THE HIGHLAND COUNCIL Agenda 4
Item
Climate Change Working Group Report CCWG
No 2/09
HIGHLAND COUNCIL DRAFT CARBON MANAGEMENT PLAN 2009-2012
Report by Head of Policy and Performance
Summary
This report presents the revised Carbon Management Plan (CMP), its scope, timescales,
targets and actions to 2012. Costs of implementing the plan are still to be quantified at the
time of writing so Members are asked to note the scope and content of the Plan at this
time. The finalised plan would be produced for Resources Committee consideration in
June 2009. The CMP has been developed with assistance from the Carbon Trust and
through discussions with Service representatives.
1. INTRODUCTION
1.1 Following a progress report to the Climate Change Working group on the 5th of
March 2008 it was decided that the Highland Council Carbon Management Plan be
reviewed and targets set to ensure that emissions continue to reduce. This paper
accompanies the revised Carbon Management Plan, its scope, baseline, targets
and timescales.
1.2 The CMP is a lengthy document created using a standard template for Local
Authorities provided by the Carbon Trust. It is important to document the scope,
baseline and methodologies in the initial report so that emissions monitoring
remains consistent and robust over time. An executive summary of the attached
report will be produced. The Plan relate to carbon management across six sectors
of Council operations: Property; Staff Travel; Fleet; Internal Waste; Street lighting
and Water.
1.3 Key drivers for the revision of the CMP include Scotland’s Climate Change Bill , the
forthcoming Carbon Reduction Commitment (CRC) reported separately to this
meeting of CCWG and the commitment in the Council Programme to:
“Produce and implement a climate change strategy for the Highlands which will
reduce our impact on the environment and adapt our services to cope with the
impact of climate change”
In addition, there is:
the need to address pressure on Council budgets from energy costs, which
is being taken forward also through the Corporate Improvement Programme
Transport project;
the need to reduce dependency on fossil fuels;
the challenge of reducing emissions from transport given the scale of the
Council’s operating area
the importance of embedding carbon management across all Council
Services and procedures.
1.4 In recognition of these key drivers, five strategic themes have been developed.
These are explored in more detail in Section 2, page 9 of the attached plan, and
1
are summarised as:
Theme 1: Reduce carbon emissions from internal operations
Theme 2: Reduce energy costs
Theme 3: Explore new areas for action
Theme 4: Promote awareness and behavioural change
Theme 5: Lead by example
2 TARGETS AND OBJECTIVES
2.1 Highland Council carbon emissions for the baseline year of 2007/08 amount to
64,696 tonnes. It is anticipated that through the implementation of the revised
CMP the Highland Council can reduce emissions by a total of 7,796 tonnes, saving
the Council almost £1.8million pounds against current energy and fuel costs, by
2012 1 . In addition with this emissions reduction the CMP could save £70,892 in the
purchase of carbon allowances through the CRC scheme (based on the initial fixed
price of £12 per tonne). Savings will be greater should the unit price of carbon
allowances increase in the future. Achievement of these targets will require
investment and this will be quantified with services in April 2009.
2.2 Targets are broken down per sector in Section 3, page 10 of the attached report.
3 ACTIONS
3.1 Actions within the CMP are divided into quantitative (those we can measure in
tonnes CO2) and “other actions” (significant actions that are harder to quantify but
equally important). Section 5 of the accompanying report highlights the current
work plan of the Climate Change Working Group in reducing emissions as well as
further actions taking place within Highland Council Services. The CMP recognises
the need to carry these actions forward into the revised Carbon Management Plan
as well as outlining proposed new actions and timescales for implementation.
3.2 Table 4, on page 31 of the accompanying report outlines the proposed actions to
achieve 12% emissions reductions by 2012. These relate to the six sectors scoped
into the CMP: Property; Staff Travel; Fleet; Internal Waste; Street lighting and
Water. Financial implications are discussed at paragraph 5.2 below.
4 EMMISSION PROJECTIONS AND FORECASTING
4.1 Forecasting of anticipated emissions will become increasingly important after April
2010 when the Highland Council will report emissions as part of the Carbon
Reduction Commitment. The CMP therefore recommends that timelines of actions
be created to enable long-term emissions forecasting to take place. Figure 6,
page 41, shows the emission savings required to reach 50% emissions reduction
by 2030, in line with the Climate Change Bill. This projection is based upon 4% per
annum emissions reductions during the timeframe of this revised CMP and
continued 3% per annum saved thereafter.
1
Should prices continue to increase, the level of actual savings may reduce but instead costs would
be avoided.
2
4.2 Targets will need to be reviewed at regular intervals and it is anticipated that
budget periods set by the Scottish Government through the Climate Change Bill
will form the framework for these interval periods. In addition the forthcoming CRC
legislation will take place in seven year phases and it will be necessary to align
emissions forecasting with both. This graph will therefore need to be reviewed
following guidance from the Scottish Government.
5 Resource Implications
5.1 It is widely recognised that behavioural change can account for up to 20% of
emissions savings. A programme of training and awareness raising is therefore
extremely important to fund. Appendix B of the CMP outlines the proposed
communication strategy of the plan. The cost of implementing the communication
plan can be met by current Service budgets as follows:
CEXO - £5000 events
£5000 marketing
£500 prizes and incentives
H&P - £2000 for energy efficiency programmes
TECs - £500 for messages about waste minimisation and re-use.
5.2 In order to make further emissions savings, considerable investments will be
required. Section 6, of the reports will highlight the investments, pay-back periods
and associated carbon savings for each of the capital projects highlighted in the
proposed action plan. Staff in the Housing and Property Service, CEXO and
Finance Service will work together to ensure this section is complete by no later
than the end of April 09. This work has been delayed due to staff absence in the
Housing and Property Service.
5.3 It is necessary to have all projects represented together so that costs and
emissions savings can be analysed over the three year period of the plan and work
prioritised.
6 MANAGEMENT AND GOVERNANCE
6.1 A Carbon Management Matrix for embedding throughout Council Services and
operations can be found in table 5, page 45. This is the standard matrix provided
by the Carbon Trust. Using the assessment matrix the Highland Council currently
scores 25 out of a possible 35 for the baseline year of 2007/08. The aim is to
achieve a minimum of 33 points by 2012. Highland Council is currently being
assessed alongside eight other Local Authorities in the UK through Carbon
Management Plus and results will be reported at a later date.
6.2 The final section of the CMP is concerned with management and governance of
the plan. It has been developed to ensure that Services know which key staff are
responsible for actions within the plan and to make sure that carbon management
is embedded across every day service delivery.
6.3 An Officer Working Group has been developed to monitor CMP implementation
and review progress at a Service level. The Climate Change Working group will
oversee progress and it is recommended that progress be monitored twice yearly
basis by Resources Committee due to the significant financial savings involved.
7 CARBON MANAGEMENT PLUS
7.1 Consultants funded by the Carbon Trust have been assisting the Highland Council
in a pilot programme called Carbon Management Plus (CM+). This includes the
3
development of a route-map towards partnership working, a high level carbon
analysis of the Local Authority area and a comparative review of Carbon
Management Plans across Local Authorities in the UK. Results are expected at the
end of March 2009 and can be fed back to the Members workshop proposed for
end May 2009 on the CRC (see accompanying report).
8 STRATEGIC ENVIRONMENTAL ASSESSMENT
8.1 To meet legislative requirements, to allow for transparency in decision making and
obtain feedback from partners and the public on the proposed actions contained
within the draft CMP, a full Strategic Environmental Assessment is being carried
out. Currently the scoping report is with the statutory consultants. It is expected that
once the statutory six week public consultation is complete the CMP can be
formally adopted by Resources Committee in June, by which time the financial
implications of the Plan will be quantified and discussed with services.
8.2 Systems to implement and monitor the plan must be put in place in April in
advance of formal adoption. Data on business travel can be gathered no later that
April 2009 if the Council wish to retain their Carbon Trust Standard Accreditation
and be rewarded financially for early when the CRC scheme comes in to place.
9 CONCLUSION
9.1 The Carbon Management Plan outlines the baseline, scope, boundary and
methodology of emissions calculations for Highland Council. It sets targets and
actions to reduce carbon emissions by 12% by 2012 and a long term vision of the
emissions reductions required to meet future legislative requirements. Costs and
investments need to be finalised and an executive summary of the final plan will be
produced. Final adoption can be through the Council’s Resources Committee.
10. RECOMMENDATIONS
10.1 Members are asked to consider and comment on the draft plan attached and to note:
1. Since systems for implementing and monitoring the Carbon Management Plan need
to be in place on the 1st April 2009 in order to meet requirements of the Carbon
Trust Standard, monitoring arrangements can begin and actions which have no
additional cost or related to the communications plan can progress;
2. Costs for other elements in implementing the Plan will be quantified and discussed
with Services by the end of April 2009;
3. The final draft Plan can be considered by the Resources Committee in June 2009,
with performance reports considered twice a year at that Committee.
Signature:
Designation: Head of Policy and Performance
Date: 18th March 2009
Author/Ref: Ailsa Villegas, Sustainable Development Officer
4
The Highland Council
Draft Carbon Management Plan
2009-2012
Page 1
Page 2
Contents
Foreword 4
Introduction - Progress to date 5
1 Context and drivers for Carbon Management 6
2 Strategic themes 9
3 Targets and objectives 10
4 Emissions Baseline and Projections 11
4.1 Scope 11
4.2 Exclusions 13
4.3 Baseline 14
5 Carbon Management Projects 17
5.1 Current Workplan 18
5.2 Future Projects 29
5.3 Projected achievement towards target 40
6 Carbon and Cost Analysis 41
5.1 Assumptions ?
5.2 Benefits / savings – quantified and un-quantified ?
5.3 Additional resources ?
5.4 Financial costs and sources of funding ?
7 Embedding CMP processes 44
6.1 Carbon Management Assessment Matrix 45
8 Communication 46
9. Programme Management of the CMP 47
9.1 Strategic ownership 48
9.2 The Carbon Management Team 49
9.3 Succession planning for key roles 49
9.4 Annual progress review 49
Appendix A: Baseline Report 50
Appendix B: Carbon Management Communication Strategy 67
Table 1 – Summary table of emissions for baseline year 2007/08 15
Table 2 – Current Work Programme of the Climate Change Working Group 18
Table 3 – Further Work by Highland Council 26
Table 4 – Proposed Projects for Inclusion in Revised Carbon Management Plan 31
Table 5 – Carbon Management Assessment Matrix 45
Fig.1 Proposed Reporting of Carbon Emissions against National Target 7
Fig. 2 Highland Council Carbon Emissions by Sector 07/08 16
Fig.3 Current Work Plan Time Line 24
Fig.4 Example of proposed timeline for water 37
Fig.5 Example Work Plan of Travel Plan Co-ordinator 39
Fig.6 Projected Emissions reductions to 2030 41
Page 3
FOREWORD FROM [YOUR CHIEF EXEC AND POLITICAL SPONSOR]
Including a foreword signed, ideally, by both your Chief Exec and Political Sponsor will make your CMP
stand out and carry more weight within the Authority. This need only be a paragraph or two setting the
Programme against the strategic priorities of the Authority.
It should ideally include their photo and a picture of their signature, possibly even a photo of them
signing off the document.
Guidance notes – please delete from final document
Text
FOREWORD FROM THE CARBON TRUST
Cutting carbon emissions as part of the fight against climate change should be a key
priority for local authorities - it's all about getting your own house in order and leading
by example. The UK government has identified the local authority sector as key to
delivering carbon reduction across the UK inline with its Kyoto commitments and the
Local Authority Carbon Management programme is designed in response to this. It
assists councils in saving money on energy and putting it to good use in other areas,
whilst making a positive contribution to the environment by lowering their carbon
emissions.
Highland Council was selected in 2008, amidst strong competition, to take part in this
ambitious programme. Highland Council partnered with the Carbon Trust on this
programme in order to realise vast carbon and cost savings. This Carbon
Management Plan commits the council to a target of reducing CO2 by 12% by 2012
and underpins potential financial savings to the council of around £1.8 million.
There are those that can and those that do. Local authorities can contribute
significantly to reducing CO2 emissions. The Carbon Trust is very proud to support
Highland Council in their ongoing implementation of carbon management.
Richard Rugg
Head of Public Sector, Carbon Trust
Page 4
INTRODUCTION
The Highland Council was one of the first Local Authorites in Scotland to produced a
Carbon Management Plan (CMP) in 2006 with assistance from the Carbon Trust.
The Member led Climate Change Working Group reviewed this CMP in March 2008. It
was agreed to review the scope, targets and timescale of the plan. The aim was to
embed Carbon Management monitoring across all sectors and to align targets with
forthcoming legislation. The primary focus of the revised CMP will be to reduce carbon
emissions from Council buildings, vehicle fleet, business travel, street lighting, internal
waste and water.
Progress towards the reduction of CO2 emissions from Highland Council buildings is
monitored through the Energy Management Performance Plan (EMPP). The reporting
mechanisms for EMPP have been successfully embedded in Highland Council policy
and service delivery and progress is being achieved in line with the targets set. To
date, 12.5% emissions reductions have been achieved from Council buildings from a
baseline of 2004/05.
The street lighting network in the Highland region continues to expand by 800-1000
new lamp posts each year due to new developments. Achieving a net reduction in
CO2 emissions is therefore more challenging, however, with the increasing price of
electricity, and the Council’s street lighting bill rising to £1.9 million, it is important to
stabilise energy consumption. Since 2004/05 there has been a 5% increase in carbon
emissions from street lighting.
It has not been possible to monitor progress in fleet and business travel due to
problems with the quality of the baseline data and changes in data gathering process.
For this reason the revised CMP has set new baselines for both these sectors.
The final stage in developing this revised CMP was to set targets and develop actions.
This took place in February 2009 in consultation with the Carbon Trust and Council
Officers. The actions contained within the CMP are being screened under the
Environmental Assessment (Scotland) Act with a full Strategic Environmental
Assessment expected to be complete in May 2009.
The CMP will be submitted for approval to the Climate Change Working Group in
March 2009. Following the public consultation on the accompanying environmental
report, the finalised document is expected to be adopted by the Highland Council
Resources Committee in June 2009.
