professional documents
home
Upload
docsters
Upload
Word Document

Disaster Recovery Plan - SOP center doc

technology > applications

sop's, planning


Disaster Recovery Plan – Standard Operating Procedures The disaster recover plan is steps needed to ensure optimal uptime of our customer’s websites and applications. In the likelihood of a power outage, server failure or a specific website failure these steps needed to be carried out. A rotation of availability may be an option so that the same individual is not responsible for carrying out the plan. Complete Power Failure In the likelihood of a complete power failure, the following must be carried out. 1) If our power is not restored; a. On-call team is notified b. Team meets at office and begins the following; i. Power up generators ii. Run power cords to server room and establish power to the following servers/hardware; 1. APC units 2. Web Servers 3. Router 4. Hosting SonicWall 5. Switches 2) If our power is restored; a. On-call team is notified b. Team meets at office and begins the following; i. Check all servers and hardware in server room ii. Log-in to the servers to activate FTP services Server/Website Failure In the likelihood of an individual or cluster of servers/websites are to fail, the following must be carried out. 1) On-call team is notified 2) Team tries to make a VPN connection a. If no connection is established; i. Revert to the Power Failure Plan b. If a connection is established; i. Check other sites on the same server/IP 1. If others are okay; a. Check the following i. Code Issues ii. Domain Registration iii. IIS Issues iv. Etc. 2. If others are not responding; a. Check sites on a different server/IP i. If okay; 1. Revert back to the 1st server for more tests ii. If not okay; 1. Test a. If okay; i. Log-in to hosting SonicWall ii. Ping all web servers
flag this doc
2899
395
8(2)
2
10/30/2007
English
Preview

DSM-SOP

emm123 10/30/2007 | 341 | 26 | 0 | technology
Preview

what is a SOP

karkikedar 9/11/2008 | 54 | 3 | 0 | educational
Preview

SOP - 60 day project

emm123 10/30/2007 | 900 | 117 | 0 | technology
Preview

Emails

emm123 10/30/2007 | 536 | 39 | 1 | technology
Preview

Standard Operating Procedure toolkit

takepart 5/1/2008 | 279 | 18 | 0 | educational
Preview

CS_SOP

StarBoy 11/7/2007 | 163 | 3 | 0 | educational
Preview

Checklist for Site SOP Required Elements Specimen Management Plan

NIHhealth 7/9/2008 | 33 | 1 | 0 | legal
Preview

Disaster Recovery Planning

user002 2/5/2008 | 445 | 82 | 0 | business
Preview

Statement of Policy SOP

FDIC 6/24/2008 | 22 | 1 | 0 | legal
Preview

Subcontracting SOP and Checklist

VeteransAffairsVA 7/10/2008 | 46 | 2 | 0 | legal
Preview

Template of SOP format

VeteransAffairsVA 7/10/2008 | 70 | 8 | 0 | legal
Preview

Del Warranty SOP

anonymous 11/12/2007 | 190 | 4 | 0 |
Preview

SOP Blackboard Template

anonymous 2/2/2008 | 247 | 7 | 0 | business
Preview

CEF

shinuvet 4/29/2008 | 142 | 1 | 0 | educational
Preview

SOP file SOP Title Ground Water Sampling Revision

EPADocs 5/13/2008 | 45 | 0 | 0 | legal
Preview

Referral Biz Ideas

emm123 10/30/2007 | 622 | 69 | 0 | business
Preview

Marketing Plan Workbook

emm123 10/30/2007 | 3365 | 818 | 6 | business
Preview

06PRATradeshowbooths

emm123 10/30/2007 | 879 | 2 | 0 | business
Preview

TurboChargeYourOnlineMarketing

emm123 10/30/2007 | 574 | 72 | 0 | business
Preview

Web Application Development

emm123 10/30/2007 | 2680 | 324 | 3 | technology
Preview

Information Architecture

emm123 10/30/2007 | 1308 | 160 | 2 | technology
Preview

Site Planning

emm123 10/30/2007 | 2776 | 419 | 4 | technology
Preview

FDD for Web Development

emm123 10/30/2007 | 899 | 127 | 0 | technology
Preview

FDD_Process

emm123 10/30/2007 | 521 | 44 | 0 | technology
Preview

FDD for Small Teams

emm123 10/30/2007 | 451 | 41 | 0 | technology
 
review this doc
Quite Neatly
Rated 6 out of 10

March 02, 2008 (7 months 3 days ago)This disaster recovery plan doc is a must go through for any IT establishment for saving on crash recovery expenses

Disaster Recovery Plan
Rated 9 out of 10

March 01, 2008 (7 months 4 days ago)This Disaster Recovery Plan -SOP should be posted wherever computers are used in the workplace or even in your home. I like it suggests to know if the system failure could be power based or server based and to proceed accordingly as outlined in the document. I would also keep a spare copy or so in my desk or file.