Dener









Washington, DC

May 2007

PFMS Implementation Methodology









Presentation

• Approach

• PFMS Implementation Methodology

• Integrated PFMS Development Phases

• ECA Treasury/PFMS Projects (updated)

• Treasury/PFMS Maturity Framework

• Challenges









May 2007 ECA Treasury / PFMS Projects 1

PFMS Implementation Methodology









Approach

1. Identify PFM reform needs ( What? Why? )

Assess Readiness + Define Strategy  Conceptual Design

2. Develop necessary solutions ( How? Where? When? )

Functionality + Tech Architecture + Specs  System Design

3. Project management ( Who? )

Implement + Monitor + Evaluate + Manage  Integrated PFMS







May 2007 ECA Treasury / PFMS Projects 2

PFMS Implementation Methodology





1. Identify PFM reform needs ( What? Why? )

 Assess existing capacity and practices (PEFA, PFM questionnaire …)

 Development of the PFM Reform Strategy (if not available)

 Development of the “Conceptual Design”

• functional review of PFM organizations

• recommendations for improving the institutional capacity

• definition of PFMS functional modules (processes + info flows)

• necessary procedural and organizational changes

 Advisory support on specific PFM issues

 Coordination with donors and other sector projects

 Assistance in PFM capacity building (review docs+share knowledge)

May 2007 ECA Treasury / PFMS Projects 3

PFMS Implementation Methodology





2. Develop necessary solutions ( How? Where? When? )

 Assessment of existing ICT capacity (skills, resources, CobiT* …)

 Development of ICT/e-Gov Strategy (if not available)

 Development of “System Design”

• PFMS functional requirements (incl. records management)

• technology architecture (web-based systems)

• implementation methodology ( hybrid**: COTS + CDSW )

 Development of “Technical Specifications” (ICB tech requirements)

 Coordination with e-Gov initiatives and other ICT projects

 Assistance in technical capacity building and evaluation of design

* CobiT … Control objectives for information and related Technology

** Hybrid … COTS : customized Commercial Off-The-Shelf software) + CDSW (Custom Developed Software)



May 2007 ECA Treasury / PFMS Projects 4

PFMS Implementation Methodology





3. Project Management ( Who? )

 Form a Project Management Group (PMG) within client org (MoF)

 Assistance in funding preparation activities (Trust Funds …)

 Promoting “Country Systems”

• administration & coordination of investment projects

• financial management [ FM ], accounting, reporting, auditing

• procurement [ PRC ] (if country standards are acceptable)

 Assistance in capacity building for FM and PRC, and in the

preparation / review of ToRs, ICB documents, RFPs.

 Monitoring and Evaluation tools (surveys, maturity framework …)

 Focus on Capacity Building and Change Management (NLP*)

* NLP : Neuro Linguistic Programming

May 2007 ECA Treasury / PFMS Projects 5

Integrated PFMS Development Phases

Integrated PFMS Development : years 0 1 2 3 4 5 6 7 8 9 10



1. Identify PFM reform needs

Assess existing capacity & practices

Develop PFM Reform Strategy (if N/A)

Advisory support for PFM reforms

Conceptual Design

Coordination with donors / other projects

Assistance in PFM capacity building



2. Develop necessary solutions Preparation

Assess existing ICT skills and resources

Develop ICT/e-Gov Strategy (if N/A)

System Design

Technical Specifications [ ICB docs ]

Coordination with e-Gov / other ICT prj

Assistance in technical capacity building



3. Project management Approval

Project Management Group (PMG)

Administration of Trust Funds (if any) Implementation

Procurement of ICT solutions [ ICB ] PFMS take off

Fly

Establishment of a countrywide network

Warranty Solo

System implementation, test, acceptance

Support

Monitoring & Evaluation

and

Capacity building & Change Management Maintenance



May 2007 ECA Treasury / PFMS Projects 6

ECA Treasury/PFMS Projects

ECA Treasury / PFMS Projects 1995 2000 2005 May’07 2010 2015



AH Avg. completion time 7.1 yrs

Hungary P043446 PFMP (TS) 1996 Avg. implementation 5.7 yrs

Kazakhstan P037960 TMP (TS) 1994 AH



Türkiye* P035759 say2000i (TS+) 1927 CD AH



Ukraine P049174 TSP (TS) 1996 AH



Albania P069939 PARP (TS) 1993 DR CD



Armenia** P081668 IDF (GFMIS) 1996 CD

Completed

Slovak Rep** P069864 PFMP (TS) 1992 DR





Russia P064508 TDP (TS) 1992 AH AH, CD

AH CD Avg. compl. 7.2 yrs

Azerbaijan P066100 TIMS (TS) 1998 Avg. impl. 5.1 yrs

Kyrgyz Rep P071063 TMIS (TS) 1994 DR CD



Moldova P082916 PFMP (PFMS) 1993 CD

In Progress

Georgia P063081 FMIS (PFMS) 1998 CD





Ukraine P090389 PFMP (PFMS) 1996 Avg. compl. 5.5 yrs CD

Avg. implem. 4.1 yrs Preparation

Tajikistan P099840 PFMP (PFMS) 1997 CD





Turkmenistan P034092 IBTA (TS) 1992 DR



Croatia P050718 PFMP (TS) 1992 AH

Dropped

Uzbekistan P070084 PFMRP (TS) 1999 DR CD



Treasury established   Google  Blogs  Skype  YouTube

Prep.>Appr.>Effect.

 Web TV  Wireless

AH Ali Hashim eGov

Implementation  World Wide Web eGov recovery

DR Dominique de Roquefeuil projects stall

Browsers

Extension CD Cem Dener Java

eEurope

* The Bank funded the ICT consultant/prj coord only.