The following document outlines the scope, target and actions for the CMP 2009-
2012.
Page 5
1. CONTEXT AND DRIVERS FOR CARBON MANAGEMENT
Key drivers include:
The urgent need to address rising pressure on Council budgets from the
ongoing escalation in energy costs;
The importance of embedding Carbon Management across all Council Services
and procedures.
The need to build resilience in our Services and reduce dependency on fossil
fuels.
The challenge of transport in a geographically large Local Authority area.
The Council’s commitment to sustainable development.
The Highland Council Programme, agreed in December 2008, contains within it
several commitments aimed at reducing carbon emissions. Including:
Produce and implement a climate change strategy for the Highlands which will
reduce our impact on the environment and adapt our services to cope with the
impact of climate change.
As well as improving the energy efficiency of our Council housing stock, reduce
the Council’s energy use and carbon emissions from our buildings by 15% by
2010-11, from a baseline of 2005, by reducing or avoiding energy costs.
Increase the use of renewable microgeneration technology sources to provide
energy in the Council estate, with appropriate integration of wind turbines,
biomass fuel boilers, combined heat and power and solar energy, increasing
the overall rating from 1,800 kW in 2008 to a minimum of 4,000 kW in 2010.
Prepare a green travel plan for the Council by 2008, and work with the Scottish
Government to encourage and promote green travel plans for our public sector
partners, and all businesses and developments across the Highlands.
Reduce paper use in our offices and recycle 50% by the end of 2009.
Page 6
In addition the Highland Council has included commitments to reduce CO2 emission in
the Single Outcome Agreement to the Scottish Government. National Outcome 14
reads:
14.1 Reduce greenhouse gas emissions from regional public sector operations
14.2 Promote renewable energy and improve municipal waste management
Scotland’s Climate Change Bill:
Long-term emissions reductions targets will need to be achieved by the Highland
Council in line with Scotland’s Climate Change Bill. Figure 1 below, demonstrates the
progress in emissions reductions from properties to date alongside anticipated
Government targets. It should be noted that this graph represents the estimated
minimum targets needed to reach emissions reduction of 50% by 2030, and does not
take into consideration any purchase of international credits or carbon offsetting by the
Scottish Government. Secondary legislation could place tough targets on Local
Authorities to reduce more emissions early on. The Climate Change Bill is a key driver
in encouraging emissions reductions and Highland Council wish to start reducing
emissions in advance of any secondary legislation passed by the Scottish
Government.
Proposed Reporting of Carbon Emissions Against National Target
55000
50000
Emissions Tonnes
45000 HC Projected Emissions
Actual Emissions Achieved
Required through Climate Change Bill
40000 (assumed)
35000
30000
2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13
Year
Figure 1.
Page 7
Carbon Reduction Commitment:
The Highland Council is captured under the forthcoming Carbon Reduction
Commitment and as of April 2010 will have to purchase carbon allowances in advance
for emissions from buildings. The annual CO2 emissions for the period 2007/08, from
electricity, gas and oil amounted to 44057 tonnes as reported in the Energy
Management Performance Plan. Therefore cost of purchasing certificates in the first
year will be considerable (approximately £528,684).
Due to the remote nature and large geographical area of Highland, most areas are out
with the mains gas network and rely heavily on the use of oil and electricity. As oil and
electricity have a larger carbon footprint than gas, this will result in Highland Council
producing proportionally greater emissions than elsewhere in the UK. The prevailing
weather is also of concern as the area is characterised by a typically colder climate
than elsewhere in the UK. Should the qualifying period be particularly mild and
subsequent winters cold, carbon emissions are likely to increase, putting the Council
at greater risk of financial penalties through the purchase of increased allowances.
It is therefore important that the Council reduces energy use to avoid costs through
increased energy prices and purchase of carbon allowances.
Carbon Trust Standard:
The Carbon Trust standard is formal accreditation scheme for organisations that are
measuring, managing and reducing CO2 emissions. In January 2009, Highland
Council successfully achieved the “Carbon Trust Standard” and this can be formally
used to demonstrate ‘early action’ towards the Carbon Reduction Commitment above.
In 2010 the Highland Council will participate in phase two of the accreditation
programme and will need to show continued emissions reduction, including those from
business travel.
Page 8
2. STRATEGIC THEMES
Within the revised CMP there are five strategic themes that carry across all sections.
These are:
Theme 1: Reduce Carbon Emissions from Internal Operations: Reduce emissions
from those areas of Local Authority activity that can be measured and monitored. This
includes energy use in Council owned buildings; street lighting, fuel use from staff
business travel and fleet travel, emissions associated with the disposal of internal
waste; and emissions associated with water consumption in the top 100 buildings.
Theme 2: Reduce Energy Costs: Energy and fuel effiency can bring about direct
financial savings to the Council as the unit price of electricity, gas and oil continues to
increase. This is particularly important in an area such as Highland which is
geographically dispersed and experiences a cooler climate than elsewhere in the UK.
It will also contribute towards efficiency targets set by the Scottish Government.
Theme 3: Exploring New Areas for Action: There are many actions taking place
and being developed by Council Services that can help to achieve emissions
reduction both in-house and in the wider community. While mechanisms to quantify
such emissions savings may not currently be in place, it is important to recognise the
work, encourage further projects and report progress. Over time, data monitoring
mechanisms may be developed.
Theme 4: Promote Awareness and Behavioural Change: Through training and
events run through the Highland Council “Green Ambassadors”; through working with
Personnel and developing effective staff induction and management training
programmes; and through education delivery in schools and communities the Council
will work to encourage energy efficiency and increased understanding of climate
related issues. A programme of press releases and use of the Highland Council
website will highlight progress to the public.
Theme 5: Lead by Example: Although the CMP will focus primarily on Highland
Council emissions from internal operations, Highland Council recognises that it has
the ability to influence change within the wider Highland community. The CMP will be
used as the foundation to build upon partnership working towards tackling Climate
Change across Highland.
Page 9
3. TARGETS AND OBJECTIVES
Highland Council wish to demonstrate ambition and commitment towards mitigating
the effects of Climate Change. Targets set must be SMART (specific, measurable,
achievable, realistic and time bound).
One of the main aims of the CMP will be to embed carbon management process
across all Council Services and activities to ensure that emissions reductions actions
are put in place and monitored. It may be necessary to review such targets at interim
points to take into consideration changing legislation. The finalised CMP will act as a
catalyst to promote further action within the Highland Council and will evolve over time
becoming stronger and more effective at reducing carbon emissions.
Highland Council will reduce the CO2 emissions from its activities by 12% from
the 2007/08 baseline, by April 2012.
Emissions will be monitored by financial year. The overall emissions reduction target
will be set out as follows:
Target 1: 12% in Council properties: This will include all Council owned
properties and schools but excludes any PPP schools. The aim will be to save
5286 tonnes of Co2 by 2012.
Target 2: 12% in staff travel: This will include all business travel by Council
employees but excludes commuting to and from work. Emission reductions
targets will focus on journeys made by car with the aim of saving 522 tonnes
C02.
Target 3: 5% in the Council’s fleet: This will include all Council owned
vehicles but excludes school transport (which is contracted out) and plant
machinery. The aim will be to save 207 tonnes C02.
Target 4: 20% in internal waste management: This will be achieved by
reducing waste and increasing recycling of materials from all Council premises.
By 2012, 831 tonnes of C02 will have been saved.
Target 5: 5% in street lighting: This includes all street lighting but excludes
road signs and bollards. The aim will be to save 353 tonnes C02 by 2012.
Target 6: 10% from water: This includes water consumed at Highland Council
buildings with water meters installed. It excludes water usage from building
charged a set rate. The aim is to save 14 tonnes of C02 by 2012
To monitor progress and allow for any revisions to be made following implementation
of Government legislation an interim target of 8% emissions reduction by April 2011
will be set and reviewed as necessary.
Page 10
4. EMISSIONS BASELINE AND PROJECTIONS
4.1 SCOPE
The CMP will be used to monitor and report progress from Highland Council internal
operations only. Through the Highland Councils ongoing partnership work in Highland
it is hoped that coordinated systems to measure and monitor community based
emissions will be developed and this is discussed further in the accompanying
partnership report.
The CMP will rely on fairly complicated data sets to measure performance which will
need to be gathered from various sources on a quarterly basis. It is important to be
concise about which sets/sites are to be included within the scope of CMP reporting.
The following summarises the intended scope of the Highland Council CMP 2009-
2012.
CO2 Reduction in Council Properties:
It is not proposed to make changes to the baseline data for the Energy Management
Performance Plan (EMPP) and information will continue to be fed into the CMP under
current mechanisms. The baseline period for this plan is set as 2007/08, however it is
possible to monitor overall energy performance as far back as 2004/05 though the
EMPP.
Energy use in Council properties includes all schools but excludes PPP buildings.
Council Housing Stock:
At the time of implementing the original CMP in 2006, discussions were taking place
over the transfer of the Highland Council housing stock. It was therefore decided to
scope the housing stock out of the CMP at this time. The Highland Council retained
ownership of the housing stock and in the three years since, much work has been
undertaking to improve the energy efficiency of these buildings and reduce C02
emissions.
Actions to reduce emissions within Highland Council Housing will be scoped into the
plan, but quantitative emissions savings will not be reported alongside Council
properties.
Street Lighting:
The street lighting data to be scoped into the CMP excludes traffic lights and bollards.
Electricity for street lighting is charged at a set price per lantern and the Office of
Government Commerce (OGC) North of Scotland buying group operate the current
tendering process.
Where energy savings through carbon management works have been demonstrated,
information is returned to OGC by the Highland Council Street lighting manager and
Page 11
these savings are deducted from the bill. At present there is nothing written into the
contract as to the frequency of reporting back such energy savings from the OGC
The purchase of energy for street lighting through national procurement is expected to
commence in 2009 and reporting requirements are likely to change as a result of this.
Therefore actions to reduce emissions from street lighting will continue to be pursued
by Highland Council but methods for monitoring such changes in emissions may
change over time.
Staff Business Travel:
With over 12,800 staff the Highland Council is the largest employer in the region and
as such, carbon emissions savings can be achieved through implementing a Highland
Council Green Travel Plan. Data on staff travel can be obtained from the Finance
Service using expense claim forms. Scoped into the Carbon Management Plan will be
the following categories of business travel:
1 Casual Miles
2 Essential Miles
3 Lease Miles
4 Training Miles
5 Equivalent Car Hire
Miles
6 Hire Car Miles
7 Hire Vans (up to 3.5t)
8 Members Miles
9 Home Carer Miles
10 Support Workers Miles
11 Secondee Miles
More work is needed to accurately measure carbon emissions from journeys made by
public transport. This work is due to be completed and baseline set for 2009/2010.
Emissions from public transport use are expected to be incorporated into the CMP in
2011. It is not anticipated that any emissions reductions targets will be set against
public transport as the key focus in Highland will be to promote more sustainable
transport options in place of the car. As a result public transport use may increase.
Fleet:
Transport, Environment and Community Services have 1500 items on their database
requiring the use of fuel. 800 of these are fleet vehicles with the remainder being
made up of plant equipment which can be anything from lawnmowers to JCBs. Such
plant equipment is measured in hours not miles. For the purpose of Carbon
Management reporting fuel consumption by fleet vehicles will be scoped into the CMP
2009-2012.
Page 12
Internal Waste:
For the purposes of reporting, properties will be divided into four key types; Secondary
Schools, Primary Schools offices and “other”. All Highland Schools will be monitored
for waste generation and for Highland Council offices the top 40 premises in terms of
staff numbers will be focused on. This will allow the greatest change to be achieved
with the staff resources available.
While it is important to note that cost savings from waste uplift can be demonstrated,
this will lead to reduced income for TEC Service responsible for bin collection; costs
are also likely to increase as charges are made for the uplift of recycled material.
Water:
The Highland Council is supplied by Scottish Water with billing process carried out by
Business Stream. Currently just over 50% of Council sites have water meters installed
that give accurate measurement of usage in m3. All other sites are charged a set
figure each year through the application of rates. As of April 2009 it is a requirement of
the Scottish Government that all public buildings in Scotland have water meters
installed. Problems with installation at several sites have been discovered and
discussions are currently taking place with Business Stream on how best to deal with
these sites. It is hoped that Business stream will communicate back to the Scottish
Government who will decide on the appropriate recharge in these circumstances.
The Top 100 buildings have been ranked in order of water consumption. Actions
towards water conservation can then focus on these sites and progress monitored
through the CMP.
4.2 EXCLUSIONS
To enable the boundaries and scope of the CMP to be concise, comparable and
measurable; and to allow for the most efficient emissions savings actions to be
prioritised the following exclusions will be made:
Commuter Travel:
Within the Highland Council Green Travel Plan there are objectives to promote and
encourage emissions savings from staff traveling to and from work, however such
emissions savings are difficult to quantify in a robust manner and as such have been
scoped out of the CMP in favor of addressing business travel which the Council has
direct control over, and is a higher priority. The large geographical distribution of the
Highland Council area and rural nature create more challenges when addressing how
staff travels to and from their place of work. It should be noted that the implementation
of a Green Travel Plan is a requirement from the Scottish Government.
School Transport:
School transport is contracted to private suppliers. Due to the limited number of
suppliers it is currently very difficult for Highland Council to influence carbon
Page 13
emissions. Furthermore the Integrated Transport Network will combine public
transport provision with school transport and it will not be possible to allocate
emissions solely to school transport in these areas.
PPP Schools:
There is year on year reconciliation for energy consumption and cost in PPP schools
at present, but this data is not reported in the overall energy monitoring for Highland
Council. The risk of including within the Highland Council portfolio is that although the
energy bills are paid by the Council they have no responsibility for energy saving
works taking place at these premises, and so cannot influence carbon reduction.
Municipal Waste:
Progress towards the reduction in waste going to landfill is monitored through the
Highland Area Waste Plan (HAWP). In January 2008 the Scottish Government
introduced its “zero waste” policy which includes ambitious new targets to increase
recycling by 70% by 2025, reduce landfill to 5% by 2025 and allow no more than 25%
of energy to be produced from municipal waste by this time. The Scottish Environment
Protection Agency will include new Government targets into the Highland Area Waste
Plan and are exploring the incorporation of CO2 savings into the reporting of the
HAWP from April 2009 onwards. Municipal waste has therefore been scoped out of
Highland Council CMP to prevent duplication of work. Progress towards emissions
savings will however be monitored by the Transport Environment and Community
Service.
