Embed
Email

24 Dec 2010 Bombay to Udaipur 2.0

Document Sample

Shared by: liamei12345
Categories
Tags
Stats
views:
0
posted:
10/21/2011
language:
English
pages:
2
Bombay to Udaipur



Date : 24th December, 2010

Persons : One

Odo reading : 19679

Trip (computer) reading : 0.0

Fuel tank - distance to empty : 810 kms

Outside temperature at start : 19.5 Celsius* * Temperature in pics # 1 & 2 shows the reading in the basement which was higher than the reading just outside my building

Tyre pressure : 32 psi on all five (four plus one) tyres



Time

S. No. Sector / Point Trip reading (24 h) Remarks

1 Start from home, JVLR 0.0 6.40 Delayed start, by 40 minutes

2 Dahisar TP on WEH 14.7 6.58 Rs 30/- [Time stamp on toll receipt is 6.40:21 am]. Heavy truck traffic.



4 Khaniwade TP (Dahisar- Surat leg) 47.3 7.42 Rs 47/- [Time stamp on toll receipt is 7.44 am]. Heavy fog about 15 kms before Khaniwade TP, heavy truck traffic.





Breakfast ( One idli sambar, one medu wada & 1 tea=Rs 85/-) Time stamp 8.22 am. Temp 15 C.Restarted at 8.42, was stuck at

5 Breakfast at Kamat's Hotel on LHS(NH8) 71.6 8.05-8.42 Kamat's due to traffic jam at 8.55. Accidents ahead-possibly a bike thrown clear in the stream from the opposite side, going to Bomb



6 Charoti TP (Dahisar- Surat leg) ~ 97.4 9.43 Rs 42/- [Time stamp on toll receipt is 9.42 am]. Fog : visibility about 15 m.



7 Boriach TP, Navsari ( Dahisar-Surat leg) Rs 41/-[Time stamp on toll receipt is 11.59 am] Fog : visibility about 40 m.



8 240.2 12.20 Hoarding shows Surat 40 kms away, heavy and chaotic traffic continues



9 Choryasi TP ( Surat -Bharuch leg) Rs 50/- [Time stamp on toll receipt is 1.14:07 pm]. Fog cleared.



10 Bhagwada TP (Dahisar - Surat leg) Rs 47/- No time stamp on receipt







Rs 16/- [Time stamp on toll receipt is 14.00:14 pm]. Both lanes toward Baroda blocked with truck & taxi traffic; took shoulder-

11 Bharuch, Zadeshwar Chowk TP( Narmada bridge section) leftmost, squeezed past hulking multi-axled semi-articulated trucks, friendly cop waved private traffic on the shoulder through!





Refuelled at BPCL COCO on LHS, opp a gurdwara, four kms after the Narmada bridge in Bharuch ( 22.84 ltrs, DTE 780 kms). Also tasty

12 Refuel at BPCL COCO+AG Bharuch 336.6 14.12 - 14.52 dhaba lunch ( moong & chana dal, rotis & lassi, followed afterwards by tea-Rs 52/-)





Rs 65/- [Time stamp on toll receipt is 15.12 pm]. Messaged lightining95 in Baroda that I unfortunately couldn't meet him as I was

13 Karjan TP ( Bharuch - Vadodara section) running late; felt bad since he had been concerned about my slow progress till then. But NE1 beckoned to press on at full throttle!



14 NE1 TP ( Vadodara - Ahmedabad leg) Rs 81/- [Time stamp on toll receipt is 15.58 pm]



LT for Rajkot [20 kms after the Reliance PP]. Messaged hvk - 16.45 pm, exited NE1for Himmatnagar, 83 kms in approx 47 mins.

15 TL from NE1 for Rajkot, Himmatnagar & Udaipur Touched 175 kmph, overtook an A6, a Jetta, a Vento and two Altises.



16 Ramol TP ( Ahmedabad Ring Road) Rs 19/- [Time stamp on toll receipt is 16.58:14 pm], took a small ( ~ 7 min) break here.