** The Bank funded the TA activities only. eGov starts



May 2007 ECA Treasury / PFMS Projects 7

Monitoring and Evaluation Tools





Monitoring and Evaluation of Treasury/PFMS Projects

 Updates on key project data and sharing progress/issues with borrowers

[ ECA_Treasury+PFMS_data.xls ]

 Summary of Treasury/PFMS project implementation in ECA

[ ECA_Treasury+PFMS_projects.xls ]

 The Maturity Framework (MF) for Treasury / PFMS development process

[ www.worldbank.org/pempal ] link to Treasury MF Tool and user guide

[ www.pempal.org/pfmstool ] location of MF tool

 PEM-PAL Discussion Groups [ www.pempal.org/discussions ] > Treasury/MoF

 PEM-PAL Blog [ www.pempal.org/blogs ] > External

 Logbook of Treasury/PFMS projects (internal)

Other useful information

 Budget Classification and Chart of Accounts structures in selected countries

 Summary of Treasury Single Account operations in selected countries





May 2007 ECA Treasury / PFMS Projects 8

Maturity Framework for Treasury/PFMS Development





Maturity Framework for Treasury/PFMS projects

 A Community of Practice for Treasury Managers was established in June 2006

as part of the Public Expenditure Management-Peer Assisted Learning (PEM-

PAL) program ( www.worldbank.org/pempal ) activities.



 The Maturity Framework (MF) for the Treasury / PFMS development process

was developed during the "PEM-PAL workshop for Treasury Officials" held in

Ljubljana, Slovenia from June 26-27, 2006.



 The Maturity Framework was designed to enhance learning and knowledge

sharing among Heads of Treasury and related key officials in public

expenditure management from 14 ECA countries.



 The Bank prepared a web site to publish the results and to facilitate

interactive monitoring and management of proposed indicators

( www.pempal.org/pfmstool ).



May 2007 ECA Treasury / PFMS Projects 9

Treasury/PFMS Maturity Framework



Effectiveness

Maintenance

7 and Support

5 Implementation

 Budget funds

 System development & integration  Technical capacity

 Full scale testing and rollout  System administration

 Training and change management  Maintenance



4 Procurement

 Large scale ICT systems 18 – 36 Time

 Technical Assistance and Training

months





PFMS Design 3 9 – 18

months

 Definition of system functionality

 Detailed technical requirements Monitoring &

Evaluation

6



Preparation 2

 Monitoring mechanisms

 Project mgmt capacity



 Legal and institutional frameworks

 Budget coverage

 Treasury Single Account (TSA) 9 – 18

months Maturity Framework

for Treasury/PFMS projects

Readiness 1 www.pempal.org/pfmstool

interactive monitoring and management of MF indicators

 PFM reform strategy

 Institutional capacity

 Countrywide network infrastructure

Resources

May 2007 ECA Treasury / PFMS Projects 10

ECA Treasury/PFMS Development Indicators









ECA - Treasury/PFMS Development Indicators - Estimates





100.0%

90.0%



80.0%



70.0% Maintenance and Support

Monitoring & Evaluation

60.0%

Implementation

50.0% Procurement

40.0% PFMS Design

Preparation

30.0%

Readiness

20.0%

10.0%

0.0%

ALB ARM AZE BIH GEO KAZ KOS KYR MOL RUS SER MON TAJ TUR UKR UZB









May 2007 ECA Treasury / PFMS Projects 11

ECA Treasury/PFMS Development Status



ECA - Treasury / PFMS Implementation – Feb 2007

100%



Completed

90% TUR



KAZ

ALB

80%

In progress

RUS

70% AZE

MOL

SER

KYR

MON

60% UZB

Evaluation









UKR

BIH

GEO

50%

Started ARM

TAJ

40% KOS





30%





20%





10%





0%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Estimation

May 2007 ECA Treasury / PFMS Projects 12

Challenges in Treasury/PFMS Projects









PFM Challenges

 Existence of a committed leader and a dedicated team

 Allow enough time for the assessment of readiness, the PFM Strategy

and the development of conceptual design during preparation phase

 Coordinate with donors and other sector projects









May 2007 ECA Treasury / PFMS Projects 13

Challenges in Treasury/PFMS Projects







ICT Challenges

 Recruitment and sustainability of IT specialists in public sector



 Existence of a reliable countrywide network infrastructure



 Realistic ICT cost estimates to reduce procurement risks



 Web based applications & open systems to reduce cost and duration of



implementation



 Proper requirements for Records Management, Information/System



Security and Digital Signature in design



 Coordination with e-Gov activities (interoperability & resource sharing)





May 2007 ECA Treasury / PFMS Projects 14

Challenges in Treasury/PFMS Projects









PRJ Challenges

 Establish the Project Management Group at early stages

 Promote country systems

 Reduce the number of procurement packages

(ideally 2 separate independent ICB packages for all ICT solutions)

 Focus on capacity building and change management activities (NLP)









May 2007 ECA Treasury / PFMS Projects 15

Implementation Methodology of the

Integrated Public Financial Management Systems

in

Europe and Central Asia









Thank You





Washington, DC

May 2007


Related docs
Other docs by worldbank
March mini CPPR table
Views: 22  |  Downloads: 0
William McCormick USAID Ru
Views: 24  |  Downloads: 0
Estrategia de Alianza con el Pas
Views: 66  |  Downloads: 0
List of goals and targets
Views: 17  |  Downloads: 0
World Bank Global Issues Seminar Series
Views: 37  |  Downloads: 0
Making Budget Reform Work Better in Armenia
Views: 37  |  Downloads: 0
AMAC The Case for Local Capacity Building
Views: 16  |  Downloads: 0
Special focus Reducing rural poverty
Views: 19  |  Downloads: 0
JS OECD Financing water 0312 v3
Views: 18  |  Downloads: 1
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!