BASELINE
For the purpose of the revised CMP the baseline period is set as the financial year
2007/08.
The emission calculation factors are taken from Defra's Environmental Reporting
Guidelines for Company Reporting on Greenhouse Gas Emissions. In June 2007
the factors were updated by DEFRA to take into account changing behaviours and
technologies relating to energy efficiency, vehicle type and fuel economy. The revised
CMP 2009-2012 has applied the revised conversion factors.
In addition to reporting on energy consumption, carbon emissions and cost, a factor is
included (where applicable) to account for the likely costs associated with the
purchase of carbon allowances through the forthcoming Carbon Reduction
Commitment (CRC) legislation.
The Highland Council baseline CO2 emissions for 2007/08
= 64 964 tonnes.
Page 14
Table 1 and Figure 2 below outline the CO2emissions and associated costs per
sector scoped into the CMP for the baseline year 2007/08. The accompanying
“Baseline Report” outlines the methodology for emissions calculations per sector in
more detail. See Appendix A.
Table 1 – Summary table of emissions for baseline year 2007/08
2007/08
Highland Council Carbon Footprint C02 emissions Cost CRC
tonnes Cost £ Certificates
Target 1: Emissions from Buildings 44057 8,249,018.00 528,684
Target 2: Emissions from Staff Business Travel
Staff Miles 571.98 672,913.20 N/A
Essential Miles 889.52 918.297.08 N/A
Lease Miles 449.76 145,511.85 N/A
Training Miles 203.72 127,026.16 N/A
Equivalent Car hire Miles 476.93 154,301.29 N/A
Hire Cars 255.88 167,850.00 N/A
Hire Vans 172.34 115.290.60 N/A
Member Miles 208.12 301,778.60 N/A
Home carers 944.10 1,110,706.80 N/A
Support Workers 197.04 231,815.20 N/A
Public transport N/A
Total: 4369 3,945,490.79 N/A
Target 3: Emissions From Fleet
Vehicles Diesel 55.31 2,773,176 N/A
Vehicles Petrol 6.31 162,912 N/A
Vehicles Gas Oil 4157.43 4,262 N/A
Vehicles LPG 193.23 24,014 N/A
Total: 4157 2,964,364 N/A
Target 4: Emissions Internal Waste
Internal Waste Top 40 521.37 108,689.10 N/A
Waste from Primary Schools 660.82 N/A
Waste from Secondary Schools 773.06
Other HC 3219
Total: 5174
Target 5:Emissions from Street lighting 7065 1, 400 000 847,80
Target 6: Emissions from Water
Water Top 100 142 991,833 N/A
TOTAL 2007/08 64 964
Page 15
Figure 2.
Highland Council Carbon Emissions by Sector 2007/08
Street Lighting Car Travel
11% 7%
Fleet Travel
7%
Internal Waste
6%
Car Travel
Fleet Travel
Internal Waste
Energy
Street Lighting
Energy
69%
Page 16
5. CARBON MANAGEMENT PROJECTS
5.1 Current Work Programme
Table 2 outlines the current work programme of the Climate Change Working Group
in relation to mitigation (reducing GHG emissions). The work plan has been developed
to help achieve the targets set out in the original CMP, aiming to reduce carbon
emissions by 15% by 2010. In developing this revised CMP and new actions to 2012,
it will be important to incorporate the actions currently under way.
The current actions included in the work plan are colour coded to show that actions
are:
• Completed or delivery is on target: G (Green)
• Making progress with some slippage: A (Amber)
• Showing no significant progress: R (Red)
• To be programmed: P (Purple)
Those actions that are driven by legislative commitments are also highlighted.
Timeline of Progress:
Figure 3 illustrates the actions of the Climate Change Working Group in the form of a
time line. This demonstrates that long term actions are being set to ensure continued
monitoring and behavioural change in properties, but the remaining sectors contain
short-term individual actions with little long-term vision. This therefore makes it difficult
to forecast future emissions in line with legislative targets. It also leads to difficulties in
securing funding and resources for projects.
Forecasting of anticipated emissions will become increasingly important after April
2010 when the Highland Council will be captured under the Carbon reduction
Commitment.
Table 3 outlines some of the work taking place within Highland Council Services that
further contribute toward emissions reduction for the Council, the wider region and
beyond. While such actions are difficult to quantify in terms of tonnes of CO2 saved,
highlighting such actions demonstrates the good work Highland Council is already
doing and that Climate Change issues are already being adopted across the different
Services.
Through the implementation of the revised CMP it is hoped that more actions can be
identified and developed across services so that Climate Change can become an
integral part of every day decision making.
17
TABLE 2. CURRENT WORK PROGRAMME OF THE CLIMATE CHANGE WORKING GROUP
G = Completed or delivery on target A = progress with some slippage R = No significant progress P = To be programmed
= Influenced by Legislative/ Regulatory Driver
11 MITIGATION: ACTION TO REDUCE THE COUNCIL'S GREENHOUSE GAS EMISSIONS
1.1 ENERGY MANAGEMENT PERFORMANCE PLAN (EMPP)
Action Service Review Status Comment
date
1.1.1 Invest £5.344m over five years & deliver 100% of capital programmes funded H&P Done G 2009-10 programme being developed
through available resource
1.1.2 Improve systems for: H&P Ongoing G Systems in place and functioning.
• tracking and reporting energy saving associated with energy efficiency Finance Options to enhance reporting on
works (including renewables) EMPP progress being explored.
• tracking and reporting energy efficiency investment in Top 100+ (e.g.
CEEF fund), including obstacles to investment
• checking and paying energy bills
• appraising costs and benefits of renewables options
1.1.3 Investigate implementation of formal environmental Management Systems in H&P August P Reported to Audit & Scrutiny
accordance with ISO14001 09 Committee in April 08 to test accuracy
of reporting and to resolve any issues
1.1.4 Incorporate recommendations from Apr 08 internal audit of energy management H&P August G Amendments in line with audit
targets reporting and energy billing into energy management reporting CEXO 09 recommendations commenced from
07/08 annual Resources progress
1
Work plan is still to take into account any new legislative requirements expected in 08/09 (Scottish Climate Change Bill, Energy Services Directive, Carbon Reduction
Commitment etc)
18
mechanisms and associated processes. report in August 08.
1.1.5 Measure and report on energy efficiency component in mainstream capital and H&P April 08 G Current reporting covers installed
maintenance programmes capacity of renewable energy
equipment in capital and maintenance
programmes. This is separated out in
new reporting structures so that
impacts of separate funding streams
can be monitored.
1.1.6 Quarterly performance reports on electricity & gas use, CO2 reduction, costs and CEXO Ongoing G Quarterly performance reports on
savings and achievements to date in installing renewable energy in Council electricity use, based on billing
buildings information, are submitted to
Resources Committee. Annual
performance in August.
1.1.7 Annual report on oil consumption CEXO August G Included in annual performance report
to Resources Committee in August.
1.1.8 Pilot installation of oil meters at four sites, including monitoring and reporting oil H&P August G Pilot complete. New research being
usage 09 undertaken on benefits of installations
and report to be provided.
1.1.9 Review and refresh baseline data after one year of reliable data has been H&P Oct-08 G Options to enhance reporting on
collected CEXO EMPP process being explored.
1.1.10 Process Round 1 Innovation Fund bids H&P April 08 G Funds diverted to project work
1.1.11 Ensure “low-carbon” approach is woven into the delivery of all building projects H&P Done G Achieved through the presumption in
under the capital programme favour of renewables and the options
appraisal process. H&P Energy
section to establish measurable
standards for all design &
construction projects. Will monitor and
report on environmental credentials &
energy/carbon performance of
buildings.
19
1.1.12 Publicity campaign to coincide with UK/Scottish Energy Efficiency Weeks CEXO Ongoing G Annual events to be arranged in
conjunction with ‘Green
Ambassadors’ programme.
1.1.13 Refresh E-campaign CEXO Sep 08 G Sustainable Development (Green
Council) web pages updated. Further
resources to be added.
1.1.14 Refresh Energy Champion activity CEXO Sept-08 G Training packages and associated
publicity campaigns under review.
1.1.15 Energy management training for Top 100+ managers / Responsible Officers CEXO Dec-08 A Employee Development team working
with Health & Safety and H&P to roll
out an intranet topic based training
course (including Energy
Management) for Management of
Health, Safety & Property as a
corporate priority targeting building
‘responsible persons’ with ultimate
objective of reaching all building
managers.
1.1.16 Refresh Display Campaign labels to reflect more current data. H&P Dec-08 G New 07/08 data being gathered for
CEXO updated launch in 2009.
1.1.17 Produce Energy Performance Certificates in line with EU Energy Performance H&P Jan-09 G Requirements will come into effect in
Directive for all Council buildings 1000m2 or over and exhibit in conjunction with CEXO Jan 2009. 4 staff members have
Display Campaign Posters where appropriate. undergone accredited training
process.
1.1.18 Ensure energy supply contracts offer VFM H&P/ Ongoing G Gas: Participating in Scotland Excel
/TECS arrangements until 31st March 2010.
Currently 3 months into a 6 month
Finance
block purchase of gas. Main Elec:
Current contract expires 31st Mar
2009; intend to extend to Oct 2009
when purchases from forthcoming
20
Procurement Scotland contract can
commence. Public Space Lighting
electricity, committed via OGC buying
Solutions to May 2009, Heating oil,
committed on a year to year basis to
OGC, to March 2009. All utilities are
to be taken on board with
Procurement Scotland & work being
carried out in association with Council
to establish demand & profiles.
1.1.19 Integrate the plans and targets associated with improving energy efficiency in the H&P Aug 09 G Report on Energy Efficiency works in
Council’s housing stock as part of the Council’s approach to energy management CEXO housing stock & associated carbon
savings to be produced for future
meeting of the Group.
1.2 CARBON MANAGEMENT PLAN
Staff and member travel
1.2.1 Re-set baseline for staff and member travel which takes into account CO2 CEXO June 09 G Action underway. Process of baseline
emissions from: Finance data management being formulated.
• business travel (hire care, lease car, personal car use claims, public Scheduled date for new baselines
TECS
transport including air travel) June 09
• commuting (drawing on Green Travel plans)
1.2.2 Systems in place to: Dec 08 G Action underway.
• measure emissions reductions CEXO
• monitor cost savings from staff travel reductions Finance
• monitor and report on quarterly performance against carbon reduction
TECS
targets for staff travel
1.2.3 Systems in place to: CEXO Dec 08 G Trial complete. Online booking form
• measure carbon emissions reduction from use of video-conferencing and guidance page created by
Business Improvement Team. Further
work to be undertaken to promote.
1.2.4 Develop a THC Travel Plan in association with HITRANS TECS/ April/08 A Staff survey complete. Travel reports
• Survey of staff to establish current transport trends CEXO produced for 5 key sites. Action
21
points being developed for the plan.
TECS leading travel plan steering
group to finalise recommendations.
Awaiting feedback from report to
TECS committee.
1.2.5 • Adapt Hire and Lease car policies to promote the use of diesel and/or low- Finance/ Dec 08 G Options identified. Awaiting
emission vehicles CEXO prioritisation.
1.2.6 • Guidance to encourage Officers and Members to select low emissions CEXO Dec 08 G Options identified. Awaiting
option for lease cars prioritisation.
1.2.7 • Campaign to persuade staff and members to move to sustainable modes of CEXO Dec 08 G
transport
1.2.8 • Identify implications of efficient driver training to wider category of staff & TECS/ Dec 08 P Awaiting outcome of TECS travel plan
Members CEXO report recommendations.
Fleet Transport
1.2.9 Undertake an Energy Savings trust (EST) Fleet Review, including advice on TECS Done G Review completed.
developing a Green Fleet Action Plan
1.2.10 Develop a Green Fleet Action Plan TECS/ June 08 A Final report yet to be received from
CEXO consultant. Fleet actions will also be
built into CMSIP.
1.2.11 Report to CCWG on how to monitor CO2 emissions from fleet against the base- TECS/ Sept 08 G Advice available from DEFRA &
line including whether the base-line should be re-set given the new fuel purchase CEXO Carbon Trust. Progress on fuel cards
arrangements (this is to include measuring any cost savings) could help monitor litre consumption
& mileage. Report to 3.9.08 CCWG.
1.2.12 Introduce a 5% biodiesel blend for selected fleet vehicles TECS Sept A Adherence to RTFO requirement will
2008 progress action. Scoping process for
potential selection of applicable
vehicles for trial use with regional
supplier undertaken. Potential future
report to CCWG.
1.2.13 Deliver driver training to maximise fuel efficiency through behavioural change. TECS P CPC training for PSV (bus) drivers
Produce plan for certificate of professional competence comes in later this year. Will be
extended to HGV drivers in 2009.
Training for other staff being explored.
22
1.2.14 Scope out potential to adapt Schools Transport contracts to deliver / measure ECS/ P Next contract renewal date is 2011.
emissions reductions TECS/ Contractual specification to move
Finance towards emission reductions to be
programmed accordingly.
Street lighting
1.2.15 Systems to monitor performance against carbon reduction targets for street TECS Dec G Part of CMSIP development
lighting 2008
1.2.16 Scope out viability of “spend to save” bid to achieve emissions reduction in TECS June 08 P
routine maintenance Report to CCWG Finance
1.2.17 Compile baseline emissions data and forecasts for developer-led expansion of TECS G It is currently possible to estimate
street lighting network dependant on the rate of
development.
1.2.18 Systems to set higher standards of energy efficiency for all new street lighting TECS G New electrical lighting equipment to
provided by developers be energy efficient through current
tendering process.
