  Resources                                                                                                                           2011                  2012                  2013                 2014                 2015                  2016                  2017                  2018                  2019                  2020                  2021

The following are those resources designated by Seminole Electric Cooperative, Inc. (SECI)         Total Installed capacity   Network Resource      Network Resource      Network Resource      Network Resource    Network Resource      Network Resource      Network Resource      Network Resource      Network Resource      Network Resource      Network Resource
as Network Resources pursuant to the provision of Network Transmission Service under                or Entitlement (MW)       Designation (MW)      Designation (MW)      Designation (MW)      Designation (MW)    Designation (MW)      Designation (MW)      Designation (MW)      Designation (MW)      Designation (MW)      Designation (MW)      Designation (MW)
FPL’s Open Access Transmission Tariff.
                                                                                                     Winter      Summer       Winter    Summer      Winter    Summer      Winter    Summer      Winter   Summer      Winter    Summer      Winter    Summer     Winter    Summer      Winter    Summer      Winter    Summer      Winter    Summer      Winter    Summer
                                                                                                     Period       Period      Period     Period     Period     Period     Period     Period     Period    Period     Period     Period     Period     Period    Period     Period     Period     Period     Period     Period     Period     Period     Period     Period
Resources                           Unit     Geographic location         Electrical location Capability         Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability Capability
Seminole Generating Station          1-3          Putnam                  Seminole Plant       1326               1306       350        500        350        350        424        424        100        100         55         55         56         56         58         58         58         58         60         60         61         61         61         61
Lee County Resource Recovery                        Lee               Buckingham Substation     55                 50         55         50         55         50         55         50         55         50         55         50         55         50         55         50         55         50         55         50         55         50         55         50
Bio-Energy Partners                              Broward              Tradewinds Substation     0                  0          0          0          0          0          0          0          0          0          0          0          0          0          0          0          0          0          0          0          0           0         0          0
Midulla Generating Station           1-9          Hardee                   Midulla Plant       844                 757         300           300     300           300     300           300      0           0        0           0         0           0         0           0         0           0        0            0         0            0       350          350
Calpine Osprey                                     Polk                    Recker Plant        144                 144         144           144     144           144     144           144     144          0        0           0         0           0         0           0         0           0        0            0         0            0        0            0
Invenergy HPS                                     Hardee               Hardee Power Station    230                 230         230           230     230           230     89            89      89           89       89          89        89          89        89          89        89          89       89           89       230          230      230          230
Southern Oleander                                 Brevard               Brevard Substation     546                 459         546           459     546           459     546           459     546          459     546          459      546          459      546          459      546          459      546          459      546          459      546           0
Seminole Energy LLC                              Seminole              Geneva Subst. (FPL)      6                    6           6            6       6             6       6             6       6            6        6           6        6            6        6            6        6            0        0            0        0            0        0            0
Brevard Energy LLC                                Brevard              Cox Substation (FPL)     9                    9           9            9       9             9       9             9       9            9        9           9        9            9        9            9        9            0        0            0        0            0        0            0



PURCHASED POWER
FPL Long Term Firm Purchase                        Various                    Various                   -            -                                                                                        200     200          200      200          200      200          200      200          200      200          200      200          200      200           0



                                                                                                                               1640          1698    1640          1548    1573          1481    949          913     960          868      961          869      963          871      963          856      950          858     1092          1000    1442          691
                                            Notes:
                                           * Invenergy HPS entitlement increases to 445 MW on 1/1/13
                                                LOG OF REVISIONS
                                                        Rev. Date                                                 Description
                                                         2/4/2003 Add new Network Resource from Osprey/Blue Heron Power Plant: 144 MW from 6/1/04 to 5/31/09
                                                          8/11/2003 Add new Network Resources from Payne Creek Power Plant (5 peakers): 310 MW from 12/06
                                                         12/17/2004 Add new Network Resource from Bio-Energy Partners CDSL Landfill: 8 MW from 1/1/05 through 12/31/09
                                                          5/25/2005 Designate 400 MW of new generation at Seminole Plant for the period 5/1/12 - 12/1/20. Also, increases the Lee
                                                                    County R.R. output by 20 MW for the period 1/1/07 - 1/1/16.
                                                          4/25/2006 Extension of Oleander 546 MW Power Purchase for the period 1/1/10 - 1/1/16.