17 Chillodamoda roundabout -TR for Himmatnagar-Udaipur Undivided, narrow, rough surfaced two lane NH8, overtaking difficult for about 10 kms.





Rs 30/- [Time stamp on toll receipt is 17.49:27 pm]. One of the best stretches- surface, signage, limited access to the highway; the

only downside is that private jeep-taxis do not make way for faster traffic from the rightmost lane, so you have to swerve to the

18 Kathpur TP left/middle lane to overtake -irritating. Did 120-130km kmph on some stretches.



Vegetable sandwiches, tea. Nature break. Windscreen & ORVM cleaning. Was dark by now. Overtook a truck with a separate six axled

19 Tea break at Hotel Landmark, Himmatnagar (TR for Udaipur) 585.8 18.10- 18.50 trolley carrying what looked like a mammoth turbine-very difficult for any car to overtake on the four lane divided NH8 highway

20 Vantada TP Rs 25/- [Time stamp on toll receipt is 19.30:43 pm]

21 Ratanpur/Kherwara TP Rs 20/-. No time stamp on receipt

22 Paduna TP Rs 35/- [Time stamp on toll receipt is 20.37:37 pm]





Rolled in in Rajdarshan (0294-2526601) at 21.51. Had entered Udaipur at 21.00, searched and located Mor & Sons, BPCL PP for

23 Udaipur-Hathipol - Hotel Rajdarshan 765.9 21.51 refuelling tomorrow, re-confirmed directions for hotel and so lost some time. Temp 17.5 C.

Legend

LHS; RHS Left hand side; Right hand side

TL Turn left

TR Turn right

TP Toll plaza

Ch Chowraha

NH 8/NE 1 National Highway 8/National Expressway 1

SH xy State Highway no. xy

BP By pass

NR Not recorded

BPCL COCO BPCL COCO

BPCL COCO +AG BPCL COCO plus Apna Ghar dhaba

BPCL PFS BPCL Pure For Sure (non COCO)

IOC COCO Indian Oil PP COCO

IOC PP Indian Oil PP non COCO

CC Credit card

PCP Police check post

FO Flyover

L Road on the left goes to kms

R Road on the right goes to kms

S Road straight ahead goes to kms

RLX Railway level crossing

PP -xyz Other petrol pumps

PP 24 -xyz Petrol pump open 24 hours

Rest Restaurant

Db Dhaba

Lav Lavatory/Toilet

ATM -xyz ATM with bank's name

NS No signage

RQ 1 Highest road quality,super smooth

RQ 2 Good road, average speed 50-70 kmph approx.

RQ 3 Poor road, bad surfacing, average speed 20 kmph

TC 1 Light traffic conditions, orderly, predictable

TC 2 Moderate traffic with chaotic conditions, drive at moderate speeds with caution

TC 3 Heavy traffic,drive with extreme caution

0 Cold; temp range 0-10

11 Pleasant; Temp range 11-20

21 Warm; Temp range 21 plus

Fz Fog with near zero visibility

F25 Fog with visibility upto 25-35 feet

F75 Fog with visibility upto 75 feet

Cl Clear visibility

UPH Uphill

DWH Downhill

TWS Twisty road (with curves)

JVLR Jogeshwari-Vikhroli Link Road


Related docs
Other docs by liamei12345
T14_Op_Exp_Mode_Class_Bus
Views: 0  |  Downloads: 0
Diagnostic principle_ rule in database
Views: 0  |  Downloads: 0
daet_result
Views: 0  |  Downloads: 0
Samplevoucher
Views: 0  |  Downloads: 0
TOMMY12
Views: 0  |  Downloads: 0
Copy_of_2010-2011School_Calendar
Views: 0  |  Downloads: 0
2011_Kits_Invite_Final_Results_web
Views: 0  |  Downloads: 0
Journal Holdings 2004 ENG
Views: 0  |  Downloads: 0
CS 10-080
Views: 1  |  Downloads: 0
DevelopmentalCodingWorkbook
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!