1.2.19 Feasibility study into potential to dim street lighting at selected locations TECS G Ross-shire trial complete.
Internal Waste Management
1.2.20 Audit of internal waste and associated costs in top 40 waste producing sites CEXO Dec G
2008
1.2.21 Set systems to measure baseline recycling rates CEXO Dec G
2008
1.2.22 Develop waste reduction action plan CEXO P
Water Management
1.2.23 Audit of water consumed and associated costs in top 40 Council properties CEXO Dec G
2008
1.2.24 Develop water conservation action plan CEXO P
23
Figure 3. Current Work Plan Time Line:
2009 2010
Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr1 Qtr2 Qtr3 Qtr4
Improving systems for tracking and monitoring energy use
Investigate ISO14001 accreditation
Implement internal audit
recommendations
Council Properties
Quarterly Performance Reports on Electricity and Gas Use
Annual Reports on oil use
Investment from Capital Programme
Pilot Installation of oil meters
Measure and report on energy efficiency in mainstream capital maintenance programmes.
EPC's
Ensure "low carbon" approach is woven into the delivery of all building projects under the capital programme.
Display
Campaigns
Integrate Housing Stock into Energy
Reporting
Re-set public
Transport
Staff Travel
baseline
Adapt hire/Lease car policies
Guidance for staff to select low emissions vehicles
Roll out of efficient driver training
Education and Awareness Campaign to encourage staff to use more sustainable travel options
EST Green Fleet
Review
Complete
Fleet
Green Fleet
Action Plan
Introduce 5%
biodiesel blend
24
2009 2010
Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr1 Qtr2 Qtr3 Qtr4
Systems to
monitor carbon
reduction
Feasibility study
for streetlight
Street Lighting
dimming
complete
Viability of
Spend to save
bid complete
System to make
new electric
lighting energy
efficient
complete.
Audit of Internal
Waste Complete
Internal Waste
Systems to
measure
baseline
recycling rates
complete
Develop Waste Reduction Action
Plan
Audit of water
Water
consumption in
top 100 complete
Water Conservation Action Plan
25
TABLE 3. FURTHER WORK BY HIGHLAND COUNCIL
Service Action Description
P&D Forest and Woodland Strategy The regional Strategy has three main functions.
1. It identifies opportunity at a Strategic Level in key areas.
2. It draws attention to types of forestry that funding should be targeted at.
3. It provides a framework for evaluating individual grant applications under the Scottish Forestry
Grant Scheme.
P&D Sustainable Design Guidance Highland Council Supplementary Planning Policy: Designing for Sustainability, housing in the Countryside,
Affordable Housing. Provides more detailed policy on the implementation of existing Local Plan policy in
terms of the various topics listed.
P&D Renewable Energy Strategy The Strategy supplements the existing policies of the Council. It aims to provide guidance and direction for
Council decisions and developer’s plans. Many of the actions will be carried out through the planning and
associated Environmental Impact Assessment processes. The Strategy outlines a vision for renewables
energy in Highland and identifies 11 key points for action.
P&D Access Strategy Aims to address the needs and aspirations of people of all ages and abilities to deliver a wide range of
recreational and enjoyment of the environment benefits for walkers, cyclists, equestrians and paddlers.
Thereby contributing to social inclusion, health improvements, sustainable transport and improvement to the
overall quality of life by unlocking this potential and guiding the way in which the Council and its partners
can take forward plans for access throughout the Highland Council area.
P&D Development Plan Policy Guideline on Developer Sets the framework for the type and scale of developer contributions which will be expected through
Contributions (in development). developer contributions in association with the delivery of masterplans/development briefs or the
assessment of planning applications.
P&D Highland Food Conference Around ninety participants attended the “Local Food in the Highlands” conference in the Council Chamber
on the 7th November 2008, representing a wide range of food producers, producer organisations, retailers
and other food-related groups, in addition to the Highland Council, Scottish Government and other public
sector organisations with an interest in the subject.
P&D Local Food Action Plan Taking forward the actions highlighted in the local food conference.
P&D Area Wide Local Plan The 2001 Highland Structure Plan is to be replaced by a Highland Wide Local Plan being developed under
new legislation. The Council is working with Scottish Government on a pilot project to deliver new planning
policies which are shorter, clearer and focussed on delivery of infrastructure and economic development for
the area, and the first milestone will be to publish a Main Issues report in May 2009.
CEXO Fair Trade Members Group The Council has been serving Fairtrade tea and coffee following a decision by the Council in 2003 which
26
stated that “The Highland Council supports the principle of Fairtrade and sustainable production and
accordingly wishes to see all tea and coffee that is provided at official meetings brought under a recognised
Fairtrade label or equivalent.”
The Council has established a small Working Group be established comprising to look at progressing
Fairtrade status for the Council area as a whole in with the Scottish Government’s objective of
achieving Fairtrade Nation Status.
Fair Trade also aims to ensure that local producers get a good deal for their produce and reduce food
miles.
CEXO Fair Trade Event 2008 An exploration of the social movements that have shaped our past and guide our principles today.
CEXO Corporate Improvement Programme Focusing on eight areas of opportunity which have been formed into projects each with an individual
business case identifying the anticipated immediate benefits and what the opportunities are in the future.
Although focusing on cost savings, associated emissions savings can be achieved as a result particularly
through projects:
• Information Management
• Mobile and Flexible Working
• Transport
• Asset management.
These individual projects are explained in more detail below.
FINANCE Procurement – recycling of construction materials Mandatory targets to ensure that construction materials are recycled.
FINANCE Procurement – Supply contracts. The procurement unit currently request certification of energy usage, heat, light, noise and radiation of
goods purchased by the Council. Also accreditation such as ISO 14001from suppliers. To date 1/3 of
suppliers have come forward with information.
FINANCE Procurement - ICT contract. Working to secure community benefits in terms of social-economic as well as environmental performance.
The ICT contract ensures systems and training is made available and generates employment. Internally IS
client exploring more efficient ICT equipment for use by Council staff.
EDUCATION Eco Schools Achieve Eco School status for all Highland schools by 2011.
CEXO Allotments policy The Council has recently agreed to develop an allotments policy and to support
the development of allotments where there is demand.
27
CORPORATE IMPROVEMENT PROGRAMME
Information Management:
Information Management includes creating, capturing, registering, classifying,
indexing, storing, retrieving, using and disposing of records and developing ways to
manage records. The vision for an Information Management Strategy is for a
consistent, co-ordinated and proactive approach to our information; managing it
efficiently and effectively in order to give the customer a better service. Actions
relevant to the CMP include:
• Development of the intranet to include data directories, online forms etc
• Development of the internet to include publishing FOI results for public
consumption
• Creation of an information catalogue and a register of information custodians
• Requirements of a document management system
• Policy and procedure regarding records inventory, storage, retrieval and
destruction
• Information currently in paper format to be scanned according to classification
and use, to release estate for other purposes.
This project will use technology to help reduce the amount of paper consumed and
disposed of by Highland Council and contributes towards emissions savings through
reduced internal waste.
Mobile and Flexible Working:
The vision is ‘for our workforce to be deployed speedily to where it's needed by our
customers. Maximising the use of technology to sustain mobile and flexible working to
create a more effective working pattern, maximising the Council’s commitment to
rationalise office accommodation. To achieve this vision the project will aim to :
• Develop workforce management technology which includes flexible working
and task scheduling.
• Re-design Business Processes to deliver from a mobile workforce.
• Incorporate performance monitoring for continuous improvement.
This project will contribute towards the targets set out in the Business Travel and Fleet
Travel sections of the CMP through reducing the need to travel. It will also contribute
to reduced emissions from buildings as flexible approaches to work reduce the need
to be based at a desk.
Transport:
There is a need for a Corporate Transportation Strategy/Policy to take account of the
current fragmented organisation of transport connected activities within the Highland
Council. The Highland Council Travel Plan Coordinator is working closely with the
Corporate improvement team to ensure that products that come out of the project are
in line with the objectives of the CMP. These include:
• Saving in staff travel through reducing unnecessary journeys, video
conferencing, less use of hired vehicles, taxis etc.
• More efficient use of pooled vehicles
28
• Reduce unnecessary journeys through GPS implementation and better co-
ordination of the operational fleet.
This project will contribute towards the targets set out in the Business Travel and Fleet
Travel sections of the CMP.
Asset Management:
The vision is to adopt a corporate approach to asset management to enable The
Highland Council to proactively manage its assets. This will ensure Members and
officers are provided with accurate information on which to base investment,
maintenance and risk management decisions regarding the Highland Council’s assets
and that the assets support the strategic objectives of the Council, are fit for purpose,
efficient and effective. Actions relevant to the CMP include:
• the rationalisation of assets i.e. disposing of surplus assets, acquiring assets,
investment in assets together with maintenance to ensure that use of assets is
maximised and costs minimised while meeting delivery needs
• making best use of scarce capital resources by taking a Corporate view of
priorities to ensure that capital allocations support the objectives of the Council,
the priorities of its Service teams and the capital requirements of its assets.
This project will have contribute towards the targets set for street lighting, buildings
and water.
5.2 FUTURE PROJECTS:
Table 4 outlines projects for future inclusion in CMP following discussions with the
Service personnel responsible for each of the sectors scoped into the Carbon
Management Plan.
A section is also included for actions following discussions with Service personnel
involved in the qualitative projects highlighted in table 3 above. Such actions will
enable carbon management to be embedded across all sectors. It is anticipated that
through the implementation of the CMP, the actions contained within the qualitative
section will increase and capture more of the climate related work taking place within
the Council.
To enable efficient use of staff time and resources it is recommended that actions
against each sector are mapped on a time line. Figure 3 demonstrates how the
workload will be divided over the three years leading to 2012. Combined with the
carbon and cost analysis of the individual projects (Section 6 of the CMP), this will
allow emissions forecasting and a long term vision of progress towards targets to be
created.
Carbon Management work may form all, or only part of an employees responsibilities.
It may be beneficial to create a GANTT chart of activity so that workload at an
individual level can be managed. An example is shown in Figure 4.
29
30
Table 4. Proposed Projects for Inclusion in Revised Carbon Management Plan.
G = Completed or delivery on target A = progress with some slippage R = No significant progress P = To be programmed
12 MITIGATION: ACTION TO REDUCE THE COUNCIL'S GREENHOUSE GAS EMISSIONS
PROPERTY – 12% EMISSIONS SAVINGS BY 2012
Service Date Costs
Action Progress Notes:
Responsible (TBC) (TBC)
1.1 Energy Monitors to all schools H&P/ P
ECS
1.2 Installation of heating Monitors to buildings H&P P
1.3 Ranking Buildings in relation to heat loss and H&P P
insulating the worst performers
1.4 Reviewed programme of renewable installations H&P G Programme currently under
review.
1.5 Voltage and Power improvement Devices to H&P P
buildings
1.6 Low Energy Bulbs to all Council Housing Stock H&P P Reviewing buildings and seeing
if the number of toilets is
necessary. Many are surplus to
need.
1.6 Zoning of Heating Systems in buildings H&P P .
2
Work plan is still to take into account any new legislative requirements expected in 08/09 (Scottish Climate Change Bill, Energy Services Directive, Carbon Reduction Commitment etc)
31
1.7 Replacement of old heating controls in buildings H&P P
1.8 Installation of new Biomass boiler at Drummuie H&P P
flagship building.
1.9 Conduct Insulation and improvement to one high H&P P
profile building visited by the public.
1.10 Create online energy consumption data for each CEXO/H&P P
Council property and monitor trends against
targets.
1.10 Investigate implementation of formal environmental H&P August 09 P
Management Systems in accordance with
ISO14001
1.11 Incorporate recommendations from Apr 08 internal H&P August 09 P
audit of energy management targets reporting and CEXO
energy billing into energy management reporting
mechanisms and associated processes.
1.12 Explore Alternative methods of accurately H&P P
monitoring heating need and oil consumption in
buildings.
1.13 Integrate the plans and targets associated with H&P August 09 P
improving energy efficiency in the Council’s
housing stock as part of the Council’s approach to
energy management
1.14 Report on Energy Efficiency works in housing H&P Aug 09 P
stock & associated carbon savings to be produced CEXO
for future meeting of the Group.
STAFF TRAVEL – 12% EMISSIONS SAVINGS BY 2012
32
2.1 Increase of Passenger mileage rate claim to encourage car CEXO P
share (5ppm)
2.2 Commitment to low emissions business related car hire CEXO/ P
FINANC
E
2.3 Multi ticket purchase for bus and train travel at sites CEXO P
2.4 Extension of VC/TC facilities, equipment and guidance. CEXO P
2.5 Exploration of desk-based alternative to VC( e.g. webcams) CEXO/IT P
2.6 Continued survey of staff travel patterns CEXO G
2.7 System in place for booking public transport and capturing CEXO G
mileage.
2.8 Dissemination of Transport hierarchy across staff to aid CEXO G
travel decisions.
2.9 Roll out Travel Plans across council premises CEXO G
2.10 Purchase of “pool” bikes for business travel CEXO P
2.11 Improve cycle storage facilities. CEXO P
2.12 Explore options for increased shower facilities with CEXO P
neighbouring businesses.
2.13 Identify implications of efficient driver training to wider CEXO P
category of staff & Members
FLEET – 5% EMISSIONS SAVINGS BY 2012
3.1 Extension of speed limiters on select fleet vehicles TECS Done P
including LGV.
3.2 Develop a Green Fleet Action Plan TECS/ A Final report yet to be received
CEXO from consultant on green fleet
review.
3.3 Fleet Rationalisation of vehicles TECS/ P Advice available from DEFRA &
33
CEXO Carbon Trust. Progress on fuel
cards could help monitor litre
consumption & mileage. Report
to 3.9.08 CCWG.
3.4 Re-routing of waste collection vehicles to maximise uplift TECS P
and minimise mileage.
3.5 Deliver driver training to maximise fuel efficiency through TECS P CPC training for PSV (bus)
behavioural change. Produce plan for certificate of drivers comes in later this year.
professional competence Will be extended to HGV drivers
in 2009. Training for other staff
being explored.
3.6 Strong policy in relation to fleet vehicle use. TECS P
3.7 Purchase of electric vehicle for use in Inverness (e.g. mail TECS P
van)
INTERNAL WASTE – 20% EMISSIONS SAVINGS BY 2012
4.1 Audit of internal waste and associated costs in top 40 CEXO Complete G
waste producing sites
4.2 Set systems to measure baseline recycling rates CEXO Dec 2008 G Systems in place through CMP
process.