                                                             6/8/2006 Designate new amounts from Network Resources at Seminole Plant. OASIS request 897423 was queued on 6/8/06.
                                                          7/12/2006 FPL will grant SECI's OASIS request #878486 to designate 62 MW of Network Resource at Payne Creek generation
                                                                    site, commencing in 12/01/07, subject to the understanding that until construction of needed transmission facilities on
                                                                    the PEF, OUC and TEC systems have been completed, the 62 MW shall be subject to interruption and curtailment to
                                                                    the extent necessary to relieve the adverse impact or eliminate the reliability violations on the PEF, OUC and TEC
                                                                    systems.
                                                          7/18/2006 FPL will grant SECI's OASIS request #840603 to designate 144 MW of Network Resource at Osprey Energy Center,
                                                                    for the period 6/1/09 - 5/31/12 assuming that Calpine successfully exercises its rollover rights with the Tampa Electric
                                                                    Company to secure firm transmission service for the Network Resource for the relevant time period.
                                                           6/1/2007 Revised Table Format to include additional requirements of FERC Order 890. Designated new amounts from Network
                                                                    Resources at Seminole Generating Station ("SGS") (OASIS request #997647) and Payne Creek Generating Station
                                                                    ("PCGS") (OASIS request #997655) per letter Re: Network Resource Designation/Undesignation dated 4/25/2007.
                                                                    Revised PCGS Peaker #9 in-service date from 12/2007 to 6/2011 (OASIS request #997660).
                                                          9/13/2007 Add new Network Resources from Seminole Energy LLC: 7 MW from 10/1/07 through 3/31/18, OASIS Request #
                                                                    71578386, Subject to completion of distribution facilities required to provide the requested service, and from Brevard
                                                                    Energy LLC: 9 MW from 4/1/2008 through 3/31/2018, OASIS Request # 71578380, Subject to completion of
                                                                    distribution facilities required to provide the requested service.               Also changed name of Payne Creek
                                                          5/16/2008 Generating Station (PCGS) to Richard J. Midulla Generating Station (MGS).Station ("SGS") (OASIS request
                                                                    Designated new amounts from Network Resources at Seminole Generating
                                                                    #72128064) and Midulla Generating Station ("MGS") (OASIS request #72128074) per Jason Peters email dated
                                                                    4/22/2008. Revised SGS Unit #3 in-service date from 5/2012 to 5/2014 (OASIS request #72128139. Revised
                                                                    Designation of Hardee resource from 230MW to 133MW (OASIS request #72128090).
                                                           6/3/2008 FPL will grant SECI's OASIS request #71758133 to designate 144 MW of Network Resource at Osprey Energy Center,
                                                                    for the period 6/1/12 - 5/31/14 assuming that Calpine successfully exercises its rollover rights with the Tampa Electric
                                                                    Company to secure firm transmission service for the Network Resource for the relevant time period.
                                                          5/19/2009 Revised table to indicate resources by site. Designated new amounts from Network Resources at Seminole
                                                                    Generating Station ("SGS") (OASIS request #73048506) and Midulla Generating Station ("MGS") (OASIS request
                                                                    #73048538) per Jason Peters email dated 4/30/2009. Revised SGS Unit #3 in-service date from 5/2014 to 5/2016
                                                                    (OASIS request #72128139. Added Power Purchase from FPL 200 MW 6/1/14 - 5/31/2021 (OASIS request
                                                                    #72511419). Revised temporary undesignation of 97 MW of Hardee resource (OASIS request #73051221) to include
                                                                    2018 and 2019.
                                                          9/11/2009 Extension of Oleander 546 MW Power Purchase as a Designated Network Resource for the period 1/1/16 - 5/31/2021.
                                                                    OASIS # 73311624
                                                          12/4/2009 Designated new amounts from Network Resources at Seminole Generating Station ("SGS") (OASIS request
                                                                    #73585950) and Midulla Generating Station ("MGS") (OASIS request #73565986). Revised temporary undesignation
                                                                    of Hardee resource (OASIS request #73565995).
                                                         12/30/2009 Updated document for 2010.
                                                           4/9/2010 Added 25 MW Network Resource from Southeast Renewable Fuels starting 12/1/2011, (OASIS reservation
                                                                    #73333608), revised Midulla Generating Station ("MGS") (OASIS reservation #73893546), and revised Seminole
                                                                    Generating Station ("SGS") (OASIS reservation #73924626). Removed Timberline Energy resource and note.
                                                          5/28/2010 Corrected error in Summer 2010 MGS designation. (incorporates OASIS request # 73893540)
                                                                    Updated document for 2011. Designated new amounts from Network Resources at Seminole Generating Station
                                                                    ("SGS") (OASIS request #`s 74983223, 74933977) and Midulla Generating Station ("MGS") (OASIS request #`s
                                                           1/5/2011 74983206, 74934035).
                                                                      Removed Southeast Renewable resource, CONFIRMED OASIS # 76040277 to UNDESIGNATE NETWORK
                                                             9/1/2011 RESOURCE (Replaces ANNULLED OASIS # 76035916, 75893944, and 73333608).

								