CS-SWIM Meeting Planning

 6 March 2007

Short term pre-PSACI

 Users/advisory panel identified, invited (CS

victims needed; Al Sussman, Andrew Seigel)

 Schedule for PS branch.

 Request for capabilities, by 18 March

 Branch 25 March or later

 Need to have unbroken codes/executables for

PSACI runs

 Longer term schedule of PS upgrades (and

concommittent requests for changes)

Short term pre-PSACI

 Primary science-driven sims needed

 ITER start-up (run on PPPL mhd)

 Porcelli test: Linear MHD (run on PPPL mhd)

 Rate of tail formation on CMOD (requires Jaguar)

 At least first two require EPA component, need

to get this working with current driver/fmwk

 Propogation of time-step backtracking not essential

(but we still must allow for it in fmwk and driver)

Short term pre-PSACI

 Have portal that

 Provides active monitoring of job events

 Monitoring via ElViz of desired physics thingies

 Allows access to data management system for

users to filter (via easily generated provenance

data) among files generated during a SWIM run

 Job launch on PPPL systems from portal

 Longer term to address others, esp Jaguar

Short term pre-PSACI

 Getting SWIM framework, driver, and

configuration system documented, design

explained

 Need schedule for when runs must be

completed for analysis, and who does the runs

(DB will propose this schedule)

Mid Term: between PSACI's

 Need capability for signaling between

components (including driver component).

 Need use scenarios delineated!

 Will only need (in fast MHD) to signal from a component

when it completes, or from a component in mid-

execution?

 Will a component need to signal in mid-execution for a

service that it needs before it can continue?

 Can use (untested) exception model from CCA for this

Mid Term: between PSACI's

 Refine data management system

 Get what data files, what data objects are of interest

 For monitoring

 For ease of extraction later

 More generally, use cases for portal and use of

data by physicists here

 Identification of most useful metadata (in end user

terms, what kind of questions do you want to ask to

locate data from SWIM runs?)

 Don: find the sim I did for a similar case, find the

experimental data used with/for it.

Mid Term: between PSACI's

 Science runs needed for PSACI 2008

 Timelines like for this year's to get geared up earlier

 Need to fulfill promise to effectively use the

Leadership Class Facility

 Address job launch from portal to LCF systems

 Is this useful, or stick with having LCF runs done

separately (but sending data/monitoring to portal)

 Issues of LCF systems; check particularly the

PS being built since it is central.

Mid Term: between PSACI's

 Regression tests for components

 Identification of a few test cases that can be used

by CS people. Need not be complete coverage.

 Performance testing of components (including

driver component)

 Build and configure system

 Currently a top-level make system set up by Wael

 Review is about 1.x years from now. Need to

also determine goals for it. Depends on cycle,

but may need to detail goals earlier for it.


Related docs
Other docs by liamei12345
23-Calendario U19 femminile
Views: 0  |  Downloads: 0
who_can_claim
Views: 0  |  Downloads: 0
4X4 Nov 09
Views: 0  |  Downloads: 0
cv_general_0
Views: 0  |  Downloads: 0
LaptopReplace090111
Views: 0  |  Downloads: 0
TAN-0879-SyedMuhammadAli
Views: 1  |  Downloads: 0
gmaker
Views: 0  |  Downloads: 0
Community_Resources_Brochure
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!