4.3 Develop waste reduction action plan CEXO June 2009 P To be developed alongside
Carbon management Plan
following experience of waste
reduction at HQ
4.4 New kerbside collection routes incorporating schools TECs P
4.5 Replacing residual bins with recycling bins CEXO Ongoing G Work underway at HQ and
Kinmylies. To be continued
across all properties.
4.6 Monitoring amount of internal waste produced CEXO/TE Ongoing G As part of CMP.
CS
34
4.7 Reduction of paper usage in sites ALL Ongoing G Some printer/photocopier
rationalisation work to date.
Opportunities to use alternative
technologies and raise
awareness.
4.8 Encouraging bin reduction CEXO Ongoing G
4.9 Waste Awareness behavioural / educational campaign CEXO Ongoing G
4.10 Establishment of policy on ‘confidential’ waste CEXO Jan P
2010
4.11 Reduction of food waste in schools and encouragement of CEXO/EC P
composting linking with eco-school campaign S/
TECS
4.12 Energy from Waste Plan. Isle of Skye H&P/TEC A
S
4.13 Heat sinks linked to thermal treatment of waste in locations H&P/TEC P
across highland to serve buildings/ houses S
4.14 Re-establish internal shredders for confidential waste CEXO Jan P
2010
4.15 Commence plastic cup recycling through “Save a Cup” CEXO June 09 P
scheme.
4.16 Roll out facilities for recycling of plastic bottles and cans CEXO 2011 P
4.17 Campaign to reduce packaging on goods purchased by CEXO 2011 P
the Council.
STREET LIGHTING – 5% EMISSIONS REDUCTIONS
5.1 Change Lanterns on existing lighting schemes to use TECS P
dimmed white lighting source
5.2 Policy in favour of electronic lanterns during renewals. TECS G Policy exists.
5.3 Systems to set higher standards of energy efficiency for all TECS G New electrical lighting equipment
new street lighting provided by developers to be energy efficient through
35
current tendering process.
WATER – 10% EMMISSION SAVINGS BY 2012
Service
Action Date Progress Notes:
Responsible
6.1 Set system in place to monitor the number of call- H&P April 09 G A separate code will be created
outs to fix leakages and floods in buildings for maintenance to log reports of
faults.
6.2 Input water meter data into SIGMA to enable H&P/ June 09 P
consumption reports to be drawn out in line with
energy reports. CEXO
6.3 Further roll out the installation of Hippo’s in toilet CEXO Sept 09 G Hippo’s have already been
cisterns. installed in ?? buildings. Extend
this Service and encourage
schools to make their own
Hippo’s.
6.4 Further roll out of water saving urinal scheme. Sept 09 G
6.5 Policy in place for twin flush/low water WC’s when H&P Sept 2009 P
replaced.
6.6 Programme of toilet rationalisation CEXO Sept 09 P Reviewing buildings and seeing
if the number of toilets is
necessary. Many are surplus to
need.
6.7 Policy in place for inclusion of grey water systems P&D Ongoing G As part of sustainable design
in new-builds of a certain size. guidance.
6.8 Identify sites with little waste water (e.g. Nursery H&P June 09 P
and village greens); review the rates charged and
back-date.
36
6.9 Review of the rate-able charges at sites. H&P April 09 P
6.10 Education and Awareness Campaign on water CEXO April 09 P To be programmed into Green
conservation Ambassadors training and in line
with CMP communication
strategy. Also water features as
part of Eco-schools work.
6.11 Conduct Water Audit CEXO/H&P G
6.12 Develop Water minimisation Action Plan CEXO P
OTHER ACTIONS PER SERVICE
Service Costs
Action Date Progress Notes:
Responsible (TBC)
7.1 Monitor the number of suppliers that provide FINANCE P
environmental management information.
7.2 Monitor how well we are doing against the FINANCE P
mandatory targets for recycling of construction
materials.
7.3 Scope the use of FSC accredited paper FINANCE P
purchased by Highland Council, where
recycling paper is unavailable.
7.4 Through CMP we could monitor the turnover of FINANCE P
the number of units replaced or removed as
part of the WEEE directive.
7.5 Record small grants given by Council that could P&D/ P
contribute towards climate change action in the CEXO
community
37
Figure 4: Example of proposed timeline for water.
2009 2010 2011
Water Audit
Develop Water Action Plan
Systems to Monitor
Water Leakages
Input Water Data into
SIGMA
Distribution of rain water butts for schools
Further Roll out of Installation of hippo's
Further roll out of water saving urinal scheme
Programme of Toilet Rationalisation
Water
Policy in Favour of Grey
Water Systems in New
Builds
Identify Sites with little waste water
Review of rateable charging at sites
Education and Awareness Campaign on Water Conservation
Review options for
location of compost Installation of Compost toilet.
toilet
Conduct cost analysis of replacements taps and parts at sites
Replace faulty equipment
38
Figure 5. Example Work Plan of Travel Plan Coordinator
Jan 2009 Feb 2009 March 2009 April 2009 May 2009 June 2009
ID
Task Descriptions
12 19 26 2 9 16 23 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29
Develop a Green Travel Plan (GTP)
1
1.1 Read Energy Saving Trust travel reports for Invergordon & Charleston Academy
1.2 Make contact with staff at both sites involved with previous reports
1.3 Develop action points
1.4 Draft GTP's developed for both schools sites
1.5 GTP's developed for both school sites
1.6 Implement GTPs at both school sites previously reviewed by Energy Saving Trust (EST)
1.7 Read reports for HQ, Kinmylies and Lochaber House office sites
Staff & Member Car Use for Business
2
2.1 Determine baseline measure for staff & member emissions from car use
2.2 Emissions reduction targets investigated as part of Carbon Management+ programme
2.3 Emissions reduction targets set and progress being monitored
2.4 Cost savings from staff travel reductions being monitored
2.5 Contact relevant staff to investigate hire/lease car policies
2.7 Investigate hire/lease car policy adaptions
2.8 Develop draft hire/lease car policy adaptions
2.9 Adapt Hire and Lease car policies to promote use of low-emission vehicles
2.12 Guidance for Officers/Members to select low emissions option for hire cars
Public Transport (PT) for Business
3
3.1 Contact relevant staff to investigate capturing Public Transport for business data
3.2 Investigate options and discuss optimum measures with Sustainability Officer
3.3 Set systems to capture mileage data & costs for bus, train, air, ferry & taxi travel
3.4 Investigate public transport booking methods
3.5 Investigate options and discuss optimum measures with Sustainability Officer
3.6 Provide guidance & training for staff booking public transport
3.7 Make information on routes, times and fares easily accessible to all council staff
39
5.3 PROJECTED FUTURE EMISSIONS
Projected Emissions:
The Climate Change Bill requires a 50% emissions reduction by 2030 over a baseline
of 1990. It is not possible to measure Highland Council internal emissions for 1990;
however it is expected that in line with national trends emissions at this time would
have been higher than they are currently. Therefore, to reach a reduction target of
50% by 2030 over a baseline of 2007/08 will be ahead of the requirements contained
within the Climate Change Bill and enable Highland Council to lead the way in tackling
climate change.
It is reasonable to expect that Highland Council can achieve these emissions
reductions without the need to purchase international credits or to carbon offset.
Figure 5 shows the emission savings required to reach 50% emissions reduction by
2030, over a baseline of 2007/08.This projection is based upon 4% per annum
emissions reductions during the timeframe of this revised CMP and continued 3% per
annum saved thereafter.
Targets will need to be reviewed at regular intervals and it is anticipated that budget
periods set by the Scottish Government through the Climate Change Bill will form the
framework for these interval periods.
This graph will therefore need to be reviewed following guidance from the Scottish
Government.
40
Co2 in tonnes
20
0
10000
20000
30000
40000
50000
60000
70000
07
/0
8
20
08
/0
20 9
09 2007/08
Baseline
/2
01
20 0
10
/2
01
20 1
11
/2
01
20 2
12
/2
01
20 3
12
/2
01
20 4
12
/2
01
20 5
12
/2
01
20 6
12
/2
01
20 7
12
/2
01
20 8
12
/2
01
20 9
12
/2
02
20 0
12
Financial year
/2
02
20 1
12
/2
02
20 2
12
/2
Figure 6 Projected Emissions reductions to 2030
02
20 3
12
/2
02
20 4
12
/2
02
20 5
12
/2
Revised CMP trajectory
02
20 6
12
/2
02
20 7
12
/2
02
20 8
12
/2
02
20 9
12
/2
03
0
Former CMP trajectory
CCB
2030
Target
41
6. CARBON AND COST ANALYSIS
2009-2012
Highland Council Carbon Management C02 emissions Financial Savings Savings in CRC RISKS
Plan Targets saved £ Certificates
Target 1: 12% Buildings 5286 989 882 63 442 The Increased price of energy in this time. Prevailing climatic conditions.
Costs will be saved through reduced mileage claims but may increase for
Target 2: 12% Staff Business Travel: 522 473 458 N/A public transport as people shift mode.
Target 3: 5% Fleet 207 148 218 N/A Variable fuel prices.
Target 4: 20% Internal Waste 831 None* N/A
Target 5: 5 % Street lighting: 353 70 000 7450 The increased price of energy in this time
Target 6: 10% Water 14 99 183 N/A
TOTAL SAVINGS: 7213 1 780 741 70 892
*
Increased recycling facilities and the need to continually uplift waste of any kind will make cost savings in the first three years difficult. Reduced waste would reduce revenue for TEC
service who receive income from collecting waste at office sites.
42
43
7. EMBEDDING CMP PROCESS
A Carbon Management Matrix for embedding throughout Council Services and
operations can be found in table 6. This is the standard matrix provided by the Carbon
Trust. Using the assessment matrix the Highland Council currently scores 25 out of a
possible 35 for the baseline year of 2007/08. This can be broken down as follows:
Corporate Strategy 4 points
Programme Management 5 points
Responsibility 3 points
Data Management 3 points
Communication and Training 3 points
Finance and Investment 4 points
Policy Alignment 3 points
Total: 25
The Highland Council aims to have achieved a score of 33 or above by 2012, through
implementing the Carbon Management Plan.
44
Table 5. Carbon Management Assessment Matrix
CORPORATE PROGRAMME COMMUNICATION & FINANCE &
RESPONSIBILITY DATA MANAGEMENT POLICY ALIGNMENT *
STRATEGY MANAGEMENT TRAINING INVESTMENT
• CM integrated in
BEST • All staff given formalised
• Cabinet / SMT review responsibilities of senior • Quarterly collation of • CO2 friendly operating
managers
CO2 reduction: • Finance committed for
• Top level target progress against targets CO2 emissions for all
o induction and training 2+yrs of Programme
procedure in place
allocated across on quarterly basis • CM part of all job sources • Central team provide
o communications • External funding being
organisation • Quarterly diagnostic descriptions • Data externally verified advice and review, when
• CO2 reduction targets reports provided to • Central CO2 reduction • Joint CM routinely obtained
requested
• M&T in place for:
5 in Directorate Business
Plans
Directorates
• Progress against target
advice available o buildings
communications with
key partners
• Ring-fenced fund for
carbon reduction
• Barriers to CO2 reduction
• Green Champions o street lighting routinely considered and
published externally leading local action • Staff awareness tested initiatives
removed
o waste
groups through surveys
• CO2 reduction • Sponsor reviews • CM integrated in to
• Annual collation of CO2 • All staff given CO2 • Coordinated financing
commitment in progress and removes responsibilities of • Comprehensive review
emissions for: reduction: for CO2 reduction
Corporate Strategy blockages through department heads of policies complete
o buildings o induction projects via Programme
• Top level targets set for regular Programme • Cabinet / SMT regularly • Lower level policies
4 CO2 reduction Boards updated
o street lighting
o transport
o communications
o CM matters
Board
• Finances committed 1yr
reviewed locally
• Climate Change • Progress against targets • Staff engaged though o waste ahead • Unpopular changes
routinely reported to communicated to
Strategy reviewed Green Champion being considered
Senior Mgt Team • Data internally reviewed external community • Some external financing
annually network
• A view of the cost of CO2
• CO2 reduction vision • An individual provides reduction is developing, • All high level and some
clearly stated and • Core team regularly full time focus for CO2 • Environmental / energy but finance remains ad- mid level policies
published review CM progress: reduction and • Collation of CO2 group(s) given ad hoc: hoc reviewed, irregularly
3 • Climate Change
Strategy endorsed by
o actions
o profile & targets
coordination across the
organisation
emissions for limited
scope i.e. buildings only
o training • Some centralised
resource allocated
• Substantial changes
o communications made, showing CO2
Cabinet and publicised o new opportunities • Senior Sponsor actively
with staff engaged • Finance representation savings
on CM Team
• Draft Climate Change • Regular awareness
• CO2 reduction a part- • No CO2 emissions data • Partial review of key,
Policy campaigns
• Ad hoc reviews of CM time responsibility of a compiled • Ad hoc financing for CO2 high level policies
2 • Climate Change
references in other
actions progress few department
champions
• Energy data compiled on
• Staff given CM
information on ad-hoc
reduction projects • Some financial quick
a regular basis wins made
strategies basis
• No policy • No CO2 emissions data
1 • No Climate Change • No CM monitoring
• No recognised CO2
reduction responsibility
compiled • No communication or
training
• No specific funding for
CO2 reduction projects
• No alignment of policies
for CO2 reduction
reference • Estimated billing
* Major operational policies and procedures, e.g. Capital Projects, Procurement, HR, Business Travel
45
8. COMMUNICATION
A communication Strategy has been developed to enable successful implementation
of the Carbon Management Plan. This can be found in Appendix B
Through the Councils reporting requirements of Scotland’s Climate Change
declaration and through the Single Outcome Agreement, progress against targets are
published externally. In addition quarterly reports of the progress in reducing energy
use through the Energy Management Performance Plan are published with the
committee papers and available for the public to see on the Councils internet. The aim
is to publish progress reports of the CMP in the same way.
The Council’s Carbon Management Plan incorporates emission reduction targets for
staff and member travel, fleet, street lighting, water and waste management as well as
from buildings. There was recognised a need to revise the Council’s existing
behavioural change and training packages which focused primarily on energy from
buildings. This also recognised the vital role all staff and members can play in not
only reducing the emissions of Council operations but also of the region in general
through good practice applied at home. Such programmes must be updated and
refreshed to ensure that energy savings are sustained.
The Highland Council developed a voluntary scheme for Council employees called
“Green Ambassadors”. More than 70 staff joined the scheme and benefits included:
• Resources in the form of posters, stickers and information sheets, both online and
in hard copy.
• Advice, guidance, training, toolkits, contact and FAQ sources;
• Exclusive opportunities for Green Ambassadors to network and liaise with each
other in person at events or electronically through forums;
• Exclusive e-mail updates on Climate Change related developments occurring
within the Council.
• Free training programme.
• Free Library Service
• Competitions and prizes.
46
9. PROGRAMME MANAGEMENT OF THE CMP
9.1 STRATEGIC OWNERSHIP:
The Climate Change Working Group will oversee progress towards targets set within
the CMP. The Working Group is made up of cross-party Members as outlined below:
CLIMATE CHANGE WORKING GROUP
Members (15) to incorporate Convener, Leader of Council’s Administration and Committee Chairs
PARTY NAME ROLE WARD
Independent (6) Sandy Park Convener Nairn
Carolyn Wilson Chair – Resources Cromarty Firth
Margaret Chair – HSW Committee Aird & Loch Ness
Davidson
Bill Fernie Chair – ECS Committee Wick
John Laing Chair – TECS Committee Eilean a'Cheo
Hamish Fraser Chair - Gaelic Committee Eilean a'Cheo
Liberal Dr Michael Leader of the Council’s Fort William and Ardnamurchan
Democrat (4) Foxley Administration
Ian Ross Chair – PED Committee East Sutherland and Edderton
Dr David Alston Budget Leader and Chairman Black Isle
of the Budget Information
Group
Glynis Sinclair Culloden and Ardersier
SNP (3) Jean Urquhart Chair – A& S Committee Wester Ross, Strathpeffer and
Lochalsh
Drew Hendry Aird & Loch Ness
George Farlow North, West and Central
Sutherland
Labour (1) Jimmy Gray Provost Chair – City of Inverness Millburn
Inverness Committee
IMG (1) David Chisholm Dingwall and Seaforth
All CMP papers on will go to the Councils Weekly Business Meeting to allow Director
scrutiny before presenting to the Climate Change Working Group.
47
Following approval by the Climate Change Working Group, progress will be reported
to the Councils Resources Committee. This report will contain:
• the carbon emissions savings to date
• the financial savings to date
• progress against legislative requirements
• progress against internal targets set
9.2 THE CARBON MANAGEMENT TEAM
Carbon Management Plan implementation will be coordinated by the Sustainable
Development Officer. The Head of Policy and Performance will oversee progress and
submit reports to the relevant committees. A number of key individuals will have
responsibility for different aspects of the plan:
Responsible For: Lead officer:
Co-ordination and Monitoring: Sustainable Development Officer, Policy and Performance,
Chief Executives Office.
Policy Assistant, Sustainable Development, Policy and
Performance, Chief Executives Office.
Target 1:12% Council property. Principal Sustainability Officer, Housing and Property.
Target 2: 12% staff travel Travel Plan Coordinator, Policy and Performance, Chief
Executives Office.
Target 3: 5% fleet Fleet Manager, Transport Environment and Community
Service.
Target 4: 20% Internal Waste Waste Management Officer, Transport, Environment and
Community Service (advice),
Sustainable Development Officer (implementation)
Street lighting Manager, Transport, Environment and
Target 5: 5% street lighting Community Service.
Target 6: 10% water Senior Energy Inspector, Housing and Property (advice)
Sustainable Development Officer (implementation)
The above staff will make up the CMP Working Group and will meet regularly during
Carbon Management development and implementation. Following sign-off of the
CMP, it is proposed the CMP will meet quarterly to discuss progress in advance of any
reports being submitted to Committee.
48
9.3 Responsibility Across Services:
In addition to the CMP Working group, staff from personnel, procurement, ICT and
Planning and Development will be invited to meeting to discuss ongoing and proposed
projects that contribute towards more qualitative carbon emissions reductions projects.
Such projects are highlighted in Section 6.
9.4 Succession planning:
The Highland Council have learned from past experience that if key individuals leave
post before the programme is fully established progress can stall. For this reason the
following succession plan should be used to ensure that this revised Carbon
Management Plan continues to be monitored and reported.
The Sustainable Development Officer is responsible for monitoring Carbon
Management Progress. In the absence of a Sustainable Development Officer the
Policy Assistant, Sustainable Development should assume responsibility. In the
unlikely event that neither are available then responsibility should go to the Principal
Sustainability Officer, Housing and Property Service.
All reports must be signed by the Head of Policy and Performance before going to
committee.
It is recognised that some individuals may be nearing retirement and will take with
them a vast amount of knowledge and understanding when they leave. It is
recommended that where possible replacements shadow staff before they leave the
Council to ensure that information and knowledge is transferred and not lost.
9.5 ANNUAL PROGRESS REVIEW
The Energy Management Performance Plan is reported quarterly to the Resources
Committee and anuually each August. This process will continue for emissions
savings in Council properties.
All other targets within the Carbon Management Plan will be reported quarterly to the
Climate Change Working Group, where possible, and annually to the Resources
Committee. For certain sections, for example, streetlighting, it will not be possible to
report progress on a quarterly basis and annual reporting will give a clearer picture of
progress.The Climate Change Working Group will review progress towards Carbon
Management. This will include:
CO2 savings against the internal target
Co2 savings against national targets
financial savings, from fuel and energy efficiency
financial savings through the CRC
Progress towards partnership working
Behavioural change
49
APPENDIX A
Baseline Report 2007/08
1 Emissions from buildings
The Finance Service assimilates energy billing process, and has provided resources for
accounting support for gas and electricity to ensure that the best available data, derived
from billing information is available for reporting. The billing process has been
reviewed and streamlined where possible e.g. the largely paper-based process to pay
gas bills has now been automated. Conversion factors used are those supplied by the
Department for the Environment, Food and Rural Affairs (Defra) in their guidelines for
company reporting on greenhouse gas emissions.
National Procurement and forthcoming legislation on the Carbon Reduction
Commitment will result in metered energy use soon becoming available on a monthly
basis for each Council building and available in real time. This will remove the risks
associated with reporting estimated billing information and remove the need for a time
delay in reporting as we wait for billing information to come in to the Council.
The baseline for energy from buildings remains set at 2004/05 and APPENDIX ?
demonstrates progress as at the end of 2007/08.
The figure below shows the overall trend in energy consumption from April 2005 to
April 2008. This is based on actual billing data derived from SIGMA. The graph
illustrates the seasonal fluctuation in energy use between summer and winter.
Total Consumption & Energy Mix
25,000,000.00
20,000,000.00
15,000,000.00
Electricity
Oil
kWh
gas
Total Energy
10,000,000.00
5,000,000.00
0.00
05
05
6
06
7
07
8
08
05
05
06
06
06
07
07
07
08
08
05
06
07
08
r0
r0
r0
r
g
b
g
b
g
b
g
n
n
n
ec
n
ec
ec
ct
ct
ct
ct
Ap
Ap
Ap
Ap
Fe
Fe
Fe
Ju
Au
Ju
Au
Ju
Au
Ju
Au
O
O
O
O
D
D
D
50
Only 71 of the Council’s 815 properties are heated by gas because of the limited extent
of the mains gas network. The majority of the Council’s top-energy consuming
properties are heated by oil, which accounts for 46% of all energy use and 44% of
energy bills. Electricity is the most expensive fuel source used by the Council with the
highest associated CO2 emissions. 3Electricity accounts for 39% of the Council’s
energy use and 49% of energy costs. Over 60% of Council properties rely on electricity
for both heat and power. 60% of electricity bills are currently estimated (although
regarded as accurate).
For a more accurate portrayal of energy use against energy need, heating degree days
will be taken into account. Heating degree day (HDD) and cooling degree day (CDD)
are quantitative indices designed to reflect the demand for energy needed to heat or
cool a home or business. These indices are derived from daily temperature
observations, and the heating (or cooling) requirements for a given structure at a
specific location are considered to be directly proportional to the number of heating
degree days at that location. More specifically, the number of heating degrees in a day
is defined as the difference between a reference value of 15.5°C and the average
outside temperature for that day. The value 15.5°C is taken as a reference point
because experience shows that if the outside temperature is this value then no heating
or cooling is normally required. HDD can be added alongside consumption data when
monitoring trends.
Trend graphs can be developed for all fuels and all buildings and it is proposed that
graphs will be provided for each building on a monthly basis available on the Council
intranet. Targets will be set for each site and these will be indicated on the profiles and
users and officers will be able to check on, and monitor performance, identifying major
variations and changes at an early stage. For the purpose of reporting performance
can be presented by Service or by Area and linked to overall targets and legislation
such as the Climate Change Bill and the Carbon Reduction Commitment.
The following charts show the overall trend per fuel type. It demonstrates that while
there is an upward trend in energy use over the three years, this due to a steep
increase in oil use.
There remains an issue with oil supplies as the records are based on quantities of
delivery instead of actual use and this gives large variations in consumption
dependant on when, and by how much tanks are re-filled. Their needs to be
consideration of metering options available and an assessment made on the benefits
in terms of reporting and carbon penalty costs. Six sites piloted oil meters with limited
success. Options for using heat meters as an alternative are currently being explored.
3
http://www.defra.gov.uk/environment/business/envrp/conversion-factors.htm
51
Total Consumption & Energy Mix
25,000,000.00
20,000,000.00
15,000,000.00
Total Energy
kWh
Linear (Total Energy)
10,000,000.00
5,000,000.00
0.00
05
05
06
06
06
07
07
07
08
08
05
05
06
06
06
07
07
05
07
r
r
g
b
r
g
b
g
b
r
ct
ct
ct
n
ec
n
n
ec
ec
Ap
Ap
Ap
Ap
Fe
Fe
Fe
Au
Au
Au
Ju
Ju
Ju
O
O
O
D
D
D
Total Site Electricity
7,000,000.00
6,000,000.00
5,000,000.00
4,000,000.00
Electricity Use
kWh
Linear (Electricity Use)
3,000,000.00
2,000,000.00
1,000,000.00
0.00
05
05
06
6
06
07
7
07
08
8
08
Au 5
Fe 5
06
Fe 6
07
Fe 7
08
D 5
D 6
D 7
08
r0
r0
r0
0
0
0
0
0
0
0
r
g
b
g
b
g
b
g
n
n
n
ec
n
ct
ct
ec
ct
ec
ct
Ap
Ap
Ap
Ap
Ju
Ju
Au
Ju
Au
Ju
Au
O
O
O
O
52
kWh kWh
Ap
1,000,000.00
2,000,000.00
3,000,000.00
4,000,000.00
5,000,000.00
6,000,000.00
0.00
r0
5
0.00
2,000,000.00
4,000,000.00
6,000,000.00
8,000,000.00
10,000,000.00
12,000,000.00
14,000,000.00
Ju
l0
Apr 05 5
O
ct
May 05 05
Ja
Jun 05 n
06
Ap
Jul 05 r0
6
Aug 05 Ju
l0
Sep 05 6
O
ct
Oct 05 06
Ja
Nov 05 n
07
Dec 05 Ap
r0
Jan 06 7
Ju
l0
Feb 06 7
O
ct
Mar 06 07
Ja
Apr 06 n
08
May 06 Ap
r0
Jun 06 M 8
ay
Jul 06 0
Au 5
Aug 06 g
0
No 5
Sep 06 v
Total Gas Consumption
05
Oct 06 Fe
Total Oil Consumption
b
0
Nov 06 M 6
ay
Dec 06 0
Au 6
Jan 07 g
06
No
Feb 07 v
0
Mar 07 Fe 6
b
Apr 07 0
M 7
ay
May 07 0
Au 7
Jun 07 g
0
Jul 07 No 7
v
0
Aug 07 Fe 7
b
Sep 07 0
M 8
ay
Oct 07 0
Au 8
Nov 07 g
08
Dec 07
Jan 08
53
Feb 08
Mar 08
2. Emissions from Street Lighting:
Electricity for street lighting is charged at a set price per lantern and the office of
Government Commerce North of Scotland buying group operate the current tendering
process. The new contract commenced in June 2008 and saw a 42% increase in
energy costs further highlighting the need for energy reduction measures.
Emissions from street lighting are calculated by applying the standard Defra
conversion factor to the total Kwh the Highland Council were billed for in a given year.
Total electricity consumption of street lighting for the period 2007/08 was
16,431,516KwH resulting in 7065 tonnes of CO2.
Where energy savings can be demonstrated, information on savings is returned to
OGC by the Highland Council Street lighting manager and these savings are deducted
from the bill. At present there is nothing written into the contract as to the frequency of
reporting back energy savings. The purchase of energy for street lighting through
national procurement is expected to commence in 2009 and reporting requirements
are likely to change as a result of this.
54
3. Emissions from Business Travel:
In the past it is was only possible to calculate carbon emissions based on vehicle size
and fuel type. This resulted in a complicated data collection process. In June 2007 the
factors were updated by DEFRA to take into account changing behaviours and
technologies relating to energy efficiency, vehicle type and fuel economy. It is now
possible to apply an average conversion factor for all vehicles regardelss of size or
fuel type. To provide for consitency with other EU nations this data is presented in
grams of Carbon Dioxide emitted per kilometer (see below).
It is therefore proposed that Highland Council collect mileage data for all business
travel undertaken by car. This data can then be converted into Co2 emissions per km
to give an overall figure for Co2 emissions in tonnes.
Mileage data will be collected as follows:
Casual Miles: Individuals must provide a record of miles with their expense forms and
therefore a fairly robust record of miles is held by Finance Service. There will always
be some individuals who do not claim miles but this is unavoidable. For the baseline
year total miles claimed was
Lease Cars: Lease car users also have to provide a record of their miles in their
expense claim forms and this will also provide a robust record.
Hire Cars: Mileage data is provided monthly from the hire car companies and divided
into categories based on car type and engine size. This process was put in place in
November 2007 and so a full baseline year (April 07-March 08) has not been
gathered. However it has been possible to calculate a monthly average and therefore
yearly total for the period 2007/08.
Hire Vans: As with hire cars, companies provide the Council with monthly data on
mileage. A separate conversion factor for vans will be applied based on Defra
guidance for company reporting:
55
Occasional hire of vans over 3.5t does take place however due to the difficulty in
applying the correct conversion factor for this type of vehicle these have been scoped
out of the CMSIP. The Category for hire vans is inclusive of minibuses.
Home Carers: Currently self-calculate their miles and submit a financial sum for re-
payment to the Social Work Service.
Support Workers:
Members: Submit mileage details monthly with their expense claim forms. This data is
kept in isolation to other staff claims.
Motorbike: Staff that use motorbikes for business purposes can claim expenses at a
special mileage rates dependant on the size of the engine. The number of staff
claiming mileage for motorcycles is too small to be of any significance to the overall
reporting in the CMSIP and as such have been scoped out of the report.
Excess Miles/ Secondment: This is paid to staff that have moved from their base to
a new working place as a compulsory measure. It covers the extra journey costs to
and from work and as such would come under “commuting” not business mileage. It
will therefore not be reported through the CMSIP but may provide useful evidence for
monitoring progress of the green travel plan.
Public Transport
Public transport is defined as any journey made by taxi, bus, aircraft, train and ferry.
The majority of travel by public transport is booked through each Service. To ensure
data is collected there would need a public transport booking form would need to be
developed (similar to that used for hire car booking currently used by some Services).
A central location for data storage would need to be identified and training for staff in
receipt of forms carried out to ensure mileage data is reliable.
As with car use, Defra has created standard conversion factors for carbon emissions
from the different types of public transport.
Reporting on public transport cannot not begin until 2011 when systems for data
management have been created and one full year of progress monitored.
Walking/Cycling: In addition to demonstrating a decrease in vehicle use through the
CMSIP it is hoped that increasing walking and cycling figures can be measured. There
56
is currently a system in place for staff to record cycling miles and staff are paid
12pence per mile (ppm) for each journey made this way. Very few staff make use of
this and greater promotion is needed to encourage more claims for cycle miles.
Further encouragement could be made by raising the mileage rate for cycling in line
with the government’s allowance of 20ppm.
There is currently no method of recording or rewarding staff for making business
journeys on foot.
Video Conferencing: To encourage fewer business journeys, the Council’s Business
Improvement Team extended the video and telephone conferencing facilities across
the council. A standardised on-line booking system has been developed that allows
cost and carbon savings from the use of the facilities to be measured. Staff can apply
a conversion factor of 0.34kg/mile for each journey prevented as a result of using
video conferencing. This data can be incorporated into the reporting of the CMSIP and
can be gathered quarterly.
Passenger Miles: The Highland Council currently pay staff carrying passengers a
mileage rate of .004ppm through expense submissions. Currently no record of
passenger miles is kept. This system could be used to monitor any increase in lift
sharing for work purposes in the future.
57
4. Reduction from Fleet Travel
Unlike Business travel it is not possible to collect robust mileage data from fleet
vehicles for a number of reasons:
• Fuel cards – When a vehicle is filled at a forecourt petrol pump, the driver pays
with a fuel card and is asked to state the vehicle mileage to the cashier who
inputs the data onto the system. Many drivers submit numbers off the top of
their heads and this method is not robust enough.
• Depots – When a vehicle is filled from a Highland Council Depot and the driver
is asked to read the milometer on the vehicle there is room for personal error
and often milometers are misread.
• Workshops – The only way to get accurate vehicle mileage data is when a
mechanic reads the milometer during regular service. The length of time
between servicing is dependant on vehicle type and use and therefore it is not
a data source that can be relied upon for reporting regularly.
At the time of creating baseline data for the previous CMSIP mileage data was based
on an estimate of expected vehicle use. In many cases vehicles actually did fewer
miles than anticipated and sometimes by a considerable amount. In addition none of
the winter maintenance vehicles were included because at the time there were no
adequate conversion factors for gas/oil, the fuel used in such vehicles. It has been
agreed that a more robust approach is needed.
It is therefore proposed that vehicle Co2 emissions are measured in terms of actual
fuel consumption in litres rather than miles travelled. TECs keep data on fuel
consumption and Defra have separate conversion factors for the different fuel types.
The main fuel types used in fleet vehicles are petrol, diesel and gas oil with a limited
number of vehicles running on LPG and bio-diesel blend.
58
Carbon Emissions from Council Fleet and business Travel
Essential Miles
7%
Lease Miles
Casual Miles 3%
4%
Training Miles
2%
Equivalent Car Hire Miles
4% Casual Miles
Fleet Hire Car Miles Essential Miles
34% 2%
Lease Miles
Vans (up to 3.5t)
1% Training Miles
Members Miles Equivalent Car Hire Miles
2%
Hire Car Miles
Home Carer Miles Vans (up to 3.5t)
7% Members Miles
Support Workers Miles Home Carer Miles
1% Support Workers Miles
0%
Total
Fleet
Total
33%
59
4. Internal Waste
In August 2005 funding was made available by the Scottish Executive to employ a
Waste Audit Officer. A waste review of Highland Council premises was completed in
August 2006 and identified short, medium and long term opportunities to reduce
waste. While the findings of this report will form a useful tool in formulating a waste
reduction action plan, for example considering what methods are needed to change
behaviours, it does not provide accurate or comprehensive data to set a baseline for
carbon emission reduction which would give us confidence in measuring our progress.
To re-audit Council properties would require significant staff resources and time.
Therefore the following methodology is proposed:
1. The CMSIP should report on waste reduction from those Council premises
where general waste is produced (e.g. paper, cardboard, glass etc) and
exclude properties with specialist or hazardous waste (e.g. depots which would
include things such as tar, scrap metal and grass cuttings).
2. For the purposes of reporting properties will be divided into two key types.
Schools and Offices.
3. All Highland Schools will be monitored for waste generation and for Highland
Council Offices the top 40 premises in terms of staff numbers will be focused
on. This will allow the greatest change to be achieved with the staff resources
available.
4. The total volume of waste can be calculated from bin uplift data collected by the
refuse collection service. This provides the total number and volume of bins
collected and the information can be converted into weight using standard
conversion factors:
5. There are national statistics for the percentage of waste type generated from
offices and schools allowing the correct conversion factors to be applied to
paper, card, glass and other waste types:
6. The total weight of waste of varying types can be calculated for schools and
offices. A final conversion factor can be applied to give the overall CO2
emissions from such waste streams.
7. The baseline CO2 emissions from internal waste streams can then be set. The
tables below outlines the carbon emissions associated with waste production in
the Council’s top 40 waste producing buildings for the period 2007/08 and
demonstrate the information available for Schools.
8. An approach to measuring the reduction in paper use in schools and offices is
still to be developed and will be taken forward along with any new action
planning required for the amended Council programme 2009-11.
60
Highland Council Carbon Emissions from Internal Waste 2007/08
10%
15%
Office Waste from top 40 sites
Secondary School Waste
Primary School Waste
Other HC premises waste
62% 13%
61
Top 40 waste producing buildings and associated emissions 2007/08:
Total
No. annual Total CO2
of No. of waste Tonnage annual *Equivalent
Highland Council Site: Bin Size bins collections (Litres) (tonnes) cost (tonnes)
1 Glenurquhart Road, Inverness 1100 4 260 1144000 152.88 £14,092.00 68.34
2 94 DIRIEBUGHT ROAD Inverness 1100 8 52 457600 61.15 £5,636.80 27.33
3 Craig Road, Dingwall 1100 4 104 457600 61.15 £5,636.80 27.33
4 Uig Pier 1100 4 104 457600 61.15 £5,636.80 27.33
5 Divisional Office Market Sq Wick 1100 2 156 343200 45.86 £4,227.60 20.50
6 Education, Castle Street, Dingwall 1100 3 104 343200 45.86 £4,227.60 20.50
7 Ross House, Dingwall 1100 3 104 343200 45.86 £4,227.60 20.50
8 Bayview house, Wick 1100 3 104 343200 45.86 £4,227.60 20.50
Size of Weight Cost Apply Carbon Trust conversion factor for
container in Kg Council buildings It is not possible to accurately forecast the number of staff within
(Litres) each building. This is because each Service keeps details of staff
sack 13 £1.74 numbers at each site rather than a total per building being
120 19 £2.35 gathered. Staff move frequently and it would be too large a task to
240 32 £3.62 keep such information up to date. It is however possible to rank
360 48 £5.07
schools on performance based on the amount of waste produced
447
kgCO2e/tonne
per child. This is because school role records are up to date and
660 88 £8.46
accurate. An example is shown below:
1100 147 £13.55
62
Internal Waste from schools ranked as waste per child 2007/08:
Based on 2007-08 school roll figures Apply a conversion factor of 447 gCO2 e/tonne
paper recycling
Primary Total
School * annual Total CO2 Waste
excluding Number Number of waste Tonnage annual Equivalent School per child
canteen waste Bin Size of bins* collections (Litres) (tonnes) cost (tonnes) Roll (litres)
Applecross 240 3 45 32400 4.32 488.7 1.93 15 2160.00
Ardross 360 2 45 32400 4.32 456.3 1.93 34 2160.00
Ardgour 240 2 46 22080 2.94 333.04 1.32 15 1472.00
Arderseir 1100 3 43 141900 18.96 1747.95 8.48 103 1377.67 y
Arisaig 360 2 46 33120 4.42 466.44 1.97 37 895.14
Auchtertyre 240 3 86 61920 8.26 933.96 3.69 72 860.00
Aldourlie 360 2 43 30960 4.13 436.02 1.85 38 814.74
Alvie 240 2 76 36480 4.86 237.88 2.17 48 760.00 y
Achiltibuie 240 2 45 21600 2.88 325.8 1.29 29 744.83
Auldearn 1100 2 41 90200 12.05 5.39 143 630.77 y
Abernethy 1100 1 41 45100 6.03 474.37 2.69 83 543.37 y
Altnaharra 360 1 43 15480 2.06 0.92 3 407.37
Acharacle 240 3 46 33120 4.42 499.56 1.97 55 399.04
Aviemore 1100 1 76 83600 11.17 902.46 4.99 227 368.28 y
Achfary 360 1 43 15480 3.78 1.69 6 281.45
63
5. Emissions from Water
In calculating CO2 emission from water a standard conversion factor of 0.404kg
CO2/m3 of water consumed can be applied. This is based on standard conversion
factors supplied by the Carbon Trust and takes into account the energy needed to
treat and pump the water we use and dispose of. Below is a table outlining the energy
requirements involved in supplying drinking water and treating waste.
Stages in treatment Energy using equipment
Abstracting water from boreholes or rivers. Pumps
Filtering, disinfecting and water treatment. Monitors, dosing machines and
analytical equipment.
Transfer to storage reservoirs. Pumps
Supply to domestic and commercial consumers. Pumps and monitoring equipment
Return of wastewater to treatment works Pumps
Cleaning wastewater Aerators, pumps, actuator valves,
level controllers, mixers, monitoring
equipment.
Return the treated water to the environment or re- Pumps
use the water.
The Highland Council is supplied by Scottish Water with billing process carried out by
Business Stream. Currently just over 50% of Council sites have water meters installed
that give accurate measurement of usage in m3. All other sites are charged a set
figure each year through the application of rates. As of April 2009 it is a requirement of
the Scottish Government that all public buildings in Scotland have water meters
installed. Problems with installation at several sites have been discovered and
discussions are currently taking place with Business Stream on how best to deal with
these sites. It is hoped that Business stream will communicate back to the Scottish
Government who will decide on the appropriate recharge in these circumstances.
Below is a table outlining the baseline data for 2007/08 for water consumed in
Highland Council premises with metered readings only. In line with the process for
energy and waste, the Top 100 buildings have been ranked in order of water
consumption. Actions towards water conservation can then focus on these sites and
progress monitored through the CMSIP. Unusual or differing figures can be
investigated and causes of water loss avoided.
64
Example of water consumption, cost and associated emissions:
Associated
Co2
Usage Total emissions
3
Highland Council Sites: M Charge £ (tonnes)
1 Office, Glenurquhart Road, , , INVERNESS IV3 5NX 12,276 58,411 4.96
2 Nursery, Floral Hall Bught, , , INVERNESS IV3 5SS 10,950 22,866 4.42
3 Wick High School, West Banks Avenue, , , WICK KW1 5LU 10,710 31,654 4.33
4 Dingwall Academy, Back Road, , Maryburgh, DINGWALL IV7 8DS 10,676 30,675 4.31
5 Millburn Academy, Diriebught Road, , , INVERNESS IV2 3QR 10,335 28,867 4.18
Training, Health & Safety Unit, Located at Inverness High Montague
6 Row, INVERNESS IV3 5DZ 8,514 20,482 3.44
7 Culloden Academy, Keppoch Road, , Culloden, INVERNESS IV2 7JZ 8,457 28,509 3.42
PH33
8 Sports Centre, Belford Road, , , FORT WILLIAM 6BU 8,238 20,305 3.33
9 Charleston Academy, General Booth Road, , Kinmylies, INVERNESS IV3 8ET 7,538 26,100 3.05
10 Inverness Royal Academy, Culduthel Road, , , INVERNESS IV2 6RE 7,433 25,331 3.00
65
CARBON MANAGEMENT PLAN COMMUNICATION STRATEGY APPENDIX B
Introduction:
As a signatory of Scotland’s Climate Change Declaration the Highland Council is
committed to tackling the effects of climate change and adapting to the anticipated
impacts.
A Carbon Management Plan has been developed, which aims to reduce Highland
Council carbon emissions by 12% between 2009 -2012. The primary focus of the plan
is to reduce carbon emissions from Council buildings, vehicle fleet, business travel,
street lighting, internal waste and water. There are five strategic themes that carry
across all sectors. These are:
Theme 1: Reduce Carbon Emissions from Internal operations
Theme 2: Reduce Energy Costs
Theme 3: Explore new areas for action
Theme 4: Promote Awareness and Behavioural Change
Theme 5: Lead by example
The timely and accurate communication of carefully chosen messages to specific
individuals and groups, through appropriate and effective channels, will enable
Highland Council to address the themes as outlined above. It is a key component in
the design, introduction and implementation of a successful carbon management
programme. It is widely accepted that behavioural change can result in up to 20%
emissions savings (ref). This communication Strategy is needed to ensure that
emissions savings are achieved and that such savings are sustained over time.
A programme of behavioural change and awareness raising will be delivered across
all Highland Council staff, Members and the wider public. It will also facilitate
knowledge transfer between stakeholders and partner organisations.
It is hoped that the communication plan will help to:
• Establish a shared understanding of the Carbon Management Plan’s vision and
goals
• Generate enthusiasm for carbon management
• Secure necessary resources
• Keep the actions in touch with changing priorities
• Identify risks and issues and adapt actions where appropriate
• ensure accurate information and guidance is available for staff
• Improve readiness for change amongst individuals that may be impacted by the
carbon management programme, through changes to working practices etc.
• Improve communication between staff of different Services, between
operational and management staff and between different organisations.
66
Communication Channel Audit
Establishing what current channels of communication exist, who they reach, and how
effective they are is an important first step in designing communication of the carbon
management programme. A communication channel audit was carried out by the
Highland Council Carbon Management Working Group and is summarised in
Appendix 1:
Examples of channels include:
• Face to Face channels (e.g. departmental meetings, team meetings, staff
forums, management cascades, video conferencing);
• Electronic channels (e.g. e-mail, intranet, internet, CD ROMs, pop-ups);
• Printed channels (e.g. local authority newsletter or newspaper, specialist or
departmental newsletter, posters, stickers, external magazines or newspapers);
• Other media channels (e.g. video, telephone, teleconference, marketing media
(products, disposables), radio, television etc).
Identifying Audience
There are a number of key audience groups to target and each require a different
approach to ensure key messages are communicated in the correct language, format
and to the correct timescale. A summary of key audience groups is shown below:
Target Audience Description.
HC general staff 12 500 employees work for Highland
Council and can be contacted via all
media types highlighted in the
communications channel audit in
Appendix 1.
HC teaching staff The school systems have their own
method of communicating with
teaching staff that we should tap into
including Head teacher forums and
CPD training events.
HC manual staff Do not have access to electronic
forms of communication and would
require more face to face and written
forms.
HC management staff There are approximately 200
managers within HC that attend
management briefings and
management development training
days. In addition to the general
medias, communication should be in
the form of presentations and reports
67
at designated meetings.
HC Members There are 80 elected highland
Council members representing
communities across Highland. They
each have pigeon holes centrally at
HQ and can be contacted via e-mail.
Members will also read reports put to
committees and make
recommendations.
HC Green Ambassadors There are approximately 65 Highland
Council Green Ambassadors –
volunteers to promote green
awareness amongst fellow
colleagues. They have their own
online forum to discuss green issues
as well as a designated web page on
the intranet.
HC Temporary staff Highland Council use “Global
Highland”, an employment agency, to
hire temporary staff. Such staff do not
undergo induction training in the
same way as other HC employees.
HC Responsible Premises Officers Each Council site has a designated
responsible officer responsible for the
management of that facility. Such
officers receive training to enable
them to carry out their duties (e.g.
meter readings and maintenance
checks)
The Public Approximately 230 000 people live
within Highland. News releases,
radio broadcasts, household mailings
and the internet are the methods
used to communicate with the public
at present. The HC internet gets 7000
hits a day.
Partner Organisations 80 partner organisations from the
private, voluntary and public sectors
attended the highland Council
Climate Change Workshop in June
2008 and are moving towards a joint
declaration on Climate Change. In
addition the Single outcome
Agreement is developing
commitments with key partner
organisations, including the set-up of
an environmental forum.
68
Council House Tenants Approximately 14000 Council House
tenants are communicated directly
through the Housing and Property
Service.
Communication Action Plan
The communications action plan is a summary of intended communications actions,
their timing and responsibility. The plan has been developed based on the findings of
the communications channel audit in Appendix 1.
Progress will be monitored as part of the Carbon Management Plan monitoring
framework.
The Communication Action Plan is outlined in Appendix 2.
69
APPENDIX 1
HIGHLAND COUNCIL COMMUNICATION CHANNELS AUDIT
Internal Facing:
Communication Description Target Audience Timing Responsible
Channel Service/Officers
Management Briefing An opportunity for senior Service Managers Ongoing Employee Development
management to filter
down key strategic
messages form the
council to Service
Management Staff.
Payslips 12500 staff get payslips All Staff Monthly Finance
through the post and
there is an opportunity
to put key messages
into these.
Head Teacher Forums Head Teachers meet to Head Teachers Ongoing ECS
discuss key topics.
Service Newsletters Some Services produce All Staff Various depending on Services
quarterly newsletter Service but at least
which are available Quarterly.
under common folders
on the staff Intranet.
Council Newsletters The Council PR team Staff/members/Public Every 2 months PR Team/Services
produce a Corporate
Newsletter every two or
70
three months that is
distributed electronically
to 4500 staff. It is
expected that manager
print off a copy for
manual staff to read but
is hard to police.
Member Workshop It is proposed to hold a Members To be scheduled Weekly Business
two hour workshop to go annually Meeting/Leadership
over carbon Meeting
management issues
with ALL members. The
idea will be run past the
Weekly business Group.
Staff Workshop Green Ambassadors are All Staff To be scheduled CEXO
currently invited to a annually
Carbon management
Workshop and it is
proposed to extend this
to ALL staff.
Job Specification It is proposed that those Staff with Sustainability As and when Personnel
employees with climate issues as part of their
change responsibilities remit.
in the role should have
something incorporated
into their job description
to this effect. Currently
only a handful of staff
have climate change
mitigation in their job
71
description.
Events A programme of events All Staff Throughout the year. CEXO/H&P/TECS
is being developed to
role out to highland
council green
Ambassadors and link in
with the Highland
Environmental Networks
yearly training
programme.
Staff Intranet Use of the staff All Staff Ongoing CEXO
noticeboard and
common folders to
communicate events,
news and information
Staff E-mail All user e-mails used to All Staff Ongoing CEXO
promote events,
competitions and news
on climate related
issues.
Posters Posters have been All Staff Ongoing – updated bi- CEXO
created in line with the annually.
Green Ambassador
Campaign to encourage
people to switch off
power, use less paper
and create less waste
as well as make
informed decisions
about the need to travel.
72
Member Champion It is proposed to select a Members, Staff and Ongoing CEXO
Member to Champion Communities
individual actions
towards reducing
carbon emissions
amongst staff and
employees.
Head Teacher As above but to Schools Ongoing ECS
Champion Champion the work
within schools.
Green Ambassadors Over 60 green All Staff Ongoing CEXO
Ambassadors are in
place to communicate
action within the work
force.
Agency Contracts Currently agency staff Temporary Staff, As and When Procurement/All
do not require to go
through an induction
and so some way of
ensuring they are aware
of Highland Council
policy on climate
change is needed.
Flexi Card Machines Staff that clock in and All Staff at clock-in sites Combine with events. Personnel
out using time cards can
be given key messages
via the machine to
coincide with events.
Screensavers The highland Council All staff with computers Ongoing – updated bi- CEXO/IS
screensaver is in need annually.
73
of refreshing with new
messages on emissions
savings.
Notice Boards Staff communal areas All Staff Ongoing All
and canteens have
notice boards where
leaflets, posters and
information can be
placed. Especially
important for manual
staff who have no
access to computers.
74
External Facing:
Communication Channel Description Target Audience Timing Responsible
Service/Officers
Publications Pamphlets, leaflets, Public Ongoing CEXO/graphics team
posters etc produced
by Services to inform
public of their current
work.
Website The One-stop shop Public and staff Ongoing PR Team/Webmaster.
for all areas of CEXO could coordinate
Corporate and relevant Carbon
Service information, Management Sites.
including ward
forums and
Community
Councils, minutes of
meetings etc. there
are over 7000 hits a
day with up to 11
000 hits during times
of bad weather.
Annual Newspaper Printed and Staff/members/Public Once a year PR Team
distributed to the (November)
public by the PR
team.
Council Tax leaflets Information on Public Once a year Finance
Council tax rates is (March/April)
75
distributed to 115
000 households
across Highland.
Partnership Workshops Through working Stakeholders Ongoing CEXO
towards a Climate
Change Strategy for
Highland
opportunities exists
to communicate with
partners in
workshops.
Site unveilings When new Public As and When Services/Pr Team
renewable energy
installations or
recycling facilities
are installed use as
an opportunity for a
press release.
Press releases Ensure we report on Public Ongoing Services/PR Team
progress in the press
and in particular,
installations as
above and events.
Waste Awareness The Waste Public Ongoing TECS
Campaigns Awareness Team
have a programme
of education and
awareness raising
and leaflets and
materials for
distribution to
76
highland Household.
National Events Tie in with events Public Ongoing CEXO
such as Energy
Efficiency Week,
Bike week etc
Staff Training and Development
Communication Channel Description Target Audience Timing Responsible Service/Officers
Management Development All Managers attend a 2 Managers Once a year Employee Development
Training day residential training
exercise once a year.
Staff Induction Training All staff work through an All Staff As and When Personnel
induction check list with
their line managers upon
joining the Council.
77
Personal Development Plans Staff are encouraged to All Staff Once a Year Employee Development
work with Line managers
to develop Personal
Development Plans aimed
at addressing any training
needs and building on
staff experience.
Responsible Officer Training All Council buildings have Staff at specific Once a Year CEXO
a nominated responsible Building Sites
officer responsible for the
day to day
Health and Safety Training Staff with specific jobs Once a Year Services
78
HIGHLAND COUNCIL CARBON MANAGEMENTCOMMUNICATION ACTION PLAN 2009-2012 APPENDIX 2
G = Completed or delivery on target A = progress with some slippage R = No significant progress P = To be programmed
INTERNAL FACING:
Action Service Time Status Comment
Frame
1.1 Explore the opportunity to add a message to Employee payslips in line with a CEXO/ Annually P Currently income is generated
national event or campaign FINANCE through advertising space on
pay slips so would depend on
available space.
1.2 Attend one management briefing session for each Service. CEXO Annually P Scope out timetable of briefing
sessions and arrange a slot on
one.
1.3 Attend a head teacher Forum CEXO/ ECS Annually P Scope out timetable of forums
and subject matter and liaise
with ECS an appropriate one to
attend
1.4 Feature Carbon management Progress in Service Newsletters ALL Annually P
1.5 Corporate Newsletter CEXO Quarterly G Progress in emissions
reductions featured in recent
edition.
1.6 Hold a series of events aimed at raising awareness amongst staff CEXO/ Ongoing G Two events have taken place
H&P/TECS with green Ambassadors and a
programme of events is being
developed.
1.7 Advertise initiatives and events on staff notice board on intranet CEXO Ongoing A More use of Intranet staff notice
board is needed.
1.8 Hold Staff workshop aimed at raising awareness of Carbon Management. CEXO Once at A One workshop held with TECS
time of Service was found to be very
79
CMP useful. Need to Role out across
Launch all Services.
1.9 Member Workshop CEXO Once at P Extend beyond the Membership
time of of the CCWG.
CMP
Launch
1.10 Poster Campaign aimed at reducing waste and energy use and encouraging CEXO Bi- G Posters have been created and
sustainable modes of transport. annually distributed across premises and
staff. Update and refresh
campaign every two years.
1.11 Energy Display Certificates Campaign H&P Bi- G Posters created for all properties
annually over 1000m2 and all schools.
1.12 Assign a Member Champion CEXO April P Invite to Launch of CMP
2009
1.13 Assign a Head Teacher Champion CEXO/ECS April P Invite to Launch of CMP
2009
1.14 Encourage more Green Ambassadors to volunteer CEXO/ 2010 P The scheme is only in it’s third
TECS/ month so a new marketing
campaign should take place
H&P
next year
1.15 Develop message on Flexi card machine to coincide with key events CEXO/ P
personnel
1.16 Update Council Screensaver CEXO April R Action delayed by IT staff.
2009
1.17 Create printed guidance for manual staff CEXO April R Web materials have been
2009 created. Need to produce a
printed version for use by all.
80
EXTERNAL FACING:
Action Service Time Status Comment
Frame
2.1 Update the Carbon Management Section of the Highland Council Website and CEXO April P
ensure linkages are made with all other relevant section on line. 2009
2.2 Hold Community Events to tie in with National Campaigns ALL Ongoing G Energy Efficiency Weeks, Waste
Awareness Campaigns and WWF
Earth Hour are examples of some.
2.3 Send a message out on the annual distribution of council tax letters CEXO/ April P
FINANCE 2010
2.4 Continue regular role out of press releases related to emissions reductions CEXO/Ser Ongoing G
vices
2.5 Conduct regular workshops with partnership organisations CEXO Quarterly G This has commenced through the
HC partnership approach to climate
change conference and will
continue.
2.6 Conduct events at site-unveilings for new renewable energy installations CEXO Ongoing P
2.7 Ensure Carbon Management features on publications distributed to the public CEXO Ongoing P
81
STAFF TRAINING AND DEVELOPMENT:
Action Service Review Status Comment
date
3.1 Explore Inclusion of CMP priorities in induction for agency workers. Liaise with FINANCE/C P
Global Highland over options EXO
3.2 Attend Management Development Training CEXO/ 2010 P First round of Management Training
H&P has passed. Tie in with the next set.
3.3 Build CMP priorities into staff induction training CEXO/ 2009 P
Personnel
3.4 Build CMP into Personal Development Plans linking to the training CEXO/ 2009 P
opportunities on offer for staff Personnel
3.5 Responsible Officer training CEXO/ 2009 A Training has taken place in the past
H&P but needs refreshed.
3.6 Link in with Health and Safety training for certain staff groups. CEXO 2009 A Has taken place in the past through
TECS. Need to explore more
opportunities in future.
3.7 Programme of training opportunities for Green Ambassadors CEXO Ongoing G Programme developed. Linking in
with the Highland Environmental
Network.
82